Designing, implementing and updating performance measurement systems
The DOI matches its Crossref record; 34 of the 36 references it cites were found in a registry or an index.
Abstract
This paper addresses issues met when designing, implementing, using and continuously updating performance measurement systems in manufacturing companies. The paper develops, from theory, a framework for analysing the implementation of a performance measurement system and uses this framework to interpret three longitudinal case studies. The paper concludes that specific processes are required to continuously align the performance measurement system with strategy. When these processes are combined with a well defined model of strategic success, the measurement system can enhance the strategic management process by challenging the assumptions and the strategy itself.
Overview
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
Claims other papers make about this one
Each is checked against this paper’s own text: does it say what the citing paper says it does?
In the citing paper
“Bourne et al., identified from previous literature three main phases of performance measurement system implementation, i.e., design, implementation and use; besides, they underlined also the essential role of updating and reviewing processes of measures and targets.”
From The Evolution of Balanced Scorecard in Healthcare: A Systematic Review of Its Design, Implementation, Use, and Review (2022) · cites this paper as [40]
In the citing paper
“The adoption of a BSC follows four phases [40].”
From The Evolution of Balanced Scorecard in Healthcare: A Systematic Review of Its Design, Implementation, Use, and Review (2022) · cites this paper as [40]
In the citing paper
“in line with [40], the review process includes a set of mechanisms for reviewing targets and standards and processes for a periodical review of the set of measures adopted.”
From The Evolution of Balanced Scorecard in Healthcare: A Systematic Review of Its Design, Implementation, Use, and Review (2022) · cites this paper as [40]
In the citing paper
“As BSC literature outlines, there are four phases in the BSC adoption [40,58]”
From The Evolution of Balanced Scorecard in Healthcare: A Systematic Review of Its Design, Implementation, Use, and Review (2022) · cites this paper as [40]
In the citing paper
“By adopting the review’s framework (Figure 2), BSC adoption phases [40], i.e., design, implementation, use and review are strictly related.”
From The Evolution of Balanced Scorecard in Healthcare: A Systematic Review of Its Design, Implementation, Use, and Review (2022) · cites this paper as [40]
Citations
Cites
(1984) · Cited by 81,983
The balanced scorecard : measures that drive performance
Caplan, R. S. (1992) · Harvard business review · Cited by 12,085
The balanced scorecard: Translating strategy into action
(1997) · Long Range Planning · doi:10.1016/s0024-6301(97)80925-9 · Cited by 8,192
(1992) · PubMed · Cited by 7,979
Leading change: why transformation efforts fail
Kotter, J. P. (2009) · IEEE Engineering Management Review · doi:10.1109/emr.2009.5235501 · Cited by 3,566
Relevance Lost: The Rise and Fall of Management Accounting
Johnson, T. H., & Kaplan, R. S. (1987) · Medical Entomology and Zoology · Cited by 3,177
Putting the Balanced Scorecard to Work
Kaplan, R. S., & Norton, D. P. (1998) · The Economic Impact of Knowledge · doi:10.1016/b978-0-7506-7009-8.50023-9 · Cited by 2,180
The performance measurement revolution: why now and what next?
Neely, A. (1999) · International Journal of Operations & Production Management · doi:10.1108/01443579910247437 · Cited by 1,154 · cited 2×
“Academic interest is manifest through the considerable number of papers on the topic ( Neely, 1999 ).”
BackgroundSelf-citationPerformance measurement in service businesses
Brignall, T. J., Fitzgerald, L., Johnston, R., & Silvestro, R. (1991) · University of Warwick · doi:10.82444/warw.33720976 · Cited by 777
(2020) · Management Accounting · doi:10.24053/9783739880280-167 · Cited by 706
Research works printed but not linked: 15
- Banks, R.L. and Wheelwright, S.C. (1979), “Operations versus strategy – trading tomorrow for today”, Harvard Business Review, May/June, pp. 112‐20.
- Deming, W.E. (1986), Out of Crisis, Massachusetts Institute of Technology, Centre for Advanced Engineering Study, Cambridge, MA.
- Eccles, R.G. and Pyburn, P.J. (1992), “Creating a comprehensive system to measure performance”, Management Accounting (US), October, pp. 41‐4.
- Fry, T.D. and Cox, J.F. (1989), “Manufacturing performance; local versus global measures”, Production and Inventory Management Journal, 2nd Quarter, pp. 52‐6.
- Goold, M. (1991), “Strategic control in the decentralised firm”, Sloan Management Review, Vol. 32 No. 2, pp. 69‐81.
- Grady, M.W. (1991), “Performance measurement: implementing strategy”, Management Accounting, June, pp. 49‐53.
- Hayes, R.H. and Abernathy, W.J. (1980), “Managing our way to economic decline”, Harvard Business Review, Vol. 62, pp. 95‐101.
- Lingle, J.H. and Schiemann, W.A. (1996), “From balanced scorecard to strategy gauge: is measurement worth it?”, Management Review, March , pp. 56‐62.
- McMann, P. and Nanni, A.J. (1994), “Is your company really measuring performance”, Management Accounting (US), November, pp. 55‐8.
- Marris, P. (1974), “The management of change”, in Loss and Change, Routledge, London, pp. 147‐59.
- Maskell, B. (1989), “Performance measurement for world class manufacturing”, Management Accounting, May, pp. 32‐3, June, pp. 32‐3, July/August, pp. 48 and 50, September, pp. 64‐6.
- Schein, E.H. (1969), Process Consultation, Addison‐Wesley, Reading, MA.
- Sink, P.E. (1986), “Performance and productivity measurement: the art of developing creative score boards”, Industrial Engineer, January, pp. 86‐90.
- Skinner, W. (1974), “The decline, fall and renewal of manufacturing”, Industrial Engineering, October, pp. 32‐8.
- Wisner and Fawcett (1991), “Link firm strategy to operating decisions through performance measurement”, Production and Inventory Management Journal, Third Quarter, pp. 5‐11.
Cited by
Items 401–500 of 1,000
Greig, M. A., Village, J. L., Dixon, S. M., Salustri, F. A., & Neumann, P. (2019) · Ergonomics · doi:10.1080/00140139.2019.1572228 · Cited by 27
Liu, Y.-D. (2008) · Systemic Practice and Action Research · doi:10.1007/s11213-008-9103-y · Cited by 27
“Some authors have focused attention on how organisations can design more appropriate measurement systems (e.g., Bourne et al. 2000, 2002; Neely et al. 1997, 2000 etc.).”
BackgroundMethodWorkflow and process management in printing and publishing firms
Glykas, M. (2004) · International Journal of Information Management · doi:10.1016/j.ijinfomgt.2004.08.003 · Cited by 27
JOHDON LASKENTATOIMI KÄRKIYRITYSVERKOSTOISSA Soveltamismahdollisuudet ja yritysten tarpeet
Tenhunen, J. T. (2006) · LUTPub (LUT University) · Cited by 27
Medição de desempenho para gestão da produção em um cenário de cadeia de suprimentos.
Bond, E. (2002) · Digital Library of Theses and Dissertations (Universidade de São Paulo) · doi:10.11606/d.18.2002.tde-04022003-160321 · Cited by 27
Social media marketing and performance measurement: does it take two to tango?
Ascani, I., & Ancillai, C. (2025) · Review of Managerial Science · doi:10.1007/s11846-025-00891-0 · Cited by 26
“The “use” step, in turn, relates to the application of PMSs and to how they are used within organizations for decision-making and control processes (Bourne et al. 2000; Ferreira and Otley 2009; Neely and Bourne 2000).”
Evaluating Construction Project Performance: A Case of Construction SMEs in Lagos, Nigeria
Tunji-Olayeni, P. F., Mosaku, T. O., Fagbenle, O. I., Omuh, I. O., & Joshua, O. (2016) · Journal of Innovation and Business Best Practices · doi:10.5171/2016.482398 · Cited by 26
Strategic Performance Management with Focus on the Customer
Stříteská, M., & Jelínková, L. (2015) · Procedia - Social and Behavioral Sciences · doi:10.1016/j.sbspro.2015.11.330 · Cited by 26
“In recent years, more and more attention has been paid to the issue of performance measurement as a tool for the effective implementation of a strategy (Kaplan, Norton, 1996; Bourne et al., 2000; Simons, 2000; Schneier, 1991).”
MethodUse of customer satisfaction measurements to drive improvements
Birch-Jensen, A., Gremyr, I., Hallencreutz, J., & Rönnbäck, Å. (2018) · Total Quality Management & Business Excellence · doi:10.1080/14783363.2018.1436404 · Cited by 26
“…and CSM ownership, previous research has emphasised formal structures, for example, ‘to review the measures and ideally to agree to action […] a regular meeting is required, attended by directors and managers who have responsibility for the performance being measured’ (Bourne et al., 2000, p. 761).”
BackgroundAureli, S., Cardoni, A., Baldo, M. D., & Lombardi, R. (2018) · Accounting and Management Information Systems · doi:10.24818/jamis.2018.02001 · Cited by 26
Supplier performance measurement systems: Communication and reaction modes
Maestrini, V., Maccarrone, P., Caniato, F. F. A., & Luzzini, D. (2018) · Industrial Marketing Management · doi:10.1016/j.indmarman.2018.07.002 · Cited by 26
Identifying a Suitable Approach for Measuring and Managing Public Service Productivity
Jääskeläinen, A. (2009) · Electronic Journal of Knowledge Management · Cited by 26
Arena, M., Conte, A., & Melacini, M. (2015) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2015.07.068 · Cited by 26
“In general, two basic principles inform the construction of a reward system: controllability and measurability (Neely et al., 1995; Bourne et al., 2000).”
BackgroundPerformance measurement scenarios with fuzzy cognitive strategic maps
Glykas, M. (2012) · International Journal of Information Management · doi:10.1016/j.ijinfomgt.2011.12.004 · Cited by 26
Reviewing the Application of the Balanced Scorecard with Implications for Low-Income Health Settings
Rabbani, F., Jafri, W. S. M., Abbas, F., Pappas, G., Brommels, M., & Tomson, G. B. (2007) · Journal for Healthcare Quality · doi:10.1111/j.1945-1474.2007.tb00210.x · Cited by 25
The Roles of Information Technology and Knowledge Management in Project Management Metrics
Kasemsap, K. (2015) · Advances in IT personnel and project management · doi:10.4018/978-1-4666-7536-0.ch018 · Cited by 26
Project Management Priorities and the Link with Performance Management Systems
Bryde, D., & Wright, G. H. (2007) · Project Management Journal · doi:10.1002/pmj.20014 · Cited by 25
INSTITUTIONAL FACTORS AS CRITERIA FOR BUSINESS ENVIRONMENT IDENTIFICATION
Klovienė, L. (2012) · ECONOMICS AND MANAGEMENT · doi:10.5755/j01.em.17.4.2984 · Cited by 25
Testing the EFQM model as a framework to measure a company’s procurement performance
Belvedere, V., Grando, A., & Legenvre, H. (2016) · Total Quality Management & Business Excellence · doi:10.1080/14783363.2016.1224085 · Cited by 26
An Exploratory Study on the Balanced Scorecard Model of Social Enterprise
Lee, Y., & Moon, J. (2008) · Asian Journal on Quality · doi:10.1108/15982688200800014 · Cited by 25
The effect of fairness perception of performance measurement in the balanced scorecard environment
Aryani, Y. A. (2009) · Victoria University Research Repository (Victoria University) · Cited by 25
Um modelo de gestão estratégica para serviços de saúde
Pedroso, M. C. (2011) · Digital Library of Theses and Dissertations (Universidade de São Paulo) · doi:10.11606/t.5.2011.tde-24052011-115333 · Cited by 25
Maestrini, V., Patrucco, P. P., Luzzini, D., Caniato, F. F. A., & Maccarrone, P. (2021) · The International Journal of Logistics Management · doi:10.1108/ijlm-08-2020-0339 · Cited by 24
Greig, M. A., Village, J. L., Salustri, F. A., & Neumann, P. (2023) · Ergonomics · doi:10.1080/00140139.2023.2168065 · Cited by 24
“Stakeholder and user input is commonly promoted for performance measurement design, strategy implementation (Platts 1994), understanding design requirements (Dym et al. 2005), and creating objectives and measures (Bourne et al. 2000).”
BackgroundThe Literature Review of Supply Chain Performance Measurement in the Manufacturing Industry
Sillanpää, I., & Kess, P. (2012) · Osuva (University of Vaasa) · doi:10.2478/v10270-012-0017-x · Cited by 24
Choong, K. K. (2018) · Measurement · doi:10.1016/j.measurement.2018.04.008 · Cited by 24
The use of performance measurement system in logistics change process: Proposal of a guide
Barbosa, D. H., & Musetti, M. A. (2011) · International Journal of Productivity and Performance Management · doi:10.1108/17410401111123526 · Cited by 24
Developing a quality management system implementation process for a medical device manufacturer
Martins, E. G., de Lima, E. P., & da Costa, S. E. G. (2015) · Journal of Manufacturing Technology Management · doi:10.1108/jmtm-12-2012-0119 · Cited by 24
Gestão do desempenho em cadeias de suprimentos usando lógica fuzzy
Ganga, G. M. D., Carpinetti, L. C. R., & Politano, P. R. (2011) · Gestão & Produção · doi:10.1590/s0104-530x2011000400006 · Cited by 24
Digalwar, A. K., & Sangwan, K. S. (2011) · International Journal of Services and Operations Management · doi:10.1504/ijsom.2011.040322 · Cited by 24
“Also, the SMART system does not explicitly integrate the concept of continuous improvement (Ghalayini and Noble, 1996; Bourne et al., 2000).”
BackgroundMethodImplementation of lean within the cement industry.
Tourki, T. (2010) · DMU Open Research Archive (De Montfort University) · Cited by 25
Performance measurement framework for the oil and gas supply chain
Menhat, M., Yusuf, Y. Y., Gunasekaran, A., & Mohammad, A. M. (2022) · Benchmarking An International Journal · doi:10.1108/bij-11-2021-0704 · Cited by 23
Measuring Innovation Effectively—Nine Critical Lessons
Björk, J., Frishammar, J., & Sundström, L. (2023) · Research-Technology Management · doi:10.1080/08956308.2022.2151232 · Cited by 23
“In accounting, several studies focus specifically on measuring organizational performance (Bourne et al. 2000; Kaplan and Norton 1996).”
Oyewobi, L. O., Windapo, A. O., Cattell, K., & Rotimi, J. O. B. (2013) · Tuwhera (Auckland University of Technology) · Cited by 23
Aligning change deployment: a Balanced Scorecard approach
Jayashree, P., & Hussain, S. J. (2011) · Measuring Business Excellence · doi:10.1108/13683041111161166 · Cited by 24
“In the late 1980s and early 1990s, these have progressed to more balanced and integrated performance measurement frameworks with a focus on lead and laggard measures and internal and external factors ( Bourne et al. , 2000”
BackgroundSjøbakk, B., Bakås, O., Bondarenko, O., & Kamran, T. (2015) · Advances in Manufacturing · doi:10.1007/s40436-015-0109-2 · Cited by 23
Avaliação de Desempenho de Gestão de Recursos Humanos no Setor Público
Guesser, P. C. L., Ensslin, S. R., & Petri, S. M. (2021) · Sociedade Contabilidade e Gestão · doi:10.21446/scg_ufrj.v0i0.19644 · Cited by 23
Felizardo, A., Fėlix, E. G. S., & Thomaz, J. P. C. F. (2017) · RePEc: Research Papers in Economics · Cited by 23
Hyvä implementointi : kulttuurista toiseen siirrettävän menetelmän käyttöönottoprosessi
Nevalainen, M. T. (2007) · Jyväskylä University Digital Archive (University of Jyväskylä) · Cited by 23
Reconceptualising benchmarking development in UK organisations: the effects of size and sector
Anderson, K., & McAdam, R. (2007) · International Journal of Productivity and Performance Management · doi:10.1108/17410400710823615 · Cited by 22
“The business environment is becoming increasingly uncertain, with increased fragmentation, globalisation, technological development and competition in all areas ( Bourne et al. , 2000”
BackgroundPanorama da produção intelectual sobre a medição de desempenho na gestão pública
Akim, É. K., & Mergulh�ão, R. C. (2015) · Revista de Administração Pública · doi:10.1590/0034-7612126126 · Cited by 23
“…de desempenho possuía um enfoque unidimensional legado da contabilidade tradicional com apenas medidas financeiras, mas a partir do final dos anos 1980, o enfoque passou a ser multidimensional com equilíbrio entre medidas financeiras e não financeiras (Bourne et al., 2000; Nudurapati et al., 2011).”
BackgroundA performance measurement system for small enterprises – a case study
Waśniewski, P. (2017) · Zeszyty Teoretyczne Rachunkowości · doi:10.5604/01.3001.0010.3197 · Cited by 22
Wadongo, B. I., Odhuno, E., & Kambona, O. O. (2010) · Managing Leisure · doi:10.1080/13606710903447980 · Cited by 22
“(2000) argue that unless action is taken based on the results attained then the measures are meaningless, costing money to obtain and not adding value to business.”
BackgroundImproving design management techniques in construction
Bibby, L. (2003) · OpenGrey (Institut de l'Information Scientifique et Technique) · Cited by 22
de Andrade, J. H., Piagge, R. M. D., Braga, F. A. S., & Romano, A. L. (2018) · Revista Fatec Zona Sul · Cited by 21
Moxham, C. (2013) · Public Money & Management · doi:10.1080/09540962.2013.785704 · Cited by 21
“Performance measurement literature advocates that explicit linkages be made between performance indicators, strategic objectives and an organization’s mission when designing a performance measurement system (Bourne et al., 2000).”
BackgroundTangkesalu, A. A., & Suseno, J. E. (2018) · E3S Web of Conferences · doi:10.1051/e3sconf/20187313002 · Cited by 21
Performance leadership: managing for flexibility
Wilkes, J., Yip, G. S., & Simmons, K. (2011) · Journal of Business Strategy · doi:10.1108/02756661111165444 · Cited by 21
Chu, Y. H. (2016) · RMIT Research Repository (RMIT University Library) · doi:10.25439/rmt.27580893 · Cited by 21
An experiment in the usefulness of a strategy map
Rompho, N. (2012) · Measuring Business Excellence · doi:10.1108/13683041211230320 · Cited by 20
A life cycle approach to business performance measurement systems
Landström, A., Almström, P., Winroth, M., Andersson, C., Öberg, A. E., Kurdve, M., Shahbazi, S., Wiktorsson, M., Windmark, C., & Zackrisson, M. (2018) · Procedia Manufacturing · doi:10.1016/j.promfg.2018.06.066 · Cited by 20
Management control systems and performance in strategic supply relationships
Beuren, I. M., & Vesco, D. G. D. (2021) · International Journal of Productivity and Performance Management · doi:10.1108/ijppm-01-2020-0036 · Cited by 20
Campra, M., Riva, P. L. M., Oricchio, G., & Brescia, V. (2021) · Archivio Istituzionale della Ricerca (Universita Degli Studi Di Milano) · Cited by 20
Impact of national culture on performance measurement systems in manufacturing firms
Jwijati, I., Bititci, U., Caldwell, N., Garengo, P., & Dan, W. (2022) · Production Planning & Control · doi:10.1080/09537287.2022.2026674 · Cited by 21
“…2011; Taylor and Taylor 2014) along-side other factors such as top management commitment, teamwork, resource availability, communication and leadership (Bourne et al. 2000; Franco-Santos and Bourne 2005; Henri 2006; Bititci et al. 2006; de Waal and Counet 2009; Sardi, Garengo, and Bititci 2019).”
BackgroundSupporting the Performance Assessment of Product-service Systems During the Use Phase
Wilberg, J., Hollauer, C., & Omer, M. (2015) · Procedia CIRP · doi:10.1016/j.procir.2015.02.119 · Cited by 20
Digital technologies and the balance between control and empowerment in performance management
Korsen, E. B. H., Holmemo, M. D.-Q., & Ingvaldsen, J. A. (2021) · Measuring Business Excellence · doi:10.1108/mbe-04-2021-0055 · Cited by 20
Controlling Tools Use in Business Processes Management
Csikósová, A., Čulková, K., & Janošková, M. (2022) · TEM Journal · doi:10.18421/tem111-45 · Cited by 20
“the financial and performance area, we call controlling [13], [14], [15], [16].”
BackgroundPerformance Measurement Systems: Empirical Evidence from Slovenia
Odar, M., Kavčić, S., & Jerman, M. (2012) · Economic Research-Ekonomska Istraživanja · doi:10.1080/1331677x.2012.11517517 · Cited by 20
“In the 2000s a lot of research emphasizes the need to re-evaluate the existing performance measurement systems (Bourne et al., 2000; Bititci, Turner and Begemann, 2000).”
BackgroundResultInfluentialPerformance measurement systems in nonprofit organizations: an authorship-based literature review
Munik, J., de Lima, E. P., Deschamps, F., da Costa, S. E. G., Aken, E. M. V., Cestari, J. M. A. P., Moura, L. F., & Treinta, F. T. (2021) · Measuring Business Excellence · doi:10.1108/mbe-05-2020-0069 · Cited by 20
Performance Measurement Systems and Firms' Characteristics: Empirical Evidences from Nigerian Banks
Michael, O. B. (2015) · International Journal of Business Analytics · doi:10.4018/ijban.2015070105 · Cited by 20
The size of a logistics performance measurement system
Forslund, H. (2011) · Facilities · doi:10.1108/02632771111109261 · Cited by 20
Auditing the strategic role of operations
Lillis, B., & Lane, R. (2007) · International Journal of Management Reviews · doi:10.1111/j.1468-2370.2007.00209.x · Cited by 20
Evaluating the effectiveness of strategic planning within the Middle Eastern public sector
Shahin, B. (2011) · Victoria University Research Repository (Victoria University) · Cited by 20
Value-risk based performance evaluation of industrial systems
Shah, L.-A. (2012) · HAL · Cited by 20
The quest for business value drivers: applying machine learning to performance management
Visani, F., Raffoni, A., & Costa, E. (2023) · Production Planning & Control · doi:10.1080/09537287.2022.2157776 · Cited by 19
“More broadly, there is strong consensus on the need to align the PMS to the objectives and goals of an organisation (Micheli and Manzoni 2010; Chenhall 2005; Bourne et al., 2000).”
BackgroundThe Meaning of Success for Software SMEs: An Holistic Scorecard Based Approach
Clarke, P. M., & O’Connor, R. V. (2011) · Communications in computer and information science · doi:10.1007/978-3-642-22206-1_7 · Cited by 19
“Owing to the dissatisfaction with traditional accounting-based performance measurement systems, multi-dimensional performance measurement frameworks were created as an alternative approach to business performance measurement [23].”
BackgroundExploring the performance effects of performance measurement system use in maintenance process
Tätilä, J., Helkiö, P., & Holmström, J. (2014) · Journal of Quality in Maintenance Engineering · doi:10.1108/jqme-07-2013-0051 · Cited by 19
Farsi, M., Bailly, A., Bodin, D., Penella, V., Pinault, P.-L., Nghia, E. T. T., Sibson, J., & Erkoyuncu, J. A. (2020) · Procedia Manufacturing · doi:10.1016/j.promfg.2020.07.017 · Cited by 19
Widarti, W., Desfitrina, D., & Zulfadhli, Z. (2020) · International Journal of Economics and Financial Issues · doi:10.32479/ijefi.10516 · Cited by 19
Horenberg, F., Lungu, D. A., & Nuti, S. (2020) · Health Policy · doi:10.1016/j.healthpol.2020.10.002 · Cited by 19
Purchase offering quality: The effects of buyer behaviour on organizational supplying behaviour
Ramsay, J., Wagner, B. A., & Kelly, S. (2013) · International Journal of Operations & Production Management · doi:10.1108/ijopm-09-2011-0325 · Cited by 19
Pandolfi, M. A. C. (2005) · Digital Library of Theses and Dissertations (Universidade de São Paulo) · doi:10.11606/t.3.2005.tde-30052005-165204 · Cited by 19
Implementing organizational performance measurement systems: measures and success strategies
Keathley-Herring, H., Aken, E. M. V., & Letens, G. (2024) · International Journal of Productivity and Performance Management · doi:10.1108/ijppm-05-2023-0266 · Cited by 19
Modelling plant capacity and productivity: conceptual framework in a single-machine case
Grando, A., & Turco, F. (2005) · Production Planning & Control · doi:10.1080/09537280500067377 · Cited by 18
“…with the measurement of physical quantities to be associated to the consolidated methods based on financial measures (Dixon et al. 1990, McNair et al. 1990, Kaplan and Norton 1992, 1996, Lorino 1996, Bourne et al. 2000, Neely et al. 2000, Hudson et al. 2001, Lillis 2002, Kennerley and Neely 2002).”
MethodOyewobi, L. O., Windapo, A. O., Jimoh, R. A., & Rotimi, J. O. B. (2019) · International Journal of Construction Supply Chain Management · doi:10.14424/ijcscm901019-35-59 · Cited by 18
Morched, S., & Jarboui, A. (2020) · Qualitative Research in Financial Markets · doi:10.1108/qrfm-01-2020-0005 · Cited by 18
Stakeholder Management Strategies: The Special Case of Universities
Chan, G. (2021) · International Education Studies · doi:10.5539/ies.v14n7p12 · Cited by 20
The characteristics of nonprofit performance measurement systems
Cestari, J. M. A. P., Treinta, F. T., Moura, L. F., Munik, J., de Lima, E. P., Deschamps, F., da Costa, S. E. G., Aken, E. M. V., Leite, L. R., & Duarte, R. B. (2021) · Total Quality Management & Business Excellence · doi:10.1080/14783363.2021.1948323 · Cited by 18
“PM systems also have their own process-based definitions, and according to Bourne et al. (2000), these PM processes are related to the design, implementation, management, and review of measurement systems.”
BackgroundPerformance measurement and management systems for dealing with strategies in uncertain ecosystems
Gomes, L. A. D. V., Hourneaux, F., Facin, A. L. F., & Leal, L. F. (2022) · International Journal of Operations & Production Management · doi:10.1108/ijopm-03-2021-0209 · Cited by 18
Laihonen, H., & Sillanpää, V. (2014) · Knowledge and Process Management · doi:10.1002/kpm.1438 · Cited by 20
Performance dialogue: A framework to enhance the effectiveness of performance measurement systems
Couturier, J., & Sklavounos, N. S. (2019) · International Journal of Productivity and Performance Management · doi:10.1108/ijppm-09-2017-0238 · Cited by 18
Kongela, S. (2013) · University of Regensburg Publication Server (University of Regensburg) · Cited by 18
A case study of an integrated manufacturing performance measurement and meeting system
Nadal, J. O., & Gregorio, R. (2015) · Journal of Manufacturing Technology Management · doi:10.1108/jmtm-09-2012-0089 · Cited by 18
Innovation & Performance Measurement: An Adapted Balanced Scorecard
Spanò, R., Sarto, F., Caldarelli, A., & Viganò, R. (2016) · International Journal of Business and Management · doi:10.5539/ijbm.v11n6p194 · Cited by 18
“Literature enlightens that to ensure effectiveness of the PMS, these have to be developed by taking into account the peculiarities of the organisations (Chenhall & Langfield-Smith, 1998; Ittner & Larcker, 1998b; Kaplan and Norton, 1996, 2001; Libby and Waterhouse, 1996; Lillis, 2002; Bourne et al., 2000).”
BackgroundA CRITICAL REVIEW OF PMS IN CONSTRUCTION: TOWARDS A RESEARCH AGENDA
Deng, F., Smyth, H., & Anvuur, A. M. (2012) · Lancaster EPrints (Lancaster University) · Cited by 18
Lönnqvist, A., & Kujansivu, P. (2007) · International Journal of Knowledge Management Studies · doi:10.1504/ijkms.2007.012526 · Cited by 18
Xirogiannis, G., Glykas, M., & Staikouras, C. (2004) · Knowledge and Process Management · doi:10.1002/kpm.199 · Cited by 18
“FCMs may serve as a back end to performance score cards (Bourne et al., 2000; Kaplan and Norton, 1996, 2001) to provide holistic strategic performance evaluation and management.”
BackgroundThe impact of performance targets on behaviour: A close look at sales forcecontexts
Franco‐Santos, M., & Bourne, M. (2008) · CERES (Cranfield University) · Cited by 18
Self-citationRelações entre competências gerenciais de líderes de grupos de pesquisa e resultados alcançados
de Freitas, P. F. P. (2016) · RIUnB Institutional Repository (University of Brasília) · doi:10.26512/2016.02.d.19827 · Cited by 18
Ijeomah, S. (2020) · NORMA · Cited by 18
Ravelomanantsoa, M. S. (2009) · theses.fr (ABES) · doi:10.70675/ff965d30zc358z4667zaac5z9b6276a8655e · Cited by 18
Guimarães, D. E. L., Bitencourt, I. R., & Soares, C. S. (2024) · Revista Gestão & Conexões · doi:10.47456/regec.2317-5087.2024.13.1.42072.120-146 · Cited by 17
DESIGNING A HEALTH SYSTEM PERFORMANCE ASSESSMENT MODEL FOR IRAN
Amin, B. M., Sudabeh, V., Jamaladin, T. S., & Tourani, S. (2011) · DOAJ (DOAJ: Directory of Open Access Journals) · Cited by 17
System dynamics applications in performance measurement research: progress and challenges
Oladimeji, O., Cross, J., & Keathley-Herring, H. (2020) · Management Decision · doi:10.1108/md-11-2019-1596 · Cited by 17
Ferramentas de avaliação de desempenho de cidades inteligentes: uma análise da norma ISO 37122:2019
de Abreu, J. P. M., & Marchiori, F. F. (2023) · PARC Pesquisa em Arquitetura e Construção · doi:10.20396/parc.v14i00.8668171 · Cited by 17
Dahal, R. K., Rai, B., Shahi, B. J., & Ghimire, B. (2023) · Journal of Governance and Regulation · doi:10.22495/jgrv12i3art8 · Cited by 17
“Many researchers (Bourne et al., 2000; Cooper & Ezzamel, 2013; Garengo & Sharma, 2014; Kasperskaya & Tayles, 2013) have looked at the change from FPMs to border NPMs as a major step forward in the field of performance measurement systems.”
BackgroundWong, D. W. C., Choy, K. L., Chow, H. K. H., & Lin, C. (2013) · International Journal of Systems Science · doi:10.1080/00207721.2012.761468 · Cited by 17
“Bourne and Mills (2000) defined the updated PMS, and the PMS methods generally included are (1) a balanced scorecard (Kaplan and Norton 1992), (2) a performance measurement questionnaire, (3) an integrated dynamic PMS and (4) a strategic PMS.”
MethodStudy of Performance Measurement Practices in Supply Chain Management
Kazemkhanlou, H., & Ahadi, H. R. (2014) · Cited by 17
Adoption of the balanced scorecard in local government organizations : an exploratory study
Perera, S., Schoch, H., & Sabaratnam, S. (2007) · Macquarie University · Cited by 17
Metadata
- Authors
- Bourne, M., Mills, J., Wilcox, M., Neely, A., & Platts, K.
- Affiliations
- University of Cambridge (GB)
- Northumbria University (GB)
- Cranfield University (GB)
- Venue
- International Journal of Operations & Production Management
- Publisher
- Emerald
- Published
- 2000-07-01
- Volume
- 20
- Issue
- 7
- Pages
- 754-771
- ISSN
- 0144-3577 (ISSN-L)
- OpenAlex
- W1991697830
- Cited by
- 1,143
- References
- 36
- Citations by year
- 2026: 18 · 2025: 20 · 2024: 14 · 2023: 35 · 2022: 39 · 2021: 69 · 2020: 59 · 2019: 57 · 2018: 68 · 2017: 52 · 2016: 72 · 2015: 69 · 2014: 66 · 2013: 72 · 2012: 75
- FWCI
- 23.48
- Type
- journal article
- Language
- en
- Open access
- closed
- Licence
- www.emerald.com/insight/site-policies (tdm)
- Locations
- International Journal of Operations & Production Management (publishedVersion)
- Cambridge University Engineering Department Publications Database (submittedVersion)
- Topics
- Social Sciences › Business, Management and Accounting › Accounting › Accounting and Organizational Management
- Social Sciences › Business, Management and Accounting › Management Information Systems › Quality and Supply Management
- Social Sciences › Business, Management and Accounting › Strategy and Management › Corporate Governance and Management
- Keywords
- performance measurement systems, strategic alignment, strategic management, manufacturing companies, implementation framework
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.