Designing, implementing and updating performance measurement systems
The DOI matches its Crossref record; 34 of the 36 references it cites were found in a registry or an index.
Abstract
This paper addresses issues met when designing, implementing, using and continuously updating performance measurement systems in manufacturing companies. The paper develops, from theory, a framework for analysing the implementation of a performance measurement system and uses this framework to interpret three longitudinal case studies. The paper concludes that specific processes are required to continuously align the performance measurement system with strategy. When these processes are combined with a well defined model of strategic success, the measurement system can enhance the strategic management process by challenging the assumptions and the strategy itself.
Overview
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
Claims other papers make about this one
Each is checked against this paper’s own text: does it say what the citing paper says it does?
In the citing paper
“Bourne et al., identified from previous literature three main phases of performance measurement system implementation, i.e., design, implementation and use; besides, they underlined also the essential role of updating and reviewing processes of measures and targets.”
From The Evolution of Balanced Scorecard in Healthcare: A Systematic Review of Its Design, Implementation, Use, and Review (2022) · cites this paper as [40]
In the citing paper
“The adoption of a BSC follows four phases [40].”
From The Evolution of Balanced Scorecard in Healthcare: A Systematic Review of Its Design, Implementation, Use, and Review (2022) · cites this paper as [40]
In the citing paper
“in line with [40], the review process includes a set of mechanisms for reviewing targets and standards and processes for a periodical review of the set of measures adopted.”
From The Evolution of Balanced Scorecard in Healthcare: A Systematic Review of Its Design, Implementation, Use, and Review (2022) · cites this paper as [40]
In the citing paper
“As BSC literature outlines, there are four phases in the BSC adoption [40,58]”
From The Evolution of Balanced Scorecard in Healthcare: A Systematic Review of Its Design, Implementation, Use, and Review (2022) · cites this paper as [40]
In the citing paper
“By adopting the review’s framework (Figure 2), BSC adoption phases [40], i.e., design, implementation, use and review are strictly related.”
From The Evolution of Balanced Scorecard in Healthcare: A Systematic Review of Its Design, Implementation, Use, and Review (2022) · cites this paper as [40]
Citations
Cites
(1984) · Cited by 81,983
The balanced scorecard : measures that drive performance
Caplan, R. S. (1992) · Harvard business review · Cited by 12,085
The balanced scorecard: Translating strategy into action
(1997) · Long Range Planning · doi:10.1016/s0024-6301(97)80925-9 · Cited by 8,192
(1992) · PubMed · Cited by 7,979
Leading change: why transformation efforts fail
Kotter, J. P. (2009) · IEEE Engineering Management Review · doi:10.1109/emr.2009.5235501 · Cited by 3,566
Relevance Lost: The Rise and Fall of Management Accounting
Johnson, T. H., & Kaplan, R. S. (1987) · Medical Entomology and Zoology · Cited by 3,177
Putting the Balanced Scorecard to Work
Kaplan, R. S., & Norton, D. P. (1998) · The Economic Impact of Knowledge · doi:10.1016/b978-0-7506-7009-8.50023-9 · Cited by 2,180
The performance measurement revolution: why now and what next?
Neely, A. (1999) · International Journal of Operations & Production Management · doi:10.1108/01443579910247437 · Cited by 1,154 · cited 2×
“Academic interest is manifest through the considerable number of papers on the topic ( Neely, 1999 ).”
BackgroundSelf-citationPerformance measurement in service businesses
Brignall, T. J., Fitzgerald, L., Johnston, R., & Silvestro, R. (1991) · University of Warwick · doi:10.82444/warw.33720976 · Cited by 777
(2020) · Management Accounting · doi:10.24053/9783739880280-167 · Cited by 706
Research works printed but not linked: 15
- Banks, R.L. and Wheelwright, S.C. (1979), “Operations versus strategy – trading tomorrow for today”, Harvard Business Review, May/June, pp. 112‐20.
- Deming, W.E. (1986), Out of Crisis, Massachusetts Institute of Technology, Centre for Advanced Engineering Study, Cambridge, MA.
- Eccles, R.G. and Pyburn, P.J. (1992), “Creating a comprehensive system to measure performance”, Management Accounting (US), October, pp. 41‐4.
- Fry, T.D. and Cox, J.F. (1989), “Manufacturing performance; local versus global measures”, Production and Inventory Management Journal, 2nd Quarter, pp. 52‐6.
- Goold, M. (1991), “Strategic control in the decentralised firm”, Sloan Management Review, Vol. 32 No. 2, pp. 69‐81.
- Grady, M.W. (1991), “Performance measurement: implementing strategy”, Management Accounting, June, pp. 49‐53.
- Hayes, R.H. and Abernathy, W.J. (1980), “Managing our way to economic decline”, Harvard Business Review, Vol. 62, pp. 95‐101.
- Lingle, J.H. and Schiemann, W.A. (1996), “From balanced scorecard to strategy gauge: is measurement worth it?”, Management Review, March , pp. 56‐62.
- McMann, P. and Nanni, A.J. (1994), “Is your company really measuring performance”, Management Accounting (US), November, pp. 55‐8.
- Marris, P. (1974), “The management of change”, in Loss and Change, Routledge, London, pp. 147‐59.
- Maskell, B. (1989), “Performance measurement for world class manufacturing”, Management Accounting, May, pp. 32‐3, June, pp. 32‐3, July/August, pp. 48 and 50, September, pp. 64‐6.
- Schein, E.H. (1969), Process Consultation, Addison‐Wesley, Reading, MA.
- Sink, P.E. (1986), “Performance and productivity measurement: the art of developing creative score boards”, Industrial Engineer, January, pp. 86‐90.
- Skinner, W. (1974), “The decline, fall and renewal of manufacturing”, Industrial Engineering, October, pp. 32‐8.
- Wisner and Fawcett (1991), “Link firm strategy to operating decisions through performance measurement”, Production and Inventory Management Journal, Third Quarter, pp. 5‐11.
Cited by
The performance measurement revolution: why now and what next?
Neely, A. (1999) · International Journal of Operations & Production Management · doi:10.1108/01443579910247437 · Cited by 1,154
Self-citationNeely, A. (2005) · International Journal of Operations & Production Management · doi:10.1108/01443570510633648 · Cited by 866
“There followed a rich stream of work on the design and deployment of performance measurement systems, which reported on research to develop processes for designing measurement systems and barriers to their successful implementation ( Bourne et al. , 2000”
BackgroundSelf-citationPerformance measurement systems in SMEs: A review for a research agenda
Garengo, P., Biazzo, S., & Bititci, U. S. (2005) · International Journal of Management Reviews · doi:10.1111/j.1468-2370.2005.00105.x · Cited by 733
“The lack of alignment between performance measurement and business strategy in traditional models has been found to be one of the main obstacles to achieving the expected results from a PMS (Atkinson and Waterhouse 1997; Bourne et al. 2000; Dixon et al. 1990; Goold 1991; Kaplan and Norton 1992, 1996; Keegan et al. 198…”
BackgroundOrganizational culture and performance measurement systems
Henri, J.-F. (2006) · Accounting, Organizations and Society · doi:10.1016/j.aos.2004.10.003 · Cited by 700
Performance Measurement: Challenges for Tomorrow*
Bititci, U., Garengo, P., Dörfler, V., & Nudurupati, S. (2012) · International Journal of Management Reviews · doi:10.1111/j.1468-2370.2011.00318.x · Cited by 685
Measuring supply chain performance: current research and future directions
Shepherd, C., & Günter, H. (2006) · International Journal of Productivity and Performance Management · doi:10.1108/17410400610653219 · Cited by 646
“In total, 42 journal articles and books were identified which were directly concerned with performance measurement systems and metrics for supply chains (Artz 1999; Baiman et al. 2001; Beamon 1998, 1999; Bourne et al. 2000, 2002; Cachon and Lariviere 1999; Chan 2003; Chan and Qi 2003; Chen and Paulraj 2004; Dasgupta 2…”
BackgroundInfluentialMeasuring performance in a changing business environment
Kennerley, M., & Neely, A. (2003) · International Journal of Operations & Production Management · doi:10.1108/01443570310458465 · Cited by 610
“Many processes (Bourne et al., 2000) and frameworks (Kennerley and Neely, 2000) have been proposed which are designed to help organisations implement an appropriate measurement system.”
BackgroundSelf-citationMir, F. A., & Pinnington, A. H. (2014) · International Journal of Project Management · doi:10.1016/j.ijproman.2013.05.012 · Cited by 602
“Traditional PM systems which exclusively pursue the success criteria of cost, time, quality and meeting technical requirements have become considered ineffective (Bourne et al., 2000; Walton and Dawson, 2001).”
BackgroundMethodA framework of the factors affecting the evolution of performance measurement systems
Kennerley, M., & Neely, A. (2002) · International Journal of Operations & Production Management · doi:10.1108/01443570210450293 · Cited by 575
“In a case study company, Bourne et al. (2000) observed that performance measures changed over time.”
BackgroundInfluentialSelf-citationPerformance Measurement in a Supply Chain
Chan, F. T. S. (2003) · The International Journal of Advanced Manufacturing Technology · doi:10.1007/s001700300063 · Cited by 545
“It assists in directing management attention, revising company goals, and re-engineering business processes [6–8].”
BackgroundA review of performance measurement: Towards performance management
Folan, P., & Browne, J. (2005) · Computers in Industry · doi:10.1016/j.compind.2005.03.001 · Cited by 496
Is performance measurement and management fit for the future?
Melnyk, S. A., Bititci, U., Platts, K., Tobias, J., & Andersen, B. (2014) · Management Accounting Research · doi:10.1016/j.mar.2013.07.007 · Cited by 494
“That is, does the PMM system provide guidance after a significant change in the environment, or do the strategy and the PMM system have to be updated in light of the unexpected environmental change? We know that the development of a complete and effective PMM system is not a trivial task for managers (Butler et al., 1…”
BackgroundMethodInfluentialSelf-citationCorporate Sustainability Performance Measurement Systems: A Review and Research Agenda
Searcy, C. (2012) · Journal of Business Ethics · doi:10.1007/s10551-011-1038-z · Cited by 480
“Among the many relevant examples are the extensive amount of research on environmental reporting (see, for example, Jose and Lee 2007), environmental auditing (Maltby 1995), and corporate accountability (Brennan and Solomon 2008).”
Implementing performance measurement systems: a literature review
Bourne, M., Neely, A., Mills, J., & Platts, K. (2003) · International Journal of Business Performance Management · doi:10.1504/ijbpm.2003.002097 · Cited by 480
Self-citationDesigning a performance measurement system: A case study
Lohman, C., Fortuin, L., & Wouters, M. (2004) · European Journal of Operational Research · doi:10.1016/s0377-2217(02)00918-9 · Cited by 473
Manufacturing strategy: Literature review and some issues
Dangayach, G. S., & Deshmukh, S. G. (2001) · International Journal of Operations & Production Management · doi:10.1108/01443570110393414 · Cited by 469
State of the art literature review on performance measurement
Nudurupati, S. S., Bititci, U. S., Kumar, V., & Chan, F. T. S. (2011) · Computers & Industrial Engineering · doi:10.1016/j.cie.2010.11.010 · Cited by 467
“Just as the strategy for the company changes dynamically based on external fluctuations, the relevant performance measures/ indicators should also be reviewed to sustain their relevance with the strategy (Bourne et al., 2000; Dixon et al., 1990).”
BackgroundMethodInfluentialBourne, M., Neely, A., Platts, K., & Mills, J. (2002) · International Journal of Operations & Production Management · doi:10.1108/01443570210450329 · Cited by 403
“The whole design process took between 15 and 26 weeks with the subsequent implementation in successful companies (from the end of the workshops to measures being displayed around the business) a further nine to 13 months (Bourne et al., 2000).”
BackgroundSelf-citationPerformance Measurement in Construction
Bassioni, H. A., Price, A. D. F., & Hassan, T. M. (2004) · Journal of Management in Engineering · doi:10.1061/(asce)0742-597x(2004)20:2(42 · Cited by 383
Performance measurement and management: a literature review and a research agenda
Taticchi, P., Tonelli, F., & Cagnazzo, L. (2010) · Measuring Business Excellence · doi:10.1108/13683041011027418 · Cited by 374
The use of Web analytics for digital marketing performance measurement
Järvinen, J., & Karjaluoto, H. (2015) · Industrial Marketing Management · doi:10.1016/j.indmarman.2015.04.009 · Cited by 364
Supply chain performance measurement systems: A systematic review and research agenda
Maestrini, V., Luzzini, D., Maccarrone, P., & Caniato, F. (2017) · International Journal of Production Economics · doi:10.1016/j.ijpe.2016.11.005 · Cited by 349
“Studies on the internal PMS show how failures could occur due to poor implementation (Bourne et al, 2000, 2003), inappropriate use (Henri, 2006; Micheli & Manzoni, 2010) or a lack of review (Braz et al, 2011).”
The Role of Performance Measurement Systems in Strategy Formulation Processes
Gimbert, X., Bisbe, J., & Mendoza, X. (2010) · Long Range Planning · doi:10.1016/j.lrp.2010.01.001 · Cited by 325
Kamble, S. S., & Gunasekaran, A. (2020) · International Journal of Production Research · doi:10.1080/00207543.2019.1630770 · Cited by 296
“The previous studies argue that design, development, and implementation of PMMs is not a one-time activity and has to be continuously monitored and reviewed for accommodating the changes in the competitive environment (Beamon 1999; Bourne et al. 2000; Medori and Steeple 2000).”
BackgroundReal-time supply chain—A blockchain architecture for project deliveries
Helo, P., & Shamsuzzoha, A. H. M. (2020) · Robotics and Computer-Integrated Manufacturing · doi:10.1016/j.rcim.2019.101909 · Cited by 280
KPIs: a critical appraisal of their use in construction
Beatham, S., Anumba, C., Thorpe, T., & Hedges, I. (2004) · Benchmarking: An International Journal · doi:10.1108/14635770410520320 · Cited by 260
How project management approach impact project success? From traditional to agile
Lalić, D. Ć., Lаlić, B., Delić, M., Gračanin, D., & Stefanović, D. (2022) · International Journal of Managing Projects in Business · doi:10.1108/ijmpb-04-2021-0108 · Cited by 259
Dynamics of performance measurement and organisational culture
Bititci, U. S., Mendibil, K., Nudurupati, S., Garengo, P., & Turner, T. (2006) · International Journal of Operations & Production Management · doi:10.1108/01443570610710579 · Cited by 254
“…performance measurement mostly comprises of case studies and surveys, with very progressive and longitudinal et al, 2000, Bourne and Neely 2000 and Bourne et al 2000, Nudurupati, 2003, Kennerley and Neely, 2003) rformance Bourne (2001), using systems dynamics and action research, identified two…”
MethodTayles, M., Pike, R. H., & Sofian, S. (2007) · Accounting, Auditing & Accountability Journal · doi:10.1108/09513570710762575 · Cited by 251
“These have been criticised for being backward looking, unable to measure intangible resources and not suitable for assessing performance of investments in new technologies and markets which firms require to compete successfully in global markets (Bourne et al., 2000; Amir and Lev, 1996).”
BackgroundKoufteros, X., Verghese, A. (., & Lucianetti, L. (2014) · Journal of Operations Management · doi:10.1016/j.jom.2014.06.003 · Cited by 234
Kühnen, M., & Hahn, R. (2017) · Journal of Industrial Ecology · doi:10.1111/jiec.12663 · Cited by 230
“…practice would be especially important because the evolution of performance measurement has the potential to challenge and change strategic assumptions, for example, from short-term profit thinking to long-term progress of social responsibility and sustainable development (Bourne et al. 2000).”
BackgroundMethodInfluentialHistorical analysis of performance measurement and management in operations management
Radnor, Z. J., & Barnes, D. (2007) · International Journal of Productivity and Performance Management · doi:10.1108/17410400710757105 · Cited by 224
“As Bourne et al. (2000) note:”
Thakkar, J., Deshmukh, S. G., Gupta, A. D., & Shankar, R. (2006) · International Journal of Productivity and Performance Management · doi:10.1108/17410400710717073 · Cited by 222
“The new performance measurement frameworks may have answered the question “what types of measures should a company use?” but they did not provide specific advice to a company implementing a performance measurement system (Bourne et al., 2000).”
BackgroundSilva, S., Nuzum, A.-K., & Schaltegger, S. (2019) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2019.01.203 · Cited by 222
Bisbe, J., & Malagueño, R. (2012) · Management Accounting Research · doi:10.1016/j.mar.2012.05.002 · Cited by 220
“…emergent strategies (Bisbe and Otley, 2004; Henri, 2006; Simons, 1995; Tuomela, 2005; Widener, 2007); as well as assisting in the revision or (re)formulation of intended strategies (Bourne et al., 2000; Campbell et al., 2008; Gimbert et al., 2010; Kald and Nilsson, 2000; Kaplan and Norton, 2008).”
BackgroundInfluentialMoxham, C. (2009) · International Journal of Operations & Production Management · doi:10.1108/01443570910971405 · Cited by 219
“) and the continual updating of relevant measures is viewed as essential ( Bourne et al. , 2000”
BackgroundBeeri, I., Uster, A., & Vigoda‐Gadot, E. (2018) · Public Performance & Management Review · doi:10.1080/15309576.2018.1436074 · Cited by 217
Towards a holistic enterprise innovation performance measurement system
Dewangan, V., & Godse, M. (2014) · Technovation · doi:10.1016/j.technovation.2014.04.002 · Cited by 215
“The late 20th century witnessed the emergence of several multi-dimensional IPM systems designed to address this need (Bourne et al., 2000).”
BackgroundModeling organizational performance indicators
Popova, V., & Sharpanskykh, A. (2010) · Information Systems · doi:10.1016/j.is.2009.12.001 · Cited by 211
Managing through measures: a study of impact on performance
Bourne, M., Kennerley, M., & Franco‐Santos, M. (2005) · Journal of Manufacturing Technology Management · doi:10.1108/17410380510594480 · Cited by 209
“A recent study has analysed 99 published papers on the impact of performance measurement on organisational performance (Franco & Bourne, 2004).”
BackgroundInfluentialSelf-citationPerformance measurement systems in the Finnish public sector
Rantanen, H., Kulmala, H. I., Lönnqvist, A., & Kujansivu, P. (2007) · International Journal of Public Sector Management · doi:10.1108/09513550710772521 · Cited by 206
“According to Bourne et al. (2000) and Leinonen (2001), choosing the success factors and defining the measures can be called designing the PMS, and the phase of taking the measures into use can be called implementation.”
BackgroundMethodInfluentialAssociation between performance measurement systems and organisational effectiveness
Upadhaya, B., Munir, R., & Blount, Y. (2014) · International Journal of Operations & Production Management · doi:10.1108/ijopm-02-2013-0091 · Cited by 203
Interplay between performance measurement and management, employee engagement and performance
Smith, M., & Bititci, U. S. (2017) · International Journal of Operations & Production Management · doi:10.1108/ijopm-06-2015-0313 · Cited by 201
“Consequently a plethora of performance measurement frameworks emerged (Keegan et al., 1989; Kaplan and Norton, 2001; Bourne et al., 2000; Neely et al., 2002).”
BackgroundHumanitarian supply chain performance management: a systematic literature review
Abidi, H., de Leeuw, S., & Klumpp, M. (2014) · Supply Chain Management: An International Journal · doi:10.1108/scm-09-2013-0349 · Cited by 199
“Implementation of performance management is defined as putting the performance management system and procedures in place (Bourne et al., 2000) and should be handled as a part of an organization wide project (Bourne, 2005; Bourne et al.”
BackgroundMeasuring Enterprise Sustainability
Searcy, C. (2016) · Business Strategy and the Environment · doi:10.1002/bse.1861 · Cited by 152
State-of-the-art of design, evaluation, and operation methodologies in product service systems
Qu, M., Yu, S., Chen, D., Chu, J., & Tian, B. (2016) · Computers in Industry · doi:10.1016/j.compind.2015.12.004 · Cited by 196
A critique of benchmarking and performance measurement: Lead or lag?
Anderson, K., & McAdam, R. (2004) · Benchmarking An International Journal · doi:10.1108/14635770410557708 · Cited by 200
“In the late 1970s and 1980s numerous authors expressed a general dissatisfaction with traditional backward looking or lag accounting based performance measurement systems, identifying their shortcomings and arguing for change ( Bourne et al. , 2000”
BackgroundSupply chains in circular business models: processes and performance objectives
Vegter, D., van Hillegersberg, J., & Olthaar, M. (2020) · Resources, Conservation and Recycling · doi:10.1016/j.resconrec.2020.105046 · Cited by 193
A framework to review performance measurement systems
Najmi, M., Rigas, J., & Fan, I. (2005) · Business Process Management Journal · doi:10.1108/14637150510591129 · Cited by 191
“The review framework and the review card comply with the findings of Bourne et al. (2000) through literature as stated below: The performance measurement system requires developing and reviewing at a number of different levels as the situation changes.”
BackgroundMethodThe Evolution of Sustainability Measurement Research
Mura, M., Longo, M., Micheli, P., & Bolzani, D. (2018) · International Journal of Management Reviews · doi:10.1111/ijmr.12179 · Cited by 190
“Therefore, performance measurement is seen as encompassing various activities such as the design and implementation of performance indicators, collection and analysis of data, and reporting of performance information to internal and external stakeholders (Bourne et al. 2000).”
Towards a contingency approach to performance measurement: an empirical study in Scottish SMEs
Garengo, P., & Bititci, U. (2007) · International Journal of Operations & Production Management · doi:10.1108/01443570710763787 · Cited by 189
An examination of the literature relating to issues affecting how companies manage through measures
Franco‐Santos, M., & Bourne, M. (2005) · Production Planning & Control · doi:10.1080/09537280512331333020 · Cited by 187
“BPM systems cannot be fully understood using a narrow analysis perspective that only focuses on the single process of designing and/or implementing the system (e.g. Neely et al. 1995, Bourne et al. 2000).”
BackgroundMethodInfluentialSelf-citationStrategic alignment and middle‐level managers' motivation in a balanced scorecard setting
Decoene, V., & Bruggeman, W. (2006) · International Journal of Operations & Production Management · doi:10.1108/01443570610650576 · Cited by 184
Reviewing and improving performance measurement systems: An action research
BRAZ, R. G. F., Scavarda, L. F., & Martins, R. A. (2011) · International Journal of Production Economics · doi:10.1016/j.ijpe.2011.06.003 · Cited by 181
“…performance measures with organisational strategy (Globerson, 1985; Eccles, 1991; Neely et al., 1996; Beamon, 1999; Bourne et al., 2000; Kaplan and Norton, 2001; Lambert and Pohlen, 2001; Coyle et al., 2002; Attadia and Martins, 2003; Lohman et al., 2004; Kaplan and Norton, 2006; Chen, 2008).”
BackgroundGomes, C. F., Yasin, M. M., & Lisboa, J. V. (2004) · Journal of Manufacturing Technology Management · doi:10.1108/17410380410547906 · Cited by 180
Pavlov, A., & Bourne, M. (2011) · International Journal of Operations & Production Management · doi:10.1108/01443571111098762 · Cited by 187
Self-citationPerformance measures in English small and medium enterprises: survey results
Sousa, S., Aspinwall, E. M., & Rodrigues, A. G. (2006) · Benchmarking An International Journal · doi:10.1108/14635770610644628 · Cited by 179
Determinants of quality management systems implementation in hospitals
Wardhani, V., Utarini, A., van Dijk, J. P., Post, D., & Groothoff, J. W. (2008) · Health Policy · doi:10.1016/j.healthpol.2008.06.008 · Cited by 179
“Studies inmanufacturing industries suggest at least 3 years of QMS implementation throughout the organization and a longer period to measure the overall impact on organization performance improvement [4,33,34].”
McAdam, R., & Bailie, B. (2002) · International Journal of Operations & Production Management · doi:10.1108/01443570210440492 · Cited by 175
A performance measurement framework in portfolio management: A constructivist case
Lacerda, R. T. D. O., Ensslin, L., & Ensslin, S. R. (2011) · Management Decision · doi:10.1108/00251741111126530 · Cited by 175
“As a first step, it is necessary to define what should be done by focusing on the strategic organization objectives (Bourne et al., 2000; Harrison and Pelletier, 2000).”
BackgroundImplementing strategically aligned performance measurement in small firms
Hudson Smith, M., & Smith, D. (2007) · International Journal of Production Economics · doi:10.1016/j.ijpe.2006.07.011 · Cited by 174
Adding value to performance measurement by using system dynamics and multicriteria analysis
Santos, S. P., Belton, V., & Howick, S. (2002) · International Journal of Operations & Production Management · doi:10.1108/01443570210450284 · Cited by 173
Understanding the features of performance measurement system: a literature review
Choong, K. K. (2013) · Measuring Business Excellence · doi:10.1108/mbe-05-2012-0031 · Cited by 177
Improving control through effective performance measurement in SMEs
Smith, M. H., Lean, J., & Smart, P. A. (2001) · Production Planning & Control · doi:10.1080/09537280110061557 · Cited by 172
“The length of time required to integrate the system into companies has been identi ed as a potential reason why the implementation rate was so low (Bourne et al. 2000).”
BackgroundPun, K. F., & White, A. S. (2005) · International Journal of Management Reviews · doi:10.1111/j.1468-2370.2005.00106.x · Cited by 171
Performance measurement of construction firms in developing countries
Luu, V. T., Kim, S.-Y., Cao, H.-L., & Park, Y. (2008) · Construction Management and Economics · doi:10.1080/01446190801918706 · Cited by 171
“Bourne et al. (2000) presented the following PM frameworks.”
Uma análise bibliométrica da literatura sobre estratégia e avaliação de desempenho
Lacerda, R. T. D. O., Ensslin, L., & Ensslin, S. R. (2012) · Gestão & Produção · doi:10.1590/s0104-530x2012000100005 · Cited by 168
Factors that play a role in “managing through measures”
Franco, M., & Bourne, M. (2003) · Management Decision · doi:10.1108/00251740310496215 · Cited by 168
“Managers were concerned with questions such as: What is our strategic success map? What type of measures should we select? In the late 1990s and early 2000s, authors became more interested in the implementation processes of SPM systems and the reasons why many organisations struggled in this task ( Bourne et al., 2000…”
BackgroundSelf-citationA review on supply chain performance measures and metrics: 2000‐2011
Gopal, P. R. C., & Thakkar, J. (2012) · International Journal of Productivity and Performance Management · doi:10.1108/17410401211232957 · Cited by 168
“Unfortunately, there is little evidence of systematic empirical research on the implementation of performance measurement systems (Bourne et al., 2000; Neely et al., 2000; Nudurupati et al., 2011).”
BackgroundInfluentialRelevance assumed: a case study of balanced scorecard development using system dynamics
Akkermans, H. A., & van Oorschot, K. E. (2005) · Journal of the Operational Research Society · doi:10.1057/palgrave.jors.2601923 · Cited by 168
A SCOR-based model for supply chain performance measurement: application in the footwear industry
Sellitto, M. A., Pereira, G. M., Borchardt, M., da Silva, R. I., & Viegas, C. V. (2015) · International Journal of Production Research · doi:10.1080/00207543.2015.1005251 · Cited by 166
“…with collective indicators (Bechtel and Jayaram 1997); (2) hierarchical systemic structures, as boxes-within-boxes (Simon 1999; Holmberg 2000; Bourne et al. 2000; Chan 2003; Hausman 2003; Azevedo, Carvalho, and Cruz-Machado 2011); and (3) structures based on reference models, as BSC…”
BackgroundModelling the Impact of Climate Change Risk on Supply Chain Performance
Er, M., Ghadge, A., & Bititci, U. (2020) · International Journal of Production Research · doi:10.1080/00207543.2020.1849844 · Cited by 166
“Performance measurement and management systems provide a wide range of advantages such as increased performance and competitive advantage, improved visibility on processes, standard framework for communication, tracking and documentation of performance among others (Bourne et al., 2000; Bititci et al., 2016).”
Triple bottom line and sustainable performance measurement in industrial companies
Hourneaux Jr, F., Gabriel, M. L. D. S., & Gallardo-Vázquez, D. A. (2018) · Revista de Gestão · doi:10.1108/rege-04-2018-0065 · Cited by 165
Methods for Managing Different Perspectives of Project Success
Bryde, D. (2005) · British Journal of Management · doi:10.1111/j.1467-8551.2005.00438.x · Cited by 166
Supply chain performance measures and metrics: a bibliometric study
Mishra, D., Gunasekaran, A., Papadopoulos, T., & Dubey, R. (2018) · Benchmarking: An International Journal · doi:10.1108/bij-08-2017-0224 · Cited by 164
Managerial processes: business process that sustain performance
Bititci, U. S., Ackermann, F., Ates, A., Davies, J., Garengo, P., Gibb, S., MacBryde, J., Mackay, D., Maguire, C., van der Meer, R., et al. (2011) · International Journal of Operations & Production Management · doi:10.1108/01443571111153076 · Cited by 162
Self-citationPerformance measurement and management: a system of systems perspective
Bourne, M., Franco-Santos, M., Micheli, P., & Pavlov, A. (2018) · International Journal of Production Research · doi:10.1080/00207543.2017.1404159 · Cited by 161
“Consequently, performance reviews should be undertaken in a consistent fashion and pace, so as to feed information back to the corporate centre (Bourne et al. 2000; Martinez, Pavlov, and Bourne 2010).”
BackgroundMethodSelf-citationRediscovering performance management: systems, learning and integration
Brudan, A. (2010) · Measuring Business Excellence · doi:10.1108/13683041011027490 · Cited by 160
“In the late 1980s and early 1990s, this dissatisfaction [with traditional backward looking accounting based performance measurement systems] led to the development of “balanced” or “multi-dimensional” performance measurement frameworks ( Bourne et al., 2000 ).”
BackgroundPerformance Measurement and Management Systems: A Perspective from Complexity Theory
Okwir, S., Nudurupati, S., Ginieis, M., & Angelis, J. (2018) · International Journal of Management Reviews · doi:10.1111/ijmr.12184 · Cited by 161
“Therefore, to understand complexity in the PMS context, it is necessary to understand the role of PMSs as agents of change (Bourne et al. 2000; Nudurupati et al. 2011).”
BackgroundInfluentialGroen, B. A. C., Wouters, M. J. F., & Wilderom, C. P. M. (2017) · Management Accounting Research · doi:10.1016/j.mar.2016.10.001 · Cited by 158
Performance measurement and management in practice: Advantages, disadvantages and reasons for use
de Waal, A. A., & Kourtit, K. (2013) · International Journal of Productivity and Performance Management · doi:10.1108/ijppm-10-2012-0118 · Cited by 160
“…empirical evidence about the advantages, or for that matter the disadvantages, that organizations may expect when implementing and using PMM (Bourne et al., 2000, 2003; Davis and Albright, 2004; Ittner, 2008; Ittner and Larcker, 1997; Holloway, 1999; Marchand and Raymond, 2008; Neely, 2005;…”
de Leeuw, S., & van den Berg, J. P. (2011) · Journal of Operations Management · doi:10.1016/j.jom.2010.12.009 · Cited by 162
Project management concepts, methods and application
Bryde, D. (2003) · International Journal of Operations & Production Management · doi:10.1108/01443570310481559 · Cited by 155
“performance measurement over the past 20 years that focus on establishing “balanced” or “multi-dimensional” constructs ( Bourne et al., 2000 ).”
BackgroundMeasuring Supply Chain Performance: Current Research and Future Directions
Shepherd, C., & Guenter, H. (2010) · Springer eBooks · doi:10.1007/978-3-642-13382-4_6 · Cited by 152
Bourne, M., Pavlov, A., Franco‐Santos, M., Lucianetti, L., & Mura, M. (2013) · International Journal of Operations & Production Management · doi:10.1108/ijopm-07-2010-0200 · Cited by 151
Self-citationPerformance measurement and management: theory and practice
Bourne, M., Melnyk, S. A., & Bititci, U. (2018) · International Journal of Operations & Production Management · doi:10.1108/ijopm-11-2018-784 · Cited by 150
Self-citationShaik, M. N., & Abdul‐Kader, W. (2013) · Computers & Industrial Engineering · doi:10.1016/j.cie.2013.12.008 · Cited by 146
Performance measurement systems: successes, failures and future – a review
Paranjape, B., Rossiter, M., & Pantano, V. (2006) · Measuring Business Excellence · doi:10.1108/13683040610685748 · Cited by 144
The interplay between performance measurement, organizational culture and management styles
Bititci, U., Mendibil, K., Nudurupati, S., Turner, T. J., & Garengo, P. (2004) · Measuring Business Excellence · doi:10.1108/13683040410555591 · Cited by 142
Taticchi, P., Balachandran, K. R., & Tonelli, F. (2012) · Measuring Business Excellence · doi:10.1108/13683041211230311 · Cited by 142
Development of Performance Dashboards in Healthcare Sector: Key Practical Issues
Ghazisaeidi, M., Safdari, R., Torabi, M., Mirzaee, M., Farzi, J., & Goodini, A. (2015) · Acta Informatica Medica · doi:10.5455/aim.2015.23.317-321 · Cited by 142
“study, committed management support and sponsorship are of critical success factors for advanced technologies adoption (27).”
BackgroundInfluentialHow performance measurement can support achieving success in project-based operations
Korhonen, T., Jääskeläinen, A., Laine, T., & Saukkonen, N. (2022) · International Journal of Project Management · doi:10.1016/j.ijproman.2022.11.002 · Cited by 144
“Nevertheless, performance measures support the monitoring of target attainment and help ensure that activities are implemented as planned — provided measures are updated if needed (e.g., Bourne, Mills, Wilcox, Neely & Platts, 2000; Ferreira & Otley, 2009; Korhonen, Laine & Suomala, 2013).”
BackgroundGarengo, P., & Bernardi, G. (2007) · International Journal of Productivity and Performance Management · doi:10.1108/17410400710757178 · Cited by 141
Supplier evaluation processes: the shaping and reshaping of supplier performance
Hald, K. S., & Ellegaard, C. (2011) · International Journal of Operations & Production Management · doi:10.1108/01443571111153085 · Cited by 141
“), fuelled by the inadequacy of previous one-dimensional financially oriented performance measurement practices ( Bourne et al. , 2000”
BackgroundMoxham, C., & Boaden, R. (2007) · International Journal of Operations & Production Management · doi:10.1108/01443570710763796 · Cited by 140
Researching performance measurement system implementation: the dynamics of success and failure
Bourne, M. (2005) · Production Planning & Control · doi:10.1080/09537280512331333011 · Cited by 140
Self-citationKnowledge Management and Performance Measurement Systems for SMEs’ Economic Sustainability
Cardoni, A., Zanin, F., Corazza, G., & Paradisi, A. (2020) · Sustainability · doi:10.3390/su12072594 · Cited by 142
Morioka, S. N., & Carvalho, M. M. (2016) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2016.01.103 · Cited by 138
Contemporary performance measurement and management (PMM) in digital economies
Nudurupati, S. S., Tebboune, S., & Hardman, J. (2016) · Production Planning & Control · doi:10.1080/09537287.2015.1092611 · Cited by 109
“The organisations should explore how technology could create competitive advantage at a strategic level, which could be deployed through PMM (see the three stage model of Bourne et al. 2000) thus ben-efitting from big data.”
BackgroundMeasures vs actions: the balanced scorecard in Swedish Law Enforcement
Carmona, S., & Grönlund, A. (2003) · International Journal of Operations & Production Management · doi:10.1108/01443570310506722 · Cited by 144
“Accordingly, the four perspectives enshrined in the scorecard used by Swedish Law Enforcement “balanced” measures of internal success as well as internal performance ( Bourne et al. , 2000”
Metadata
- Authors
- Bourne, M., Mills, J., Wilcox, M., Neely, A., & Platts, K.
- Affiliations
- University of Cambridge (GB)
- Northumbria University (GB)
- Cranfield University (GB)
- Venue
- International Journal of Operations & Production Management
- Publisher
- Emerald
- Published
- 2000-07-01
- Volume
- 20
- Issue
- 7
- Pages
- 754-771
- ISSN
- 0144-3577 (ISSN-L)
- OpenAlex
- W1991697830
- Cited by
- 1,143
- References
- 36
- Citations by year
- 2026: 18 · 2025: 20 · 2024: 14 · 2023: 35 · 2022: 39 · 2021: 69 · 2020: 59 · 2019: 57 · 2018: 68 · 2017: 52 · 2016: 72 · 2015: 69 · 2014: 66 · 2013: 72 · 2012: 75
- FWCI
- 23.48
- Type
- journal article
- Language
- en
- Open access
- closed
- Licence
- www.emerald.com/insight/site-policies (tdm)
- Locations
- International Journal of Operations & Production Management (publishedVersion)
- Cambridge University Engineering Department Publications Database (submittedVersion)
- Topics
- Social Sciences › Business, Management and Accounting › Accounting › Accounting and Organizational Management
- Social Sciences › Business, Management and Accounting › Management Information Systems › Quality and Supply Management
- Social Sciences › Business, Management and Accounting › Strategy and Management › Corporate Governance and Management
- Keywords
- performance measurement systems, strategic alignment, strategic management, manufacturing companies, implementation framework
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.