Designing, implementing and updating performance measurement systems
The DOI matches its Crossref record; 34 of the 36 references it cites were found in a registry or an index.
Abstract
This paper addresses issues met when designing, implementing, using and continuously updating performance measurement systems in manufacturing companies. The paper develops, from theory, a framework for analysing the implementation of a performance measurement system and uses this framework to interpret three longitudinal case studies. The paper concludes that specific processes are required to continuously align the performance measurement system with strategy. When these processes are combined with a well defined model of strategic success, the measurement system can enhance the strategic management process by challenging the assumptions and the strategy itself.
Overview
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
Claims other papers make about this one
Each is checked against this paper’s own text: does it say what the citing paper says it does?
In the citing paper
“Bourne et al., identified from previous literature three main phases of performance measurement system implementation, i.e., design, implementation and use; besides, they underlined also the essential role of updating and reviewing processes of measures and targets.”
From The Evolution of Balanced Scorecard in Healthcare: A Systematic Review of Its Design, Implementation, Use, and Review (2022) · cites this paper as [40]
In the citing paper
“The adoption of a BSC follows four phases [40].”
From The Evolution of Balanced Scorecard in Healthcare: A Systematic Review of Its Design, Implementation, Use, and Review (2022) · cites this paper as [40]
In the citing paper
“in line with [40], the review process includes a set of mechanisms for reviewing targets and standards and processes for a periodical review of the set of measures adopted.”
From The Evolution of Balanced Scorecard in Healthcare: A Systematic Review of Its Design, Implementation, Use, and Review (2022) · cites this paper as [40]
In the citing paper
“As BSC literature outlines, there are four phases in the BSC adoption [40,58]”
From The Evolution of Balanced Scorecard in Healthcare: A Systematic Review of Its Design, Implementation, Use, and Review (2022) · cites this paper as [40]
In the citing paper
“By adopting the review’s framework (Figure 2), BSC adoption phases [40], i.e., design, implementation, use and review are strictly related.”
From The Evolution of Balanced Scorecard in Healthcare: A Systematic Review of Its Design, Implementation, Use, and Review (2022) · cites this paper as [40]
Citations
Cites
(1984) · Cited by 81,983
The balanced scorecard : measures that drive performance
Caplan, R. S. (1992) · Harvard business review · Cited by 12,085
The balanced scorecard: Translating strategy into action
(1997) · Long Range Planning · doi:10.1016/s0024-6301(97)80925-9 · Cited by 8,192
(1992) · PubMed · Cited by 7,979
Leading change: why transformation efforts fail
Kotter, J. P. (2009) · IEEE Engineering Management Review · doi:10.1109/emr.2009.5235501 · Cited by 3,566
Relevance Lost: The Rise and Fall of Management Accounting
Johnson, T. H., & Kaplan, R. S. (1987) · Medical Entomology and Zoology · Cited by 3,177
Putting the Balanced Scorecard to Work
Kaplan, R. S., & Norton, D. P. (1998) · The Economic Impact of Knowledge · doi:10.1016/b978-0-7506-7009-8.50023-9 · Cited by 2,180
The performance measurement revolution: why now and what next?
Neely, A. (1999) · International Journal of Operations & Production Management · doi:10.1108/01443579910247437 · Cited by 1,154 · cited 2×
“Academic interest is manifest through the considerable number of papers on the topic ( Neely, 1999 ).”
BackgroundSelf-citationPerformance measurement in service businesses
Brignall, T. J., Fitzgerald, L., Johnston, R., & Silvestro, R. (1991) · University of Warwick · doi:10.82444/warw.33720976 · Cited by 777
(2020) · Management Accounting · doi:10.24053/9783739880280-167 · Cited by 706
Research works printed but not linked: 15
- Banks, R.L. and Wheelwright, S.C. (1979), “Operations versus strategy – trading tomorrow for today”, Harvard Business Review, May/June, pp. 112‐20.
- Deming, W.E. (1986), Out of Crisis, Massachusetts Institute of Technology, Centre for Advanced Engineering Study, Cambridge, MA.
- Eccles, R.G. and Pyburn, P.J. (1992), “Creating a comprehensive system to measure performance”, Management Accounting (US), October, pp. 41‐4.
- Fry, T.D. and Cox, J.F. (1989), “Manufacturing performance; local versus global measures”, Production and Inventory Management Journal, 2nd Quarter, pp. 52‐6.
- Goold, M. (1991), “Strategic control in the decentralised firm”, Sloan Management Review, Vol. 32 No. 2, pp. 69‐81.
- Grady, M.W. (1991), “Performance measurement: implementing strategy”, Management Accounting, June, pp. 49‐53.
- Hayes, R.H. and Abernathy, W.J. (1980), “Managing our way to economic decline”, Harvard Business Review, Vol. 62, pp. 95‐101.
- Lingle, J.H. and Schiemann, W.A. (1996), “From balanced scorecard to strategy gauge: is measurement worth it?”, Management Review, March , pp. 56‐62.
- McMann, P. and Nanni, A.J. (1994), “Is your company really measuring performance”, Management Accounting (US), November, pp. 55‐8.
- Marris, P. (1974), “The management of change”, in Loss and Change, Routledge, London, pp. 147‐59.
- Maskell, B. (1989), “Performance measurement for world class manufacturing”, Management Accounting, May, pp. 32‐3, June, pp. 32‐3, July/August, pp. 48 and 50, September, pp. 64‐6.
- Schein, E.H. (1969), Process Consultation, Addison‐Wesley, Reading, MA.
- Sink, P.E. (1986), “Performance and productivity measurement: the art of developing creative score boards”, Industrial Engineer, January, pp. 86‐90.
- Skinner, W. (1974), “The decline, fall and renewal of manufacturing”, Industrial Engineering, October, pp. 32‐8.
- Wisner and Fawcett (1991), “Link firm strategy to operating decisions through performance measurement”, Production and Inventory Management Journal, Third Quarter, pp. 5‐11.
Cited by
Items 301–400 of 1,000
A metrics suite of cloud computing adoption readiness
Kauffman, R. J., Ma, D., & Yu, M. Y. (2016) · Electronic Markets · doi:10.1007/s12525-015-0213-y · Cited by 42
“A stakeholder is an agent who initiates changes or is impacted by changes derived from a technological innovation (Bourne et al. 2000).”
Challenges impacting performance management implementation in public universities: A case of Uganda
Karuhanga, B. N., & Werner, A. (2013) · African Journal of Economic and Management Studies · doi:10.1108/ajems-nov-2011-0103 · Cited by 42
“Literature presents a number of challenges which are in line with the items which loaded to this factor, such as a lack of staff support (Horine and Hailey, 1995; Bourne et al., 2000; Amaratunga and Baldry, 2002; Halachmi, 2002), limited teamwork (Ingram, 1997; Castka et al.”
BackgroundA Hybrid Dynamic Framework for Supply Chain Performance Improvement
Agami, N., Saleh, M. M., & Rasmy, M. (2011) · IEEE Systems Journal · doi:10.1109/jsyst.2011.2177109 · Cited by 42
“Financial approaches are traditional accounting methods that mainly focus on financial indicators and ignore important strategic nonfinancial ones such as customer loyalty, and service quality.”
BackgroundReviewing performance: an analysis of the structure and functions of performance management reviews
Martinez, V., Pavlov, A., & Bourne, M. (2010) · Production Planning & Control · doi:10.1080/09537280903317049 · Cited by 42
“However, despite the plethora of articles, papers and books on the scorecard content (Kaplan and Norton 1996; 2001; 2004; 2006), its design and implementation (Neely et al., 1996; 2002; Bourne and Bourne, 2003; 2007; Olve et al., 1999; Neely et al., 2000; Bourne et al., 1999; 2000; 2001; 2005 ) much less has been writ…”
BackgroundSelf-citationMoving goals and governance in megaprojects
Bourne, M., Bosch-Rekveldt, M., & Pesämaa, O. (2023) · International Journal of Project Management · doi:10.1016/j.ijproman.2023.102486 · Cited by 41
Self-citationBehavioral factors influencing performance management systems' use
Elzinga, T., Albronda, B., & Kluijtmans, F. (2009) · International Journal of Productivity and Performance Management · doi:10.1108/17410400910977064 · Cited by 41
“doesn’t stop with the selection and definition of measures. Bourne et al. (2000) emphasize”
BackgroundThe Implications of Intellectual Capital on Performance Measurement and Corporate Performance
Sofian, S. B., Tayles, M. E., & Pike, R. H. (2006) · Cited by 41
Figueiredo, M. A. D., de Macedo-Soares, T. D. L. V. A., Fuks, S., & Figueiredo, L. C. (2005) · Gestão & Produção · doi:10.1590/s0104-530x2005000200013 · Cited by 45
The strategic management of operations system performance
de Lima, E. P., da Costa, S. E. G., & Angelis, J. (2007) · International Journal of Business Performance Management · doi:10.1504/ijbpm.2008.015924 · Cited by 41
The use of context-based environmental indicators in corporate reporting
Haffar, M., & Searcy, C. (2018) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2018.04.202 · Cited by 42
PERFORMANS ÖLÇÜMÜ VE ÖLÇÜM SİSTEMLERİ: GENEL BİR BAKIŞ
Yüreğir, Y. D. D. O. H., & Nakıboğlu, A. G. G. (2007) · Çukurova Üniversitesi Sosyal Bilimler Enstitüsü Dergisi · Cited by 40
Sellitto, M. A., Borchardt, M., & Pereira, G. M. (2006) · Gestão & Produção · doi:10.1590/s0104-530x2006000200014 · Cited by 39
Garza‐Reyes, J. A. (2017) · Business Process Management Journal · doi:10.1108/bpmj-12-2016-0248 · Cited by 39
Morioka, S. N., Iritani, D. R., Ometto, A. R., & de Carvalho, M. M. (2018) · Gestão & Produção · doi:10.1590/0104-530x2720-18 · Cited by 40
The process of constructing performance measurement
Elg, M. (2007) · The TQM Journal · doi:10.1108/09544780710745649 · Cited by 39
“(Kaplan and Norton, 1996b; Bititci et al., 1997; Bourne et al., 2000).”
Himme, A. (2012) · Journal of Management Control · doi:10.1007/s00187-012-0157-8 · Cited by 39
“Such an environment alleviates the importance of formal controls (Bourne et al. 2000).”
BackgroundPerformance measurement system for lean manufacturing: a perspective from SMEs
Anand, G., & Kodali, R. (2008) · International Journal of Globalisation and Small Business · doi:10.1504/ijgsb.2008.018101 · Cited by 39
“This section corresponds to the second phase of the PMS development methodology proposed by Bourne et al. (2000). Kennerley and Neely (2002) stated that the objective of the PMS frameworks is to help organisations define a set of measures that reflect their objectives and assess their performance appropriately.”
BackgroundMethodInfluentialTaxonomy of performance measurement systems
Henri, J. (2008) · Advances in management accounting · doi:10.1016/s1474-7871(08)17009-5 · Cited by 39
The Use of Performance Measurement in Knowledge Work Context
Okkonen, J. (2004) · Tampere University Institutional Repository (Tampere University) · Cited by 39
Nouveaux défis du système de mesure de la performance : cas des tableaux de bord
Bouamama, M. (2015) · theses.fr (ABES) · doi:10.70675/228781f4z801fz4607z96f9zb4340e0a6a0b · Cited by 39
The use of performance measurement information in the work of middle managers
Jääskeläinen, A., & Luukkanen, N. (2017) · International Journal of Productivity and Performance Management · doi:10.1108/ijppm-02-2016-0043 · Cited by 38
“These two tasks are intrinsic in the literature on performance management (Bourne et al. 2000; Neely et al. 2000).”
BackgroundDesigning operative productivity measures in public services
Jääskeläinen, A., & Lönnqvist, A. (2009) · VINE · doi:10.1108/03055720910962443 · Cited by 38
“The designing of measures can be divided into identifying the factors to be measured and defining the measures themselves ( Bourne et al. , 2000”
BackgroundNon-Financial Performance Measures in Small Medium Enterprises’ Supply Chain Management
Matsoso, M. L., & Benedict, O. H. (2014) · Journal of Economics · doi:10.1080/09765239.2014.11885001 · Cited by 38
“Implementation of performance measures should be perceived as a critical step to a successful manufacturing business that requires a maximum functioning capacity of automated systems and thus frequent reporting mechanisms (Bourne et al. 2000).”
BackgroundProject control: an exploratory study of levers of control in the context of managing projects
Rezania, D., Baker, R., & Burga, R. (2016) · Journal of Accounting & Organizational Change · doi:10.1108/jaoc-10-2015-0084 · Cited by 39
The new ISO 9001 and the problem of ceremonial conformity: How have audit methods evolved?
Biazzo, S. (2005) · Total Quality Management & Business Excellence · doi:10.1080/14783360500054145 · Cited by 38
“This dimension deals with the problem of using the performance indicators (see Bourne et al., 2000).”
BackgroundReconceptualising e‐business performance measurement using an innovation adoption framework
Barnes, D., & Hinton, C. M. (2012) · International Journal of Productivity and Performance Management · doi:10.1108/17410401211232948 · Cited by 37
A decision framework for the consolidation of performance measurement systems
Grosswiele, L., Röglinger, M., & Friedl, B. (2012) · Decision Support Systems · doi:10.1016/j.dss.2012.10.027 · Cited by 38
“All rights reserved.”
A history of intellectual capital measurements: from production to consumption
Giuliani, M., Chiucchi, M. S., & Marasca, S. (2016) · Journal of Intellectual Capital · doi:10.1108/jic-08-2015-0071 · Cited by 37
Performance compétente : Relations avec valeurs, pratiques et identité dans le service de police
Nascimento, T. (2014) · theses.fr (ABES) · doi:10.70675/59c33333zb3ebz4baczacb2z9bc45a187052 · Cited by 37
Exploring performance measurement practices in Brazilian startups
Costa, M. A. S., Guerino, G. C., Leal, G. C. L., Balancieri, R., & Galdámez, E. V. C. (2021) · Total Quality Management & Business Excellence · doi:10.1080/14783363.2021.1884063 · Cited by 36
“Therefore, the literature points out that results are still inconsistent in the relationship between non-financial indicators and performance (Bourne et al., 2000).”
ResultMeasuring performance: the operations management perspective
Neely, A. D. (2007) · Cambridge University Press eBooks · doi:10.1017/cbo9780511488481.005 · Cited by 36
Self-citationHow to compare performances of firms operating in different sectors?
Bititci, U., Fırat, S. Ü. O., & Garengo, P. (2012) · Production Planning & Control · doi:10.1080/09537287.2011.643829 · Cited by 36
“2000 , Kaplan and Norton 2001 , Anderson and McAdam 2004 ).”
BackgroundManagerial choices in orchestrating dialogic performance management
Rajala, T., & Laihonen, H. (2018) · Baltic Journal of Management · doi:10.1108/bjm-12-2017-0416 · Cited by 35
Gomes, L. A. D. V., Facin, A. L. F., & Hourneaux, F. (2019) · Creativity and Innovation Management · doi:10.1111/caim.12348 · Cited by 35
Valmorbida, S. M. I., Ensslin, S. R., & Ensslin, L. (2018) · Contabilidade, Gestão e Governança/UNB Contábil · doi:10.21714/1984-3925_2018v21n3a3 · Cited by 35
“…a Contabilidade se encarregou de avaliar o desempenho com base em aspectos financeiros das organizações, tais como receitas, custos, rentabilidade e retorno sobre investimento (BITITCI et al., 2012; BROADBENT; LAUGHLIN, 2009; NEELY, 2005; BOURNE et al. 2000; GHALAYINI; NOBLE, 1996).”
BackgroundInfluentialThe path toward successful safety performance measurement
Jääskeläinen, A., Tappura, S., & Pirhonen, J. (2022) · Journal of Safety Research · doi:10.1016/j.jsr.2022.08.014 · Cited by 35
Alternative arguments and directions for studying performance measurement
Elg, M., & Kollberg, B. (2009) · Total Quality Management & Business Excellence · doi:10.1080/14783360902781899 · Cited by 35
“In an intervention study of success and failure of performance measurement systems in 10 British manufacturing organisations, Bourne et al. (2002) developed their findings further.”
BackgroundMethodInfluentialPerformance measurement system in the situation of simultaneous vertical and horizontal integration
Pellinen, J., Teittinen, H., & Järvenpää, M. (2016) · International Journal of Operations & Production Management · doi:10.1108/ijopm-12-2014-0611 · Cited by 37
Relevance Assumed: A Case Study of Balanced Scorecard Development Using System Dynamics
Akkermans, H. A., & van Oorschot, K. E. (2017) · Palgrave Macmillan UK eBooks · doi:10.1057/978-1-349-95257-1_4 · Cited by 35
Continuous improvement of performance measurement by TQM adopters
Kumar, U., Kumar, V., de Grosbois, D., & Choisne, F. (2009) · Total Quality Management & Business Excellence · doi:10.1080/14783360902924242 · Cited by 35
“They have been extensively criticised for their short-term orientation and lack of flexibility (Bourne et al., 2000; Ghalayini & Noble, 1996; Hayes & Garvin, 1982; Jonsson & Lesshammar, 1999; Motwani, 2001; van Schalkwyk, 1998); lack of strategic focus (Skinner, 1974); not covering performances…”
BackgroundInfluentialKasie, F. M. (2013) · Global Journal of Researches in Engineering · Cited by 34
A case study extension methodology for performance measurement diagnosis in nonprofit organizations
Cestari, J. M. A. P., de Lima, E. P., Deschamps, F., Aken, E. M. V., Treinta, F. T., & Moura, L. F. (2018) · International Journal of Production Economics · doi:10.1016/j.ijpe.2018.06.018 · Cited by 34
Accountability mechanisms in international climate change financing
Basak, R., & van der Werf, E. (2019) · International Environmental Agreements Politics Law and Economics · doi:10.1007/s10784-019-09437-8 · Cited by 34
Dynamic framework of performance assessment for startups
Antunes, L. G. R., Vasconcelos, F. F., de Oliveira, C. M., & Corrêa, H. L. (2021) · International Journal of Productivity and Performance Management · doi:10.1108/ijppm-07-2020-0382 · Cited by 34
Lalić, D. Ć., Delić, M., Lаlić, B., Gračanin, D., & Lolić, T. (2021) · Advances in Production Engineering & Management · doi:10.14743/apem2021.1.387 · Cited by 34
Micheli, P. G., & Muctor, G. (2021) · International Journal of Operations & Production Management · doi:10.1108/ijopm-05-2021-0317 · Cited by 34
McAdam, R., Hazlett, S., & Anderson‐Gillespie, K. (2008) · International Journal of Operations & Production Management · doi:10.1108/01443570810919350 · Cited by 34
The role of exogenous factors in the strategic performance of construction companies
Işık, Z., Arditi, D., Dilmen, I., & Birgönül, M. T. (2010) · Engineering Construction & Architectural Management · doi:10.1108/09699981011024650 · Cited by 34
Predicting performance – a dynamic capability view
Hasegan, M. F., Nudurupati, S., & Childe, S. J. (2018) · International Journal of Operations & Production Management · doi:10.1108/ijopm-10-2016-0601 · Cited by 34
Evaluating community facilities in local government: Managing for service enablement
Brackertz, N., & Kenley, R. (2002) · Journal of Facilities Management · doi:10.1108/14725960310807971 · Cited by 34
“Performance measures also have the ability to influence behaviour and decision making, thereby making them a key factor in the implementations of strategy and business plans, by promoting consistency of behaviour and decision making.(8) It is because of their ability to influence behaviour and monitor processes and ou…”
BackgroundBarth, K. B., & Formoso, C. T. (2020) · Frontiers of Engineering Management · doi:10.1007/s42524-020-0108-2 · Cited by 33
Fuzzy Cognitive Maps in Banking Business Process Performance Measurement
Xirogiannis, G., Glykas, M., & Staikouras, C. (2010) · Studies in fuzziness and soft computing · doi:10.1007/978-3-642-03220-2_7 · Cited by 33
“[ 4 ], [23], [22]) to provide holistic strategic performance evaluation and management.”
BackgroundA model for customer‐focused objective‐based performance evaluation of logistics service providers
Chen, C. (2008) · Asia Pacific Journal of Marketing and Logistics · doi:10.1108/13555850810890075 · Cited by 33
“Such performance measurement facilitates identification of potentially successful management strategies and directs management attention to the appropriate revision of companygoals and re-engineering of business processes (Bourne et al., 2000).”
BackgroundOtheitis, N., & Kunc, M. H. (2015) · Management Decision · doi:10.1108/md-02-2014-0108 · Cited by 33
Six Sigma implementation, organisational change and the impact on performance measurement systems
Rajamanoharan, I. D., & Collier, P. (2006) · International Journal of Six Sigma and Competitive Advantage · doi:10.1504/ijssca.2006.009369 · Cited by 34
Singh, A., Narain, R., & Yadav, R. C. (2006) · International Journal of Services and Operations Management · doi:10.1504/ijsom.2006.010250 · Cited by 33
“attention, revising organisations goals and reengineering business process (Bourne et al., 2000; Kuwaiti and Kay, 2000; van Hoek, 1998).”
BackgroundAn empirical study of the uptake of performance measurement by Internet retailers
Gunawan, G., Ellis‐Chadwick, F., & King, M. R. N. (2008) · Internet Research · doi:10.1108/10662240810897781 · Cited by 33
“Performance measurement in Internet retailing Performance measurement plays a critical role in understanding how a business is operating; it helps to identify where improvements might be made and ultimately informs the strategic planning process (Bititci et al., 2002; Bourne et al., 2000; Kaplan and Norton, 1996).”
BackgroundHourneaux, F. (2010) · Digital Library of Theses and Dissertations (Universidade de São Paulo) · doi:10.11606/t.12.2010.tde-28072010-151731 · Cited by 33
Financial Performance Measures of Small Medium Enterprises in the 21st Century
Matsoso, M. L., & Benedict, O. H. (2016) · Journal of Economics · doi:10.1080/09765239.2016.11907829 · Cited by 32
“However, barriers to implementation were also reported (Bourne et al. 2000: 759).”
BackgroundErgonomics indicators: A proposal for sustainable process performance measurement in ergonomics
Sarbat, I., & Taşan, S. Ö. (2021) · Ergonomics · doi:10.1080/00140139.2021.1953614 · Cited by 32
An exploratory study of strategic performance measurement systems
Bento, A. M., & White, L. F. (2010) · Advances in management accounting · doi:10.1108/s1474-7871(2010)0000018004 · Cited by 32
Ukko, J., & Saunila, M. (2019) · Journal of Purchasing and Supply Management · doi:10.1016/j.pursup.2019.02.001 · Cited by 32
Performance measurement and management of third party logistics : an organizational theory approach
Yuen, S. M. (2006) · HKBU Institutional Repository (Hong Kong Baptist University) · Cited by 32
Anderson, K., & McAdam, R. (2005) · International Journal of Quality & Reliability Management · doi:10.1108/02656710510591200 · Cited by 32
“, 1995); “Leading indicators” (Cumby and Conrod, 2001; Kaplan and Norton, 2001); “Proactive-leading indicators, Preventive/subjective” (Manoochehri, 1999) “Future looking performance measures” (Bourne et al., 2000) “Lead or expost indicators” (Nixon, 1998); “Performance drivers” (Olve et al.”
BackgroundKnowledge as a critical success factor in the Finnish social and health-care reform
Ikonen, A.-K. (2019) · Knowledge Management Research & Practice · doi:10.1080/14778238.2019.1621223 · Cited by 31
Khafri, A. Z., Aboumasoudi, A. S., & Khademolqorani, S. (2023) · Complexity · doi:10.1155/2023/4820636 · Cited by 31
Système de gestion de la performance : les conditions du succès
Botton, C., Jobin, M., & Nagati, H. (2012) · Gestion 2000 · doi:10.3917/g2000.292.0037 · Cited by 31
Practical Application of SWOT Analysis in the Management of a Construction Project
Milosevic, I. N. (2010) · Leadership and Management in Engineering · doi:10.1061/(asce)lm.1943-5630.0000041 · Cited by 31
“Tedarik Zincirleri İçin Performans Ölçüm Sistemlerinin Tasarımı”
Yüksel, H. (2004) · Yönetim ve Ekonomi Dergisi · Cited by 31
Barbosa, A. S. (2010) · Digital Library of Theses and Dissertations (Universidade de São Paulo) · doi:10.11606/t.18.2010.tde-05082010-145722 · Cited by 31
Performance measurement and management in a collaborative network
Pekkola, S. (2013) · Doria (University of Helsinki) · Cited by 32
Performance measurement and management in a VUCA world
Bourne, M. (2021) · International Journal of Production Research · doi:10.1080/00207543.2021.2004042 · Cited by 31
Self-citationDesigning Performance Measurement Systems Using Business Models
Montemari, M., Chiucchi, M. S., & Nielsen, C. (2017) · Journal of Business Models · doi:10.5278/ojs.jbm.v7i5.1905 · Cited by 30
Mapping the Impacts of Industry 4.0 on Performance Measurement Systems
Lopes, M. A., & Martins, R. A. (2021) · IEEE Latin America Transactions · doi:10.1109/tla.2021.9475625 · Cited by 30
Development of a leagile transformation methodology for product development
Lemieux, A.-A., Lamouri, S., Pellerin, R., & Tamayo, S. (2015) · Business Process Management Journal · doi:10.1108/bpmj-02-2014-0009 · Cited by 30
Methods for identifying and measuring the performance impacts of work environment changes
Palvalin, M., & Vuolle, M. (2016) · Journal of Corporate Real Estate · doi:10.1108/jcre-11-2015-0035 · Cited by 30
Prayudi, M. A., Nurkholis, N., Saraswati, E., & Rusydi, M. K. (2024) · Australasian Accounting Business and Finance Journal · doi:10.14453/aabfj.v18i1.04 · Cited by 30
Wang, Y., Ahmed, P. K., & Farquhar, S. S. (2007) · The Journal of Entrepreneurship · doi:10.1177/097135570701600203 · Cited by 30
“Traditionally, performance assessment follows the financial approach (Bourne et al., 2000).”
BackgroundAvaliação de desempenho e eficiência em organizações de saúde: um estudo em hospitais filantrópicos
da Cunha, J. A. C. (2011) · Digital Library of Theses and Dissertations (Universidade de São Paulo) · doi:10.11606/t.12.2011.tde-01092011-190122 · Cited by 32
A soft knowledge modeling approach for geographically dispersed financial organizations
Glykas, M., & Xirogiannis, G. (2004) · Soft Computing · doi:10.1007/s00500-004-0401-8 · Cited by 30
“FCMs may serve as a back end to performance scorecards [4, 21, 22] to provide holistic strategic performance evaluation and management.”
BackgroundPlace-Specific Corona Dashboards for Health Policy: Design and Application of a ‘Dutchboard’
Nijkamp, P. J., & Kourtit, K. (2022) · Sustainability · doi:10.3390/su14020836 · Cited by 29
Ambiguity in performance management systems of complex multi-stakeholder organisations
Ojiako, U., Bititci, U., Marshall, A. J., Chipulu, M., Manville, G., Muthalagu, S. J., & Farrington, T. (2022) · Production Planning & Control · doi:10.1080/09537287.2021.2014590 · Cited by 29
“The literature on PMS implementation largely suggests the need for the PMS to be successfully deployed across a wide range of different organisational levels (Bourne et al. 2000, 2002; Bourne 2005; Bititci, Cavalieri, and Cieminski 2005; Bracci, Maran, and Inglis 2017).”
InfluentialBassani, C., Lazzarotti, V., Manzini, R., Pellegrini, L., & Santomauro, S. (2010) · European Journal of Innovation Management · doi:10.1108/14601061011086302 · Cited by 29
Understanding performance measurement dynamism: a case study
Korhonen, T., Laine, T., & Suomala, P. (2012) · Journal of Management & Governance · doi:10.1007/s10997-012-9217-6 · Cited by 29
“The use of measures should also question the strategy and provide a critique of the strategic assumptions being made (Bourne et al. 2000, p. 768; Wisner and Fawcett 1991, p. 9).”
InfluentialPerformance Management for Syrian Construction Projects
Maya, R. A. (2016) · International Journal of Construction Engineering and Management · Cited by 29
Khan, M. W. J., Khalique, M., & Nor, R. M. (2014) · Market Forces · Cited by 29
Prerequisites for performance measurement supporting purchaser-supplier collaboration
Jääskeläinen, A., & Thitz, O. (2018) · Benchmarking An International Journal · doi:10.1108/bij-08-2016-0121 · Cited by 29
System dynamics applications in performance measurement research
Oladimeji, O., Keathley-Herring, H., & Cross, J. (2020) · International Journal of Productivity and Performance Management · doi:10.1108/ijppm-12-2018-0453 · Cited by 29
The mediating role of fairness on the effectiveness of strategic performance measurement systems
Baird, K. M., Su, S. X., & Nuhu, N. A. (2021) · Personnel Review · doi:10.1108/pr-07-2020-0573 · Cited by 29
Sellitto, M. A., & Walter, C. (2006) · Production · doi:10.1590/s0103-65132006000100004 · Cited by 29
Diseño de sistemas de medición de desempeño de proveedores: experiencias de un caso de estudio
Fernandez, N. S., Scavarda, L. F., Leiras, A., & Hamacher, S. (2011) · Production · doi:10.1590/s0103-65132011005000043 · Cited by 28
“…resultados del sistema de medición con la estrategia organizacional, donde, a través de continuas revisiones del sistema se mejore la calidad de decisiones tomadas a partir de las mediciones de desempeño obtenidas (BITITCI; TURNER; BEGEMANN, 2000; BOURNE et al., 2000; HUDSON; SMART; BOURNE, 2000).”
BackgroundInfluentialde Araújo, S. S., Matos, L. D. S., & Ensslin, S. R. (2020) · Revista Gestão & Conexões · doi:10.13071/regec.2317-5087.2020.9.1.27486.99-127 · Cited by 28
Ketonen‐Oksi, S. (2020) · IEEE Transactions on Engineering Management · doi:10.1109/tem.2020.3038283 · Cited by 28
“Regardless of the various strategic performance measurement models that have been created throughout the last 30 years, both for the purposes of policy making [94] and for organizational strategic management [95], [96], their effectiveness has remained rather fragmented and ambiguous [97].”
BackgroundGallardo‐Vázquez, D., Hourneaux, F., Gabriel, M. L. D. D. S., & Valdez-Juárez, L. E. (2021) · Sustainability · doi:10.3390/su13020914 · Cited by 28
“Second, we know that company performances are a complex concept [92,93].”
BackgroundFerretti, M., Parmentola, A., Parola, F., & Risitano, M. (2017) · Production Planning & Control · doi:10.1080/09537287.2017.1375146 · Cited by 28
“Bourne et al. (2000) describe the importance of digital technologies, in order to implement each measure of the strategic monitoring system: (1) Data creation: the policies, procedures and systems required to create the data needed.”
BackgroundSener, A., Barut, M., Dağ, A., & Yildirim, M. B. (2019) · Annals of Operations Research · doi:10.1007/s10479-019-03504-8 · Cited by 28
“While qualitative measures are considered important, Chen and Paulraj (2004), Kaplan and Norton (1997), Bourne et al. (2000), and Vickery et al. (2003) suggest focusing on quantitative measures, such as financial measures, serving shareholders’ interests, productivity, and capacity improvement.”
BackgroundLääts, K., Haldma, T., & Möller, K. (2011) · Baltic Journal of Management · doi:10.1108/17465261111167993 · Cited by 29
Measuring environmental performance in hospitals: a framework and process
Blass, A. P., da Costa, S. E. G., de Lima, E. P., & Borges, L. A. (2016) · Measuring Business Excellence · doi:10.1108/mbe-03-2015-0011 · Cited by 28
DEVELOPMENT OF PERFORMANCE EVALUATION THEME: A SYSTEMATIC ANALYSIS OF THE LITERATURE
Matos, L. D. S., Valmorbida, S. M. I., Martins, V. A., & Ensslin, S. R. (2019) · Contextus - Revista Contemporânea de Economia e Gestão · doi:10.19094/contextus.v17i2.40146 · Cited by 27
Ensslin, S. R., Rodrigues, K. T., Yoshiura, L. J. M., da Silva, J. C., & Longaray, A. A. (2022) · Sustainability · doi:10.3390/su141711005 · Cited by 27
Metadata
- Authors
- Bourne, M., Mills, J., Wilcox, M., Neely, A., & Platts, K.
- Affiliations
- University of Cambridge (GB)
- Northumbria University (GB)
- Cranfield University (GB)
- Venue
- International Journal of Operations & Production Management
- Publisher
- Emerald
- Published
- 2000-07-01
- Volume
- 20
- Issue
- 7
- Pages
- 754-771
- ISSN
- 0144-3577 (ISSN-L)
- OpenAlex
- W1991697830
- Cited by
- 1,143
- References
- 36
- Citations by year
- 2026: 18 · 2025: 20 · 2024: 14 · 2023: 35 · 2022: 39 · 2021: 69 · 2020: 59 · 2019: 57 · 2018: 68 · 2017: 52 · 2016: 72 · 2015: 69 · 2014: 66 · 2013: 72 · 2012: 75
- FWCI
- 23.48
- Type
- journal article
- Language
- en
- Open access
- closed
- Licence
- www.emerald.com/insight/site-policies (tdm)
- Locations
- International Journal of Operations & Production Management (publishedVersion)
- Cambridge University Engineering Department Publications Database (submittedVersion)
- Topics
- Social Sciences › Business, Management and Accounting › Accounting › Accounting and Organizational Management
- Social Sciences › Business, Management and Accounting › Management Information Systems › Quality and Supply Management
- Social Sciences › Business, Management and Accounting › Strategy and Management › Corporate Governance and Management
- Keywords
- performance measurement systems, strategic alignment, strategic management, manufacturing companies, implementation framework
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.