This paper addresses issues met when designing, implementing, using and continuously updating performance measurement systems in manufacturing companies. The paper develops, from theory, a framework for analysing the implementation of a performance measurement system and uses this framework to interpret three longitudinal case studies. The paper concludes that specific processes are required to continuously align the performance measurement system with strategy. When these processes are combined with a well defined model of strategic success, the measurement system can enhance the strategic management process by challenging the assumptions and the strategy itself.
Overview
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
Claims other papers make about this one
Each is checked against this paper’s own text: does it say what the citing paper says it does?
In the citing paper
“Bourne et al., identified from previous literature three main phases of performance measurement system implementation, i.e., design, implementation and use; besides, they underlined also the essential role of updating and reviewing processes of measures and targets.”
From The Evolution of Balanced Scorecard in Healthcare: A Systematic Review of Its Design, Implementation, Use, and Review (2022) · cites this paper as [40]
In the citing paper
“The adoption of a BSC follows four phases [40].”
From The Evolution of Balanced Scorecard in Healthcare: A Systematic Review of Its Design, Implementation, Use, and Review (2022) · cites this paper as [40]
In the citing paper
“in line with [40], the review process includes a set of mechanisms for reviewing targets and standards and processes for a periodical review of the set of measures adopted.”
From The Evolution of Balanced Scorecard in Healthcare: A Systematic Review of Its Design, Implementation, Use, and Review (2022) · cites this paper as [40]
In the citing paper
“As BSC literature outlines, there are four phases in the BSC adoption [40,58]”
From The Evolution of Balanced Scorecard in Healthcare: A Systematic Review of Its Design, Implementation, Use, and Review (2022) · cites this paper as [40]
In the citing paper
“By adopting the review’s framework (Figure 2), BSC adoption phases [40], i.e., design, implementation, use and review are strictly related.”
From The Evolution of Balanced Scorecard in Healthcare: A Systematic Review of Its Design, Implementation, Use, and Review (2022) · cites this paper as [40]
Citations
Cites
(1984) · Cited by 81,983
The balanced scorecard : measures that drive performance
Caplan, R. S. (1992) · Harvard business review · Cited by 12,085
The balanced scorecard: Translating strategy into action
(1997) · Long Range Planning · doi:10.1016/s0024-6301(97)80925-9 · Cited by 8,192
(1992) · PubMed · Cited by 7,979
Leading change: why transformation efforts fail
Kotter, J. P. (2009) · IEEE Engineering Management Review · doi:10.1109/emr.2009.5235501 · Cited by 3,566
Relevance Lost: The Rise and Fall of Management Accounting
Johnson, T. H., & Kaplan, R. S. (1987) · Medical Entomology and Zoology · Cited by 3,177
Putting the Balanced Scorecard to Work
Kaplan, R. S., & Norton, D. P. (1998) · The Economic Impact of Knowledge · doi:10.1016/b978-0-7506-7009-8.50023-9 · Cited by 2,180
The performance measurement revolution: why now and what next?
Neely, A. (1999) · International Journal of Operations & Production Management · doi:10.1108/01443579910247437 · Cited by 1,154 · cited 2×
“Academic interest is manifest through the considerable number of papers on the topic ( Neely, 1999 ).”
BackgroundSelf-citationPerformance measurement in service businesses
Brignall, T. J., Fitzgerald, L., Johnston, R., & Silvestro, R. (1991) · University of Warwick · doi:10.82444/warw.33720976 · Cited by 777
(2020) · Management Accounting · doi:10.24053/9783739880280-167 · Cited by 706
Research works printed but not linked: 15
- Banks, R.L. and Wheelwright, S.C. (1979), “Operations versus strategy – trading tomorrow for today”, Harvard Business Review, May/June, pp. 112‐20.
- Deming, W.E. (1986), Out of Crisis, Massachusetts Institute of Technology, Centre for Advanced Engineering Study, Cambridge, MA.
- Eccles, R.G. and Pyburn, P.J. (1992), “Creating a comprehensive system to measure performance”, Management Accounting (US), October, pp. 41‐4.
- Fry, T.D. and Cox, J.F. (1989), “Manufacturing performance; local versus global measures”, Production and Inventory Management Journal, 2nd Quarter, pp. 52‐6.
- Goold, M. (1991), “Strategic control in the decentralised firm”, Sloan Management Review, Vol. 32 No. 2, pp. 69‐81.
- Grady, M.W. (1991), “Performance measurement: implementing strategy”, Management Accounting, June, pp. 49‐53.
- Hayes, R.H. and Abernathy, W.J. (1980), “Managing our way to economic decline”, Harvard Business Review, Vol. 62, pp. 95‐101.
- Lingle, J.H. and Schiemann, W.A. (1996), “From balanced scorecard to strategy gauge: is measurement worth it?”, Management Review, March , pp. 56‐62.
- McMann, P. and Nanni, A.J. (1994), “Is your company really measuring performance”, Management Accounting (US), November, pp. 55‐8.
- Marris, P. (1974), “The management of change”, in Loss and Change, Routledge, London, pp. 147‐59.
- Maskell, B. (1989), “Performance measurement for world class manufacturing”, Management Accounting, May, pp. 32‐3, June, pp. 32‐3, July/August, pp. 48 and 50, September, pp. 64‐6.
- Schein, E.H. (1969), Process Consultation, Addison‐Wesley, Reading, MA.
- Sink, P.E. (1986), “Performance and productivity measurement: the art of developing creative score boards”, Industrial Engineer, January, pp. 86‐90.
- Skinner, W. (1974), “The decline, fall and renewal of manufacturing”, Industrial Engineering, October, pp. 32‐8.
- Wisner and Fawcett (1991), “Link firm strategy to operating decisions through performance measurement”, Production and Inventory Management Journal, Third Quarter, pp. 5‐11.
Cited by
Items 101–200 of 1,000
Performance measures and quality tools in Portuguese small and medium enterprises: survey results
Sousa, S., Aspinwall, E. M., Sampaio, P. A. D. C. A., & Rodrigues, A. G. (2005) · Total Quality Management & Business Excellence · doi:10.1080/14783360500054434 · Cited by 135
“(2000) proposed a framework divided into three phases: the design, the implementation, and the use of performance measures, and Bititci et al.”
MethodAccounting for Managers: Interpreting Accounting Information for Decision-Making
Collier, P. M. (2003) · Thammasat University Digital Collections · Cited by 138
Development of a performance measurement framework for SMEs
Sousa, S., & Aspinwall, E. M. (2010) · Total Quality Management & Business Excellence · doi:10.1080/14783363.2010.481510 · Cited by 133
“Other benefits are found in Ahmed (2002), Basu (2001), Bititci, Suwignjo and Carrie (2001), Bourne et al. (2000), Frigo (2002), Ghalayini et al. (1997), Hudson et al. (2001a), McAdam and Bailie (2002), Neely (2002), Niven (2002), Rouse and Putterill (2003).”
BackgroundForslund, H., & Jönsson, P. (2009) · International Journal of Operations & Production Management · doi:10.1108/01443570910925370 · Cited by 130
“This supports the results of Brewer and Speh (2001), Bourne et al. (2000), Lohman et al. (2004), Hervani et al. (2005) and Forslund and Jonsson (2007a).”
BackgroundResultInfluentialFuzzy cognitive strategic maps in business process performance measurement
Glykas, M. (2012) · Expert Systems with Applications · doi:10.1016/j.eswa.2012.01.078 · Cited by 129
Blomquist, T., Farashah, A. D., & Thomas, J. L. (2016) · International Journal of Project Management · doi:10.1016/j.ijproman.2016.07.010 · Cited by 129
Lalić, D. Ć., Lаlić, B., Gračanin, D., Palčić, I., & Zivlak, N. (2018) · IEEE International Symposium on Innovation and Entrepreneurship (TEMS-ISIE) · doi:10.1109/tems-isie.2018.8478461 · Cited by 127
“TPM approach, which exclusively pursue the success criteria of costs, time, quality and meeting technical requirements, have become considered ineffective [20], [21].”
BackgroundFuzzy Cognitive Maps in Business Analysis and Performance-Driven Change
Xirogiannis, G., & Glykas, M. (2004) · IEEE Transactions on Engineering Management · doi:10.1109/tem.2004.830861 · Cited by 130
“FCMs may serve as a back end to performance scorecards ([4], [23], [24]) to provide holistic strategic performance evaluation and management.”
BackgroundChiesa, V., & Frattini, F. (2007) · R and D Management · doi:10.1111/j.1467-9310.2007.00476.x · Cited by 126
Collaborative performance measurement in supply chain
Papakiriakopoulos, D., & Pramatari, K. C. (2010) · Industrial Management & Data Systems · doi:10.1108/02635571011087400 · Cited by 125
“However, resistance to measurement efforts (Bourne et al., 2000) and top management commitment (Neely et al.”
BackgroundInfluentialDoes the balance scorecard work: an empirical investigation
Neely, A. D. (2008) · CERES (Cranfield University) · Cited by 124
Self-citationPešalj, B., Pavlov, A., & Micheli, P. G. (2018) · International Journal of Operations & Production Management · doi:10.1108/ijopm-09-2016-0565 · Cited by 128
“This research also speaks to the body of work that considers the design, implementation and use of performance measurement systems (Bourne et al., 2000; Kaplan and Norton, 2008; Ferreira and Otley, 2009; Melnyk et al., 2014).”
BackgroundResearching performance measurement systems: An information systems perspective
Marchand, M., & Raymond, L. (2008) · International Journal of Operations & Production Management · doi:10.1108/01443570810881802 · Cited by 122
An empirical study of employee loyalty, service quality, cost reduction and company performance
Tomic, I., Tešić, Z., Kuzmanović, B., & Tomić, M. (2018) · Economic Research-Ekonomska Istraživanja · doi:10.1080/1331677x.2018.1456346 · Cited by 123
Is performance measurement suitable for an extended enterprise?
Lehtinen, J., & Ahola, T. (2010) · International Journal of Operations & Production Management · doi:10.1108/01443571011018707 · Cited by 121
Executing strategy through comprehensive performance measurement systems
Micheli, P. G., & Mura, M. (2017) · International Journal of Operations & Production Management · doi:10.1108/ijopm-08-2015-0472 · Cited by 120
van Capelleveen, G., Vegter, D., Olthaar, M., & van Hillegersberg, J. (2023) · Resources, Conservation & Recycling Advances · doi:10.1016/j.rcradv.2023.200131 · Cited by 117
Performance measurement to drive improvements in healthcare practice
Elg, M., Broryd, K. P., & Kollberg, B. (2013) · International Journal of Operations & Production Management · doi:10.1108/ijopm-07-2010-0208 · Cited by 117
“To do this, a regular meeting is required, attended by the directors and managers who have responsibility for the performance being measured” (Bourne et al., 2000, p. 761).”
BackgroundUpdating corporate sustainability performance measurement systems
Searcy, C. (2011) · Measuring Business Excellence · doi:10.1108/13683041111131619 · Cited by 117
The role of existing measures in developing and implementing performance measurement systems
Wouters, M. J. F., & Sportel, M. (2005) · International Journal of Operations & Production Management · doi:10.1108/01443570510626899 · Cited by 114
“One of the major challenges that has been discussed, is defining a consistent set of measures that are clearly linked to the operational strategy of the organization (Kaplan and Norton, 1992, 1993, 1996, 2000; Nanni et al., 1992; Neely et al., 1995; Bourne et al., 2000).”
BackgroundManaging the tension between performance measurement and strategy: coping strategies
Johnston, R. B., & Pongatichat, P. (2008) · International Journal of Operations & Production Management · doi:10.1108/01443570810903104 · Cited by 113
“The need to continually adapt appears to be an important factor in the success of performance management systems (Bourne et al. 2000, Kennerley and Neely 2003).”
BackgroundInfluentialSupply Chain Performance Measurement Approaches: Review and Classification
Agami, N., Saleh, M. M., & Rasmy, M. (2012) · Journal of Organizational Management Studies · doi:10.5171/2012.872753 · Cited by 113
“…Gunasekaran et al., 2004; Parker, 2000; Lapide, 2000; Chan and Qi, 2003; Chan, 2003; Simchi-Levi et al., 2002; Basu, 2001; Beamon and Ware, 1998; Bourne et al., 2000; Bourne et al., 2002; Dasgupta , 2003; De Toni and Tonchia, 2001; Gunasekara et al., 2005; Gunasekaran, and Kobu, 2007; Harrison…”
Azevedo, S. G., Carvalho, H., & Machado, V. A. C. (2013) · Baltic Journal of Management · doi:10.1108/17465261311310027 · Cited by 113
Implementing performance measurement systems: Indonesian local government under pressure
Akbar, R., Pilcher, R., & Perrin, B. (2015) · Qualitative Research in Accounting & Management · doi:10.1108/qram-03-2013-0013 · Cited by 111
Implementing industry 4.0 real-time performance management systems: the case of Schneider Electric
Robert, M., Giuliani, P., & Gurǎu, C. (2020) · Production Planning & Control · doi:10.1080/09537287.2020.1810761 · Cited by 113
Implementing a new performance management system within a project‐based organization: A case study
Cheng, M., Dainty, A., & Moore, D. (2006) · International Journal of Productivity and Performance Management · doi:10.1108/17410400710717082 · Cited by 118
“However, performance management presents severe challenges in terms of practical implementation ( Bourne et al. , 2000”
BackgroundForward performance measurement and management integrated frameworks
Taticchi, P., & Balachandran, K. R. (2008) · International Journal of Accounting and Information Management · doi:10.1108/18347640810913807 · Cited by 111
“The authors argue that the design of a PMS is a cognitive exercise, and focusing on the importance of business dynamics they present four additional processes to update the PM system over time (Bourne et al., 2000).”
BackgroundCollaborative knowledge sharing in Composite New Product Development: An aerospace study
McAdam, R., O’Hare, T., & Moffett, S. (2007) · Technovation · doi:10.1016/j.technovation.2007.07.003 · Cited by 111
Evaluating Organizational Performance of Public Hospitals using the McKinsey 7-S Framework
Chmielewska, M., Stokwiszewski, J., Markowska, J., & Hermanowski, T. (2022) · BMC Health Services Research · doi:10.1186/s12913-021-07402-3 · Cited by 116
“Since the 1980s, performance indicators, mostly financial ones, have been increasingly monitored in profitoriented sectors of the economy [15], while in public services, including the healthcare sector, non-financial measures have been brought to the fore [16].”
BackgroundDefining and measuring alignment in performance management
Hanson, J. D., Melnyk, S. A., & Calantone, R. J. (2011) · International Journal of Operations & Production Management · doi:10.1108/01443571111172444 · Cited by 110
Why some performance measurement initiatives fail: lessons from the change management literature
Bourne, M., Neely, A. D., Mills, J., & Platts, K. (2003) · International Journal of Business Performance Management · doi:10.1504/ijbpm.2003.003250 · Cited by 108
Self-citationChoong, K. K. (2014) · International Journal of Productivity and Performance Management · doi:10.1108/ijppm-01-2013-0015 · Cited by 109
Nudurupati, S., Arshad, T., & Turner, T. J. (2007) · Computers in Industry · doi:10.1016/j.compind.2007.05.005 · Cited by 105
Choong, K. K. (2013) · International Journal of Production Research · doi:10.1080/00207543.2013.866285 · Cited by 109
“…methods of measurement and performance measurement were proposed and introduced into the workplace (see Johnson 1981; Johnson and Kaplan 1987; Maskell 1991; Kaplan and Norton 1992; Kaplan and Norton 1996; Ghalayini, Noble, and Crowe 1997; Bourne et al. 2000, 2003; Tangen 2002, 2004; White 2008).”
BackgroundMethodResultInfluentialEditorial: Towards a Theoretical Foundation for Performance Measurement and Management
Bititci, U., Bourne, M., Cross, J., Nudurupati, S., & Sang, K. (2018) · International Journal of Management Reviews · doi:10.1111/ijmr.12185 · Cited by 108
Self-citationFinancial performance measurement of supply chains: a review
Galankashi, M. R., & Rafiei, F. M. (2021) · International Journal of Productivity and Performance Management · doi:10.1108/ijppm-11-2019-0533 · Cited by 108
Performance measurement systems: A consensual analysis of their roles
de Lima, E. P., da Costa, S. E. G., Angelis, J., & Munik, J. (2012) · International Journal of Production Economics · doi:10.1016/j.ijpe.2012.05.007 · Cited by 104
Implementation and impact of IT-supported performance measurement systems
Nudurupati, S., & Bititci, U. (2005) · Production Planning & Control · doi:10.1080/09537280512331333057 · Cited by 103
“focused on its implementation and use (Bourne et al. 2000).”
MethodDynamic Strategic Performance Measurement Systems: Balancing Empowerment and Alignment
Kolehmainen, K. (2009) · Long Range Planning · doi:10.1016/j.lrp.2009.11.001 · Cited by 103
Assessing maturity and effectiveness of enterprise performance measurement systems
Aken, E. M. V., Letens, G., Coleman, G. D., Farris, J. A., & Goubergen, D. V. (2005) · International Journal of Productivity and Performance Management · doi:10.1108/17410400510604557 · Cited by 102
“has emphasized that there is currently a lack of sufficient guidance for practitioners on how to evaluate, manage, and update their measurement system efforts over time, and subsequent authors have also emphasized the need for this ( Bourne et al. , 2000”
BackgroundPractical Framework for Measuring Performance of International Construction Firms
Jin, Z., Deng, F., Li, H., & Skitmore, M. (2013) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000718 · Cited by 101
Avaliação de desempenho organizacional: um estudo aplicado em hospitais filantrópicos
da Cunha, J. A. C., & Corrêa, H. L. (2013) · Revista de Administração de Empresas · doi:10.1590/s0034-75902013000500006 · Cited by 99
How to measure the “value” in value chains
Barber, E. (2008) · International Journal of Physical Distribution & Logistics Management · doi:10.1108/09600030810925971 · Cited by 99
“The new frameworks were more “balanced” and fairly successfully, through a series of adaptations, have generally answered well the question of “what types of metrics should be used” ( Bourne et al. , 2000”
BackgroundPerformance management in supply chains: logistics service providers' perspective
Forslund, H. (2012) · International Journal of Physical Distribution & Logistics Management · doi:10.1108/09600031211225972 · Cited by 98
“Various limitations or obstacles with information technology, such as the fact that ERP systems do not support supply chain integration well enough, are found by Bourne et al. (2000), Brewer and Speh (2001) and Mortensen and Lemoine (2008).”
BackgroundResultInfluentialGutierrez, D. M., Scavarda, L. F., Fiorencio, L., & Martins, R. A. (2014) · International Journal of Production Economics · doi:10.1016/j.ijpe.2014.08.012 · Cited by 98
“Bourne et al. (2000) suggested a three-stage procedural model for the PMS life cycle development: design, implementation and use/review.”
BackgroundMethodInfluentialThe effectiveness of strategic performance measurement systems
Baird, K. M. (2017) · International Journal of Productivity and Performance Management · doi:10.1108/ijppm-06-2014-0086 · Cited by 96
Rola rachunkowości zarządczej we wspomaganiu zarządzania dokonaniami przedsiębiorstwa
Nita, B. (2009) · Cited by 95
A framework to review Performance Prism
Najmi, M., Etebari, M., & Emami, S. (2012) · International Journal of Operations & Production Management · doi:10.1108/01443571211274486 · Cited by 96
Measuring environmental performance in hospitals: A practical approach
Blass, A. P., da Costa, S. E. G., de Lima, E. P., & Borges, L. A. (2016) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2016.07.213 · Cited by 95
Grando, A., & Belvedere, V. (2005) · International Journal of Production Economics · doi:10.1016/j.ijpe.2005.01.007 · Cited by 95
“The main debates still open on this topic are split in several streams of interest (Bourne et al., 2000); among these, the paper addresses explicitly the two mentioned below: C 87 89 91 93 UN the individual measures that can be employed to quantify manufacturing performances; according to most authors, such performanc…”
BackgroundPerformance measurement of research and development activities
Chiesa, V., Frattini, F., Lazzarotti, V., & Manzini, R. (2009) · European Journal of Innovation Management · doi:10.1108/14601060910928166 · Cited by 91
“This explains the vast bulk of literature inquiring into the design and implementation of Performance Measurement Systems (PMSs) and the extensive acceptance of these managerial instruments among practitioners (e.g. Eccles and Pyburn, 1992; Gregory, 1993; Neely et al., 1995, 1996; Bititci et al., 1997; Bourne et al.,…”
BackgroundPerformance measurement and management research in the hospitality and tourism industry
Altin, M., Köseoğlu, M. A., Yu, X., & Riasi, A. (2018) · International Journal of Contemporary Hospitality Management · doi:10.1108/ijchm-05-2017-0251 · Cited by 92
Understanding the relationship between PMS and MIS in SMEs: An organizational life cycle perspective
Garengo, P., Nudurupati, S., & Bititci, U. (2007) · Computers in Industry · doi:10.1016/j.compind.2007.05.006 · Cited by 90
Ravelomanantsoa, M. S., Ducq, Y., & Vallespir, B. (2018) · International Journal of Production Research · doi:10.1080/00207543.2018.1506178 · Cited by 88
Costa, D. B. (2003) · Americanae (AECID Library) · Cited by 87
Comprehensive performance measurement systems design and organizational effectiveness
Lucianetti, L., Battista, V., & Koufteros, X. (2019) · International Journal of Operations & Production Management · doi:10.1108/ijopm-07-2017-0412 · Cited by 34
Pohl, M., & Foerstl, K. D. (2011) · Journal of Purchasing and Supply Management · doi:10.1016/j.pursup.2011.04.001 · Cited by 86
“This notion is based on the fact that performance measurement systems assess the implementation of strategy and the success of strategy, which in this case requires the selection of suitable purchasing practices (Bourne et al., 2000).”
BackgroundInfluentialMeasuring the productivity impacts of new ways of working
Laihonen, H., Jääskeläinen, A., Lönnqvist, A., & Ruostela, J. (2012) · Journal of Facilities Management · doi:10.1108/14725961211218749 · Cited by 87
Praxis of Performance Measurement in Public-Private Partnerships: Moving beyond the Iron Triangle
Liu, J., Love, P. E. D., Smith, J., Matthews, J., & Sing, C.-P. (2016) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000433 · Cited by 86
“and Bourne et al. (2000) maintain that understanding the existing PM and interpreting what key objectives and measures should be”
Backgroundda Luz, S. O. D. C., Sellitto, M. A., & Gomes, L. P. (2006) · Gestão & Produção · doi:10.1590/s0104-530x2006000300016 · Cited by 85
“Para Bourne et al. (2000), a medição de desempenho tem duas funções: medir o sucesso de uma estratégia e verificar a validade dos pressupostos assumidos ao formulá-la.”
BackgroundΣιγάλα, Μ., & Chalkiti, K. (2007) · International Journal of Productivity and Performance Management · doi:10.1108/17410400710757141 · Cited by 87
“Such a department will also be responsible for the continuous update and improvement of the KM performance management system, as the robustness of performance management systems should be periodically checked and monitored according to internal and external firm developments (Bourne et al., 2000).”
BackgroundUnveiling strategy in SMEs through balanced scorecard implementation: A circular methodology
Garengo, P., & Biazzo, S. (2012) · Total Quality Management & Business Excellence · doi:10.1080/14783363.2011.637800 · Cited by 85
Adair, C. E., Simpson, E., Casebeer, A. L., Birdsell, J. M., Hayden, A., & Lewis, S. J. (2006) · Healthcare policy · doi:10.12927/hcpol.2006.18338 · Cited by 84
“However, the PM process is typically described as having approximately four stages (Nadzam and Nelson 1997; Nutley and Smith 1998; Bourne et al. 2000; Ibrahim 2001; Smith and Goddard 2002), although many authors caution that the process is more dynamic and less linear than a simple set of stages…”
BackgroundSchmidberger, S., Bals, L., Hartmann, E., & Jahns, C. (2008) · International Journal of Production Economics · doi:10.1016/j.ijpe.2008.10.006 · Cited by 83
“Bourne et al. (2000) suggest, in accordance to Schein (1969), the involvement of a process consultant, who acts as a coordinator of this process.”
BackgroundResultIntelligent modeling of e-business maturity
Xirogiannis, G., & Glykas, M. (2006) · Expert Systems with Applications · doi:10.1016/j.eswa.2006.01.042 · Cited by 83
Fuzzy performance measurement of a supply chain in manufacturing companies
El-Baz, M. A. (2010) · Expert Systems with Applications · doi:10.1016/j.eswa.2010.11.067 · Cited by 83
“The development of a PMS may conceptually be separated into phases of design, implementation and use (Bourne et al., 2000).”
Exploring strategy‐misaligned performance measurement
Pongatichat, P., & Johnston, R. B. (2008) · International Journal of Productivity and Performance Management · doi:10.1108/17410400810857220 · Cited by 82
“), whether driven by changes in the external environment or internal changes in senior personnel or profit requirements for example, performance measures need to be reviewed and if necessary changed, to ensure alignment with strategy ( Bourne et al. , 2000”
BackgroundAnjomshoae, A., Banomyong, R., Mohammed, F., & Kunz, N. (2022) · International Journal of Disaster Risk Reduction · doi:10.1016/j.ijdrr.2022.102852 · Cited by 81
Beer, H. A., Micheli, P. G., & Besharov, M. H.-P. (2021) · Academy of Management Journal · doi:10.5465/amj.2019.0916 · Cited by 80
Strecker, S. E., Frank, U., Heise, D., & Kattenstroth, H. (2011) · Information Systems and e-Business Management · doi:10.1007/s10257-011-0172-6 · Cited by 83
A Review of Literature on Performance Measurement of Supply Chain Network
Ramaa, A., Rangaswamy, T. M., & Subramanya, K. (2009) · International Conference on Emerging Trends in Engineering and Technology (ICETET) · doi:10.1109/icetet.2009.18 · Cited by 80
Research opportunities in strategic management field: a performance measurement approach
Lacerda, R. T. D. O., Ensslin, L., & Ensslin, S. R. (2014) · International Journal of Business Performance Management · doi:10.1504/ijbpm.2014.060165 · Cited by 83
Dyadic integration of the performance management process: A delivery service case study
Forslund, H., & Jönsson, P. (2007) · International Journal of Physical Distribution & Logistics Management · doi:10.1108/09600030710776473 · Cited by 78
“This supports the findings of Bourne et al. (2000), Lohman et al. (2004) and Busi and Bitici (2006) who identified computer system issues as causes for lack of PM integration.”
BackgroundResultHumanitarian supply chains and performance measurement schemes in practice
Santarelli, G., Abidi, H., Klumpp, M., & Regattieri, A. (2015) · International Journal of Productivity and Performance Management · doi:10.1108/ijppm-11-2013-0185 · Cited by 78
Deng, F., & Smyth, H. (2013) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000738 · Cited by 79
Performance measurement: learning from the past and projecting the future
Bourne, M. (2008) · Measuring Business Excellence · doi:10.1108/13683040810919971 · Cited by 78
“The processes required for reviewing targets, measures, groups of measures and strategy have been specified (Bourne et al., 2000), and the capabilities needed identified (Kennerley and Neely, 2002), but more collaborative research is needed into understanding how organisations maintain their fit…”
BackgroundMethodSelf-citationHald, K. S., & Mouritsen, J. (2018) · International Journal of Production Economics · doi:10.1016/j.ijpe.2018.09.021 · Cited by 80
Intelligent impact assessment of HRM to the shareholder value
Xirogiannis, G., Chytas, P., Glykas, M., & Valiris, G. (2007) · Expert Systems with Applications · doi:10.1016/j.eswa.2007.08.103 · Cited by 77
The Assessment of Internal Indicators on The Balanced Scorecard Measures of Sustainability
Gazi, F., Atan, T., & Kılıç, M. (2022) · Sustainability · doi:10.3390/su14148595 · Cited by 77
The impact of performance management on customers' expected logistics performance
Forslund, H. (2007) · International Journal of Operations & Production Management · doi:10.1108/01443570710763822 · Cited by 77
“Implementing a performance measurement system was discussed by Bourne et al. (2000)”
MethodSanyal, M. K., & Biswas, S. (2014) · Procedia Economics and Finance · doi:10.1016/s2212-5671(14)00187-7 · Cited by 76
Performance measurement of reverse logistics enterprise: a comprehensive and integrated approach
Shaik, M. N., & Abdul‐Kader, W. (2012) · Measuring Business Excellence · doi:10.1108/13683041211230294 · Cited by 76
“The proposed framework considers the multiple characteristics of non-financial/financial and internal/external measures (Bourne et al., 2000) with an emphasis on the integration of the drivers and the results that determine performance.”
BackgroundMethodIntangible resources in performance measurement systems of the hotel industry
Zigan, K., & Zeglat, D. (2010) · Facilities · doi:10.1108/02632771011083667 · Cited by 76
“Such balanced PMS is thought to gain a comprehensive and multi-dimensional view of the company’s performance (Ghalayini and Noble, 1996; Mills et al., 2000).”
BackgroundLiu, J., Love, P. E. D., Smith, J., Irani, Z., Hajli, N., & Sing, M. C. P. (2017) · Production Planning & Control · doi:10.1080/09537287.2017.1382740 · Cited by 78
Traditional or contemporary? The prevalence of performance measurement system types
Burgess, T. F., Ong, T. S., & Shaw, N. E. (2007) · International Journal of Productivity and Performance Management · doi:10.1108/17410400710823633 · Cited by 75
The use of digital analytics for measuring and optimizing digital marketing performance
Mero, J. (2016) · Jyväskylä University Digital Archive (University of Jyväskylä) · Cited by 75
Evaluation and revision of performance measurement systems
Tangen, S. (2004) · KTH Publication Database DiVA (KTH Royal Institute of Technology) · Cited by 75
The effect of performance management on the organizational results of a bank
de Waal, A. A., & Coevert, V. (2007) · International Journal of Productivity and Performance Management · doi:10.1108/17410400710757114 · Cited by 74
“There is however little knowledge about the actual mechanisms which cause the positive effects of performance management (Bourne et al., 2000; Bourne et al., 2005).”
BackgroundUsing performance measures conceptually in innovation control
Janssen, S., Möller, K., & Schläfke, M. (2011) · Journal of Management Control · doi:10.1007/s00187-011-0130-y · Cited by 74
“Therefore, the complete set of performance measures should be reviewed and revised periodically (Bourne et al. 2000).”
BackgroundInfluentialPerformance measurement in humanitarian supply chains
van der Laan, E. A., Brito, M. D., & Vergunst, D. A. (2009) · International Journal of Risk Assessment and Management · doi:10.1504/ijram.2009.026388 · Cited by 73
The role of causal maps in intellectual capital measurement and management
Montemari, M., & Nielsen, C. (2013) · Journal of Intellectual Capital · doi:10.1108/jic-01-2013-0008 · Cited by 72
“Their design process can be sorted into identifying the key objectives to be measured and creating the indicators (Bourne et al., 2000).”
BackgroundPerformance measurement in a quality management system
Rezaei, A., Çelik, T., & Baalousha, Y. (2011) · Scientia Iranica · doi:10.1016/j.scient.2011.05.021 · Cited by 76
“and the Skandia navigator have recently been used [13,45–57].”
MethodPerformance measurement in SMEs: literature review and results from a German case study
Brem, A., Kreusel, N., & Neusser, C. R. (2008) · International Journal of Globalisation and Small Business · doi:10.1504/ijgsb.2008.018102 · Cited by 72
“Using a practical example, the following article tries to answer what fundamental factors influence the implementation process of SMEs and whether these prerequisites are adequately appreciated by the postulated process from Bourne (2000). As successful implementation is particularly important for SMEs, the characteri…”
BackgroundMethodInfluentialBusiness intelligence for performance measurement: A case based analysis
Vallurupalli, V., & Bose, I. (2018) · Decision Support Systems · doi:10.1016/j.dss.2018.05.002 · Cited by 74
Are PMS meeting the measurement needs of BPM? A literature review
Choong, K. K. (2013) · Business Process Management Journal · doi:10.1108/14637151311319941 · Cited by 71
The practice of the Balanced Scorecard in health care services
Kollberg, B., & Elg, M. (2011) · International Journal of Productivity and Performance Management · doi:10.1108/17410401111140374 · Cited by 70
“During the last decade there have been a growing number of publications on the implementation of performance measurement systems ( Bourne et al. , 2000”
BackgroundSmart manufacturing: a framework for managing performance
Parhi, S., Joshi, K., & Akarte, M. (2020) · International Journal of Computer Integrated Manufacturing · doi:10.1080/0951192x.2020.1858506 · Cited by 71
“One of the primary functions of the performance measures is reinforcing strategy formulation and its assessment (Schmitz and Platts 2004; Bourne et al. 2000).”
BackgroundTaxonomizing performance measurement systems’ failures
Camp, J. V., & Braet, J. (2016) · International Journal of Productivity and Performance Management · doi:10.1108/ijppm-03-2015-0054 · Cited by 70
“(Baglieri et al., 2001; Bititci et al., 2001; Bourne et al., 2000; Cedergren et al., 2010; Garengo et al., 2005; Geisler, 2000; Geisler, 2002; Griffin and Page, 1996; Holloway, 2001; Kerssens-van Drongelen et al., 2000; Lazzarotti et al., 2011; Nudurupati et al., 2011; OECD, 2005; Roth and Senge,…”
Influentialvan Helden, J., & Reichard, C. (2016) · Emerald Group Publishing Limited eBooks · doi:10.1108/s1479-351220160000031010 · Cited by 71
Developing a balanced scorecard with System Dynamics
Akkermans, H. A., & Oorschot, V. K. K. (2002) · TU/e Research Portal · Cited by 71
Metadata
- Authors
- Bourne, M., Mills, J., Wilcox, M., Neely, A., & Platts, K.
- Affiliations
- University of Cambridge (GB)
- Northumbria University (GB)
- Cranfield University (GB)
- Venue
- International Journal of Operations & Production Management
- Publisher
- Emerald
- Published
- 2000-07-01
- Volume
- 20
- Issue
- 7
- Pages
- 754-771
- ISSN
- 0144-3577 (ISSN-L)
- OpenAlex
- W1991697830
- Cited by
- 1,143
- References
- 36
- Citations by year
- 2026: 18 · 2025: 20 · 2024: 14 · 2023: 35 · 2022: 39 · 2021: 69 · 2020: 59 · 2019: 57 · 2018: 68 · 2017: 52 · 2016: 72 · 2015: 69 · 2014: 66 · 2013: 72 · 2012: 75
- FWCI
- 23.48
- Type
- journal article
- Language
- en
- Open access
- closed
- Licence
- www.emerald.com/insight/site-policies (tdm)
- Locations
- International Journal of Operations & Production Management (publishedVersion)
- Cambridge University Engineering Department Publications Database (submittedVersion)
- Topics
- Social Sciences › Business, Management and Accounting › Accounting › Accounting and Organizational Management
- Social Sciences › Business, Management and Accounting › Management Information Systems › Quality and Supply Management
- Social Sciences › Business, Management and Accounting › Strategy and Management › Corporate Governance and Management
- Keywords
- performance measurement systems, strategic alignment, strategic management, manufacturing companies, implementation framework
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.