A Systematic Review of Digital Technology Adoption in Off-Site Construction: Current Status and Future Direction towards Industry 4.0
Open accessThe DOI matches its Crossref record; 78 of the 78 references it cites were found in a registry or an index.
Abstract
Off-site construction (OSC) is known as an efficient construction method that could save time and cost, reduce waste of resources, and improve the overall productivity of projects. Coupled with digital technologies associated with the Industry 4.0 concept, OSC can offer a higher rate of productivity and safety. While there is a rich literature focusing on both OSC and Industry 4.0, the implementation of associated digital technologies in the OSC context has not been fully evaluated. This paper intends to evaluate the current literature of digital technology applications in OSC. Scientometric analyses and a systematic review were carried out evaluating fifteen typical digital technologies adopted by OSC projects, including building information modelling (BIM), radio frequency identification devices (RFID), global positioning systems (GPS), the Internet of Things (IoT), geographic information systems (GIS), sensors, augmented reality (AR), virtual reality (VR), photogrammetry, laser scanning, artificial intelligence (AI), 3D printing, robotics, big data, and blockchain. This review formulates a clear picture of the current practice of these digital technologies and summarizes the main area of application and limitations of each technology when utilized in OSC. The review also points out their potential and how they can be better adopted to improve OSC practice in the future.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Industry 4.0 and the current status as well as future prospects on logistics
Hofmann, E., & Rüsch, M. (2017) · Computers in Industry · doi:10.1016/j.compind.2017.04.002 · Cited by 1,841
Kabirifar, K., Mojtahedi, M., Wang, C., & Tam, V. W. Y. (2020) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2020.121265 · Cited by 695
Self-citationFerdous, W., Bai, Y., Ngo, T. D., Manalo, A., & Mendis, P. (2019) · Engineering Structures · doi:10.1016/j.engstruct.2019.01.061 · Cited by 681
Li, J., Greenwood, D., & Kassem, M. (2019) · Automation in Construction · doi:10.1016/j.autcon.2019.02.005 · Cited by 665
Life cycle performance of modular buildings: A critical review
Kamali, M., & Hewage, K. (2016) · Renewable and Sustainable Energy Reviews · doi:10.1016/j.rser.2016.05.031 · Cited by 642
Darko, A., Chan, A. P. C., Adabre, M. A., Edwards, D. J., Hosseini, M. R., & Ameyaw, E. E. (2020) · Automation in Construction · doi:10.1016/j.autcon.2020.103081 · Cited by 603
Jia, M., Komeily, A., Wang, Y., & Srinivasan, R. S. (2019) · Automation in Construction · doi:10.1016/j.autcon.2019.01.023 · Cited by 597
Critical review of the research on the management of prefabricated construction
Li, C. Z., Shen, Q., & Xue, X. (2014) · Habitat International · doi:10.1016/j.habitatint.2014.04.001 · Cited by 565
Barriers to promoting prefabricated construction in China: A cost–benefit analysis
Hong, J., Shen, G. Q., Li, Z., Zhang, B., & Zhang, W. (2018) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2017.10.171 · Cited by 503
Wang, Z., Wang, T., Hu, H., Gong, J., Ren, X., & Xiao, Q. (2020) · Automation in Construction · doi:10.1016/j.autcon.2019.103063 · Cited by 481
Alaloul, W. S., Liew, M. S., Zawawi, N. A. W. A., & Kennedy, I. B. (2020) · Ain Shams Engineering Journal · doi:10.1016/j.asej.2019.08.010 · Cited by 472
Li, C. Z., Xue, F., Li, X., Hong, J., & Shen, G. Q. (2018) · Automation in Construction · doi:10.1016/j.autcon.2018.01.001 · Cited by 420
Building information modelling for off-site construction: Review and future directions
Yin, X., Liu, H., Chen, Y., & Al-Hussein, M. (2019) · Automation in Construction · doi:10.1016/j.autcon.2019.01.010 · Cited by 420
Prefabricated construction enabled by the Internet-of-Things
Zhong, R. Y., Peng, Y., Xue, F., Fang, J., Zou, W., Luo, H., Thomas Ng, S., Lu, W., Shen, G. Q. P., & Huang, G. Q. (2017) · Automation in Construction · doi:10.1016/j.autcon.2017.01.006 · Cited by 395
A holistic review of off-site construction literature published between 2008 and 2018
Jin, R., Gao, S., Cheshmehzangi, A., & Aboagye-Nimo, E. (2018) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2018.08.195 · Cited by 363
Key constraints and mitigation strategies for prefabricated prefinished volumetric construction
Hwang, B.-G., Shan, M., & Looi, K.-Y. (2018) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2018.02.136 · Cited by 318
Digital construction: From point solutions to IoT ecosystem
Woodhead, R., Stephenson, P., & Morrey, D. (2018) · Automation in Construction · doi:10.1016/j.autcon.2018.05.004 · Cited by 310
Life-cycle energy analysis of prefabricated building components: an input–output-based hybrid model
Hong, J., Shen, G. Q., Mao, C., Li, Z., & Li, K. (2016) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2015.10.030 · Cited by 304
Design for Manufacture and Assembly-oriented parametric design of prefabricated buildings
Yuan, Z., Sun, C., & Wang, Y. (2018) · Automation in Construction · doi:10.1016/j.autcon.2017.12.021 · Cited by 293
Building Information Modeling: Technology Foundations and Industry Practice
(2018) · Springer eBooks · doi:10.1007/978-3-319-92862-3 · Cited by 292
Schedule risks in prefabrication housing production in Hong Kong: a social network analysis
Li, C. Z., Hong, J., Xue, F., Shen, G. Q., Xu, X., & Mok, M. K. (2016) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2016.02.123 · Cited by 282
Gan, X., Chang, R., Zuo, J., Wen, T., & Zillante, G. (2018) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2018.06.184 · Cited by 276
Li, C. Z., Zhong, R. Y., Xue, F., Xu, G., Chen, K., Huang, G. G., & Shen, G. Q. (2017) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2017.07.156 · Cited by 272
Strategies for Applying the Circular Economy to Prefabricated Buildings
Minunno, R., O’Grady, T., Morrison, G. M., Gruner, R. L., & Colling, M. (2018) · Buildings · doi:10.3390/buildings8090125 · Cited by 270
Che, E., Jung, J., & Olsen, M. J. (2019) · Sensors · doi:10.3390/s19040810 · Cited by 253
BIM in off-site manufacturing for buildings
Abanda, F. H., Tah, J. H. M., & Cheung, F. K. T. (2017) · Journal of Building Engineering · doi:10.1016/j.jobe.2017.10.002 · Cited by 236
Cost analysis for sustainable off-site construction based on a multiple-case study in China
Mao, C., Xie, F., Hou, L., Wu, P., Wang, J., & Wang, X. (2016) · Habitat International · doi:10.1016/j.habitatint.2016.08.002 · Cited by 226
Industry 4.0 for the Construction Industry—How Ready Is the Industry?
Maskuriy, R., Selamat, A., Ali, K. N., Maresova, P., & Krejcar, O. (2019) · Applied Sciences · doi:10.3390/app9142819 · Cited by 220
Bortolini, R., Formoso, C. T., & Viana, D. D. (2019) · Automation in Construction · doi:10.1016/j.autcon.2018.11.031 · Cited by 211
Industry 4.0 for the Construction Industry: Review of Management Perspective
Maskuriy, R., Selamat, A., Maresova, P., Krejcar, O., & David, O. O. (2019) · Economies · doi:10.3390/economies7030068 · Cited by 202
Perceptions of offsite construction in the United States: An investigation of current practices
Razkenari, M., Fenner, A., Shojaei, A., Hakim, H., & Kibert, C. (2020) · Journal of Building Engineering · doi:10.1016/j.jobe.2019.101138 · Cited by 196
Cloud asset-enabled integrated IoT platform for lean prefabricated construction
Xu, G., Li, M., Chen, C.-H., & Wei, Y. (2018) · Automation in Construction · doi:10.1016/j.autcon.2018.05.012 · Cited by 192
Gan, X., Chang, R., & Wen, T. (2018) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2018.07.299 · Cited by 186
Integration of parametric design into modular coordination: A construction waste reduction workflow
Banihashemi, S., Tabadkani, A., & Hosseini, M. R. (2017) · Automation in Construction · doi:10.1016/j.autcon.2017.12.026 · Cited by 183
BIM-Based End-of-Lifecycle Decision Making and Digital Deconstruction: Literature Review
Akbarieh, A., Jayasinghe, L. B., Waldmann, D., & Teferle, F. N. (2020) · Sustainability · doi:10.3390/su12072670 · Cited by 183
Offsite construction: Developing a BIM-Based optimizer for assembly
Gbadamosi, A.-Q., Mahamadu, A., Oyedele, L. O., Akinadé, O. O., Manu, P., Mahdjoubi, L., & Aigbavboa, C. O. (2019) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2019.01.113 · Cited by 181
Li, C. Z., Hong, J., Xue, F., Shen, Q., Xu, X., & Luo, L. (2016) · Habitat International · doi:10.1016/j.habitatint.2016.07.002 · Cited by 177
Zhou, Y., Luo, H., & Yang, Y. (2017) · Automation in Construction · doi:10.1016/j.autcon.2017.02.007 · Cited by 171
BIM compatibility and its differentiation with interoperability challenges as an innovation factor
Shirowzhan, S., Sepasgozar, S. M. E., Edwards, D. J., Li, H., & Wang, C. (2020) · Automation in Construction · doi:10.1016/j.autcon.2020.103086 · Cited by 164
Self-citationAltaf, M. S., Bouferguene, A., Liu, H., Al-Hussein, M., & Yu, H. (2018) · Automation in Construction · doi:10.1016/j.autcon.2017.09.009 · Cited by 159
Automated progress control using laser scanning technology
Zhang, C., & Arditi, D. (2013) · Automation in Construction · doi:10.1016/j.autcon.2013.08.012 · Cited by 154
Keeping up with the pace of digitization: The case of the Australian construction industry
Leviäkangas, P., Paik, S. M., & Moon, S. (2017) · Technology in Society · doi:10.1016/j.techsoc.2017.04.003 · Cited by 139
Li, X., Shen, Q., Wu, P., Fan, H., Wu, H., & Teng, Y. (2017) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000577 · Cited by 138
Arashpour, M., Kamat, V. R., Bai, Y., Wakefield, R. R., & Abbasi, B. (2018) · Automation in Construction · doi:10.1016/j.autcon.2018.07.027 · Cited by 132
Scientometric analysis of BIM-based research in construction engineering and management
Jin, R., Zou, Y., Gidado, K., Ashton, P., & Painting, N. (2019) · Engineering Construction & Architectural Management · doi:10.1108/ecam-08-2018-0350 · Cited by 131
Vilutienė, T., Kalibatienė, D., Hosseini, M. R., Pellicer, E., & Zavadskas, E. K. (2019) · Advances in Civil Engineering · doi:10.1155/2019/5290690 · Cited by 121
Liu, H., Sydora, C., Altaf, M. S., Han, S., & Al‐Hussein, M. (2019) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2019.07.055 · Cited by 120
Determinants of Adoption of Robotics in Precast Concrete Production for Buildings
Pan, M., & Pan, W. (2019) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000706 · Cited by 118
Liu, G., Yang, H. M., Fu, Y., Mao, C., Xu, P., Hong, J., & Li, R. (2019) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2019.119059 · Cited by 116
Building Information Modeling: Technology Foundations and Industry Practice
Borrmann, A., König, M., Beetz, J., & Koch, C. (2018) · Cited by 115
Worker 4.0: The Future of Sensored Construction Sites
Calvetti, D., Mêda, P., Gonçalves, M. C., & Sousa, H. J. C. D. (2020) · Buildings · doi:10.3390/buildings10100169 · Cited by 115
A vision-based system for pre-inspection of steel frame manufacturing
Martínez, P., Ahmad, R., & Al‐Hussein, M. (2018) · Automation in Construction · doi:10.1016/j.autcon.2018.10.021 · Cited by 114
Valinejadshoubi, M., Bagchi, A., & Moselhi, O. (2019) · Journal of Computing in Civil Engineering · doi:10.1061/(asce)cp.1943-5487.0000826 · Cited by 102
BIM-based automated design and planning for boarding of light-frame residential buildings
Liu, H., Singh, G., Lu, M., Bouferguène, A., & Al‐Hussein, M. (2018) · Automation in Construction · doi:10.1016/j.autcon.2018.02.001 · Cited by 101
Shirowzhan, S., Sepasgozar, S. M. E., Li, H., Trinder, J. C., & Tang, P. (2019) · Automation in Construction · doi:10.1016/j.autcon.2019.102841 · Cited by 99
Self-citationRFID Enabled Knowledge‐Based Precast Construction Supply Chain
Wang, Z., Hu, H., & Zhou, W. (2017) · Computer-Aided Civil and Infrastructure Engineering · doi:10.1111/mice.12254 · Cited by 90
Alfieri, E., Seghezzi, E., Sauchelli, M., Giuda, G. M. D., & Masera, G. (2020) · Architectural Engineering and Design Management · doi:10.1080/17452007.2020.1726725 · Cited by 69
Relationship between BIM Implementation and Performance of OSM Projects
Tang, X., Chong, H., & Wei, Z. (2019) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000704 · Cited by 67
Product-Oriented Information Delivery Framework for Multistory Modular Building Projects
Ramaji, I. J., Memari, A. M., & Messner, J. (2017) · Journal of Computing in Civil Engineering · doi:10.1061/(asce)cp.1943-5487.0000649 · Cited by 64
A collaborative augmented reality annotation tool for the inspection of prefabricated buildings
García-Pereira, I., Portalés, C., Gimeno, J., & Casas, S. (2019) · Multimedia Tools and Applications · doi:10.1007/s11042-019-08419-x · Cited by 64
Design of prefabricated wall-floor building systems using meta-heuristic optimization algorithms
Baghdadi, A., Heristchian, M., & Kloft, H. (2020) · Automation in Construction · doi:10.1016/j.autcon.2020.103156 · Cited by 62
Sepasgozar, S. M. E. (2020) · Construction Innovation · doi:10.1108/ci-02-2020-0020 · Cited by 59
Self-citationSamarasinghe, T., Gunawardena, T., Mendis, P. A., Sofi, M., & Aye, L. (2019) · Automation in Construction · doi:10.1016/j.autcon.2019.03.021 · Cited by 58
Integrated BIM/Lean Base Production Line Schedule Model for Modular Construction Manufacturing
Moghadam, M., Alwisy, A., & Al‐Hussein, M. (2012) · ASCE Construction Research Congress (CRC) · doi:10.1061/9780784412329.128 · Cited by 54
A Scanner Technology Acceptance Model for Construction Projects
Sepasgozar, S. M. E., Shirowzhan, S., & Wang, C. (2017) · Procedia Engineering · doi:10.1016/j.proeng.2017.04.285 · Cited by 50
Self-citationA BIM‐Based Study on the Comprehensive Benefit Analysis for Prefabricated Building Projects in China
Ji, Y., Chang, S., Qi, Y., Li, Y., Li, H., & Qi, K. (2019) · Advances in Civil Engineering · doi:10.1155/2019/3720191 · Cited by 49
Evaluation of Terrestrial and Mobile Scanner Technologies for Part-Built Information Modeling
Sepasgozar, S. M. E., Forsythe, P. J., & Shirowzhan, S. (2018) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0001574 · Cited by 42
Self-citationMao, C., Tao, X., Yang, H. M., Chen, R., & Liu, G. (2018) · International Conference on Construction and Real Estate Management (ICCREM) · doi:10.1061/9780784481738.015 · Cited by 36
Building information modelling and its effect on off-site construction in UK civil engineering
Vernikos, V. K., Goodier, C. I., Broyd, T. W., Robery, P. C., & Gibb, A. (2014) · Proceedings of the Institution of Civil Engineers - Management Procurement and Law · doi:10.1680/mpal.13.00031 · Cited by 35
The cost calculation method of construction 3D printing aligned with internet of things
Yang, H., Chung, J. K. H., Chen, Y., & Li, Y. (2018) · EURASIP Journal on Wireless Communications and Networking · doi:10.1186/s13638-018-1163-9 · Cited by 35
Han, D., Yin, H., Qu, M., Zhu, J., & Wickes, A. (2020) · Journal of Architectural Engineering · doi:10.1061/(asce)ae.1943-5568.0000397 · Cited by 35
Virtual Prototyping for Robotic Fabrication of Rebar Cages in Manufactured Concrete Construction
Garg, A., & Kamat, V. R. (2013) · Journal of Architectural Engineering · doi:10.1061/(asce)ae.1943-5568.0000134 · Cited by 27
Decision-making model for the evaluation of industrialized housing systems in Ethiopia
Daget, Y. T., & Zhang, H. (2019) · Engineering Construction & Architectural Management · doi:10.1108/ecam-05-2018-0212 · Cited by 26
Implementation of As-Built Information Modelling UsingMobile and Terrestrial Lidar Systems
Sepasgozar, S. M. E., Lim, S., Shirowzhan, S., & Kim, Y. M. (2014) · International Symposium on Automation and Robotics in Construction (ISARC) · doi:10.22260/isarc2014/0118 · Cited by 23
Self-citationKrieg, O. D., & Lang, O. (2019) · International Symposium on Automation and Robotics in Construction (ISARC) · doi:10.22260/isarc2019/0070 · Cited by 23
The Use of BIM in Project Planning and Scheduling in the Australian Construction Industry
Wang, C., & Chien, O. (2014) · International Conference on Construction and Real Estate Management (ICCREM) · doi:10.1061/9780784413777.015 · Cited by 21
Self-citationTechnological Mediation in Construction: Postphenomenological Inquiry into Digital Technologies
Voordijk, H. (2019) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0001719 · Cited by 20
Energy optimization in modular buildings made from 3d printing
Sepasgozar, S. M. E., Huang, T., Wang, C., & Tahmasebinia, F. (2017) · Modular and Offsite Construction (MOC) Summit Proceedings · doi:10.29173/mocs68 · Cited by 2
Self-citation
Cited by
Adel, A. (2022) · Journal of Cloud Computing · doi:10.1186/s13677-022-00314-5 · Cited by 864
Xia, H., Liu, Z., Efremochkina, M., Liu, X., & Lin, C. (2022) · Sustainable Cities and Society · doi:10.1016/j.scs.2022.104009 · Cited by 341
BIM and Digital Twin for Developing Convergence Technologies as Future of Digital Construction
Sepasgozar, S., Khan, A., Smith, K., Romero, J., Shen, X., Shirowzhan, S., Li, H., & Tahmasebinia, F. (2023) · Buildings · doi:10.3390/buildings13020441 · Cited by 162
“The standardization of VR and AR practices will be developed, establishing metrics to assess their effectiveness and manage their implementation in the project life cycle [25,62].”
BackgroundMethodInfluentialSelf-citationExploratory literature review of blockchain in the construction industry
Scott, D. J., Broyd, T., & Ma, L. (2021) · Automation in Construction · doi:10.1016/j.autcon.2021.103914 · Cited by 159
Kayembe, M. T., & Obadire, A. M. (2025) · Modern Supply Chain Research and Applications · doi:10.1108/mscra-07-2024-0027 · Cited by 2
Metadata
- Authors
- Wang, M., Wang, C. C., Sepasgozar, S., & Zlatanova, S.
- Venue
- Buildings
- Publisher
- MDPI AG
- Published
- 2020-11-13
- Volume
- 10
- Issue
- 11
- Pages
- 204
- ISSN
- 2075-5309 (ISSN-L)
- OpenAlex
- W3101958851
- Cited by
- 357
- References
- 78
- FWCI
- 5.69
- Type
- journal article
- Language
- en
- Open access
- gold
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.