Leveraging the industry 4.0 technologies for improving agility of project procurement management processes
The DOI matches its Crossref record; 129 of the 130 references it cites were found in a registry or an index.
Overview
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
Claims other papers make about this one
Each is checked against this paper’s own text: does it say what the citing paper says it does?
In the citing paper
“To address this, the authors propose strategies for implementing I4.0 tools and leveraging selective critical success factors to enhance the agility of executive PPM processes.”
From Transformative Procurement Trends: Integrating Industry 4.0 Technologies for Enhanced Procurement Processes (2023) · cites this paper as [41]
Citations
Cites
A Guide to the project management body of knowledge
(1996) · Choice Reviews Online · doi:10.5860/choice.34-1636 · Cited by 4,339
Service-Oriented Architecture: Concepts, Technology, and Design
Erl, T. (2006) · Cited by 2,663
IoT security: Review, blockchain solutions, and open challenges
Khan, M. A., & Salah, K. (2018) · Future Generation Computer Systems · doi:10.1016/j.future.2017.11.022 · Cited by 2,488
(2017) · Cited by 1,724
Enterprise resource planning: Implementation procedures and critical success factors
Umble, E. J., Haft, R. R., & Umble, M. M. (2003) · European Journal of Operational Research · doi:10.1016/s0377-2217(02)00547-7 · Cited by 1,607 · cited 2×
“For improving agility of PPM process there has to be exhaustive training plans and then empowering the employees based on their skillset (Mandal and Gunase-karan 2002; Umble et al. 2003; Woo 2007; Garg 2010).”
BackgroundMethodUser Involvement and MIS Success: A Review of Research
Ives, B., & Olson, M. H. (1984) · Management Science · doi:10.1287/mnsc.30.5.586 · Cited by 1,318 · cited 1×
“(Ives and Olson 1984; Herzig and Jimmieson 2006; Davenport and Stoddard 1994; Almaraz 1994).”
BackgroundBlockchain Meets IoT: An Architecture for Scalable Access Management in IoT
Novo, O. (2018) · IEEE Internet of Things Journal · doi:10.1109/jiot.2018.2812239 · Cited by 1,318
The organizational antecedents of a firm’s supply chain agility for risk mitigation and response
Braunscheidel, M. J., & Suresh, N. C. (2009) · Journal of Operations Management · doi:10.1016/j.jom.2008.09.006 · Cited by 1,184 · cited 1×
“In order to become agile, the project procurement management in an organization will have to align its capabilities (People, Process, and Technology) with its needs and priorities (Braunscheidel and Suresh 2009; Mike et al. 2012).”
BackgroundThe critical success factors of business process management
Trkman, P. (2010) · International Journal of Information Management · doi:10.1016/j.ijinfomgt.2009.07.003 · Cited by 1,016 · cited 1×
“With automation performance of business activities improves and enables enterprise-wide monitoring and coordination (Trkman 2010; Harmon 2003; Shi et al. 2008; Nikolaidou et al. 2001; Erl 2005; Reijers and Mansar 2005; Shi et al. 2008; Mentzas et al. 2001).”
BackgroundVendor Selection Using Interpretive Structural Modelling (ISM)
Mandal, A., & Deshmukh, S. G. (1994) · International Journal of Operations & Production Management · doi:10.1108/01443579410062086 · Cited by 974 · cited 1×
“MICMAC analysis is to sort the variables according to their driving power and dependence (Mandal and Deshmukh 1994; Wakchaure and Jha 2011).”
MethodEnterprise resource planning: A taxonomy of critical factors
Al-Mashari, M., Al-Mudimigh, A., & Zairi, M. (2003) · European Journal of Operational Research · doi:10.1016/s0377-2217(02)00554-4 · Cited by 967 · cited 1×
“The success of implementing agility in PPM primarily depends on getting leadership buy-in and leadership needs to be committed with a clear vision and strategy to support the initiative (Kabra, 2017; Byrd 1992; Tyran and George 1993; Ang et al. 2002; Al-Mashari et al. 2003; Sangar and Iahad 2013).”
BackgroundInterpreting the Interpretive Structural Model
Sushil (2012) · Global Journal of Flexible Systems Management · doi:10.1007/s40171-012-0008-3 · Cited by 889 · cited 1×
“TISM which is an extension of ISM which interprets both nodes and links in the digraph (Sushil 2012).”
BackgroundAchieving supply chain agility through IT integration and flexibility
Swafford, P. M., Ghosh, S., & Murthy, N. (2008) · International Journal of Production Economics · doi:10.1016/j.ijpe.2008.09.002 · Cited by 817 · cited 1×
“Adapting and reacting to unexpected changes within and between organizations quickly is referred to as agility (Aziz and Zailani 2011; Sherehiy et al. 2007; Swafford et al. 2008).”
BackgroundCase handling: a new paradigm for business process support
van der Aalst, W. M. P., Weske, M., & Grünbauer, D. (2004) · Data & Knowledge Engineering · doi:10.1016/j.datak.2004.07.003 · Cited by 784
A review of enterprise agility: Concepts, frameworks, and attributes
Sherehiy, B., Karwowski, W., & Layer, J. K. (2007) · International Journal of Industrial Ergonomics · doi:10.1016/j.ergon.2007.01.007 · Cited by 775 · cited 1×
“Adapting and reacting to unexpected changes within and between organizations quickly is referred to as agility (Aziz and Zailani 2011; Sherehiy et al. 2007; Swafford et al. 2008).”
BackgroundModeling the metrics of lean, agile and leagile supply chain: An ANP-based approach
Agarwal, A., Shankar, R., & Tiwari, M. K. (2006) · European Journal of Operational Research · doi:10.1016/j.ejor.2004.12.005 · Cited by 750 · cited 2×
“Agile methodology utilizes relevant tools, techniques and work culture that can bring paradigm shift in the existing PPM (Gosling et al. 2010; Van Hoek 2001; Agarwal et al. 2006).”
BackgroundMethodA taxonomy of players and activities across the ERP project life cycle
Somers, T. M., & Nelson, K. G. (2004) · Information & Management · doi:10.1016/s0378-7206(03)00023-5 · Cited by 694 · cited 1×
“The business strategy includes planning of time, resources, cost and business benefits, setting up short and long-term visions, etc. (Kabra, 2017; Hung 2006; Rhee and Mehra 2006; Bandara et al. 2007; Umble et al. 2003; Somers and Nelson 2004).”
BackgroundDeploying Fog Computing in Industrial Internet of Things and Industry 4.0
Aazam, M., Zeadally, S., & Harras, K. A. (2018) · IEEE Transactions on Industrial Informatics · doi:10.1109/tii.2018.2855198 · Cited by 567 · cited 1×
“IIOT that can enable to capture real-time data and requirements (Ahuett-Garza and Kurfess 2018; Lynn et al. 2018; Aazam et al. 2018) enabled via Wireless Sensor Networks (WSNs)-based networking to transfer from traditional industry to digital industry (Alrashidi et al.”
BackgroundREIJERS, H., & LIMANMANSAR, S. (2005) · Omega · doi:10.1016/j.omega.2004.04.012 · Cited by 540
Toward Interpretation of Complex Structural Models
Warfield, J. N. (1974) · IEEE Transactions on Systems, Man, and Cybernetics · doi:10.1109/tsmc.1974.4309336 · Cited by 526
Reengineering: Business Change of Mythic Proportions?
Davenport, T. H., & Stoddard, D. B. (1994) · MIS Quarterly · doi:10.2307/249760 · Cited by 473 · cited 1×
“(Ives and Olson 1984; Herzig and Jimmieson 2006; Davenport and Stoddard 1994; Almaraz 1994).”
BackgroundCritical Success Factors for Business Intelligence Systems
Yeoh, W., & Koronios, A. (2010) · Journal of Computer Information Systems · doi:10.1080/08874417.2010.11645404 · Cited by 436 · cited 3×
“functional area of the company that will adopt the new ways of working smoothly (Loh and Koh 2004; Garg 2010; Yeoh and Koronios 2010).”
BackgroundEnterprise information systems project implementation:
Yusuf, Y., Gunasekaran, A., & Abthorpe, M. S. (2004) · International Journal of Production Economics · doi:10.1016/j.ijpe.2003.10.004 · Cited by 414 · cited 2×
“Vendor plays a key role in pro-curement and hence vendor support has to be leveraged to improve agility of the PPM process (Somers and Nelsons 2001; Motwani et al. 2002; Yusuf et al. 2004).”
BackgroundEnterprise Resource Planning Systems Research: An Annotated Bibliography
Esteves, J., & Pastor, J. (2001) · Communications of the Association for Information Systems · doi:10.17705/1cais.00708 · Cited by 395 · cited 1×
“Interdepartmental cooperation and communication show the teamwork of an organization and can help improve agility of PPM (Somers and Nelson 2001; Esteves and Pastor 2001).”
Hoque, Z. (2004) · International Business Review · doi:10.1016/j.ibusrev.2004.04.003 · Cited by 387 · cited 1×
“CSF 10: Performance measurement Performance measurement is crucial for eliminating lack of new technology competency barrier while implementing agility and achieving sustainable improvement(Trkman and McCor-mack 2010; Lee and Ahn 2008; Leem et al. 2004; Ray et al. 2007; Hoque 2004).”
BackgroundSuccessful implementation of ERP projects: Evidence from two case studies
Motwani, J., Mirchandani, D., Madan, M., & Gunasekaran, A. (2002) · International Journal of Production Economics · doi:10.1016/s0925-5273(01)00183-9 · Cited by 371 · cited 1×
“Vendor plays a key role in pro-curement and hence vendor support has to be leveraged to improve agility of the PPM process (Somers and Nelsons 2001; Motwani et al. 2002; Yusuf et al. 2004).”
BackgroundImpact of 5G Technologies on Industry 4.0
Rao, S. K., & Prasad, R. (2018) · Wireless Personal Communications · doi:10.1007/s11277-018-5615-7 · Cited by 369 · cited 2×
“…of various new-age technologies namely IoT, analytics, Blockchain, robotics, Chatbots, artificial intelligence (AI), augmented reality, mobility, etc (Rao and Prasad 2018; Molano et al. 2018; Fanning 2020 As seen from the literature, Project procurement management is key process for enabling…”
BackgroundDetermining Critical Success Factors of Project Management Practice: A Conceptual Framework
Alias, Z., Zawawi, E. M. A., Yusof, K., & Aris, N. M. (2014) · Procedia - Social and Behavioral Sciences · doi:10.1016/j.sbspro.2014.10.041 · Cited by 337 · cited 2×
“In order to improve agility of PPM process, CSFs needs to be identified that will act as input to project management practice for achieving success (Alias et al. 2014).”
BackgroundExploring barriers in lean implementation
R. Jadhav, J., S. Mantha, S., & B. Rane, S. (2014) · International Journal of Lean Six Sigma · doi:10.1108/ijlss-12-2012-0014 · Cited by 319 · cited 1×
“This research utilizes Total ISM technique to analyze the identified CSFs due to the merits of ISM over other contemporary multi-criteria decision making (MCDM) techniques like Analytical Hierarchy Process (AHP) and Analytical Network Process (ANP) (Thakkar et al. 2008; Jadhav et al. 2014a,b,c).”
MethodSelf-citationDoes IT investment improve bank performance? Evidence from Europe
Beccalli, E. (2007) · Journal of Banking & Finance · doi:10.1016/j.jbankfin.2006.10.022 · Cited by 319 · cited 1×
“(Kabra, 2017; Durkin and Howcroft 2003; Beccalli 2007; Pritchard and Armistead 1999; Ndubisi et al. 2007).”
BackgroundLoh, T. C., & Koh *, S. C. L. (2004) · International Journal of Production Research · doi:10.1080/00207540410001671679 · Cited by 311 · cited 1×
“There has to be strategically developed team composition, which includes the best and the brightest individuals from each functional area of the company that will adopt the new ways of working smoothly (Loh and Koh 2004; Garg 2010; Yeoh and Koronios 2010).”
BackgroundAhuett-Garza, H., & Kurfess, T. (2018) · Manufacturing Letters · doi:10.1016/j.mfglet.2018.02.011 · Cited by 311 · cited 1×
“IIOT that can enable to capture real-time data and requirements (Ahuett-Garza and Kurfess 2018; Lynn et al. 2018; Aazam et al. 2018) enabled via Wireless Sensor Networks (WSNs)-based networking to transfer from traditional industry to digital industry (Alrashidi et al.”
BackgroundIndustry 4.0 framework for management and operations: a review
Saucedo-Martínez, J. A., Pérez-Lara, M., Marmolejo-Saucedo, J. A., Salais-Fierro, T. E., & Vasant, P. (2018) · Journal of Ambient Intelligence and Humanized Computing · doi:10.1007/s12652-017-0533-1 · Cited by 299
Business process management as competitive advantage: a review and empirical study
Hung, R. Y.-Y. (2006) · Total Quality Management & Business Excellence · doi:10.1080/14783360500249836 · Cited by 295 · cited 1×
“The business strategy includes planning of time, resources, cost and business benefits, setting up short and long-term visions, etc. (Kabra, 2017; Hung 2006; Rhee and Mehra 2006; Bandara et al. 2007; Umble et al. 2003; Somers and Nelson 2004).”
BackgroundGetting value from Business Intelligence systems: A review and research agenda
Trieu, V.-H. (2017) · Decision Support Systems · doi:10.1016/j.dss.2016.09.019 · Cited by 291
2009 42nd Hawaii International Conference on System Sciences
(2009) · doi:10.1109/hicss15010.2009 · Cited by 284
Blockchain and the Internet of Things in the Industrial Sector
Miller, D. (2018) · IT Professional · doi:10.1109/mitp.2018.032501742 · Cited by 272
Supply chain flexibility as a determinant of supplier selection
Gosling, J., Purvis, L., & Naim, M. M. (2010) · International Journal of Production Economics · doi:10.1016/j.ijpe.2009.08.029 · Cited by 247 · cited 1×
“Agile methodology utilizes relevant tools, techniques and work culture that can bring paradigm shift in the existing PPM (Gosling et al. 2010; Van Hoek 2001; Agarwal et al. 2006).”
MethodUnderstanding, Implementing and Exploiting Agility and Leanness
Aitken, J., Christopher, M., & Towill, D. (2002) · International Journal of Logistics Research and Applications · doi:10.1080/13675560110084139 · Cited by 240 · cited 2×
“Agile methodology has a specific way of working and is enabled by using the latest tools and techniques (Aitken et al. 2002; Naim and Gosling 2011; Kisperska-Moron and de Haan 2011).”
MethodA Survey of How to Use Blockchain to Secure Internet of Things and the Stalker Attack
Jesus, E. F., Chicarino, V. R. L., de Albuquerque, C. V. N., & Rocha, A. A. D. A. (2018) · Security and Communication Networks · doi:10.1155/2018/9675050 · Cited by 234
Total Interpretive Structural Modeling (TISM): approach and application
Jena, J., Sidharth, S., Thakur, L. S., Pathak, D. K., & Pandey, V. (2017) · Journal of Advances in Management Research · doi:10.1108/jamr-10-2016-0087 · Cited by 230 · cited 1×
“It is basically performed for identifying factors, which drive the whole system (Jena et al. 2017).”
BackgroundThe impact model of business intelligence on decision support and organizational benefits
Rouhani, S., Ashrafi, A., Ravasan, A. Z., & Afshari, S. (2016) · Journal of Enterprise Information Management · doi:10.1108/jeim-12-2014-0126 · Cited by 215 · cited 1×
“Business intelligence is capable of extending right insights to the procurement managers, for taking the right decisions at the right time (Nicoletti 2018; Rouhani et al. 2016; Alon et al. 2016).”
BackgroundBusiness process management – lessons from European business
Pritchard, J., & Armistead, C. (1999) · Business Process Management Journal · doi:10.1108/14637159910249144 · Cited by 213 · cited 1×
“(Kabra, 2017; Durkin and Howcroft 2003; Beccalli 2007; Pritchard and Armistead 1999; Ndubisi et al. 2007).”
BackgroundDubey, R., & Ali, S. S. (2014) · Global Journal of Flexible Systems Management · doi:10.1007/s40171-014-0058-9 · Cited by 198 · cited 16×
“As per the plan, there will be a single initiative head who will receive inputs from the TISM and Fuzzy MICMAC, discuss with panel of experts and create a backlog of activities to be achieved.”
MethodInfluentialGandhi, S., Mangla, S. K., Kumar, P., & Kumar, D. (2015) · International Strategic Management Review · doi:10.1016/j.ism.2015.05.001 · Cited by 198 · cited 1×
“ISM enables establishing of relationships among specific items/elements to define a problem by means of their dependency and driving power (Gandhi et al. 2015).”
BackgroundInterpretive structural modeling (ISM) of IT‐enablers for Indian manufacturing SMEs
Thakkar, J., Kanda, A., & Deshmukh, S. G. (2008) · Information Management & Computer Security · doi:10.1108/09685220810879609 · Cited by 196 · cited 2×
“This research utilizes Total ISM technique to analyze the identified CSFs due to the merits of ISM over other contemporary multi-criteria decision making (MCDM) techniques like Analytical Hierarchy Process (AHP) and Analytical Network Process (ANP) (Thakkar et al. 2008; Jadhav et al. 2014a,b,c).”
BackgroundMethodBusiness Process Change: A Manager's Guide to Improving, Redesigning & Automating Process
Harmon, P. (2002) · Morgan Kaufmann Publishers Inc. eBooks · Cited by 191
On leanness, agility and leagile supply chains
Naim, M. M., & Gosling, J. (2011) · International Journal of Production Economics · doi:10.1016/j.ijpe.2010.04.045 · Cited by 186 · cited 1×
“Agile methodology has a specific way of working and is enabled by using the latest tools and techniques (Aitken et al. 2002; Naim and Gosling 2011; Kisperska-Moron and de Haan 2011).”
MethodBurgess, T. F. (1994) · International Journal of Operations & Production Management · doi:10.1108/01443579410068620 · Cited by 166 · cited 1×
“By definition agility is highly dependent on a wide range of operation management capabilities like available IT infrastructure, adequate knowledge and decision-making capabilities of people, involvement of people and adequate support (Burgess 1994; Vastag et al. 1994).”
BackgroundMiddle managers' uncertainty management during organizational change
Herzig, S. E., & Jimmieson, N. L. (2006) · Leadership & Organization Development Journal · doi:10.1108/01437730610709264 · Cited by 161 · cited 1×
“(Ives and Olson 1984; Herzig and Jimmieson 2006; Davenport and Stoddard 1994; Almaraz 1994).”
BackgroundA secure IoT sensors communication in industry 4.0 using blockchain technology
Rathee, G., Balasaraswathi, M., Chandran, K. P., Gupta, S. D., & Boopathi, C. S. (2020) · Journal of Ambient Intelligence and Humanized Computing · doi:10.1007/s12652-020-02017-8 · Cited by 160 · cited 1×
“CSF 10: Performance measurement Performance measurement is crucial for eliminating lack of new technology competency barrier while implementing agility and achieving sustainable improvement(Trkman and McCor-mack 2010; Lee and Ahn 2008; Leem et al. 2004; Ray et al. 2007; Hoque 2004).”
BackgroundModeling enablers of TQM to improve airline performance
Singh, A. K., & Sushil (2013) · International Journal of Productivity and Performance Management · doi:10.1108/17410401311309177 · Cited by 158
Critical success factors for implementing ERP: the case of a Chinese electronics manufacturer
Seng Woo, H. (2007) · Journal of Manufacturing Technology Management · doi:10.1108/17410380710743798 · Cited by 157
Purchasing consortia as symbiotic relationships: developing the concept of “consortium sourcing”
Eßig, M. (2000) · European Journal of Purchasing & Supply Management · doi:10.1016/s0969-7012(99)00031-3 · Cited by 155
Fuzzy-TISM: A Fuzzy Extension of TISM for Group Decision Making
Khatwani, G., Singh, S. P., Trivedi, A., & Chauhan, A. S. (2014) · Global Journal of Flexible Systems Management · doi:10.1007/s40171-014-0087-4 · Cited by 152
The development of group purchasing: an empirical study in the healthcare sector
Nollet, J., & Beaulieu, M. (2003) · Journal of Purchasing and Supply Management · doi:10.1016/s0969-7012(02)00034-5 · Cited by 146
Kumar, R., Singh, R. K., & Shankar, R. (2015) · IIMB Management Review · doi:10.1016/j.iimb.2015.03.001 · Cited by 141
Relationship marketing in the banking sector: the impact of new technologies
Durkin, M., & Howcroft, B. (2003) · Marketing Intelligence & Planning · doi:10.1108/02634500310458162 · Cited by 139 · cited 1×
“(Kabra, 2017; Durkin and Howcroft 2003; Beccalli 2007; Pritchard and Armistead 1999; Ndubisi et al. 2007).”
BackgroundMajor issues in business process management : an expert perspective
Bandara, W., Indulska, M., Chong, S., & Sadiq, S. W. (2007) · QUT ePrints (Queensland University of Technology) · Cited by 135
Motives behind purchasing consortia
Tella, E., & Virolainen, V.-M. (2004) · International Journal of Production Economics · doi:10.1016/j.ijpe.2004.06.014 · Cited by 131 · cited 1×
“Purchasing in relatively small and intensive groups is becoming increasingly popular in both the private and public sector (Polychronakis and Syntetos 2007; Tella and Virolainen 2005).”
BackgroundThe Pursuit of Global Purchasing Synergy
Faes, W., Matthyssens, P., & Vandenbempt, K. (2000) · Industrial Marketing Management · doi:10.1016/s0019-8501(00)00127-9 · Cited by 126 · cited 2×
“Majority of projects run out of budget or time significantly due to inefficient procurement strategies (Faes et al. 2000).”
BackgroundInterpretive structural modelling of factors for improving competitiveness of SMEs
Singh, R. K., Garg, S. K., & Deshmukh, S. G. (2007) · International Journal of Productivity and Quality Management · doi:10.1504/ijpqm.2007.013336 · Cited by 124
Metamodel for integration of Internet of Things, Social Networks, the Cloud and Industry 4.0
Molano, J. I. R., Lovelle, J. M. C., Montenegro, C. E., Granados, J. J. R., & Crespo, R. G. (2018) · Journal of Ambient Intelligence and Humanized Computing · doi:10.1007/s12652-017-0469-5 · Cited by 117 · cited 1×
“…namely IoT, analytics, Blockchain, robotics, Chatbots, artificial intelligence (AI), augmented reality, mobility, etc (Rao and Prasad 2018; Molano et al. 2018; Fanning 2020 As seen from the literature, Project procurement management is key process for enabling successful outcomes to…”
BackgroundThe effectiveness of workflow management systems: Predictions and lessons learned
Reijers, H. A., & van der Aalst, W. M. P. (2005) · International Journal of Information Management · doi:10.1016/j.ijinfomgt.2005.06.008 · Cited by 116
Jayalakshmi, B., & Pramod, V. R. (2014) · Global Journal of Flexible Systems Management · doi:10.1007/s40171-014-0080-y · Cited by 113
Pasi, B. N., Mahajan, S. K., & Rane, S. B. (2020) · International Journal of Productivity and Performance Management · doi:10.1108/ijppm-04-2020-0196 · Cited by 113
Self-citationModelling business processes with workflow systems: an evaluation of alternative approaches
Mentzas, G. N., Halaris, C., & Kavadias, S. (2001) · International Journal of Information Management · doi:10.1016/s0268-4012(01)00005-6 · Cited by 112 · cited 1×
“With automation performance of business activities improves and enables enterprise-wide monitoring and coordination (Trkman 2010; Harmon 2003; Shi et al. 2008; Nikolaidou et al. 2001; Erl 2005; Reijers and Mansar 2005; Shi et al. 2008; Mentzas et al. 2001).”
BackgroundDevelopment of framework for sustainable Lean implementation: an ISM approach
Jadhav, J. R., Mantha, S. S., & Rane, S. B. (2014) · Journal of Industrial Engineering International · doi:10.1007/s40092-014-0072-8 · Cited by 102 · cited 1×
“This research utilizes Total ISM technique to analyze the identified CSFs due to the merits of ISM over other contemporary multi-criteria decision making (MCDM) techniques like Analytical Hierarchy Process (AHP) and Analytical Network Process (ANP) (Thakkar et al. 2008; Jadhav et al. 2014a,b,c).”
MethodSelf-citationRhee, M., & Mehra, S. (2005) · Omega · doi:10.1016/j.omega.2005.01.017 · Cited by 100 · cited 1×
“The business strategy includes planning of time, resources, cost and business benefits, setting up short and long-term visions, etc. (Kabra, 2017; Hung 2006; Rhee and Mehra 2006; Bandara et al. 2007; Umble et al. 2003; Somers and Nelson 2004).”
BackgroundPrasad, U. C., & Suri, R. (2011) · Global Journal of Flexible Systems Management · doi:10.1007/bf03396605 · Cited by 100
Supplier‐customer relationship management and customer loyalty: The banking industry perspective
Oly Ndubisi, N., Kok Wah, C., & Ndubisi, G. C. (2007) · Journal of Enterprise Information Management · doi:10.1108/17410390710725797 · Cited by 98 · cited 1×
“(Kabra, 2017; Durkin and Howcroft 2003; Beccalli 2007; Pritchard and Armistead 1999; Ndubisi et al. 2007).”
BackgroundRane, S. B., & Narvel, Y. A. M. (2021) · Benchmarking: An International Journal · doi:10.1108/bij-12-2018-0445 · Cited by 95
Self-citationThe development and validation of the Business Cultural Intelligence Quotient
Alon, I., Boulanger, M., Meyers, J., & Taras, V. (2016) · Cross Cultural & Strategic Management · doi:10.1108/ccsm-10-2015-0138 · Cited by 92 · cited 2×
“managers, for taking the right decisions at the right time (Nicoletti 2018; Rouhani et al. 2016; Alon et al. 2016).”
BackgroundCritical success factors for business intelligence in the South African financial services sector
Dawson, L., & Belle, J.-P. V. (2013) · South African journal of information management · doi:10.4102/sajim.v15i1.545 · Cited by 88 · cited 3×
“CSF 17: Infrastructure enablement Infrastructure refers to fundamental facilities, which are needed to achieve agility in PPM (Yeoh and Koronios 2010; van der Aalst et al. 2005; Reijers and van der Aalst 2005; Dawson and Van Belle 2013).”
BackgroundQuality Management and the Process of Change
Almaraz, J. (1994) · Journal of Organizational Change Management · doi:10.1108/09534819410056096 · Cited by 86 · cited 1×
“(Ives and Olson 1984; Herzig and Jimmieson 2006; Davenport and Stoddard 1994; Almaraz 1994).”
BackgroundChidambaranathan, S., Muralidharan, C., & Deshmukh, S. G. (2008) · The International Journal of Advanced Manufacturing Technology · doi:10.1007/s00170-008-1788-7 · Cited by 86
Modeling and analysis of FMS flexibility factors by TISM and fuzzy MICMAC
Jain, V., & Raj, T. (2015) · International Journal of Systems Assurance Engineering and Management · doi:10.1007/s13198-015-0368-0 · Cited by 83 · cited 1×
“However, there are a few limitations of ISM modelling which can be summarized as follows (Jain and Raj 2015):”
BackgroundKisperska-Moroń, D., & de Haan, J. A. C. (2010) · International Journal of Production Economics · doi:10.1016/j.ijpe.2009.12.013 · Cited by 82
Application of SAP R/3 in on-line inventory control
Mandal, P., & Gunasekaran, A. (2002) · International Journal of Production Economics · doi:10.1016/s0925-5273(01)00180-3 · Cited by 81
Epilogue ‐ Moving forward with agility
van Hoek, R. I. (2001) · International Journal of Physical Distribution & Logistics Management · doi:10.1108/09600030110394941 · Cited by 79 · cited 1×
“Agile methodology utilizes relevant tools, techniques and work culture that can bring paradigm shift in the existing PPM (Gosling et al. 2010; Van Hoek 2001; Agarwal et al. 2006).”
MethodSangar, A. B., & A.Iahad, N. B. (2013) · International journal of scientific and technology research · Cited by 78
Development of Project Risk Management framework based on Industry 4.0 technologies
Rane, S. B., Potdar, P. R., & Rane, S. (2021) · Benchmarking: An International Journal · doi:10.1108/bij-03-2019-0123 · Cited by 77 · cited 1×
“In this quickly changing world, companies need to be able to adapt to changes to reduce risk and take advantage of opportunities (Rane et al. 2021; Dandage et al. 2021).”
BackgroundSelf-citationCompeting with IT: the role of shared IT-business understanding
Ray, G., Muhanna, W. A., & Barney, J. B. (2007) · Communications of the ACM · doi:10.1145/1323688.1323700 · Cited by 74 · cited 1×
“CSF 10: Performance measurement Performance measurement is crucial for eliminating lack of new technology competency barrier while implementing agility and achieving sustainable improvement(Trkman and McCor-mack 2010; Lee and Ahn 2008; Leem et al. 2004; Ray et al. 2007; Hoque 2004).”
BackgroundAnalysis of interactions among barriers in project risk management
Dandage, R. V., Mantha, S. S., Rane, S. B., & Bhoola, V. (2018) · Journal of Industrial Engineering International · doi:10.1007/s40092-017-0215-9 · Cited by 74
Self-citationThe implementation of expert systems: a survey of successful implementations
Tyran, C. K., & George, J. F. (1993) · ACM SIGMIS Database the DATABASE for Advances in Information Systems · doi:10.1145/154421.154422 · Cited by 71 · cited 1×
“The success of implementing agility in PPM primarily depends on getting leadership buy-in and leadership needs to be committed with a clear vision and strategy to support the initiative (Kabra, 2017; Byrd 1992; Tyran and George 1993; Ang et al. 2002; Al-Mashari et al. 2003; Sangar and Iahad 2013).”
BackgroundA multiple-case design methodology for studying MRP success and CSFs
Ang, J. S. K., Sum, C., & Yeo, L.-N. (2002) · Information & Management · doi:10.1016/s0378-7206(01)00096-9 · Cited by 70 · cited 1×
“The success of implementing agility in PPM primarily depends on getting leadership buy-in and leadership needs to be committed with a clear vision and strategy to support the initiative (Kabra, 2017; Byrd 1992; Tyran and George 1993; Ang et al. 2002; Al-Mashari et al. 2003; Sangar and Iahad 2013).”
BackgroundEstimating the Benefits and Risks of Implementing E-Procurement
Trkman, P., & McCormack, K. (2010) · IEEE Transactions on Engineering Management · doi:10.1109/tem.2009.2033046 · Cited by 69
Assessment of process improvement from organizational change
Lee, S., & Ahn, H. (2008) · Information & Management · doi:10.1016/j.im.2003.12.016 · Cited by 68 · cited 1×
“CSF 10: Performance measurement Performance measurement is crucial for eliminating lack of new technology competency barrier while implementing agility and achieving sustainable improvement(Trkman and McCor-mack 2010; Lee and Ahn 2008; Leem et al. 2004; Ray et al. 2007; Hoque 2004).”
BackgroundLogistical Support for Manufacturing Agility in Global Markets
Vastag, G., Kasarda, J. D., & Boone, T. (1994) · International Journal of Operations & Production Management · doi:10.1108/01443579410068657 · Cited by 66 · cited 2×
“involvement of people and adequate support (Burgess 1994; Vastag et al. 1994).”
BackgroundImplementation and Use of Expert Systems in Organizations: Perceptions of Knowledge Engineers
Byrd, T. A. (1992) · Journal of Management Information Systems · doi:10.1080/07421222.1992.11517941 · Cited by 63 · cited 1×
“The success of implementing agility in PPM primarily depends on getting leadership buy-in and leadership needs to be committed with a clear vision and strategy to support the initiative (Kabra, 2017; Byrd 1992; Tyran and George 1993; Ang et al. 2002; Al-Mashari et al. 2003; Sangar and Iahad 2013).”
BackgroundElementary fuzzy matrix theory and fuzzy models for social scientistsPreprint
Kandasamy, W. B. V., Smarandache, F., & Ilanthenral, K. (2007) · arXiv (Cornell University) · doi:10.48550/arxiv.math/0702144 · Cited by 63
Jadhav, J. R., Mantha, S. S., & Rane, S. B. (2015) · Journal of Industrial Engineering International · doi:10.1007/s40092-014-0074-6 · Cited by 62
Self-citationIselin, E. R., Mia, L., & Sands, J. (2008) · Journal of General Management · doi:10.1177/030630700803300405 · Cited by 61
Rane, S. B., Narvel, Y. A. M., & Bhandarkar, B. M. (2019) · Business Process Management Journal · doi:10.1108/bpmj-07-2017-0196 · Cited by 60 · cited 1×
“8 Exploring the CSFs for improving agility in PPM (Rane et al. 2019) have explored barriers that impact the successful implementation of agility in PPM along with higher-level strategies to mitigate them using business barriers.”
BackgroundSelf-citationMohanty, M. (2018) · Management of Environmental Quality An International Journal · doi:10.1108/meq-03-2017-0027 · Cited by 56
Exploring expert system success factors for business process reengineering
Yoon, Y., Guimãrães, T., & Clevenson, A. (1998) · Journal of Engineering and Technology Management · doi:10.1016/s0923-4748(98)00011-3 · Cited by 53 · cited 2×
“The resource skills have to be leveraged to optimize the resource utilization, spends and time to achieve the best inside of the organization which will help implementing agility in PPM (Will et al. 1994; Mykytyn et al. 1994; Yoon et al. 1998).”
BackgroundA traceability proposal for industry 4.0
Bougdira, A., Akharraz, I., & Ahaitouf, A. (2019) · Journal of Ambient Intelligence and Humanized Computing · doi:10.1007/s12652-019-01532-7 · Cited by 52
Jadhav, J. R., Mantha, S. S., & Rane, S. B. (2015) · Journal of Industrial Engineering International · doi:10.1007/s40092-014-0092-4 · Cited by 49 · cited 1×
“However, there are a few limitations of ISM modelling which can be summarized as follows (Jain and Raj 2015):”
BackgroundSelf-citationKnowledge acquisition skills and traits: A self-assessment of knowledge engineers
Mykytyn, P. P., Mykytyn, K., & Raja, M. K. (1994) · Information & Management · doi:10.1016/0378-7206(94)90057-4 · Cited by 47 · cited 1×
“The resource skills have to be leveraged to optimize the resource utilization, spends and time to achieve the best inside of the organization which will help implementing agility in PPM (Will et al. 1994; Mykytyn et al. 1994; Yoon et al. 1998).”
Background‘Soft’ supplier management related issues: An empirical investigation
Polychronakis, Y. E., & Syntetos, A. A. (2006) · International Journal of Production Economics · doi:10.1016/j.ijpe.2006.07.008 · Cited by 45 · cited 1×
“Purchasing in relatively small and intensive groups is becoming increasingly popular in both the private and public sector (Polychronakis and Syntetos 2007; Tella and Virolainen 2005).”
BackgroundSupply chain management: modelling the enablers using ISM and fuzzy MICMAC approach
Gorane, S., & Kant, R. (2013) · International Journal of Logistics Systems and Management · doi:10.1504/ijlsm.2013.056158 · Cited by 41 · cited 3×
“2015; Jain and Raj 2015) Fuzzy MICMAC analysis provides the strength of the relationship as very weak, weak, strong, and very strong (Ali and Khan 2012; Gorane and Kant 2013)”
BackgroundMethodSystem modelling of telecom service sector supply chain: a SAP-LAP analysis
Pramod, V. R., & Banwet, D. K. (2009) · International Journal of Business Excellence · doi:10.1504/ijbex.2010.029486 · Cited by 41
Garg, P. (2010) · arXiv (Cornell University) · doi:10.48550/arxiv.1006.5749 · Cited by 38 · cited 4×
“For improving agility of PPM process there has to be exhaustive training plans and then empowering the employees based on their skillset (Mandal and Gunase-karan 2002; Umble et al. 2003; Woo 2007; Garg 2010).”
BackgroundMethodInfluentialTask-based modeling method for construction business process modeling and automation
Jonathan Jingsheng, S. H. I., Lee, D., & Kuruku, E. (2007) · Automation in Construction · doi:10.1016/j.autcon.2007.10.010 · Cited by 35 · cited 1×
“With automation performance of business activities improves and enables enterprise-wide monitoring and coordination (Trkman 2010; Harmon 2003; Shi et al. 2008; Nikolaidou et al. 2001; Erl 2005; Reijers and Mansar 2005; Shi et al. 2008; Mentzas et al. 2001).”
Background5G Networks in the Value Chain
Rejeb, A., & Keogh, J. G. (2020) · Wireless Personal Communications · doi:10.1007/s11277-020-07936-5 · Cited by 35 · cited 1×
“The business strategy includes planning of time, resources, cost and business benefits, setting up short and long-term visions, etc. (Kabra, 2017; Hung 2006; Rhee and Mehra 2006; Bandara et al. 2007; Umble et al. 2003; Somers and Nelson 2004).”
BackgroundInterpretive structural modelling of risk sources in medical device development process
Rane, S. B., & Kirkire, M. S. (2015) · International Journal of Systems Assurance Engineering and Management · doi:10.1007/s13198-015-0399-6 · Cited by 32 · cited 1×
“ISM methodology utilizes experts’ opinions based on various techniques such as brainstorming and nominal group discussion technique to develop contextual relationship between the factors (Jadhav et al. 2013; Rane and Kirkire 2017).”
MethodSelf-citationImplementation Issues of AGVs in Flexible Manufacturing System : A Review
Ali, M., & Khan, W. U. (2010) · Global Journal of Flexible Systems Management · doi:10.1007/bf03396578 · Cited by 31
Energy-Efficiency Clustering and Data Collection for Wireless Sensor Networks in Industry 4.0
Alrashidi, M., Nasri, N., Khediri, S. E., & Kachouri, A. (2020) · Journal of Ambient Intelligence and Humanized Computing · doi:10.1007/s12652-020-02146-0 · Cited by 31
Embedded fog computing for high-frequency MTConnect data analytics
Lynn, R., Wescoat, E., Han, D., & Kurfess, T. R. (2017) · Manufacturing Letters · doi:10.1016/j.mfglet.2017.11.002 · Cited by 27
Rane, S. B., & Kirkire, M. S. (2016) · International Journal of Systems Assurance Engineering and Management · doi:10.1007/s13198-016-0497-0 · Cited by 26
Self-citationBordel, B., & Alcarria, R. (2017) · Journal of Ambient Intelligence and Humanized Computing · doi:10.1007/s12652-017-0664-4 · Cited by 22 · cited 1×
“in realtime (Pandya 2018; Khan and Salah 2018; Iansiti and Lakhania 2017); RPA intends to offload repetitive, nonintellect, high volume mundane tasks done by humans; Artificial Intelligence and Machine Learning learn from the human operating patterns, failure trends, ordering trends versus the needs and requirements t…”
Barriers for successful implementation of JIT: a manufacturer perspective
Jadhav, J. R., Mantha, S. S., & Rane, S. B. (2014) · International Journal of Procurement Management · doi:10.1504/ijpm.2014.060790 · Cited by 21 · cited 1×
“This research utilizes Total ISM technique to analyze the identified CSFs due to the merits of ISM over other contemporary multi-criteria decision making (MCDM) techniques like Analytical Hierarchy Process (AHP) and Analytical Network Process (ANP) (Thakkar et al. 2008; Jadhav et al. 2014a,b,c).”
MethodSelf-citationManaging big data in coal-fired power plants: a business intelligence framework
Chongwatpol, J. (2016) · Industrial Management & Data Systems · doi:10.1108/imds-11-2015-0473 · Cited by 21 · cited 1×
“Having the right information and appropriate tools at the fingertips can help project procurement managers to work in more agile way and have a winning edge over the competitors (Van-Hau Trieu 2017; Chongwatpol 2016; Rane and Mishra 2018).”
BackgroundModelling human resource dimension of international project risk management
Dandage, R. V., Rane, S. B., & Mantha, S. S. (2021) · Journal of Global Operations and Strategic Sourcing · doi:10.1108/jgoss-11-2019-0065 · Cited by 21 · cited 1×
“In this quickly changing world, companies need to be able to adapt to changes to reduce risk and take advantage of opportunities (Rane et al. 2021; Dandage et al. 2021).”
BackgroundSelf-citationFritzenschaft, T. (2013) · Springer eBooks · doi:10.1007/978-3-658-04549-4 · Cited by 20 · cited 2×
“There has to be adequate communication to portray the benefits of change management across the organization that will proactively motivate people to smoothly execute change management (Gibbons, 2012; Fritzenschaft 2014).”
BackgroundRane, S. B., & Mishra, N. (2018) · International Journal of Business Excellence · doi:10.1504/ijbex.2018.092574 · Cited by 18
Self-citationAn Integrated Ism and Fuzzy Micmac Approach for Modeling of the Enablers of Technology Management
Khan, J., & Haleem, A. (2011) · Indian Journal Of Applied Research · doi:10.15373/2249555x/july2013/74 · Cited by 17
From branches to call centres: new strategic realities in retail banking
Beckett, A. (2004) · Service Industries Journal · doi:10.1080/0264206042000247759 · Cited by 15
Identifying long-term success issues of expert systems
Will, R. P., MCQUAIG, M., & Hardaway, D. E. (1994) · Expert Systems with Applications · doi:10.1016/0957-4174(94)90043-4 · Cited by 14 · cited 2×
“The resource skills have to be leveraged to optimize the resource utilization, spends and time to achieve the best inside of the organization which will help implementing agility in PPM (Will et al. 1994; Mykytyn et al. 1994; Yoon et al. 1998).”
BackgroundProject Management for the Built Environment
Pheng, L. S. (2017) · Management in the built environment · doi:10.1007/978-981-10-6992-5 · Cited by 14 · cited 1×
“Depending on the need and requirements of the project, procurements could be anything including man, machinery, equipment, tools, materials, tradespeople, supervisors, consultancy services, employee training, IT services as well as a host of other goods and services (Pheng 2018).”
BackgroundRane, S. B., & Mishra, N. (2018) · International Journal of Business Excellence · doi:10.1504/ijbex.2018.10013833 · Cited by 13 · cited 1×
“Having the right information and appropriate tools at the fingertips can help project procurement managers to work in more agile way and have a winning edge over the competitors (Van-Hau Trieu 2017; Chongwatpol 2016; Rane and Mishra 2018).”
BackgroundSelf-citationModeling of post‐construction failure factors of bridges
Wakchaure, S. S., & Jha, K. N. (2011) · Journal of Advances in Management Research · doi:10.1108/09727981111175975 · Cited by 12 · cited 1×
“MICMAC analysis is to sort the variables according to their driving power and dependence (Mandal and Deshmukh 1994; Wakchaure and Jha 2011).”
MethodA Process-Centered IT ROI Analysis with a Case Study
Leem, C. S., Yoon, C. Y., & Park, S. K. (2004) · Information Systems Frontiers · doi:10.1023/b:isfi.0000046378.42438.5f · Cited by 11 · cited 1×
“CSF 10: Performance measurement Performance measurement is crucial for eliminating lack of new technology competency barrier while implementing agility and achieving sustainable improvement(Trkman and McCor-mack 2010; Lee and Ahn 2008; Leem et al. 2004; Ray et al. 2007; Hoque 2004).”
BackgroundSupply risks in JIT implementation
Jadhav, J. R., Mantha, S. S., & Rane, S. B. (2015) · International Journal of Business Performance and Supply Chain Modelling · doi:10.1504/ijbpscm.2015.069920 · Cited by 10
Self-citationProcesses in Agile Procurement
Nicoletti, B. (2017) · Springer eBooks · doi:10.1007/978-3-319-61082-5_6 · Cited by 6 · cited 2×
“Business intelligence is capable of extending right insights to the procurement managers, for taking the right decisions at the right time (Nicoletti 2018; Rouhani et al. 2016; Alon et al. 2016).”
BackgroundPishdar, M. (2014) · American Journal of Applied Sciences · doi:10.3844/ajassp.2014.548.557 · Cited by 5
Sharma, B., Nag, R., & Makkad, M. (2017) · Wireless Personal Communications · doi:10.1007/s11277-017-4783-1 · Cited by 4 · cited 1×
“in realtime (Pandya 2018; Khan and Salah 2018; Iansiti and Lakhania 2017); RPA intends to offload repetitive, nonintellect, high volume mundane tasks done by humans; Artificial Intelligence and Machine Learning learn from the human operating patterns, failure trends, ordering trends versus the needs and requirements t…”
BackgroundLee, J.-K., Lee, S., & Lee, K.-H. (2018) · Wireless Personal Communications · doi:10.1007/s11277-018-5970-4 · Cited by 3 · cited 1×
“There has to be strategically developed team composition, which includes the best and the brightest individuals from each functional area of the company that will adopt the new ways of working smoothly (Loh and Koh 2004; Garg 2010; Yeoh and Koronios 2010).”
BackgroundInterpretive Structural Modelling for Implementation of Integrated Green-Lean System
Jadhav, J. R., Mantha, S. S., & Rane, S. B. (2013) · International Conference on Green Computing · Cited by 1
Self-citation
Research works printed but not linked: 4
- Aziz A, Zailani S (2011) A conceptual paper on determinants and outcomes of supply chain agility. International conference on computer communication and management, Proc. of CSIT, IACSIT Press, Singapore, 5, 456–460
- Holland CP, Light B (1999) Global enterprise resource planning implementation. 32nd Hawaii international conference on system sciences. Hawaii
- Nikolaidou M, Anagnostopoulos D, Tsalgatidou A (2001) Business processes modelling and automation in the banking sector: a case study. Int J Simul 2(2):65–76
- Somers TM, Nelson K (2001) The impact of CSFs across the stages of enterprise resource planning implementations. In: Proc of the 34th Hawaii international conference on systems sciences, vol 8, 8016, IEEE Computer Society, Washington, DC, USA
Cited by
The applications of Internet of Things (IoT) in industrial management: a science mapping review
Mu, X., & Antwi‐Afari, M. F. (2023) · International Journal of Production Research · doi:10.1080/00207543.2023.2290229 · Cited by 209
“Yet, little work has been done to implement business intelligence using advanced technologies to improve the agility of the various sub-processes of project procurement management (Rane and Narvel 2021).”
BackgroundAlthabatah, A., Yaqot, M., Menezes, B., & Kerbache, L. (2023) · Logistics · doi:10.3390/logistics7030063 · Cited by 108
“Rane and Narvel [41] examine the utilization of I4.”
BackgroundGovindan, K., Jain, P., Singh, R. K., & Mishra, R. (2023) · Transportation Research Part E Logistics and Transportation Review · doi:10.1016/j.tre.2023.103352 · Cited by 94
Azonuche, T. I., & Enyejo, J. O. (2024) · International Journal of Scientific Research and Modern Technology. · doi:10.38124/ijsrmt.v3i8.448 · Cited by 62
Sahoo, P., Saraf, P. K., & Uchil, R. (2022) · Asia-Pacific Journal of Business Administration · doi:10.1108/apjba-03-2022-0105 · Cited by 60
Metadata
- Authors
- Rane, S. B., & Narvel, Y. A. M.
- Corresponding author
- Narvel, Yahya A. M.
- Venue
- International Journal of System Assurance Engineering and Management
- Published
- 2021-09-13
- Volume
- 12
- Issue
- 6
- Pages
- 1146-1172
- ISSN
- 0975-6809 (ISSN-L)
- 0976-4348
- OpenAlex
- W3199360438
- Cited by
- 26
- References
- 130
- Citations by year
- 2026: 2 · 2025: 8 · 2024: 3 · 2023: 6 · 2022: 7
- FWCI
- 2.07
- Type
- journal article
- Language
- en
- Open access
- closed
- Licence
- www.springer.com/tdm (tdm)
- www.springer.com/tdm (vor)
- Locations
- International Journal of Systems Assurance Engineering and Management (publishedVersion)
- RePEc: Research Papers in Economics (submittedVersion)
- Topics
- Physical Sciences › Engineering › Industrial and Manufacturing Engineering › Digital Transformation in Industry
- Social Sciences › Business, Management and Accounting › Management of Technology and Innovation › Collaboration in agile enterprises
- Social Sciences › Decision Sciences › Management Science and Operations Research › Construction Project Management and Performance
- Keywords
- project procurement management, Industry 4.0, agility, success factors, total interpretive structural modeling, MICMAC, Internet of Things, blockchain, robotic process automation, business intelligence, chatbots
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.