Software development project success and failure from the supplier's perspective: A systematic literature review
Open accessThe DOI matches its Crossref record; 58 of the 58 references it cites were found in a registry or an index.
Abstract
In this paper, we consider software development project success and failure from the supplier's perspective. First we clarified concepts in order to be able to exclude review articles on in-house projects, continuous services, the customer's perspective, and software product development, with the aim of providing valid results for supplier firms. We divided success criteria into project success and project management (PM) success, and, in seven articles, identified three success criteria from the supplier's perspective: customer satisfaction, short-term business benefits, and long-term business benefits. In contrast, no definition of software development project failure was found. Articles were found in seven different journals, showing that knowledge on software development project success from the supplier's perspective is fragmented. This impedes the growth of knowledge on this topic.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
A Guide to the project management body of knowledge
(1996) · Choice Reviews Online · doi:10.5860/choice.34-1636 · Cited by 4,339
Brereton, P., Kitchenham, B. A., Budgen, D., Turner, M., & Khalil, M. (2007) · Journal of Systems and Software · doi:10.1016/j.jss.2006.07.009 · Cited by 2,394 · cited 2×
“The inconsistency of the search engines has been earlier noted by Brereton et al. (2007).”
Atkinson, R. (1999) · International Journal of Project Management · doi:10.1016/s0263-7863(98)00069-6 · Cited by 2,359 · cited 1×
“…development field, the most common combination of criteria used to measure the success of a project concerns meeting time, cost, functionality and quality goals (e.g. Anda et al., 2009; Atkinson, 1999; El Emam and Koru, 2008; Kappelman et al., 2006; Lai, 1997; Sumner et al., 2006; Yeo, 2002).”
What passes as a rigorous case study?
Gibbert, M., Ruigrok, W., & Wicki, B. (2008) · Strategic Management Journal · doi:10.1002/smj.722 · Cited by 1,929 · cited 1×
“We aimed at construct validity, i.e. at ensuring that our study investigates what we claim to investigate, as Gibbert et al. (2008) recommend.”
The “real” success factors on projects
Cooke-Davies, T. (2002) · International Journal of Project Management · doi:10.1016/s0263-7863(01)00067-9 · Cited by 1,837 · cited 1×
“The differences between bespoke software development and software product development are discussed in several studies (e.g. Cusumano, 2004; Nambisan, 2001).”
Information systems outsourcing: a survey and analysis of the literature
Dibbern, J., Goles, T., Hirschheim, R., & Jayatilaka, B. (2004) · ACM SIGMIS Database: the DATABASE for Advances in Information Systems · doi:10.1145/1035233.1035236 · Cited by 1,381 · cited 7×
“…has extensively discussed subjects related to software development acquisition from the customer's perspective (see e.g. the survey and analysis by Dibbern et al. (2004) and the historical review by Hätönen and Eriksson of outsourcing generally (2009)), little attention has been paid to research…”
InfluentialSystematic literature reviews in software engineering – A tertiary study
Kitchenham, B., Pretorius, R., Budgen, D., Pearl Brereton, O., Turner, M., Niazi, M., & Linkman, S. (2010) · Information and Software Technology · doi:10.1016/j.infsof.2010.03.006 · Cited by 1,230 · cited 1×
“This phenomenon has been noted in earlier reviews, e.g. Brereton et al. (2007), Jørgensen and Shepperd (2007), and Kitchenham et al. (2010).”
Project Success: A Multidimensional Strategic Concept
Shenhar, A. J., Dvir, D., Levy, O., & Maltz, A. C. (2001) · Long Range Planning · doi:10.1016/s0024-6301(01)00097-8 · Cited by 1,222 · cited 1×
“…success criteria appear to be widely used in these publications, they suggest a definition with additional aspects that define project success (e.g. Shenhar et al., 2001) as well as take into account the individual stakeholder's opinion of project success (e.g. Agarwal and Rathod, 2006; Procaccino…”
A new framework for determining critical success/failure factors in projects
Belassi, W., & Tukel, O. I. (1996) · International Journal of Project Management · doi:10.1016/0263-7863(95)00064-x · Cited by 1,187 · cited 2×
“Project failure/success factors are understood to be elements which can be influenced to increase the likelihood of failure/success (Collins and Baccarini, 2004; de Wit, 1988; Müller and Turner, 2007; Pinto and Slevin, 1987), and a combination of many factors makes failure/success more likely (Belassi and Tukel, 1996).”
The Logical Framework Method for Defining Project Success
Baccarini, D. (1999) · Project Management Journal · doi:10.1177/875697289903000405 · Cited by 1,136 · cited 3×
“We followed the division of criteria into project success and PM success used in other reviews on project success (Baccarini, 1999; CookeDavies, 2002; de Wit, 1988; Dvir et al., 1998, 2003; Ika, 2009; Jugdev and Müller, 2005; Lipovetsky et al., 1997; Munns and Bjeirmi, 1996; Papke-Shields et al., 2010; Sadeh et al., 2…”
Measurement of project success
de Wit, A. (1988) · International Journal of Project Management · doi:10.1016/0263-7863(88)90043-9 · Cited by 977 · cited 6×
“…followed the division of criteria into project success and PM success used in other reviews on project success (Baccarini, 1999; Cooke-Davies, 2002; de Wit, 1988; Dvir et al., 1998, 2003; Ika, 2009; Jugdev and Müller, 2005; Lipovetsky et al., 1997; Munns and Bjeirmi, 1996; Papke-Shields et al.,…”
InfluentialCritical factors in successful project implementation
Pinto, J. K., & Slevin, D. P. (1987) · IEEE Transactions on Engineering Management · doi:10.1109/tem.1987.6498856 · Cited by 966 · cited 2×
“Project failure/success factors are understood to be elements which can be influenced to increase the likelihood of failure/success (Collins and Baccarini, 2004; de Wit, 1988; Müller and Turner, 2007; Pinto and Slevin, 1987), and a combination of many factors makes failure/success more likely (Belassi and Tukel, 1996).”
The role of project management in achieving project success
Munns, A., & Bjeirmi, B. (1996) · International Journal of Project Management · doi:10.1016/0263-7863(95)00057-7 · Cited by 910 · cited 6×
“They define a project as “ achievement of a specific objective, which involves a series of activities and tasks which consume resources ” (Munns and Bjeirmi, 1996, p. 81).”
InfluentialA Retrospective look at our Evolving Understanding of Project Success
Jugdev, K., & Müller, R. (2005) · Project Management Journal · doi:10.1177/875697280503600403 · Cited by 907 · cited 5×
“Two recently published reviews on project success, one by Jugdev and Müller (2005) and another by Ika (2009), emphasize the complexity of the concept, but also highlight the distinction between project success and PM success.”
InfluentialProject Success as a Topic in Project Management Journals
Ika, L. A. (2009) · Project Management Journal · doi:10.1002/pmj.20137 · Cited by 783 · cited 6×
“For this reason, Ika (2009) advises against confusing project management objectives (time/cost/ quality) with project success.”
InfluentialA systematic review of software development cost estimation studies
Jørgensen, M., & Shepperd, M. (2007) · Brunel University Research Archive (BURA) (Brunel University London) · doi:10.1109/tse.2007.3 · Cited by 742
A Systematic Review of Software Development Cost Estimation Studies
Jorgensen, M., & Shepperd, M. (2007) · IEEE Transactions on Software Engineering · doi:10.1109/tse.2007.256943 · Cited by 729 · cited 2×
“We used common search terms because earlier studies have shown that many articles use unclear and nonstandard terminology (Jørgensen and Shepperd, 2007).”
MethodLevina, N., & Ross, J. W. (2003) · MIS Quarterly · doi:10.2307/30036537 · Cited by 699 · cited 3×
“…e.g. the survey and analysis by Dibbern et al. (2004) and the historical review by Hätönen and Eriksson of outsourcing generally (2009)), little attention has been paid to research from the supplier's perspective (Dibbern et al., 2004; Goles and Chin, 2005; Levina and Ross, 2003; Taylor, 2007).”
A review of the IT outsourcing literature: Insights for practice
Lacity, M. C., Khan, S. A., & Willcocks, L. P. (2009) · The Journal of Strategic Information Systems · doi:10.1016/j.jsis.2009.06.002 · Cited by 644 · cited 3×
“Although the role of supplier firms that sell software development projects to their customers has increased during recent decades as a result of outsourcing (Dibbern et al., 2004; Lacity et al., 2009) it is not common to consider different business aspects when researching software development projects (Anda et al.”
Pinto, J. K., & Mantel, S. J. (1990) · IEEE Transactions on Engineering Management · doi:10.1109/17.62322 · Cited by 594 · cited 2×
“We realized that some studies used the term ‘ performance ’ to denote all variations between a failure and a success, e.g. studies by Nidumolu (1995, 1996a, 1996b) and Pinto and Mantel (1990).”
The Influence of Project Managers on Project Success Criteria and Project Success by Type of Project
Müller, R., & Turner, R. (2007) · European Management Journal · doi:10.1016/j.emj.2007.06.003 · Cited by 579 · cited 4×
“Project failure/success factors are understood to be elements which can be influenced to increase the likelihood of failure/success (Collins and Baccarini, 2004; de Wit, 1988; Müller and Turner, 2007; Pinto and Slevin, 1987), and a combination of many factors makes failure/success more likely (Belassi and Tukel, 1996).”
InfluentialNidumolu, S. (1995) · Information Systems Research · doi:10.1287/isre.6.3.191 · Cited by 555 · cited 2×
“The article uses the concepts of project performance and product performance developed by Nidumolu (1995, 1996a, 1996b) mainly for software organizations which develop software products.”
An empirical analysis of the relationship between project planning and project success
Dvir, D., Raz, T., & Shenhar, A. J. (2003) · International Journal of Project Management · doi:10.1016/s0263-7863(02)00012-1 · Cited by 498 · cited 6×
“…of criteria into project success and PM success used in other reviews on project success (Baccarini, 1999; Cooke-Davies, 2002; de Wit, 1988; Dvir et al., 1998, 2003; Ika, 2009; Jugdev and Müller, 2005; Lipovetsky et al., 1997; Munns and Bjeirmi, 1996; Papke-Shields et al., 2010; Sadeh et…”
InfluentialHow can IS/IT projects be measured for success?
Wateridge, J. (1998) · International Journal of Project Management · doi:10.1016/s0263-7863(97)00022-7 · Cited by 474 · cited 1×
“They decided to concentrate only on the internal characteristics (time, cost, scope) of the project organization, reasoning that software development organizations are more internally focused, and used as examples the studies of Wateridge (1998) and Linberg (1999).”
In search of project classification: a non-universal approach to project success factors
Dvir, D., Lipovetsky, S., Shenhar, A., & Tishler, A. (1998) · Research Policy · doi:10.1016/s0048-7333(98)00085-7 · Cited by 423 · cited 5×
“…of criteria into project success and PM success used in other reviews on project success (Baccarini, 1999; Cooke-Davies, 2002; de Wit, 1988; Dvir et al., 1998, 2003; Ika, 2009; Jugdev and Müller, 2005; Lipovetsky et al., 1997; Munns and Bjeirmi, 1996; Papke-Shields et al., 2010; Sadeh et…”
InfluentialDo project managers practice what they preach, and does it matter to project success?
Papke-Shields, K. E., Beise, C., & Quan, J. (2010) · International Journal of Project Management · doi:10.1016/j.ijproman.2009.11.002 · Cited by 393 · cited 5×
“We followed the division of criteria into project success and PM success used in other reviews on project success (Baccarini, 1999; CookeDavies, 2002; de Wit, 1988; Dvir et al., 1998, 2003; Ika, 2009; Jugdev and Müller, 2005; Lipovetsky et al., 1997; Munns and Bjeirmi, 1996; Papke-Shields et al., 2010; Sadeh et al., 2…”
InfluentialCritical failure factors in information system projects
Yeo, K. T. (2002) · International Journal of Project Management · doi:10.1016/s0263-7863(01)00075-8 · Cited by 359 · cited 1×
“…development field, the most common combination of criteria used to measure the success of a project concerns meeting time, cost, functionality and quality goals (e.g. Anda et al., 2009; Atkinson, 1999; El Emam and Koru, 2008; Kappelman et al., 2006; Lai, 1997; Sumner et al., 2006; Yeo, 2002).”
Defining ‘success’ for software projects: An exploratory revelation
Agarwal, N., & Rathod, U. (2005) · International Journal of Project Management · doi:10.1016/j.ijproman.2005.11.009 · Cited by 349 · cited 3×
“The first article listed in Table 1 was written by Agarwal and Rathod (2006).”
30+ years of research and practice of outsourcing – Exploring the past and anticipating the future
Hätönen, J., & Eriksson, T. (2009) · Journal of International Management · doi:10.1016/j.intman.2008.07.002 · Cited by 342
Early Warning Signs of it Project Failure: The Dominant Dozen
Kappelman, L. A., McKeeman, R., & Zhang, L. (2006) · Information Systems Management · doi:10.1201/1078.10580530/46352.23.4.20060901/95110.4 · Cited by 336
A Replicated Survey of IT Software Project Failures
Emam, K. E., & Koru, A. G. (2008) · IEEE Software · doi:10.1109/ms.2008.107 · Cited by 334 · cited 2×
“…project whereas the aim of the supplier is to maximize the profit (de Wit, 1988), a clear distinction between these different perspectives is not commonly made when discussing software development project success or failure (e.g. El Emam and Koru, 2008; Procaccino et al., 2005; Whittaker, 1999).”
Does risk management contribute to IT project success? A meta-analysis of empirical evidence
de Bakker, K., Boonstra, A., & Wortmann, H. (2010) · International Journal of Project Management · doi:10.1016/j.ijproman.2009.07.002 · Cited by 332 · cited 3×
“The literature review carried out by de Bakker et al. (2010) covers the period from 1997 to 2009.”
Software developer perceptions about software project failure: a case study
Linberg, K. R. (1999) · Journal of Systems and Software · doi:10.1016/s0164-1212(99)00094-1 · Cited by 308 · cited 1×
“They decided to concentrate only on the internal characteristics (time, cost, scope) of the project organization, reasoning that software development organizations are more internally focused, and used as examples the studies of Wateridge (1998) and Linberg (1999).”
What went wrong? Unsuccessful information technology projects
Whittaker, B. (1999) · Information Management & Computer Security · doi:10.1108/09685229910255160 · Cited by 285 · cited 2×
“Although de Wit noted over 20 years ago that the aim of the customer is to minimize the costs of the project whereas the aim of the supplier is to maximize the profit (de Wit, 1988), a clear distinction between these different perspectives is not commonly made when discussing software development project success or fa…”
The rise and fall of the Chaos report figures
Eveleens, J. L., & Verhoef, C. (2010) · IEEE Software · doi:10.1109/ms.2009.154 · Cited by 282 · cited 1×
“Furthermore, these reports have been criticized for failing to describe the research methods used (Eveleens and Verhoef, 2010; Glass, 2005, 2006; Jørgensen and Moløkken-Østvold, 2006).”
PLANNING AND TACTICAL FACTORS IN THE PROJECT IMPLEMENTATION PROCESS
Pinto, J. K., & Prescott, J. E. (1990) · Journal of Management Studies · doi:10.1111/j.1467-6486.1990.tb00249.x · Cited by 234 · cited 2×
“Comparing the success criteria used by Dvir et al. and those in our review reveals the importance of defining research settings, context, and perspectives precisely when studying software development project success, as is also suggested by Pinto and Covin (1989) and Pinto and Prescott (1990).”
MethodCritical factors in project implementation: a comparison of construction and R&D projects
Pinto, J. K., & Covin, J. G. (1989) · Technovation · doi:10.1016/0166-4972(89)90040-0 · Cited by 233 · cited 1×
“Comparing the success criteria used by Dvir et al. and those in our review reveals the importance of defining research settings, context, and perspectives precisely when studying software development project success, as is also suggested by Pinto and Covin (1989) and Pinto and Prescott (1990).”
MethodGoles, T., & Chin, W. W. (2005) · ACM SIGMIS Database: the DATABASE for Advances in Information Systems · doi:10.1145/1104004.1104009 · Cited by 228 · cited 3×
“…e.g. the survey and analysis by Dibbern et al. (2004) and the historical review by Hätönen and Eriksson of outsourcing generally (2009)), little attention has been paid to research from the supplier's perspective (Dibbern et al., 2004; Goles and Chin, 2005; Levina and Ross, 2003; Taylor, 2007).”
How large are software cost overruns? A review of the 1994 CHAOS report
Jørgensen, M., & Moløkken-Østvold, K. (2006) · Information and Software Technology · doi:10.1016/j.infsof.2005.07.002 · Cited by 227 · cited 1×
“Furthermore, these reports have been criticized for failing to describe the research methods used (Eveleens and Verhoef, 2010; Glass, 2005, 2006; Jørgensen and Moløkken-Østvold, 2006).”
Cerpa, N., & Verner, J. M. (2009) · Communications of the ACM · doi:10.1145/1610252.1610286 · Cited by 220 · cited 1×
“Moreover, researchers have questioned whether we have learned enough to ensure that our software development projects are successful (Cerpa and Verner, 2009).”
COLLINS, A., & BACCARINI, D. (2004) · Journal of Construction Research · doi:10.1142/s1609945104000152 · Cited by 204 · cited 3×
“Project failure/success factors are understood to be elements which can be influenced to increase the likelihood of failure/success (Collins and Baccarini, 2004; de Wit, 1988; Müller and Turner, 2007; Pinto and Slevin, 1987), and a combination of many factors makes failure/success more likely (Belassi and Tukel, 1996).”
Innovation in project-based firms: The context dependency of success factors
Blindenbach-Driessen, F., & van den Ende, J. (2006) · Research Policy · doi:10.1016/j.respol.2006.02.005 · Cited by 187
Cusumano, M. A. (2004) · Cited by 186
Jun, L., Qiuzhen, W., & Qingguo, M. (2011) · International Journal of Project Management · doi:10.1016/j.ijproman.2010.11.002 · Cited by 184 · cited 1×
“Only recently have studies appeared which note that the customer and the supplier may have different perceptions of risk, risk management, and project success (Jun et al., 2010; Taylor, 2007).”
Nidumolu, S. R. (1996) · Journal of Management Information Systems · doi:10.1080/07421222.1996.11518124 · Cited by 183 · cited 2×
“The article uses the concepts of project performance and product performance developed by Nidumolu (1995, 1996a, 1996b) mainly for software organizations which develop software products.”
Glass, R. L. (2006) · Communications of the ACM · doi:10.1145/1145287.1145301 · Cited by 166 · cited 1×
“Furthermore, these reports have been criticized for failing to describe the research methods used (Eveleens and Verhoef, 2010; Glass, 2005, 2006; Jørgensen and Moløkken-Østvold, 2006).”
Vendors’ perspectives on trust and control in offshore information systems outsourcing
Mao, J.-Y., Lee, J.-N., & Deng, C.-P. (2008) · Information & Management · doi:10.1016/j.im.2008.07.003 · Cited by 158 · cited 8×
“Customer satisfaction was mentioned in one article (Mao et al., 2008), but we can assume that if the customer is dissatisfied, it is unlikely that he will make future deals, and long-term business success is thus threatened.”
InfluentialWhat do software practitioners really think about project success: an exploratory study
Procaccino, J. D., Verner, J. M., Shelfer, K. M., & Gefen, D. (2005) · Journal of Systems and Software · doi:10.1016/j.jss.2004.12.011 · Cited by 141 · cited 2×
“Although de Wit noted over 20 years ago that the aim of the customer is to minimize the costs of the project whereas the aim of the supplier is to maximize the profit (de Wit, 1988), a clear distinction between these different perspectives is not commonly made when discussing software development project success or fa…”
Heiskanen, A., Newman, M., & Eklin, M. (2008) · The Journal of Strategic Information Systems · doi:10.1016/j.jsis.2008.10.001 · Cited by 138 · cited 4×
“Heiskanen et al. (2008) studied control, trust, power, and the dynamics of an information system outsourcing relationship in Finland.”
InfluentialA comparison of software project overruns - flexible versus sequential development models
Molokken-Ostvold, K., & Jørgensen, M. (2005) · IEEE Transactions on Software Engineering · doi:10.1109/tse.2005.96 · Cited by 131 · cited 1×
“Moløkken-Østvold and Jørgensen (2005) compared software project overruns between flexible and sequential development models.”
Software project managers and project success: An exploratory study
Procaccino, J. D., & Verner, J. M. (2006) · Journal of Systems and Software · doi:10.1016/j.jss.2006.01.010 · Cited by 116 · cited 2×
“, 2001) as well as take into account the individual stakeholder's opinion of project success (e.g. Agarwal and Rathod, 2006; Procaccino and Verner, 2006).”
Exploring the Linkage Between the Characteristics of it Project Leaders and Project Success
Sumner, M. R., Bock, D. B., & Giamartino, G. (2006) · Information Systems Management · doi:10.1201/1078.10580530/46352.23.4.20060901/95112.6 · Cited by 111 · cited 4×
“…the characteristics of IT project leaders and project success, but adhered to one project management criterion defining project success as “ … planned versus actual project completion time is valid measure of project success that essentially encompasses project cost ” (Sumner et al., 2006, p. 46).”
InfluentialRisks in offshore IT outsourcing: A service provider perspective
Aundhe, M. D., & Mathew, S. K. (2009) · European Management Journal · doi:10.1016/j.emj.2009.01.004 · Cited by 108 · cited 1×
“An example of difficulties is that we excluded the article made by Aundhe and Mathew (2009) but included the article made by Haried and Ramamurthy (2009).”
IT Failure Rates - 70% or 10-15%?
Glass, R. L. (2005) · IEEE Software · doi:10.1109/ms.2005.66 · Cited by 102 · cited 1×
“Furthermore, these reports have been criticized for failing to describe the research methods used (Eveleens and Verhoef, 2010; Glass, 2005, 2006; Jørgensen and Moløkken-Østvold, 2006).”
Culture in Global Software Development - A Weakness or Strength?
Deshpande, S., Richardson, I., Casey, V., & Beecham, S. (2010) · IEEE International Conference on Global Software Engineering (ICGSE) · doi:10.1109/icgse.2010.16 · Cited by 93 · cited 1×
“However, research on global software development has examined different phenomena within supplier firms, e.g. Richardson et al. (2008) and Deshpande et al. (2010), as well as software process improvement in small and medium sized enterprises, e.g. Savolainen et al. (2007) and Valtanen and Sihvonen…”
Self-citationAnda, B. C. D., Sjoberg, D. I. K., & Mockus, A. (2009) · IEEE Transactions on Software Engineering · doi:10.1109/tse.2008.89 · Cited by 83 · cited 3×
“…software development projects to their customers has increased during recent decades as a result of outsourcing (Dibbern et al., 2004; Lacity et al., 2009) it is not common to consider different business aspects when researching software development projects (Anda et al., 2009) and their success.”
Haried, P., & Ramamurthy, K. (2009) · Project Management Journal · doi:10.1002/pmj.20113 · Cited by 65 · cited 6×
“An example of difficulties is that we excluded the article made by Aundhe and Mathew (2009) but included the article made by Haried and Ramamurthy (2009).”
InfluentialHaving a Foot on Each Shore - Bridging Global Software Development in the Case of SMEs
Richardson, I., Avram, G., Deshpande, S., & Casey, V. (2008) · IEEE International Conference on Global Software Engineering (ICGSE) · doi:10.1109/icgse.2008.21 · Cited by 31 · cited 1×
“However, research on global software development has examined different phenomena within supplier firms, e.g. Richardson et al. (2008) and Deshpande et al. (2010), as well as software process improvement in small and medium sized enterprises, e.g. Savolainen et al. (2007) and Valtanen and Sihvonen…”
Self-citation
Cited by
Pospieszny, P., Czarnacka-Chrobot, B., & Kobylinski, A. (2018) · Journal of Systems and Software · doi:10.1016/j.jss.2017.11.066 · Cited by 247
Cost and time project management success factors for information systems development projects
Sanchez, O. P., Terlizzi, M. A., & de Moraes, H. R. D. O. C. (2017) · International Journal of Project Management · doi:10.1016/j.ijproman.2017.09.007 · Cited by 173
Metadata
- Authors
- Savolainen, P., Ahonen, J. J., & Richardson, I.
- Venue
- International Journal of Project Management
- Publisher
- Elsevier BV
- Published
- 2012-05
- Volume
- 30
- Issue
- 4
- Pages
- 458-469
- ISSN
- 0263-7863 (ISSN-L)
- OpenAlex
- W2090995364
- Cited by
- 168
- References
- 58
- FWCI
- 3.42
- Type
- journal article
- Language
- en
- Open access
- green
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.