The DOI matches its Crossref record; 80 of the 80 references it cites were found in a registry or an index.
Beyond the third dimension of BIM: A systematic review of literature and assessment of professional views
Open accessAbstract
Abstract Across the world, the use of Building Information Modelling (BIM) and the three-dimensional (3D) model in projects are increasingly frequent for supporting design tasks. The digital data embodied in the BIM model is shared between the project stakeholders from the various disciplines. After giving an overview of the BIM 3D Model data used for planning (4D) and costing (5D), the study assesses the level of clarity or confusion on what the numbers of dimension refer to after the 5th dimension. A systematic review of the different BIM dimensions was conducted associated with an online questionnaire sent to various Architecture, Engineering and Construction stakeholders across Europe. The online questionnaire survey was limited to the 28 European Union (EU) countries. Each of the 28 EU countries was represented by at least one respondent. The research identified 52 papers considering BIM 4D Model, 15 considering 5D modelling, 6 considering the 6D Model and 2 considering the 7D. It was also identified a confusion between academics and practitioners for the 6D and 7D BIM dimensions. In fact, 86% of the professionals, actually using 6D, allocate Sustainability to 6D. Whereas 85% of the professionals using 7D allocate it to Facility Management.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Designing and Conducting Mixed Methods Research
Robinson, P. (2007) · Australian and New Zealand Journal of Public Health · doi:10.1111/j.1753-6405.2007.00096.x · Cited by 23,258
Research Methods for Business Students
Saunders, M. N. K., Lewis, P., & Thornhill, A. R. (2003) · Cited by 18,199
Palinkas, L. A., Horwitz, S. M., Green, C. A., Wisdom, J. P., Duan, N., & Hoagwood, K. (2015) · Administration and Policy in Mental Health and Mental Health Services Research · doi:10.1007/s10488-013-0528-y · Cited by 12,038
Mixed Methods Research: A Research Paradigm Whose Time Has Come
Johnson, R. B., & Onwuegbuzie, A. J. (2004) · Educational Researcher · doi:10.3102/0013189x033007014 · Cited by 11,170
(2006) · Cited by 7,081
Comparison of PubMed, Scopus, Web of Science, and Google Scholar: strengths and weaknesses
Falagas, M. E., Pitsouni, E. I., Malietzis, G. A., & Pappas, G. (2008) · The FASEB Journal · doi:10.1096/fj.07-9492lsf · Cited by 5,039
Questionnaire Design, Interviewing and Attitude Measurement
Albuam, G., & Oppenheim, A. N. (1993) · Journal of Marketing Research · doi:10.2307/3172892 · Cited by 4,971
Systematic reviews in the social sciences: a practical guide
(2006) · Choice Reviews Online · doi:10.5860/choice.43-5664 · Cited by 4,089
Eastman, C., Teicholz, P. M., Sacks, R., & Liston, K. (2008) · Cited by 2,892
Qualitative data analysis: A sourcebook of new methods
Dijkstra, L. (1985) · European Journal of Operational Research · doi:10.1016/0377-2217(85)90239-5 · Cited by 2,880
Morgan, D. L. (2007) · Journal of Mixed Methods Research · doi:10.1177/2345678906292462 · Cited by 2,503
A Meta-Analysis of Response Rates in Web- or Internet-Based Surveys
Cook, C., Heath, F., & Thompson, R. L. (2000) · Educational and Psychological Measurement · doi:10.1177/00131640021970934 · Cited by 2,396
Building Information Modeling (BIM): Trends, Benefits, Risks, and Challenges for the AEC Industry
Azhar, S. (2011) · Leadership and Management in Engineering · doi:10.1061/(asce)lm.1943-5630.0000127 · Cited by 2,192
Merriam, S. B. (1998) · Cited by 1,965
A Comparison between Two Main Academic Literature Collections: Web of Science and Scopus Databases
Chadegani, A. A., Salehi, H., Yunus, M. M., Farhadi, H., Fooladi, M., Farhadi, M., & Ebrahim, N. A. (2013) · Asian Social Science · doi:10.5539/ass.v9n5p18 · Cited by 1,925
Five steps to conducting a systematic review
Khan, K. S., Kunz, R., Kleijnen, J., & Antes, G. (2003) · Journal of the Royal Society of Medicine · doi:10.1177/014107680309600304 · Cited by 1,873
A typology of mixed methods research designs
Leech, N. L., & Onwuegbuzie, A. J. (2009) · Quality & Quantity · doi:10.1007/s11135-007-9105-3 · Cited by 1,705
Methodology in conducting a systematic review of systematic reviews of healthcare interventions
Smith, V., Devane, D., Begley, C. M., & Clarke, M. (2011) · BMC Medical Research Methodology · doi:10.1186/1471-2288-11-15 · Cited by 1,227
Comparing Response Rates from Web and Mail Surveys: A Meta-Analysis
Shih, T.-H., & Fan, X. (2008) · Field Methods · doi:10.1177/1525822x08317085 · Cited by 1,159
International Handbook of Survey Methodology
(2012) · Routledge eBooks · doi:10.4324/9780203843123 · Cited by 1,044
Web Surveys versus other Survey Modes: A Meta-Analysis Comparing Response Rates
Manfreda, K. L., Bosnjak, M., Berzelak, J., Haas, I., & Vehovar, V. (2008) · International Journal of Market Research · doi:10.1177/147078530805000107 · Cited by 1,000
Across the Great Divide: Knowledge Creation and Transfer Between Practitioners and Academics
Rynes, S. L., Bartunek, J. M., & Daft, R. L. (2001) · Academy of Management Journal · doi:10.5465/3069460 · Cited by 925
BIM implementation throughout the UK construction project lifecycle: An analysis
Eadie, R., Browne, M., Odeyinka, H., McKeown, C., & McNiff, S. (2013) · Automation in Construction · doi:10.1016/j.autcon.2013.09.001 · Cited by 749
An overview of mixed methods research
Doyle, L., Brady, A.-M., & Byrne, G. (2009) · Journal of Research in Nursing · doi:10.1177/1744987108093962 · Cited by 608
A comparison of Scopus and Web of Science for a typical university
Vieira, E. S., & Gomes, J. A. N. F. (2009) · Scientometrics · doi:10.1007/s11192-009-2178-0 · Cited by 604
Questionnaire design, interviewing and attitude measurement
Frey, J. H. (1994) · Evaluation and Program Planning · doi:10.1016/0149-7189(94)90021-3 · Cited by 483
Abanda, F. H., & Byers, L. (2016) · Energy · doi:10.1016/j.energy.2015.12.135 · Cited by 472
BIM-based fall hazard identification and prevention in construction safety planning
Zhang, S., Sulankivi, K., Kiviniemi, M., Romo, I., Eastman, C. M., & Teizer, J. (2015) · Safety Science · doi:10.1016/j.ssci.2014.08.001 · Cited by 447
Ding, L., Zhou, Y., & Akinci, B. (2014) · Automation in Construction · doi:10.1016/j.autcon.2014.04.009 · Cited by 330
BIM Implementation – Global Strategies
Smith, P. (2014) · Procedia Engineering · doi:10.1016/j.proeng.2014.10.575 · Cited by 323
Automated construction progress measurement using a 4D building information model and 3D data
Kim, C., Son, H., & Kim, C. (2013) · Automation in Construction · doi:10.1016/j.autcon.2012.11.041 · Cited by 317
Using Social Media and Targeted Snowball Sampling to Survey a Hard-to-reach Population: A Case Study
Dusek, G., Yurova, Y., & P. Ruppel, C. (2015) · International Journal of Doctoral Studies · doi:10.28945/2296 · Cited by 290
Web of Science, Scopus and Google Scholar: A content comprehensiveness comparison
S. Adriaanse, L., & Rensleigh, C. (2013) · The Electronic Library · doi:10.1108/el-12-2011-0174 · Cited by 284
Exploring how information exchanges can be enhanced through Cloud BIM
Redmond, A., Hore, A., Alshawi, M., & West, R. (2012) · Automation in Construction · doi:10.1016/j.autcon.2012.02.003 · Cited by 281
BIM adoption and implementation for architectural practices
Arayıcı, Y., Coates, P., Koskela, L., Kagioglou, M., Usher, C., & O'Reilly, K. (2011) · International Journal of Building Pathology and Adaptation · doi:10.1108/02630801111118377 · Cited by 279
Building information modeling and safety management: A systematic review
Martínez-Aires, M. D., López-Alonso, M., & Martínez-Rojas, M. (2018) · Safety Science · doi:10.1016/j.ssci.2017.08.015 · Cited by 252
Han, K. K., & Golparvar-Fard, M. (2015) · Automation in Construction · doi:10.1016/j.autcon.2015.02.007 · Cited by 246
Integrating BIM and gaming for real-time interactive architectural visualization
Yan, W., Culp, C., & Graf, R. (2011) · Automation in Construction · doi:10.1016/j.autcon.2010.11.013 · Cited by 241
Nichols, W. H. (1919) · Science · doi:10.1126/science.50.1288.217 · Cited by 236
Lu, Q., Won, J., & Cheng, J. C. P. (2015) · International Journal of Project Management · doi:10.1016/j.ijproman.2015.09.004 · Cited by 235
BIM integrated smart monitoring technique for building fire prevention and disaster relief
Cheng, M.-Y., Chiu, K.-C., Hsieh, Y.-M., Yang, I.-T., Chou, J.-S., & Wu, Y.-W. (2017) · Automation in Construction · doi:10.1016/j.autcon.2017.08.027 · Cited by 215
Golparvar-Fard, M., Peña-Mora, F., & Savarese, S. (2011) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000371 · Cited by 210
Kim, H., Anderson, K., Lee, S. H., & Hildreth, J. C. (2013) · Automation in Construction · doi:10.1016/j.autcon.2013.05.020 · Cited by 192
Goulart Coelho, L. M., Lange, L. C., & Coelho, H. M. (2017) · Waste Management & Research: The Journal for a Sustainable Circular Economy · doi:10.1177/0734242x16664024 · Cited by 188
BIM & the 5D Project Cost Manager
Smith, P. (2014) · Procedia - Social and Behavioral Sciences · doi:10.1016/j.sbspro.2014.03.053 · Cited by 179
Towards the BIM implementation for historical building restoration sites
Biagini, C., Capone, P., Donato, V., & Facchini, N. (2016) · Automation in Construction · doi:10.1016/j.autcon.2016.03.003 · Cited by 174
Enhancing Facility Management through BIM 6D
Nicał, A. K., & Wodyński, W. (2016) · Procedia Engineering · doi:10.1016/j.proeng.2016.11.623 · Cited by 173
Dulaimi, M. F., Ling, F. Y. Y., & Bajracharya, A. (2003) · Construction Management and Economics · doi:10.1080/0144619032000056144 · Cited by 164
Popov, V., Juocevicius, V., Migilinskas, D., Ustinovičius, L., & Mikalauskas, S. (2010) · Automation in Construction · doi:10.1016/j.autcon.2009.12.005 · Cited by 162
Interior construction state recognition with 4D BIM registered image sequences
Kropp, C., Koch, C., & König, M. (2017) · Automation in Construction · doi:10.1016/j.autcon.2017.10.027 · Cited by 148
The benefits of, and barriers to, implementation of 5D BIM for quantity surveying in New Zealand
Stanley, R., & Thurnell, D. (2014) · Construction Economics and Building · doi:10.5130/ajceb.v14i1.3786 · Cited by 147
Yu, A. T. W., Poon, C. S., Wong, A., Yip, R., & Jaillon, L. C. (2012) · Waste Management · doi:10.1016/j.wasman.2012.09.023 · Cited by 147
Rynes, S. L. (2007) · Academy of Management Journal · doi:10.5465/amj.2007.27156169 · Cited by 138
Braun, A., Tuttas, S., Borrmann, A., & Stilla, U. (2015) · Journal of Information Technology in Construction · Cited by 131
Decision support for tower crane selection with building information models and genetic algorithms
Marzouk, M. M., & Abubakr, A. (2015) · Automation in Construction · doi:10.1016/j.autcon.2015.09.008 · Cited by 131
BIM – New rules of measurement ontology for construction cost estimation
Abanda, F. H., Kamsu-Foguem, B., & Tah, J. H. M. (2017) · Engineering Science and Technology an International Journal · doi:10.1016/j.jestch.2017.01.007 · Cited by 130
Chileshe, N., Rameezdeen, R., Hosseini, M. R., Lehmann, S., & Udeaja, C. E. (2016) · International Journal of Operations & Production Management · doi:10.1108/ijopm-01-2014-0024 · Cited by 94
BIM-Based Construction Scheduling Method Using Optimization Theory for Reducing Activity Overlaps
HyounSeok, M., Kim, H.-S., Kamat, V. R., & Kang, L.-S. (2013) · Journal of Computing in Civil Engineering · doi:10.1061/(asce)cp.1943-5487.0000342 · Cited by 83
Building information modeling in construction conflict management
Charehzehi, A., Chai, C., Yusof, A. M., Chong, H., & Loo, S. C. (2017) · International Journal of Engineering Business Management · doi:10.1177/1847979017746257 · Cited by 82
Automated Schedule Updates Using As-Built Data and a 4D Building Information Model
Son, H., Kim, C., & Cho, Y. K. (2017) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000528 · Cited by 81
Ding, L., Zhou, Y., Luo, H., & Wu, X. (2011) · Automation in Construction · doi:10.1016/j.autcon.2011.05.013 · Cited by 79
Lee, J., & Kim, J.-J. (2017) · Sustainability · doi:10.3390/su9030426 · Cited by 79
Toward a Standard Definition of Response Rate
Kviz, F. J. (1977) · Public Opinion Quarterly · doi:10.1086/268382 · Cited by 77
Integrating BIM and new rules of measurement for embodied energy and CO 2 assessment
Abanda, F. H., Oti, A. H., & Tah, J. H. M. (2017) · Journal of Building Engineering · doi:10.1016/j.jobe.2017.06.017 · Cited by 76
Integrated visualized time control system for repetitive construction projects
Elbeltagi, E. E., & Dawood, M. (2011) · Automation in Construction · doi:10.1016/j.autcon.2011.03.012 · Cited by 72
Tracking of secondary and temporary objects in structural concrete work
Türkan, Y., Bosché, F., Haas, C. T., & Haas, R. (2014) · Construction Innovation · doi:10.1108/ci-12-2012-0063 · Cited by 71
Database-Supported and Web-Based Visualization for Daily 4D BIM
Park, J., Cai, H., Dunston, P. S., & Ghasemkhani, H. (2017) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0001392 · Cited by 61
Embodied Energy and CO2 Analyses of Mud-brick and Cement-block Houses
F.Henry, A., Elambo, N. G., Tah, J. H. M., E.N.Fabrice, O., & M.Blanche, M. (2014) · AIMS energy · doi:10.3934/energy.2014.1.18 · Cited by 59
Jin, L. (2011) · International Journal of Market Research · doi:10.2501/ijmr-53-1-075-094 · Cited by 52
A 6D CAD Model for the Automatic Assessment of Building Sustainability
Yung, P., & Wang, X. (2014) · International Journal of Advanced Robotic Systems · doi:10.5772/58446 · Cited by 52
Effects of Building Information Modeling During Construction
Fan, S.-L. (2014) · Tamkang University Institutional Repository (TKUIR) · doi:10.6180/jase.2014.17.2.06 · Cited by 45
Lopez, R., Chong, H., Wang, X., & Graham, J. (2015) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0001094 · Cited by 41
BIM and project planning integration for on-site safety induction
Ganah, A. A., & John, G. A. (2017) · Journal of Engineering Design and Technology · doi:10.1108/jedt-02-2016-0012 · Cited by 41
Bringing Information to the Field: Automated Photo Registration and 4D BIM
Park, J., Cai, H., & Perissin, D. (2017) · Journal of Computing in Civil Engineering · doi:10.1061/(asce)cp.1943-5487.0000740 · Cited by 36
Kang, L.-S., Kim, H. S., Moon, H. S., & Kim, S.-K. (2016) · Automation in Construction · doi:10.1016/j.autcon.2016.04.003 · Cited by 28
Factors Affecting the Current Diffusion of BIM: A Qualitative Study of Online Professional Network
Panuwatwanich, K., & Peansupap, V. (2013) · Griffith Research Online · Cited by 27
Petrosino, A. J., & Lavenberg, J. G. (2007) · Cited by 27
Organizing it in construction: present state and future challenges in Sweden
Gustavsson, T. K., Samuelson, O., & Wikforss, Ö. (2012) · Journal of Information Technology in Construction · Cited by 27
Benefits of Real-Time Data Driven BIM for FM Departments in Operations Control and Maintenance
Davtalab, O. (2017) · ASCE International Conference on Computing in Civil Engineering (i3CE) · doi:10.1061/9780784480823.025 · Cited by 27
Pedagogy and assessment of student learning in BIM and sustainable design and construction
Wu, W., & Luo, Y. (2016) · Journal of Information Technology in Construction · Cited by 26
Cited by
Towards a semantic Construction Digital Twin: Directions for future research
Boje, C., Guerriero, A., Kubicki, S., & Rezgui, Y. (2020) · Automation in Construction · doi:10.1016/j.autcon.2020.103179 · Cited by 1,324
Davila Delgado, J. M., & Oyedele, L. (2021) · Advanced Engineering Informatics · doi:10.1016/j.aei.2021.101332 · Cited by 257
Barriers to Implementing the Circular Economy in the Construction Industry: A Critical Review
Charef, R., Morel, J.-C., & Rakhshan, K. (2021) · Sustainability · doi:10.3390/su132312989 · Cited by 188
Self-citationBIM-Based End-of-Lifecycle Decision Making and Digital Deconstruction: Literature Review
Akbarieh, A., Jayasinghe, L. B., Waldmann, D., & Teferle, F. N. (2020) · Sustainability · doi:10.3390/su12072670 · Cited by 183
Components reuse in the building sector – A systematic review
Rakhshan, K., Morel, J.-C., Alaka, H., & Charef, R. (2020) · Waste Management & Research: The Journal for a Sustainable Circular Economy · doi:10.1177/0734242x20910463 · Cited by 228
“Furthermore, it is also acquiring its position among other research areas such as engineering and management (Alaka et al., 2018, 2016; Charef et al., 2018; Hosseini et al., 2015).”
BackgroundSelf-citation
Metadata
- Authors
- Charef, R., Alaka, H., & Emmitt, S.
- Venue
- Journal of Building Engineering
- Publisher
- Elsevier BV
- Published
- 2018-09
- Volume
- 19
- Pages
- 242-257
- ISSN
- 2352-7102 (ISSN-L)
- OpenAlex
- W2799631697
- Cited by
- 255
- References
- 80
- FWCI
- 6.76
- Type
- journal article
- Language
- en
- Open access
- green
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.