The DOI matches its Crossref record; 75 of the 75 references it cites were found in a registry or an index.
A conceptual framework for tackling knowable unknown unknowns in project management
Abstract
Understanding and dealing with the unknown is a major challenge in project management. An extensive body of knowledge—theory and technique—exists on the “known unknowns,” i.e., uncertainties which can be described probabilistically and addressed through the conventional techniques of risk management. Although some recent studies have addressed projects where the existence of unknown unknowns (unk unks) is readily apparent or may be assumed given the type of project—e.g., new product development or new process implementation—very little work has been reported with respect to projects in general on how a project manager might assess its vulnerability to unk unks. In this paper, we present a conceptual framework to deal with (i.e., recognize and reduce) knowable unk unks in project management. The framework is supported by insights from a variety of theories, case analyses, and experiences. In this framework, we first present a model of the key factors—relating to both project design and behavioral issues—that increase the likelihood of unk unks and a set of propositions linking these factors to unk unks. We then present a set of design and behavioral approaches that project managers could adopt to reduce knowable unk unks. Our framework fills a gap in the project management literature and makes a significant practical contribution: it helps project managers diagnose a project to recognize and reduce the likelihood of unk unks and thus deal more effectively with the otherwise unrecognized risks and opportunities.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Tversky, A., & Kahneman, D. (1974) · Science · doi:10.1126/science.185.4157.1124 · Cited by 28,810
Judgment under Uncertainty: Heuristics and Biases
Tversky, A., & Kahneman, D. (1975) · Utility, Probability, and Human Decision Making · doi:10.1007/978-94-010-1834-0_8 · Cited by 22,650
The magical number seven, plus or minus two: Some limits on our capacity for processing information.
Miller, G. A. (1956) · Psychological Review · doi:10.1037/h0043158 · Cited by 17,812
(2008) · Biostatistics and Microbiology: A Survival Manual · doi:10.1007/978-0-387-77282-0_6 · Cited by 17,371
The magical number seven, plus or minus two: Some limits on our capacity for processing information.
Miller, G. A. (1994) · Psychological Review · doi:10.1037/0033-295x.101.2.343 · Cited by 17,161
A BEHAVIORAL MODEL OF RATIONAL CHOICE
Simon, H. A. (1955) · The Quarterly Journal of Economics · doi:10.2307/1884852 · Cited by 15,877
Anderson, J. R. (2013) · doi:10.4324/9781315799438 · Cited by 6,761
Rational choice and the structure of the environment.
Simon, H. A. (1956) · Psychological Review · doi:10.1037/h0042769 · Cited by 5,919
Developmental sequence in small groups.
Tuckman, B. W. (1965) · Psychological Bulletin · doi:10.1037/h0022100 · Cited by 5,778
Normal Accidents: Living with High Risk Technologies
Grimes, A. J., & Perrow, C. (1985) · The Academy of Management Review · doi:10.2307/257982 · Cited by 4,960
The Architecture of Complexity
Simon, H. A. (1991) · Facets of Systems Science · doi:10.1007/978-1-4899-0718-9_31 · Cited by 4,433
Collective Mind in Organizations: Heedful Interrelating on Flight Decks
Weick, K. E., & Roberts, K. H. (1993) · Administrative Science Quarterly · doi:10.2307/2393372 · Cited by 4,378
A Guide to the project management body of knowledge
(1996) · Choice Reviews Online · doi:10.5860/choice.34-1636 · Cited by 4,339
Making fast strategic decisions in high-velocity environments
Eisenhardt, K. M. (1989) · Academy of Management Journal · doi:10.2307/256434 · Cited by 3,818
Gorillas in our midst: sustained inattentional blindness for dynamic events
Simons, D. J., & Chabris, C. F. (1999) · Perception · doi:10.1068/p281059 · Cited by 3,181
Normal Accidents: Living with High-Risk Technologies
Cummings, L. L., & Perrow, C. (1984) · Administrative Science Quarterly · doi:10.2307/2392945 · Cited by 2,861
A manifesto for the equifinality thesis
Beven, K. (2006) · Journal of Hydrology · doi:10.1016/j.jhydrol.2005.07.007 · Cited by 2,581
Narrative Methods for Organizational & Communication Research
Boje, D. (2001) · SAGE Publications Ltd eBooks · doi:10.4135/9781849209496 · Cited by 1,654
Supply networks and complex adaptive systems: control versus emergence
Choi, T. Y., Dooley, K. J., & Rungtusanatham, M. (2001) · Journal of Operations Management · doi:10.1016/s0272-6963(00)00068-1 · Cited by 1,607
Towards a general theory of adaptive walks on rugged landscapes
Kauffman, S., & Levin, S. (1987) · Journal of Theoretical Biology · doi:10.1016/s0022-5193(87)80029-2 · Cited by 1,386
Bar-yam, Y. (2019) · CRC Press eBooks · doi:10.1201/9780429034961 · Cited by 1,375
An Emerging Strategy of "Direct" Research
Mintzberg, H. (1979) · Administrative Science Quarterly · doi:10.2307/2392364 · Cited by 1,265
The concept of project complexity—a review
Baccarini, D. (1996) · International Journal of Project Management · doi:10.1016/0263-7863(95)00093-3 · Cited by 1,192
Wacker, J. G. (1998) · Journal of Operations Management · doi:10.1016/s0272-6963(98)00019-9 · Cited by 1,042
Some Characteristics of One Type of High Reliability Organization
Roberts, K. H. (1990) · Organization Science · doi:10.1287/orsc.1.2.160 · Cited by 934
Mindfulness and the Quality of Organizational Attention
Weick, K. E., & Sutcliffe, K. M. (2006) · Organization Science · doi:10.1287/orsc.1060.0196 · Cited by 925
One Size Does Not Fit All Projects: Exploring Classical Contingency Domains
Shenhar, A. J. (2001) · Management Science · doi:10.1287/mnsc.47.3.394.9772 · Cited by 821
(1998) · Choice Reviews Online · doi:10.5860/choice.35-6275a · Cited by 818
The Architecture of Complexity
(2007) · IEEE Control Systems · doi:10.1109/mcs.2007.384127 · Cited by 805
Higgins, T. J. (1966) · Journal of the Franklin Institute · doi:10.1016/0016-0032(66)90450-9 · Cited by 797
Integration Analysis of Product Decompositions
Pimmler, T. U., & Eppinger, S. D. (1994) · 6th International Conference on Design Theory and Methodology · doi:10.1115/detc1994-0034 · Cited by 768
Tufte, E. R. (1997) · Infoscience (Ecole Polytechnique Fédérale de Lausanne) · Cited by 684
The Misalignment of Product Architecture and Organizational Structure in Complex Product Development
Sosa, M. E., Eppinger, S. D., & Rowles, C. M. (2004) · Management Science · doi:10.1287/mnsc.1040.0289 · Cited by 656
Counterintuitive behavior of social systems
Forrester, J. W. (1971) · Theory and Decision · doi:10.1007/bf00148991 · Cited by 653
Tatikonda, M. V., & Rosenthal, S. R. (2000) · IEEE Transactions on Engineering Management · doi:10.1109/17.820727 · Cited by 634
Mann, T. (1954) · Medical Entomology and Zoology · Cited by 619
Predicting Change Propagation in Complex Design
Clarkson, P. J., Simons, C., & Eckert, C. M. (2004) · Journal of Mechanical Design · doi:10.1115/1.1765117 · Cited by 619
Now, let's make it really complex (complicated): A systematic review of the complexities of projects
Geraldi, J., Maylor, H., & Williams, T. (2011) · International Journal of Operations & Production Management · doi:10.1108/01443571111165848 · Cited by 559
Defining uncertainty in projects – a new perspective
Perminova, O., Gustafsson, M., & Wikström, K. (2007) · International Journal of Project Management · doi:10.1016/j.ijproman.2007.08.005 · Cited by 492
Smithson, M. (1989) · Cognitive Science · doi:10.1007/978-1-4612-3628-3 · Cited by 476
The scientific theory‐building process: a primer using the case of TQM
Handfield, R. B., & Melnyk, S. A. (1998) · Journal of Operations Management · doi:10.1016/s0272-6963(98)00017-5 · Cited by 466
Managing project uncertainty: from variation to chaos
De Meyer, A., Loch, C. H., & Pich, M. T. (2002) · IEEE Engineering Management Review · doi:10.1109/emr.2002.1032403 · Cited by 464
Predicting Change Propagation in Complex Design
Clarkson, P. J., Simons, C., & Eckert, C. (2001) · Volume 4: 13th International Conference on Design Theory and Methodology · doi:10.1115/detc2001/dtm-21698 · Cited by 463
Explaining Complex Organizational Dynamics
Dooley, K. J., & Van de Ven, A. H. (1999) · Organization Science · doi:10.1287/orsc.10.3.358 · Cited by 403
Selectionism and Learning in Projects with Complexity and Unforeseeable Uncertainty
Sommer, S. C., & Loch, C. H. (2004) · Management Science · doi:10.1287/mnsc.1040.0274 · Cited by 390
Jones, K. S., & Willett, P. (1997) · Cited by 369
Reconceptualizing the effects of lean on production costs with evidence from the F‐22 program
Browning, T. R., & Heath, R. D. (2009) · Journal of Operations Management · doi:10.1016/j.jom.2008.03.009 · Cited by 361
Self-citationExperiencing the Improbable: Rare Events and Organizational Learning
Lampel, J., Shamsie, J., & Shapira, Z. (2009) · Organization Science · doi:10.1287/orsc.1090.0479 · Cited by 341
Measuring project complexity using the Analytic Hierarchy Process
Vidal, L.-A., Marle, F., & Bocquet, J.-C. (2011) · International Journal of Project Management · doi:10.1016/j.ijproman.2010.07.005 · Cited by 302
Sauser, B. J., Reilly, R. R., & Shenhar, A. J. (2009) · International Journal of Project Management · doi:10.1016/j.ijproman.2009.01.004 · Cited by 285
Choice over uncertainty and ambiguity in technical problem solving
Schrader, S., Riggs, W. M., & Smith, R. P. (1993) · Journal of Engineering and Technology Management · doi:10.1016/0923-4748(93)90059-r · Cited by 246
Counterintuitive Behavior of Social Systems
Forrester, J. W. (1971) · SIMULATION · doi:10.1177/003754977101600202 · Cited by 238
The Statistical Mechanics of Complex Product Development: Empirical and Analytical Results
Braha, D., & Bar-Yam, Y. (2007) · Management Science · doi:10.1287/mnsc.1060.0617 · Cited by 231
Key concepts in modeling product development processes
Browning, T. R., Fricke, E., & Negele, H. (2006) · Systems Engineering · doi:10.1002/sys.20047 · Cited by 225
Self-citationHandbook of Aviation Human Factors
(2016) · CRC Press eBooks · doi:10.1201/b10401 · Cited by 218
Deliberate ignorance in project risk management
Kutsch, E., & Hall, M. (2010) · International Journal of Project Management · doi:10.1016/j.ijproman.2009.05.003 · Cited by 202
Diagnosing Unforeseeable Uncertainty in a New Venture*
Loch, C. H., Solt, M. E., & Bailey, E. M. (2008) · Journal of Product Innovation Management · doi:10.1111/j.1540-5885.2007.00281.x · Cited by 198
Frishammar, J., Florén, H., & Wincent, J. (2011) · IEEE Transactions on Engineering Management · doi:10.1109/tem.2010.2095017 · Cited by 192
Gokpinar, B., Hopp, W. J., & Iravani, S. M. R. (2010) · Management Science · doi:10.1287/mnsc.1090.1117 · Cited by 187
Chu, D., Strand, R., & Fjelland, R. (2003) · Complexity · doi:10.1002/cplx.10059 · Cited by 182
Three Decades of Scenario Planning in Shell
Cornelius, P., Van de Putte, A., & Romani, M. (2005) · California Management Review · doi:10.2307/41166329 · Cited by 179
(2001) · Choice Reviews Online · doi:10.5860/choice.38-4525 · Cited by 177
Jacobs, M. A., & Swink, M. (2011) · Journal of Operations Management · doi:10.1016/j.jom.2011.03.002 · Cited by 175
In praise of slack: Time is of the essence
Lawson, M. B. (. (2001) · Academy of Management Perspectives · doi:10.5465/ame.2001.5229658 · Cited by 170
An Adaptive Process Model to Support Product Development Project Management
Lévárdy, V., & Browning, T. R. (2009) · IEEE Transactions on Engineering Management · doi:10.1109/tem.2009.2033144 · Cited by 154
Self-citationAdvancing the Conceptualization and Operationalization of Novelty in Organizational Research
Rosenkopf, L., & McGrath, P. J. (2011) · Organization Science · doi:10.1287/orsc.1100.0637 · Cited by 85
The Arrogance of Optimism: Notes on Failure‐Avoidance Management
Landau, M., & Chisholm, D. (1995) · Journal of Contingencies and Crisis Management · doi:10.1111/j.1468-5973.1995.tb00059.x · Cited by 79
Bazerman, M. H., & Watkins, M. D. (2004) · Cited by 75
Hundsnes, T. (2000) · NORA - Norwegian Open Research Archives · Cited by 73
Cognition and complexity: An experiment on the effect of coupling in parameter design
Hirschi, N., & Frey, D. (2002) · Research in Engineering Design · doi:10.1007/s00163-002-0011-3 · Cited by 68
Degree Distribution and Quality in Complex Engineered Systems
Sosa, M. E., Mihm, J., & Browning, T. R. (2011) · Journal of Mechanical Design · doi:10.1115/1.4004973 · Cited by 57
Self-citationLinking Cyclicality and Product Quality
Sosa, M. E., Mihm, J., & Browning, T. R. (2013) · Manufacturing & Service Operations Management · doi:10.1287/msom.2013.0432 · Cited by 56
Self-citationOn the Novelty Dimension in Project Management
Brockhoff, K. K. L. (2006) · Project Management Journal · doi:10.1177/875697280603700304 · Cited by 28
Kreye, M. E., Goh, Y. M., & Newnes, L. (2009) · Cited by 9
Landau, M., & Chisholm, D. (1988) · eScholarship (California Digital Library) · Cited by 9
Cited by
Qazi, A., Quigley, J., Dickson, A., & Kirytopoulos, K. (2016) · International Journal of Project Management · doi:10.1016/j.ijproman.2016.05.008 · Cited by 294
Clarifying the project complexity construct: Past, present and future
Bakhshi, J., Ireland, V., & Gorod, A. (2016) · International Journal of Project Management · doi:10.1016/j.ijproman.2016.06.002 · Cited by 293
The impacts of lean production on the complexity of socio-technical systems
Soliman, M., Saurin, T. A., & Anzanello, M. J. (2018) · International Journal of Production Economics · doi:10.1016/j.ijpe.2018.01.024 · Cited by 100
Metadata
- Authors
- Ramasesh, R. V., & Browning, T. R.
- Venue
- Journal of Operations Management
- Publisher
- Wiley
- Published
- 2014-03-24
- Volume
- 32
- Issue
- 4
- Pages
- 190-204
- ISSN
- 0272-6963 (ISSN-L)
- 1873-1317
- OpenAlex
- W2009853859
- Cited by
- 290
- References
- 75
- FWCI
- 18.89
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.