New perspectives on construction supply chain integration
The DOI matches its Crossref record; 7 of the 7 references it cites were found in a registry or an index.
Abstract
In 1998, a government‐sponsored review of the UK construction sector called for the adoption of initiatives from manufacturing industry in order to increase productivity and reduce costs. Subsequent research has focused on how supply chain management practices could be implemented effectively by clients, consultants and large contracting organisations. However, little attention has been paid to the integration of small and medium‐size enterprises (SMEs) in the subcontractor and material supply sectors. This paper presents the findings of research that focused on the role of these SMEs in re‐engineered construction supply chains. It was found that significant barriers exist to supplier integration within the construction sector, which stem from SME scepticism over the motives behind supply chain management practices. It is suggested that the industry must make greater efforts to extol the mutual benefits of supplier integration to SMEs if significant performance improvement is to be achieved.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
An empirical investigation into supply chain management: a perspective on partnerships
Spekman, R. E., Kamauff, J. W., & Myhr, N. (1998) · Supply Chain Management: An International Journal · doi:10.1108/13598549810215379 · Cited by 1,079
Supply Chain Management: Relationships, Chains and Networks
Harland, C. M. (1996) · British Journal of Management · doi:10.1111/j.1467-8551.1996.tb00148.x · Cited by 1,065
Squaring lean supply with supply chain management
Lamming, R. (1996) · International Journal of Operations & Production Management · doi:10.1108/01443579610109910 · Cited by 481
Rummler, G. A., & Brache, A. P. (1995) · Cited by 287
Organisational learning and inter‐firm “partnering” in the UK construction industry
Barlow, J. G., & Jashapara, A. (1998) · The Learning Organization · doi:10.1108/09696479810212051 · Cited by 196
Partnering in the construction process: the method for the 1990s and beyond
Himes, P. E. (1995) · Facilities · doi:10.1108/02632779510085168 · Cited by 22
THEORETICAL SUPPLY CHAIN NETWORK MODELLING IN THE BUILDING INDUSTRY
London, K. A., Kenley, R., & Agapiou, A. (1998) · Association of Researchers in Construction Management (ARCOM) eBooks · Cited by 21
Cited by
Dallasega, P., Rauch, E., & Linder, C. (2018) · Computers in Industry · doi:10.1016/j.compind.2018.03.039 · Cited by 468
Developing a consensus definition of supply chain management: a qualitative study
Stock, J. R., & Boyer, S. L. (2009) · International Journal of Physical Distribution & Logistics Management · doi:10.1108/09600030910996323 · Cited by 462
Engineer-to-order supply chain management: A literature review and research agenda
Gosling, J., & Naim, M. M. (2009) · International Journal of Production Economics · doi:10.1016/j.ijpe.2009.07.002 · Cited by 379
Review of supply chain management and logistics research
Sachan, A., & Datta, S. (2005) · International Journal of Physical Distribution & Logistics Management · doi:10.1108/09600030510632032 · Cited by 309
Construction supply chain integration: an elusive goal?
Briscoe, G., & Dainty, A. (2005) · Supply Chain Management: An International Journal · doi:10.1108/13598540510612794 · Cited by 303
Self-citationStakeholder Engagement: Achieving Sustainability in the Construction Sector
Bal, M., Bryde, D., Fearon, D., & Ochieng, E. (2013) · Sustainability · doi:10.3390/su5020695 · Cited by 299
Interdependence in supply chains and projects in construction
Bankvall, L., Bygballe, L. E., Dubois, A., & Jahre, M. (2010) · Supply Chain Management: An International Journal · doi:10.1108/13598541011068314 · Cited by 253
A seamless supply chain management model for construction
Love, P. E. D., Irani, Z., & Edwards, D. J. (2004) · Supply Chain Management: An International Journal · doi:10.1108/13598540410517575 · Cited by 249
The effectiveness of contractual and relational governances in construction projects in China
Lu, P., Guo, S., Qian, L., He, P., & Xu, X. (2015) · International Journal of Project Management · doi:10.1016/j.ijproman.2014.03.004 · Cited by 245
Understanding Construction Supply Chain Management
Behera, P., Mohanty, R. P., & Prakash, A. (2015) · Production Planning & Control · doi:10.1080/09537287.2015.1045953 · Cited by 194
“…scenario and analyse them for suitability/need for modification in the current context, namely, (CSC 01) Vrijhoef and Koskela 2000; (CSC 02) Dainty, Millett, and Briscoe 2001; (CSC 03) London and Kenley 2001; (CSC 04) Cox and Ireland 2002; (CSC 05) Barlow et al. 2003; (CSC 06)…”
BackgroundClient‐led strategies for construction supply chain improvement
Briscoe, G. H., Dainty, A. R. J., Millett, S. J., & Neale, R. H. (2004) · Construction Management and Economics · doi:10.1080/0144619042000201394 · Cited by 192
“This paper describes follow-on research undertaken in response to the findings of preliminary studies carried out to establish the problems preventing main contractors and subcontractors from becoming more integrated (see Millett et al., 2000; Dainty et al., 2001a, 2001b).”
BackgroundSelf-citationImpact of Team Integration and Group Cohesion on Project Delivery Performance
Franz, B., Leicht, R., Molenaar, K., & Messner, J. (2017) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0001219 · Cited by 185
Partnering in engineering projects: Four dimensions of supply chain integration
Eriksson, P. E. (2015) · Journal of Purchasing and Supply Management · doi:10.1016/j.pursup.2014.08.003 · Cited by 182
“Compared to the continuous manufacturing context, SCI is especially challenging in project-based supply chains due to: the discontinuous demand for projects; the uniqueness of each project in technical and financial terms; uncertain demand requirements and production conditions; and the complexity of each project in t…”
BackgroundShurrab, J., Hussain, M., & Khan, M. (2019) · Engineering, Construction and Architectural Management · doi:10.1108/ecam-02-2018-0056 · Cited by 182
Akinade, O. O., & Oyedele, L. O. (2019) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2019.04.232 · Cited by 173
Exploring smart construction objects as blockchain oracles in construction supply chain management
Lu, W., Li, X., Xue, F., Zhao, R., Wu, L., & Yeh, A. G. O. (2021) · Automation in Construction · doi:10.1016/j.autcon.2021.103816 · Cited by 166
“Construction supply chain management (CSCM) aims to ensure the smooth flow of goods and services to the construction site through cooperation between supply chain participants (Dainty et al., 2001).”
BackgroundLean thinking in the highways construction sector: motivation, implementation and barriers
Tezel, A., Koskela, L., & Aziz, Z. (2018) · Production Planning & Control · doi:10.1080/09537287.2017.1412522 · Cited by 165
Achieving Supply Chain Integration within Construction Industry
McDermotti, P., & Khalfan, M. (2012) · Construction Economics and Building · doi:10.5130/ajceb.v6i2.2983 · Cited by 35
Metadata
- Authors
- Dainty, A. R. J., Millett, S. J., & Briscoe, G. H.
- Venue
- Supply Chain Management: An International Journal
- Publisher
- Emerald
- Published
- 2001-10-01
- Volume
- 6
- Issue
- 4
- Pages
- 163-173
- ISSN
- 1359-8546 (ISSN-L)
- OpenAlex
- W2057299108
- Cited by
- 343
- References
- 7
- FWCI
- 11.69
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.