A Survey of Activity Network‐Based Process Models for Managing Product Development Projects
The DOI matches its Crossref record; 123 of the 123 references it cites were found in a registry or an index.
Abstract
Given the crucial role of process modeling in product development (PD) project management research and practice, and the variety of models proposed in the literature, a survey of the PD process modeling literature is timely and valuable. In this work, we focus on the activity network‐based process models that support PD project management and present a comprehensive survey of the literature published in the last decade. To organize our survey, we use a framework based on the purposes of PD process models: project visualization, project planning, project control, and project development. For each purpose, we provide an overview of the relevant models, highlight their key assumptions and findings, synthesize key insights, and illuminate avenues for further research. Although the survey reveals many insights and opportunities, five major areas for future study became apparent: activity interactions, global process improvements, process models as an organizing structure for knowledge management, modeling in cases of uncertainty and ambiguity, and determining the optimum amount of process prescription and structure for an innovative project.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
(1994) · Journal of the American Dietetic Association · doi:10.1016/0002-8223(94)92216-0 · Cited by 45,910
A Dynamic Theory of Organizational Knowledge Creation
Nonaka, I. (1994) · Organization Science · doi:10.1287/orsc.5.1.14 · Cited by 17,809 · cited 1×
“Process models can provide “situation visibility” (Steward 2000): they empower the workforce to achieve focused, committed, and accountable collaboration (Nonaka 1994), which is becoming increasingly important in large, complex organizations and supplier networks.”
Background(2000) · University of Maribor digital library (University of Maribor) · Cited by 9,354
Burns, T., & Stalker, G. M. (1994) · doi:10.1093/acprof:oso/9780198288787.001.0001 · Cited by 7,250
PRODUCT DESIGN AND DEVELOPMENT
(2018) · Handbook of Research on New Product Development · doi:10.4337/9781784718152.00017 · Cited by 5,504 · cited 1×
“Thus, we do not include in our survey the literature dealing with the product architecture (e.g., Ramdas 2003; Ulrich 1995) or the organization design (e.g., Galbraith et al. 1993).”
BackgroundExploitation, Exploration, and Process Management: The Productivity Dilemma Revisited
Benner, M. J., & Tushman, M. L. (2003) · The Academy of Management Review · doi:10.2307/30040711 · Cited by 4,371
A Guide to the project management body of knowledge
(1996) · Choice Reviews Online · doi:10.5860/choice.34-1636 · Cited by 4,339
Product development: Past research, present findings and future directions
Brown, S. L., & Eisenhardt, K. M. (1995) · The Academy of Management Review · doi:10.2307/258850 · Cited by 3,777 · cited 1×
“Brown and Eisenhardt (1995) focus on empirical work on the structures and processes by which individuals create products.”
BackgroundDesign Rules: The Power of Modularity
Baldwin, C. Y., & Clark, K. B. (2000) · doi:10.7551/mitpress/2366.001.0001 · Cited by 3,504
A framework for information systems architecture
Zachman, J. A. (1987) · IBM Systems Journal · doi:10.1147/sj.263.0276 · Cited by 3,228
The role of product architecture in the manufacturing firm
Ulrich, K. (1995) · Research Policy · doi:10.1016/0048-7333(94)00775-3 · Cited by 2,885
Information Processing as an Integrating Concept in Organizational Design
Tushman, M. L., & Nadler, D. A. (1978) · The Academy of Management Review · doi:10.2307/257550 · Cited by 2,561
Petitcolas, F. A. P., Anderson, R. J., & Kuhn, M. G. (1999) · Proceedings of the IEEE · doi:10.1109/5.771065 · Cited by 2,546 · cited 1×
“The techniques of information hiding (e.g., Petitcolas, Anderson, and Kuhn 1999) may enable a variety of users to draw from a common database while addressing security concerns—e.g., when supplier or partner companies wish to integrate their processes for a limited time without giving away all of…”
MethodThe mythical man-month: essays on software engineering
(1996) · Choice Reviews Online · doi:10.5860/choice.33-5142 · Cited by 2,452
The cathedral and the bazaar: musings on Linux and open source by an accidental revolutionary
(2002) · Choice Reviews Online · doi:10.5860/choice.39-2841 · Cited by 2,251
Galbraith, J. R. (1977) · Cited by 2,180
Suh, N. P. (1990) · Cited by 2,155
Notes on the Synthesis of Form
Alexander, C. W. (1964) · Cumulative Index of Computer Aided Architectural Design · Cited by 1,991
Browning, T. R. (2001) · IEEE Transactions on Engineering Management · doi:10.1109/17.946528 · Cited by 1,886 · cited 5×
“(1998) and Browning (2002). Browing and Ramasesh: Survey of Activity Network-based Process Models 218 Production and Operations Management 16(2), pp.”
BackgroundInfluentialSelf-citationWinning at new products : accelerating the process from idea to launch
Cooper, R. G. (2001) · Cited by 1,825
Product Development Decisions: A Review of the Literature
Krishnan, V., & Ulrich, K. T. (2001) · Management Science · doi:10.1287/mnsc.47.1.1.10668 · Cited by 1,701
Project management — A managerial approach
(1989) · European Journal of Operational Research · doi:10.1016/0377-2217(89)90451-7 · Cited by 1,547 · cited 3×
“…management literature traditionally proposes the use of a work breakdown structure (WBS) based on the desired outputs of the project—i.e., determine the high-level activities required to satisfy a project’s in-tents and then decompose these activities (e.g., Meredith and Mantel 2003; PMI 2004).”
BackgroundResource-constrained project scheduling: Notation, classification, models, and methods
Brucker, P., Drexl, A., Möhring, R., Neumann, K., & Pesch, E. (1999) · European Journal of Operational Research · doi:10.1016/s0377-2217(98)00204-5 · Cited by 1,500 · cited 2×
“Accounting for the effects of resource constraints and allocations, Brucker et al. (1999) and Herroelen (2005) review the vast literature on resource-constrained project scheduling.”
BackgroundDecoding the DNA of the Toyota Production System
Spear, S. J., & Bowen, H. K. (1999) · Harvard business review · Cited by 1,321
Balancing Agility and Discipline: A Guide for the Perplexed
Boehm, B. (2004) · Lecture Notes in Computer Science · doi:10.1007/978-3-540-24675-6_1 · Cited by 1,173
A model-based method for organizing tasks in product development
Eppinger, S. D., Whitney, D. E., Smith, R. P., & Gebala, D. A. (1994) · Research in Engineering Design · doi:10.1007/bf01588087 · Cited by 1,022 · cited 2×
“flow? (Eppinger et al. 1994)”
MethodOn Uncertainty, Ambiguity, and Complexity in Project Management
Pich, M. T., Loch, C. H., & Meyer, A. D. (2002) · Management Science · doi:10.1287/mnsc.48.8.1008.163 · Cited by 942 · cited 2×
“Viewing PD as a process of generating information that reduces uncertainty, several authors (Browning et al. 2002; Pich et al. 2002; MacCormack and Verganti 2003) advocate that an activity’s selection occur on the basis of its contribution to uncertainty or risk reduction.”
Background(2018) · Project Management Journal · doi:10.1002/(issn)1938-9507 · Cited by 834
(1996) · Sloan management review · Cited by 767
Tools for Inventing Organizations: Toward a Handbook of Organizational Processes
Malone, T. W., Crowston, K., Lee, J., Pentland, B., Dellarocas, C., Wyner, G., Quimby, J., Osborn, C. S., Bernstein, A., Herman, G., et al. (1999) · Management Science · doi:10.1287/mnsc.45.3.425 · Cited by 755
Preston, J. (1990) · Journal of the Operational Research Society · doi:10.1057/jors.1990.30 · Cited by 741
The Financial Impact of ISO 9000 Certification in the United States: An Empirical Analysis
Corbett, C. J., Montes-Sancho, M. J., & Kirsch, D. A. (2005) · Management Science · doi:10.1287/mnsc.1040.0358 · Cited by 648
Toyota's Principles of Set-Based Concurrent Engineering
Sobek, D. K., Ward, A. C., & Liker, J. Κ. (1999) · Sloan management review · Cited by 632
Product Design and Development
Mazumder, Q. H. (2018) · Introduction to Engineering · doi:10.1201/9781315368610-12 · Cited by 613
A Model-Based Framework to Overlap Product Development Activities
Krishnan, V., Eppinger, S. D., & Whitney, D. E. (1997) · Management Science · doi:10.1287/mnsc.43.4.437 · Cited by 605 · cited 2×
“By modeling the loss of design freedom over the course of a PD process, Krishnan, Eppinger, and Whitney (1997b) stipulate the optimal activity sequence as the one in which the decisions impose the least constraint on downstream activities.”
BackgroundMethodAdaptive Software Development: A Collaborative Approach to Managing Complex Systems
Highsmith, J. A. (1999) · International Linear Collider · Cited by 598
The Options Approach to Capital Investment
Dixit, A. K., & Pindyck, R. S. (1998) · Elsevier eBooks · doi:10.1016/b978-0-7506-7009-8.50024-0 · Cited by 581 · cited 1×
“They examine the value of flexibility under five types of uncertainties (payoffs, requirements, budgets, schedules, and performance/quality), beginning with a key insight from options theory: the value of flexibility increases as uncertainty increases (Dixit and Pindyck 1995).”
BackgroundBalancing Act: How to Capture Knowledge without Killing It
Brown, J. S., & Duguid, P. (2006) · Knowledge management and organizational learning · doi:10.1093/oso/9780199291793.003.0010 · Cited by 577
Modeling impacts of process architecture on cost and schedule risk in product development
Browning, T. R., & Eppinger, S. D. (2002) · IEEE Transactions on Engineering Management · doi:10.1109/tem.2002.806709 · Cited by 577 · cited 3×
“Many of the models we have surveyed support such analyses, and some (e.g., Ah-madi et al. 2001; Browning and Eppinger 2002) apply their analyses to recommend improved process structures for real projects.”
BackgroundMethodSelf-citationA Coordination Theory Approach to Organizational Process Design
Crowston, K. (1997) · Organization Science · doi:10.1287/orsc.8.2.157 · Cited by 565 · cited 1×
“Crowston (1997) explores the benefits of coordination mechanisms (i.e., the policies and techniques by which the participants in various activities exchange information) in the design and management of the information flow, showing that some process decompositions require a greater number of…”
BackgroundModeling Information Manufacturing Systems to Determine Information Product Quality
Ballou, D., Wang, R., Pazer, H., & Tayi, G. K. (1998) · Management Science · doi:10.1287/mnsc.44.4.462 · Cited by 555 · cited 1×
“From an information technology network perspective, Ballou et al. (1998) look at the cost, quality, and timeliness of information products as they move between transformers (activities) to determine whether these parameters fall within planned bounds during process execution.”
BackgroundProject Management Under Risk: Using the Real Options Approach to Evaluate Flexibility in R…D
Huchzermeier, A., & Loch, C. H. (2001) · Management Science · doi:10.1287/mnsc.47.1.85.10661 · Cited by 552
Managing Experimentation in the Design of New Products
Thomke, S. H. (1998) · Management Science · doi:10.1287/mnsc.44.6.743 · Cited by 545 · cited 1×
“Specific models have explored the number and types of test (verification) activities to include: Thomke (1998) and Thomke and Bell (2001) determine when to select a few high-fidelity tests versus a larger number of low-fidelity tests.”
BackgroundFinger, S., & Dixon, J. R. (1989) · Research in Engineering Design · doi:10.1007/bf01580003 · Cited by 521 · cited 1×
“Finger and Dixon (1989) and Kusiak (1999) review PD process models from an engineering design stand-point, whereas our survey focuses on the managerial purposes supported by process models.”
BackgroundDeveloping Products on “Internet Time”: The Anatomy of a Flexible Development Process
MacCormack, A., Verganti, R., & Iansiti, M. (2001) · Management Science · doi:10.1287/mnsc.47.1.133.10663 · Cited by 518 · cited 1×
“(MacCormack et al. 2001) (Chung et al.”
The Effect of “Front‐Loading” Problem‐Solving on Product Development Performance
Thomke, S. H., & Fujimoto, T. (2000) · Journal of Product Innovation Management · doi:10.1016/s0737-6782(99)00031-4 · Cited by 515 · cited 1×
“Thomke and Fujimoto (2000) present the benefits and enablers of front-loading the profile—i.e., investing in solving design problems and reducing uncertainties earlier.”
BackgroundEffects of Process Maturity on Quality, Cycle Time, and Effort in Software Product Development
Harter, D. E., Krishnan, M. S., & Slaughter, S. A. (2000) · Management Science · doi:10.1287/mnsc.46.4.451.12056 · Cited by 507 · cited 1×
“(In what is perhaps the closest empirical study, Harter, Krishnan, and Slaughter (2000) examine the effect of increased process maturity on the quality of the final product.)”
BackgroundNew Product Development: The Performance and Time-to-Market Tradeoff
Cohen, M. A., Eliasberg, J., & Ho, T.-H. (1996) · Management Science · doi:10.1287/mnsc.42.2.173 · Cited by 504 · cited 1×
“(Cohen et al. 1996) (Elmaghraby 1995)”
Task partitioning: An innovation process variable
von Hippel, E. (1990) · Research Policy · doi:10.1016/0048-7333(90)90049-c · Cited by 491
Managing project uncertainty: from variation to chaos
De Meyer, A., Loch, C. H., & Pich, M. T. (2002) · IEEE Engineering Management Review · doi:10.1109/emr.2002.1032403 · Cited by 464 · cited 1×
“De Meyer, Loch, and Pich (2002) classify projects by their type and amount of uncertainty—variation, foreseen uncertainty, un-foreseen uncertainty, and chaos—and suggest that the approach to project management vary accordingly.”
BackgroundTatikonda, M. V., & Rosenthal, S. R. (2000) · Journal of Operations Management · doi:10.1016/s0272-6963(00)00028-0 · Cited by 446 · cited 2×
“We identify three fundamental propositions that provide support and motivation for developing process models of PD projects: (1) Despite its novelties and ambiguities, the PD process has some repeatable structure (e.g., Austin et al. 2000a; Tatikonda and Rosenthal 2000).”
BackgroundMANAGING PRODUCT VARIETY: AN INTEGRATIVE REVIEW AND RESEARCH DIRECTIONS
Ramdas, K. (2003) · Production and Operations Management · doi:10.1111/j.1937-5956.2003.tb00199.x · Cited by 439 · cited 1×
“Thus, we do not include in our survey the literature dealing with the product architecture (e.g., Ramdas 2003; Ulrich 1995) or the organization design (e.g., Galbraith et al. 1993).”
BackgroundAdaptive enterprise creating and leading sense-and-respond organizations
(2000) · Business Horizons · doi:10.1016/s0007-6813(00)89204-6 · Cited by 438 · cited 1×
“In a companion work, Haeckel (1999) develops the metaphor of “management by wire,” akin to “fly by wire” in aircraft parlance, to portray monitoring an expansive network of commitments from a project “cockpit” and correcting any breaks.”
BackgroundA Predictive Model of Sequential Iteration in Engineering Design
Smith, R. P., & Eppinger, S. D. (1997) · Management Science · doi:10.1287/mnsc.43.8.1104 · Cited by 412 · cited 2×
“Several DSM-based models provide guidance on sequencing activities to minimize iteration (e.g., Smith and Eppinger 1997b; Ahmadi, Roemer, and Wang 2001).”
BackgroundMethodSelectionism and Learning in Projects with Complexity and Unforeseeable Uncertainty
Sommer, S. C., & Loch, C. H. (2004) · Management Science · doi:10.1287/mnsc.1040.0274 · Cited by 390 · cited 1×
“…and relationships can be anticipated from one project to the next (Austin, Baldwin, and Waskett 2000b)—re-search is needed on process models to support project planning and other purposes in cases of “unforeseen uncertainty” (e.g., Sommer and Loch 2004) and “chaos” (Sommer, Loch, and Dong 2006).”
BackgroundDynamic modeling of product development processes
Ford, D. N., & Sterman, J. D. (1998) · System Dynamics Review · doi:10.1002/(sici)1099-1727(199821)14:1<31::aid-sdr141>3.0.co;2-5 · Cited by 387 · cited 1×
“by Fricke et al. (1998) and Browning (2002).”
An Evaluation of Research on Integrated Product Development
Gerwin, D., & Barrowman, N. J. (2002) · Management Science · doi:10.1287/mnsc.48.7.938.2818 · Cited by 356 · cited 1×
“Similarly, Gerwin and Barrowman (2002) and Shane and Ulrich (2003) provide empirical and general reviews of PD literature, but they do not emphasize process modeling.”
BackgroundCommunication and Uncertainty in Concurrent Engineering
Loch, C. H., & Terwiesch, C. (1998) · Management Science · doi:10.1287/mnsc.44.8.1032 · Cited by 352 · cited 1×
“Extending this work, Loch and Terwiesch (1998) account for communication and uncertainty effects in determining the optimal degree of concurrency and show that improved communication allows increased overlapping (by mitigating rework).”
BackgroundExchanging Preliminary Information in Concurrent Engineering: Alternative Coordination Strategies
Terwiesch, C., Loch, C. H., & Meyer, A. D. (2002) · Organization Science · doi:10.1287/orsc.13.4.402.2948 · Cited by 300 · cited 1×
“In the context of activity overlapping, Terwiesch, Loch, and Meyer (2002) present a framework for communicating the accuracy and stability of preliminary information, and in contexts of low ambiguity recommend a set-based approach (Sobek, Ward, and Liker 1999) wherein each activity maintains a set…”
BackgroundAdler, P. S., Mandelbaum, A., Nguyen, V., & Schwerer, E. (1995) · Management Science · doi:10.1287/mnsc.41.3.458 · Cited by 297 · cited 1×
“Adler et al. (1995) provide a rich queuing model of iterative PD activities as stochastic processors that receive jobs.”
BackgroundA Simulation-Based Process Model for Managing Complex Design Projects
Cho, S.-H., & Eppinger, S. D. (2005) · IEEE Transactions on Engineering Management · doi:10.1109/tem.2005.850722 · Cited by 293
Levitt, R. E., Thomsen, J., Christiansen, T. R., Kunz, J. C., Jin, Y., & Nass, C. (1999) · Management Science · doi:10.1287/mnsc.45.11.1479 · Cited by 290 · cited 1×
“From an organization design and performance perspective, several papers model and simulate the micro-level actions and interactions of people and teams spawned by a process network (Christian and Seering 1995; Levitt et al. 1999; Moser et al. 1998).”
BackgroundProblem–Solving Oscillations in Complex Engineering Projects
Mihm, J., Loch, C., & Huchzermeier, A. (2003) · Management Science · doi:10.1287/mnsc.49.6.733.16021 · Cited by 280 · cited 1×
“This effect has been called design oscillations (Mihm, Loch, and Huchzermeier 2003) and design churn (Yassine et al. 2003), and both models provide strategies for achieving stability for a diverging process or speeding up a slowly converging process.”
BackgroundUnderstanding fire fighting in new product development⋆
Repenning, N. P. (2001) · Journal of Product Innovation Management · doi:10.1016/s0737-6782(01)00099-6 · Cited by 255 · cited 1×
“(Repenning 2001) (Ahmadi and Wang 1999)”
Parallel and Sequential Testing of Design Alternatives
Loch, C. H., Terwiesch, C., & Thomke, S. (2001) · Management Science · doi:10.1287/mnsc.47.5.663.10480 · Cited by 252 · cited 1×
“(Loch et al. 2001) (Engel and Barad 2003)”
Spiral Development: Experience, Principles, and Refinements
BOEHM, B. W., & Hansen, W. J. (2000) · Defense Technical Information Center (DTIC) · doi:10.21236/ada382590 · Cited by 250
Cooper, L. P. (2003) · Journal of Engineering and Technology Management · doi:10.1016/s0923-4748(03)00007-9 · Cited by 244 · cited 1×
“A large, important area for future research could be to bridge the PD and knowledge management literatures (e.g., Cooper 2003).”
BackgroundCritical Development Activities for Really New versus Incremental Products
Song, X. M., & Montoya‐Weiss, M. M. (1998) · Journal of Product Innovation Management · doi:10.1111/1540-5885.1520124 · Cited by 242
Managing Complexity and Unforeseeable Uncertainty in Startup Companies: An Empirical Study
Sommer, S. C., Loch, C. H., & Dong, J. (2009) · Organization Science · doi:10.1287/orsc.1080.0369 · Cited by 239
Terwiesch, C., & Loch, C. H. (1999) · Journal of Product Innovation Management · doi:10.1016/s0737-6782(98)00041-1 · Cited by 238
Adding value in product development by creating information and reducing risk
Browning, T. R., Deyst, J. J., Eppinger, S. D., & Whitney, D. E. (2002) · IEEE Transactions on Engineering Management · doi:10.1109/tem.2002.806710 · Cited by 238 · cited 10×
“In another view, by defining the goal of a PD project as the minimization of the risk that the project’s outcomes will be unsatisfactory to its stake-holders, Browning et al. (2002) equate progress with uncertainty and risk reduction.”
BackgroundMethodInfluentialSelf-citationGrammatical Models of Organizational Processes
Pentland, B. T. (1995) · Organization Science · doi:10.1287/orsc.6.5.541 · Cited by 233 · cited 1×
“process grammars, see Pentland (1995). Browing and Ramasesh: Survey of Activity Network-based Process Models”
BackgroundMeasuring the Effectiveness of Overlapping Development Activities
Terwiesch, C., & Loch, C. H. (1999) · Management Science · doi:10.1287/mnsc.45.4.455 · Cited by 229 · cited 2×
“Thomke and Fujimoto (2000) present the benefits and enablers of front-loading the profile—i.”
BackgroundManaging New Product Definition in Highly Dynamic Environments
Bhattacharya, S., Krishnan, V., & Mahajan, V. (1998) · Management Science · doi:10.1287/mnsc.44.11.s50 · Cited by 225 · cited 1×
“For example, by modeling the tradeoff between getting locked into incorrect requirements and not having time to optimize a product’s unit cost, Bhattacharya, Krishnan, and Mahajan (1998) determine the optimal design review in which the decision about when to freeze design requirements should be…”
BackgroundKey concepts in modeling product development processes
Browning, T. R., Fricke, E., & Negele, H. (2006) · Systems Engineering · doi:10.1002/sys.20047 · Cited by 225
Self-citationOrganizing for the future: The new logic for managing complex organizations
(1995) · Long Range Planning · doi:10.1016/0024-6301(95)90258-9 · Cited by 220 · cited 1×
“Thus, we do not include in our survey the literature dealing with the product architecture (e.g., Ramdas 2003; Ulrich 1995) or the organization design (e.g., Galbraith et al. 1993).”
An Extreme-Value Model of Concept Testing
Dahan, E., & Mendelson, H. (2001) · Management Science · doi:10.1287/mnsc.47.1.102.10666 · Cited by 220
Towards an ontology of generic engineering design activities
Sim, S. K., & Duffy, A. H. B. (2003) · Research in Engineering Design · doi:10.1007/s00163-003-0037-1 · Cited by 218
Managing Organizational Forgetting
de Holan, P. M., Phillips, N., & Lawrence, T. B. (2004) · HAL · Cited by 206
Information hiding in product development: the design churn effect
Yassine, A., Joglekar, N., Braha, D., Eppinger, S., & Whitney, D. (2003) · Research in Engineering Design · doi:10.1007/s00163-003-0036-2 · Cited by 201
Product development process modeling
Smith, R. P., & Morrow, J. A. (1999) · Design Studies · doi:10.1016/s0142-694x(98)00018-0 · Cited by 201
Reimagining the Differentiation and Integration of Work for Sustained Product Innovation
Dougherty, D. (2001) · Organization Science · doi:10.1287/orsc.12.5.612.10096 · Cited by 198 · cited 2×
“Documenting what, how, and when work should be done—in a highly visual medium—surfaces latent assumptions and sparks innovation (Dougherty 2001).”
BackgroundManaging the Sources of Uncertainty: Matching Process and Context in Software Development
MacCormack, A., & Verganti, R. (2003) · Journal of Product Innovation Management · doi:10.1111/1540-5885.2003004 · Cited by 195 · cited 1×
“Viewing PD as a process of generating information that reduces uncertainty, several authors (Browning et al. 2002; Pich et al. 2002; MacCormack and Verganti 2003) advocate that an activity’s selection occur on the basis of its contribution to uncertainty or risk reduction.”
BackgroundDefining process‐oriented knowledge management strategies
Maier, R., & Remus, U. (2002) · Knowledge and Process Management · doi:10.1002/kpm.136 · Cited by 194 · cited 1×
“Thus, if built upon systematically over time, a process description can become an effective foundation for organizational learning and knowledge management (Davenport, Jarvenpaa, and Beers 1996; Maier and Remus 2002).”
BackgroundOptimal Timing of Reviews in Concurrent Design for Manufacturability
Ha, A. Y., & Porteus, E. L. (1995) · Management Science · doi:10.1287/mnsc.41.9.1431 · Cited by 193 · cited 1×
“Ha and Porteus (1995) model the optimal positioning of de-sign reviews as a tradeoff between the preparation (setup) time for each review and its benefit in catching errors early.”
Background'Signposting', A Parameter-driven Task-based Model of the Design Process
Clarkson, P. J., & Hamilton, J. R. (2000) · Research in Engineering Design · doi:10.1007/s001630050021 · Cited by 182
Shane, S. A., & Ulrich, K. T. (2004) · Management Science · doi:10.1287/mnsc.1040.0204 · Cited by 181 · cited 1×
“Similarly, Gerwin and Barrowman (2002) and Shane and Ulrich (2003) provide empirical and general reviews of PD literature, but they do not emphasize process modeling.”
BackgroundAdaptive Enterprise — Creating and Leading Sense-and-Respond Organizations
Gaddis, P. O. (2000) · Long Range Planning · doi:10.1016/s0024-6301(00)00018-2 · Cited by 176
Sequential Testing in Product Development
Thomke, S. H., & Bell, D. E. (2001) · Management Science · doi:10.1287/mnsc.47.2.308.9838 · Cited by 168 · cited 1×
“Specific models have explored the number and types of test (verification) activities to include: Thomke (1998) and Thomke and Bell (2001) determine when to select a few high-fidelity tests versus a larger number of low-fidelity tests.”
BackgroundOppenheim, B. W. (2004) · Systems Engineering · doi:10.1002/sys.20014 · Cited by 167
GERT - Graphical Evaluation and Review Technique
Pritsker, A. A. B. (1966) · NASA Technical Reports Server (NASA) · Cited by 161
NASA Systems Engineering Handbook
nasa, & Shea, G. (2007) · Cited by 151
Predicting technical communication in product development organizations
Morelli, M. D., Eppinger, S. D., & Gulati, R. K. (1995) · IEEE Transactions on Engineering Management · doi:10.1109/17.403739 · Cited by 150 · cited 2×
“(Hong and Hong 2001) (Morelli et al. 1995)”
BackgroundConceptualizing and Measuring Variety in the Execution of Organizational Work Processes
Pentland, B. T. (2003) · Management Science · doi:10.1287/mnsc.49.7.857.16382 · Cited by 149 · cited 1×
“(Pentland 2003) (Haeckel 1999)”
Concurrent Crashing and Overlapping in Product Development
Roemer, T. A., & Ahmadi, R. H. (2004) · Operations Research · doi:10.1287/opre.1040.0125 · Cited by 144 · cited 1×
“Roemer and Ahmadi (2004) explore overlapping and crashing in a two-activ-ity model.”
BackgroundThe Process Specification Language (PSL) overview and version 1.0 specification
Schlenoff, C., Gruninger, M., Tissot, F., Valois, J., & Lee, J. (2000) · doi:10.6028/nist.ir.6459 · Cited by 141
On customer value and improvement in product development processes
Browning, T. R. (2003) · Systems Engineering · doi:10.1002/sys.10034 · Cited by 138 · cited 2×
“A value maximization objective is recommended for evaluating options (Hazelrigg 1998; Browning 2003), and the decision-based design (e.g., Ullman 2001) and decision analysis literatures provide methodological support.”
BackgroundSelf-citationTechnological Innovation, Product Development, and Entrepreneurship in Management Science
Shane, S. A., & Ulrich, K. T. (2004) · Dialnet (Universidad de la Rioja) · Cited by 133
Structuring product development processes
Ahmadi, R. H., Roemer, T. A., & Wang, R. H. (2001) · European Journal of Operational Research · doi:10.1016/s0377-2217(99)00412-9 · Cited by 123 · cited 1×
“Several DSM-based models provide guidance on sequencing activities to minimize iteration (e.g., Smith and Eppinger 1997b; Ahmadi, Roemer, and Wang 2001).”
MethodAdapting Real Options to New Product Development by Modeling the Second Toyota Paradox
Ford, D. N., & Sobek, D. K. (2005) · IEEE Transactions on Engineering Management · doi:10.1109/tem.2005.844466 · Cited by 116
A process model for packaged software development
Carmel, E., & Becker, S. A. (1995) · IEEE Transactions on Engineering Management · doi:10.1109/17.366403 · Cited by 116
Simulation of the New Product Development Process for Performance Improvement
Bhuiyan, N., Gerwin, D., & Thomson, V. (2004) · Management Science · doi:10.1287/mnsc.1040.0309 · Cited by 115 · cited 1×
“(Neumann 1990) (Belhe and Kusiak 1996a) (Bhuiyan et al. 2004) literature is replete with generic, standard (or canonical) design processes (e.g., Pahl, Beitz, and Wallace 1984; Suh 1990; Whitney 1990; Forsberg, Mooz, and Cotterman 2000; Ulrich and Eppinger 2004).”
BackgroundGuindonRaymonde (1990) · Human-Computer Interaction · Cited by 108
Performance of Coupled Product Development Activities with a Deadline
Joglekar, N. R., Yassine, A., Eppinger, S. D., & Whitney, D. E. (2001) · Management Science · doi:10.1287/mnsc.47.12.1605.10240 · Cited by 101 · cited 1×
“A further extension by Joglekar et al. (2001) accounts for resource constraints and rework generation and shows that factors exogenous to the activity dyad are important to consider when determining the optimal amount of overlap.”
BackgroundIs concurrent engineering always a sensible proposition?
AitSahlia, F., Johnson, E., & Will, P. M. (1995) · IEEE Transactions on Engineering Management · doi:10.1109/17.387269 · Cited by 89 · cited 1×
“AitSahlia, Johnson, and Will (1995) use PD process models to show that complete overlapping is suboptimal and note that uncertainty may erode the advantages of concurrency.”
On the Value of Flexibility in R&D Projects
Santiago, L. P., & Vakili, P. (2005) · Management Science · doi:10.1287/mnsc.1050.0387 · Cited by 85
A Hierarchical Product Development Planning Framework
Anderson, E. G., & Joglekar, N. R. (2005) · Production and Operations Management · doi:10.1111/j.1937-5956.2005.tb00029.x · Cited by 84 · cited 1×
“Anderson and Joglekar (2005) reopti-mize resource allocation to PD stages over a rolling horizon.”
BackgroundA simulation-based optimization framework for product development cycle time reduction
AbdelSalam, H. M. E.-S., & Bao, H. P. (2006) · IEEE Transactions on Engineering Management · doi:10.1109/tem.2005.861805 · Cited by 83
Project Management under Uncertainty: The Impact of Heuristics and Biases
McCray, G. E., Purvis, R. L., & McCray, C. G. (2002) · Project Management Journal · doi:10.1177/875697280203300108 · Cited by 80 · cited 1×
“However, eliciting the knowledge of PD process participants is notoriously difficult (McCray, Purvis, and McCray 2002).”
BackgroundRush and Be Wrong or Wait and Be Late? A Model of Information in Collaborative Processes
Loch, C. H., & Terwiesch, C. (2005) · Production and Operations Management · doi:10.1111/j.1937-5956.2005.tb00028.x · Cited by 80 · cited 1×
“More generally, Loch and Terwiesch (2005) recommend seven principles of how to exchange information in concurrent processes.”
BackgroundThe time-cost tradeoff in research and development: A review
Graves, S. B. (1989) · Engineering Costs and Production Economics · doi:10.1016/0167-188x(89)90011-6 · Cited by 68 · cited 1×
“However, Graves (1989) questions the universality of this assumption, and Brooks (1995) essentially states that going faster costs less.”
BackgroundThe dimensions of process knowledge
Amaravadi, C. S., & Lee, I. (2005) · Knowledge and Process Management · doi:10.1002/kpm.218 · Cited by 67 · cited 1×
“Thus, process models can facilitate the buildup and honing of project and enterprise information (Amaravadi and Lee 2005), including the specific purposes in Table 6.”
MethodEngineering the Virtual Enterprise: An Architecture-Driven Modeling Approach
Presley, A. R., Sarkis, J., Barnett, W. D., & Liles, D. H. (2001) · International Journal of Flexible Manufacturing Systems · doi:10.1023/a:1011131417956 · Cited by 66 · cited 2×
“Basu, Blanning, and Shtub (1997), Bond (1999), and Presley et al. (2001) all note the importance of keeping model information in one place with multiple views instead of spread across disparate models , particularly to facilitate process integration.”
BackgroundA Formal Two-Phase Method for Decomposition of Complex Design Problems
Chen, L., Ding, Z., & Li, S. (2005) · Journal of Mechanical Design · doi:10.1115/1.1778186 · Cited by 62 · cited 1×
“Hence, the engineering design literature on the decomposition of design problems into sub-problems (e.g., Pahl et al. 1984; Bras and Mistree 1991; Michelena and Papalambros 1995; Altus, Kroo, and Gage 1996; Rogers 1999; Chen, Ding, and Li 2005”
MethodEffective risk management : some keys to success
Conrow, E. H. (2000) · American Institute of Aeronautics and Astronautics eBooks · Cited by 58
On Identifying and Estimating the Cycle Time of Product Development Process
Jun, H.-B., Ahn, H.-S., & Suh, H.-W. (2005) · IEEE Transactions on Engineering Management · doi:10.1109/tem.2005.850740 · Cited by 48
Overlapping design and build cycles in product development
Chakravarty, A. K. (2001) · European Journal of Operational Research · doi:10.1016/s0377-2217(00)00264-2 · Cited by 47 · cited 1×
“(Chakravarty 2001)”
Haque, B., & Pawar, K. S. (2003) · Business Process Management Journal · doi:10.1108/14637150310484535 · Cited by 42
Inter‐firm sharing of process knowledge: exploring knowledge markets
Bell, D. G., Giordano, R., & Putz, P. (2002) · Knowledge and Process Management · doi:10.1002/kpm.131 · Cited by 39
Effective Risk Management—Some Keys to Success
Pohlmann, L. D. (2001) · Insight · doi:10.1002/inst.20014349a · Cited by 31
Making Process Visible: A Grammatical Approach to Managing Design Processes
Chung, M. J., Kwon, P. Y., & Pentland, B. T. (2002) · Journal of Mechanical Design · doi:10.1115/1.1487358 · Cited by 29 · cited 2×
“Chung, Kwon, and Pentland (2002) emphasize the importance of visualizing a project’s potential process space —the range of process scenarios that could unfold.”
BackgroundSupporting enterprise design through multiple views
Yu, B., Harding, J. A., & Popplewell, K. (2000) · International Journal of Agile Management Systems · doi:10.1108/14654650010312633 · Cited by 14 · cited 1×
“On the other hand, it is desirable to synthesize all the views into a single architecture (Basu, Blanning, Shtub 1997; Bond 1999; Yu et al. 2000; Sousa, Aken, Groesbeck 2002), like the U.S. Department of Defense Architecture Framework (DoD 2001) does for product architectures, so that each view…”
BackgroundProduct Development Process Management System Based on P_PROCE Model
Qian, F., & Shensheng, Z. (2002) · Concurrent Engineering · doi:10.1177/106329302761689124 · Cited by 9
Cited by
Marion, T. J., & Fixson, S. K. (2021) · Journal of Product Innovation Management · doi:10.1111/jpim.12547 · Cited by 466
Process models in design and development
Wynn, D. C., & Clarkson, P. J. (2018) · Research in Engineering Design · doi:10.1007/s00163-017-0262-7 · Cited by 319
Sommer, A. F., Hedegaard, C., Dukovska-Popovska, I., & Steger-Jensen, K. (2015) · Research-Technology Management · doi:10.5437/08956308x5801236 · Cited by 220
“Process models and methods become increasingly important to product development management as process complexity grows ( Browning and Ramasesh 2007 ).”
MethodModularity and Commonality Research: Past Developments and Future Opportunities
Fixson, S. K. (2007) · Concurrent Engineering · doi:10.1177/1063293x07078935 · Cited by 182
Handbook of New Product Development Management
(2007) · Routledge eBooks · doi:10.4324/9780080554402 · Cited by 176
Metadata
- Authors
- Browning, T. R., & Ramasesh, R. V.
- Venue
- Production and Operations Management
- Publisher
- SAGE Publications
- Published
- 2007-03
- Volume
- 16
- Issue
- 2
- Pages
- 217-240
- ISSN
- 1059-1478 (ISSN-L)
- 1937-5956
- OpenAlex
- W2167433132
- Cited by
- 210
- References
- 123
- FWCI
- 19.64
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.