Construction delays in a fast-growing economy: Comparing Thailand with other economies
The DOI matches its Crossref record; 5 of the 5 references it cites were found in a registry or an index.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Causes of High Costs of Construction in Nigeria
Okpala, D. C., & Aniekwu, A. N. (1988) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(1988)114:2(233 · Cited by 234
Reasons for delays in public projects in Turkey
Arditi, D., Akan, G. T., & Gurdamar, S. (1985) · Construction Management and Economics · doi:10.1080/01446198500000013 · Cited by 198
Causes of Delay in the Construction Industry
Baldwin, J. R., Manthei, J. M., Rothbart, H. A., & Harris, R. B. (1971) · Journal of the Construction Division · doi:10.1061/jcceaz.0000305 · Cited by 118
Reasons for overrun in public sector construction projects in Nigeria
Dlakwa, M. M., & Culpin, M. F. (1990) · International Journal of Project Management · doi:10.1016/0263-7863(90)90032-7 · Cited by 109
Delays on Large Construction Projects
Sullivan, A., & Harris, F. (1986) · International Journal of Operations & Production Management · doi:10.1108/eb054752 · Cited by 57
Research works printed but not linked: 5
- Padmasuta, 1992, A study of construction contracting systems for large projects in Bangkok, AIT Thesis No. ST-92-16
- Ogunlana, 1989, A survey of site management practice on some selected sites in Nigeria, Building Environ, 24, 191, 10.1016/0360-1323(89)90009-7 · doi:10.1016/0360-1323(89)90009-7
- Wahab, 1977, Improving efficiency in the building sector, West African Tech Rev, 81
- Promkuntong, 1992, Delays in building construction projects in Thailand, AIT Thesis No. ST-92-19
- Ofori, 1991, Programmes for improving the performance of contracting firms in developing industries: A review of approaches and appropriate option, Construct Management Economics, 9, 19, 10.1080/01446199100000003 · doi:10.1080/01446199100000003
Cited by
Causes and effects of delays in Malaysian construction industry
Sambasivan, M., & Soon, Y. W. (2007) · International Journal of Project Management · doi:10.1016/j.ijproman.2006.11.007 · Cited by 1,422
Causes of construction delay: traditional contracts
Odeh, A. M., & Battaineh, H. T. (2002) · International Journal of Project Management · doi:10.1016/s0263-7863(00)00037-5 · Cited by 810
Frimpong, Y., Oluwoye, J., & Crawford, L. (2003) · International Journal of Project Management · doi:10.1016/s0263-7863(02)00055-8 · Cited by 796
Cost escalation and schedule delays in road construction projects in Zambia
Kaliba, C., Muya, M., & Mumba, K. (2009) · International Journal of Project Management · doi:10.1016/j.ijproman.2008.07.003 · Cited by 596
Le-Hoai, L., Lee, Y. D., & Lee, J. Y. (2008) · KSCE Journal of Civil Engineering · doi:10.1007/s12205-008-0367-7 · Cited by 560
Significant factors causing delay in the UAE construction industry
Faridi, A. S., & El‐Sayegh, S. M. (2006) · Construction Management and Economics · doi:10.1080/01446190600827033 · Cited by 551
Delays in construction projects: The case of Jordan
Sweis, G., Sweis, R., Abu Hammad, A., & Shboul, A. (2008) · International Journal of Project Management · doi:10.1016/j.ijproman.2007.09.009 · Cited by 534
The significant factors causing delay of building construction projects in Malaysia
Alaghbari, W., Razali A. Kadir, M., Salim, A., & Ernawati (2007) · Engineering, Construction and Architectural Management · doi:10.1108/09699980710731308 · Cited by 489
Olawale, Y. A., & Sun, M. (2010) · Construction Management and Economics · doi:10.1080/01446191003674519 · Cited by 478
“…Price (2003) Design changes Mansfield et al (1994), Dlakwa and Cuplin (1990), Kaming et al (1997), Assaf et al (1995), Chang (2002), Lee et al (2005) Ogunlana et al (1996), Kartam et al (2000) Al-Momani (2000) Financing and payment for completed works Manfield et al (1994), Faniran (1999), Assaf…”
BackgroundDelays and cost increases in the construction of private residential projects in Kuwait
Koushki, P. A., Al‐Rashid, K., & Kartam, N. (2005) · Construction Management and Economics · doi:10.1080/0144619042000326710 · Cited by 456
Construction Delays and Their Causative Factors in Nigeria
Aibinu, A. A., & Odeyinka, H. A. (2006) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2006)132:7(667 · Cited by 348
Taxonomy for change causes and effects in construction projects
Sun, M., & Meng, X. (2009) · International Journal of Project Management · doi:10.1016/j.ijproman.2008.10.005 · Cited by 331
Problems causing delays in major construction projects in Thailand
Toor, S.-U.-R., & Ogunlana, S. (2008) · Construction Management and Economics · doi:10.1080/01446190801905406 · Cited by 307
Self-citationA fuzzy synthetic evaluation approach for risk assessment: a case of Singapore's green projects
Zhao, X., Hwang, B.-G., & Gao, Y. (2016) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2015.11.042 · Cited by 279
Delays and cost overruns in the construction projects in the Gaza Strip
Enshassi, A., Al‐Najjar, J., & Kumaraswamy, M. (2009) · Journal of Financial Management of Property and Construction · doi:10.1108/13664380910977592 · Cited by 278
Causes of delays on construction projects: a comprehensive list
Durdyev, S., & Hosseini, M. R. (2019) · International Journal of Managing Projects in Business · doi:10.1108/ijmpb-09-2018-0178 · Cited by 245
Delays in Building Construction Projects in Ghana
Fugar, F. D., & Agyakwah-Baah, A. B. (1970) · Construction Economics and Building · doi:10.5130/ajceb.v10i1-2.1592 · Cited by 211
“However, in developing economies Ogunlana et al. (1996) have reported that there are distinctive problems that cause delays in construction.”
BackgroundRanking of delay factors in construction projects after Egyptian revolution
Aziz, R. F. (2013) · Alexandria Engineering Journal · doi:10.1016/j.aej.2013.03.002 · Cited by 209
Improving project management performance of large contractors using benchmarking approach
Luu, V. T., Kim, S.-Y., & Huynh, T.-A. (2008) · International Journal of Project Management · doi:10.1016/j.ijproman.2007.10.002 · Cited by 208
“‘‘The Federation Internationale Des Ingenieurs-Councils (FIDIC) form of contract is mainly used with modifications to meet local laws and project requirements’’ [47].”
BackgroundDelays in Building Construction Projects in Ghana
Fugar, F. D., & Agyakwah-Baah, A. B. (2010) · Australasian Journal of Construction Economics and Building · doi:10.5130/ajceb.v10i1/2.1592 · Cited by 203
Root-Cause Analysis of Construction-Cost Overruns
Rosenfeld, Y. (2014) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000789 · Cited by 187
Causes of delay in the global construction industry: a meta analytical review
Sanni-Anibire, M. O., Mohamad Zin, R., & Olatunji, S. O. (2022) · International Journal of Construction Management · doi:10.1080/15623599.2020.1716132 · Cited by 173
Causes of delay in residential construction projects in Cambodia
Durdyev, S., Omarov, M., & Ismail, S. (2017) · Cogent Engineering · doi:10.1080/23311916.2017.1291117 · Cited by 158
A quantitative assessment of the cost and time impact of variation orders on construction projects
Oladapo, A. A. (2007) · Journal of Engineering, Design and Technology · doi:10.1108/17260530710746597 · Cited by 93
“Viewed in the light of the assertion by Ogunlana et al. (1996)”
MethodAN ASSESSMENT OF THE LITERATURE ON THE PERFORMANCE OF CONSTRUCTION PROJECTS IN NIGERIA
Unegbu, H. C. O., Yawas, D., & Dan-asabe, B. (2023) · Jurnal mekanikal · doi:10.11113/jm.v46.467 · Cited by 6
Metadata
- Authors
- Ogunlana, S. O., Promkuntong, K., & Jearkjirm, V.
- Venue
- International Journal of Project Management
- Publisher
- Elsevier BV
- Published
- 1996-02
- Volume
- 14
- Issue
- 1
- Pages
- 37-45
- ISSN
- 0263-7863 (ISSN-L)
- OpenAlex
- W1975271010
- Cited by
- 390
- References
- 5
- FWCI
- 0.00
- Type
- journal article
- Language
- en
- Open access
- closed
- Licence
- www.elsevier.com/tdm/userlicense/1.0/ (tdm)
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.