Human–Robot Collaboration in Construction: Classification and Research Trends
The DOI matches its Crossref record; 139 of the 139 references it cites were found in a registry or an index.
Abstract
Construction robots continue to be increasingly deployed on construction sites to assist human workers in various tasks to improve safety, efficiency, and productivity. Due to the recent and ongoing growth in robot capabilities and functionalities, humans and robots are now able to work side-by-side and to share workspaces. The emerging field of human–robot collaboration has significant potential applications in construction and continues to advance the state of the art in defining the responsibilities of both humans and robots during collaborative work. This paper proposes a new taxonomy for collaborative human–robot work in construction teams. The evolution of construction robots during the last two decades is first reviewed, and relevant bodies of work are categorized into one of five levels of human–robot collaboration: Preprogramming, Adaptive Manipulation, Imitation Learning, Improvisatory Control, and Full Autonomy. The categories of the proposed taxonomy are defined based on the level of robot autonomy and the corresponding human effort in collaborative teamwork. Second, this paper uses the categories of the proposed taxonomy as a contextual framework to identify current challenges and knowledge gaps in collaborative human–robot construction work and recommends directions for future research.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Advances in Neural Information Processing Systems 29
Teymur, O., Zygalakis, K., & Calderhead, B. (2016) · Cited by 13,887
Extracting and composing robust features with denoising autoencoders
Vincent, P., Larochelle, H., Bengio, Y., & Manzagol, P.-A. (2008) · Proceedings of the 25th international conference on Machine learning - ICML '08 · doi:10.1145/1390156.1390294 · Cited by 7,436 · cited 1×
“The context was extracted and translated by several encoders, decoders, and autoencoders (Vincent et al. 2008), and then defined reward functions for reinforcement learning methods were used to determine the robot control policy (Schulman et al. 2015).”
MethodStacked Hourglass Networks for Human Pose Estimation
Newell, A., Yang, K., & Deng, J. (2016) · Lecture Notes in Computer Science · doi:10.1007/978-3-319-46484-8_29 · Cited by 5,634 · cited 1×
“…to ensure the mutual understanding between humans and robots is the application of pose estimation systems to identify locations of humans and robots (Liang et al. 2019b; Newell et al. 2016) and information systems to communicate with each other, such as Digital Twins (Liang et al. 2020b).”
BackgroundEngineering Psychology and Human Performance
Wickens, C. D., Hollands, J. G., Banbury, S., & Parasuraman, R. (2015) · Psychology Press eBooks · doi:10.4324/9781315665177 · Cited by 4,982
Trust region policy optimization
Schulman, J., Levine, S., Moritz, P., Jordan, M. I., & Abbeel, P. (2015) · arXiv · doi:10.48550/arxiv.1502.05477 · Cited by 4,578 · cited 1×
“The context was extracted and translated by several encoders, decoders, and autoencoders (Vincent et al. 2008), and then defined reward functions for reinforcement learning methods were used to determine the robot control policy (Schulman et al. 2015).”
MethodA survey of robot learning from demonstration
Argall, B. D., Chernova, S., Veloso, M., & Browning, B. (2009) · Robotics and Autonomous Systems · doi:10.1016/j.robot.2008.10.024 · Cited by 3,227
Swarm robotics: a review from the swarm engineering perspective
Brambilla, M., Ferrante, E., Birattari, M., & Dorigo, M. (2013) · Swarm Intelligence · doi:10.1007/s11721-012-0075-2 · Cited by 1,762 · cited 1×
“Swarm robotics is one of the collaborative methods that aims to coordinate a team of numerous robots (Brambilla et al. 2013; Kayser et al. 2018).”
BackgroundAutomated construction by contour crafting—related robotics and information technologies
Khoshnevis, B. (2004) · Automation in Construction · doi:10.1016/j.autcon.2003.08.012 · Cited by 1,161 · cited 1×
“…crafting (CC), or 3D printing, is the first type of method in this category; it is a layered manufacturing technique that has the potential to directly construct a building or component with different designs, embedded with all conduits for mechanical, electrical, and plumbing (Khoshnevis 2004).”
BackgroundENDSLEY, M. R., & KABER, D. B. (1999) · Ergonomics · doi:10.1080/001401399185595 · Cited by 1,088
Imitation Learning: A Survey of Learning Methods
Hussein, A., Gaber, M. M., Elyan, E., & Jayne, C. (2018) · ACM Computing Surveys · doi:10.1145/3054912 · Cited by 1,060
Robot Programming by Demonstration
Billard, A., Calinon, S., Dillmann, R., & Schaal, S. (2008) · Springer Handbook of Robotics · doi:10.1007/978-3-540-30301-5_60 · Cited by 1,002
Progress and prospects of the human–robot collaboration
Ajoudani, A., Zanchettin, A. M., Ivaldi, S., Albu-Schäffer, A., Kosuge, K., & Khatib, O. (2018) · Autonomous Robots · doi:10.1007/s10514-017-9677-2 · Cited by 832 · cited 2×
“Human – robot collaboration (HRC) is defined as human(s) and robot(s) contact with each other to establish a dynamic system for accomplishing tasks in the environment (Ajoudani et al. 2018).”
BackgroundRecent Advances in Robot Learning from Demonstration
Ravichandar, H., Polydoros, A. S., Chernova, S., & Billard, A. (2020) · Annual Review of Control, Robotics, and Autonomous Systems · doi:10.1146/annurev-control-100819-063206 · Cited by 752 · cited 3×
“The traditional robot programming methods require an exhaustive specification of robot actions by programmers and are difficult to adapt to unknown geometry in the workplace, where the IL methods require task-specific experts for demonstration (Ravichandar et al. 2020; Torabi et al. 2019).”
BackgroundMethodToward a Framework for Levels of Robot Autonomy in Human-Robot Interaction
Beer, J. M., Fisk, A. D., & Rogers, W. A. (2014) · Journal of Human-Robot Interaction · doi:10.5898/jhri.3.2.beer · Cited by 629 · cited 5×
“In the Preprogramming category, the human undertakes the majority of the effort to plan the work, and the robot only executes the plan, which maps to the Tele-Operation group in the LoRA described in Beer et al. (2014).”
BackgroundMethodInfluentialDavila Delgado, J. M., Oyedele, L., Ajayi, A., Akanbi, L., Akinade, O., Bilal, M., & Owolabi, H. (2019) · Journal of Building Engineering · doi:10.1016/j.jobe.2019.100868 · Cited by 607 · cited 1×
“Construction is a low-profit and high-risk industry, and the major clients of construction companies — e.g., public owners — typically follow the lowest bid price method to procure constructed facilities; this generally inhibits the adoption of new technologies (Davila Delgado et al. 2019).”
BackgroundCollaborative manufacturing with physical human–robot interaction
Cherubini, A., Passama, R., Crosnier, A., Lasnier, A., & Fraisse, P. (2016) · Robotics and Computer-Integrated Manufacturing · doi:10.1016/j.rcim.2015.12.007 · Cited by 589 · cited 2×
“The goal of HRC is to ease the workload of humans in performing repetitive and physically demanding tasks (Cherubini et al. 2016).”
BackgroundHentout, A., Aouache, M., Maoudj, A., & Akli, I. (2019) · Advanced Robotics · doi:10.1080/01691864.2019.1636714 · Cited by 462 · cited 1×
“Similar to the fault-tolerance paradigm in the industrial cobot system (Crestani et al. 2015; Hentout et al. 2019), the discrepancy between the design model and the actual workpiece needs to be identified by construction robots.”
ResultA UAV for bridge inspection: Visual servoing control law with orientation limits
Metni, N., & Hamel, T. (2007) · Automation in Construction · doi:10.1016/j.autcon.2006.12.010 · Cited by 460 · cited 3×
“Several studies have been conducted on control algorithms for UAVs to maintain their altitude — e.g., fuzzy logic control algorithms (Bulgakov et al. 2014) or dynamic control algorithms (Metni and Hamel 2007).”
BackgroundMethod3D printing of a post-tensioned concrete girder designed by topology optimization
Vantyghem, G., Corte, W. D., Shakur, E., & Amir, O. (2020) · Automation in Construction · doi:10.1016/j.autcon.2020.103084 · Cited by 443 · cited 1×
“Concrete is the most common material used in CC and 3D printing due to its fluidity and solid characteristics during and after the fabrication (Carneau et al. 2020; Herrmann et al. 2018; Jeon et al. 2013; Li et al. 2020; Lim et al. 2011; Panda et al. 2017; Shakor et al. 2017; Vantyghem et al. 2020).”
BackgroundLarge-scale 3D printing by a team of mobile robots
Zhang, X., Li, M., Lim, J. H., Weng, Y., Tay, Y. W. D., Pham, H., & Pham, Q.-C. (2018) · Automation in Construction · doi:10.1016/j.autcon.2018.08.004 · Cited by 418 · cited 2×
“…the other hand, promising advancements in topics such as multi-robot safety (Liang et al. 2018), worker activities identification (Liu et al. 2016; Zhang et al. 2018a), or real-time tracking of construction robot and coworkers (Wu et al. 2010) can be made to promote the deployment of…”
BackgroundLiu, P., Chen, A. Y., Huang, Y.-N., Han, J.-Y., Lai, J.-S., Kang, S.-C., Wu, T.-H., Wen, M.-C., & Tsai, M.-H. (2014) · Smart Structures and Systems · doi:10.12989/sss.2014.13.6.1065 · Cited by 377 · cited 2×
“Vision systems such as CCD cameras or laser scanners are usually deployed with the robot to inspect the surface of the bridge/ tunnel structure and detect cracks (Chen et al. 2014; Lee et al. 2011; Victores et al. 2011; Yu et al. 2007).”
BackgroundAuto inspection system using a mobile robot for detecting concrete cracks in a tunnel
Yu, S.-N., Jang, J., & Han, C.-S. (2006) · Automation in Construction · doi:10.1016/j.autcon.2006.05.003 · Cited by 373 · cited 1×
“Vision systems such as CCD cameras or laser scanners are usually deployed with the robot to inspect the surface of the bridge/ tunnel structure and detect cracks (Chen et al. 2014; Lee et al. 2011; Victores et al. 2011; Yu et al. 2007).”
BackgroundOn the emergence of 3D printable Engineered, Strain Hardening Cementitious Composites (ECC/SHCC)
Li, V. C., Bos, F. P., Yu, K., McGee, W., Ng, T. Y., Figueiredo, S. C., Nefs, K., Mechtcherine, V., Nerella, V. N., Pan, J., et al. (2020) · Cement and Concrete Research · doi:10.1016/j.cemconres.2020.106038 · Cited by 342 · cited 1×
“Concrete is the most common material used in CC and 3D printing due to its fluidity and solid characteristics during and after the fabrication (Carneau et al. 2020; Herrmann et al. 2018; Jeon et al. 2013; Li et al. 2020; Lim et al. 2011; Panda et al. 2017; Shakor et al. 2017; Vantyghem et al. 2020).”
BackgroundImitation from Observation: Learning to Imitate Behaviors from Raw Video via Context Translation
Liu, Y., Gupta, A., Abbeel, P., & Levine, S. (2018) · 2018 IEEE International Conference on Robotics and Automation (ICRA) · doi:10.1109/icra.2018.8462901 · Cited by 278
Bridge inspection robot system with machine vision
Oh, J.-K., Jang, G., Oh, S., Lee, J. H., Yi, B.-J., Moon, Y. S., Lee, J. S., & Choi, Y. (2009) · Automation in Construction · doi:10.1016/j.autcon.2009.04.003 · Cited by 258 · cited 2×
“The bridge and offshore plant-maintenance robots are mounted on specially designed trucks for maneuvering on roads and train bridges (Oh et al. 2009; Sutter et al. 2018).”
BackgroundOn a human-robot collaboration in an assembly cell
Tsarouchi, P., Matthaiakis, A.-S., Makris, S., & Chryssolouris, G. (2017) · International Journal of Computer Integrated Manufacturing · doi:10.1080/0951192x.2016.1187297 · Cited by 258 · cited 1×
“In the manufacturing industry, humans and robots work in the shared workspace performing manufacturing tasks such as welding (Erden and Billard 2014), transporting (Levratti et al. 2016), and assembling (Cherubini et al. 2016; Matsas and Vosniakos 2017; Tsarouchi et al. 2017).”
BackgroundRemote proximity monitoring between mobile construction resources using camera-mounted UAVs
Kim, D., Liu, M., Lee, S., & Kamat, V. R. (2019) · Automation in Construction · doi:10.1016/j.autcon.2018.12.014 · Cited by 251 · cited 8×
“An example includes the application of UAVs to provide additional information on the construction site to on-site mobile robots (Kim et al. 2019c) or the use of multiple robotic arms to manipulate heavy and large components, such as drywall or curtain panels, for installation at desired locations…”
BackgroundMethodInfluentialSelf-citationSLAM-driven robotic mapping and registration of 3D point clouds
Kim, P., Chen, J., & Cho, Y. K. (2018) · Automation in Construction · doi:10.1016/j.autcon.2018.01.009 · Cited by 250 · cited 3×
“…evolving simultaneous localization and mapping (SLAM) techniques have enhanced mobile robot navigation ability, especially for the indoor GPS-denied environment, by building the map of the environment and locating itself (Asadi et al. 2018; Kim et al. 2018b; Nemoto and Mohan 2020; Xu et al. 2020).”
BackgroundDesign of a virtual reality training system for human–robot collaboration in manufacturing tasks
Matsas, E., & Vosniakos, G.-C. (2017) · International Journal on Interactive Design and Manufacturing (IJIDeM) · doi:10.1007/s12008-015-0259-2 · Cited by 238 · cited 1×
“In the manufacturing industry, humans and robots work in the shared workspace performing manufacturing tasks such as welding (Erden and Billard 2014), transporting (Levratti et al. 2016), and assembling (Cherubini et al. 2016; Matsas and Vosniakos 2017; Tsarouchi et al. 2017).”
BackgroundAn integrated UGV-UAV system for construction site data collection
Asadi, K., Kalkunte Suresh, A., Ender, A., Gotad, S., Maniyar, S., Anand, S., Noghabaei, M., Han, K., Lobaton, E., & Wu, T. (2020) · Automation in Construction · doi:10.1016/j.autcon.2019.103068 · Cited by 232 · cited 2×
“The UAV plays the role of an external eye for the navigation robot, which observes the blind spot and constructs a human – UAV collaboration team with unmanned ground vehicle (UGV) for on-site data collection (Asadi et al. 2020).”
BackgroundTunnel structural inspection and assessment using an autonomous robotic system
Menéndez, E., Victores, J. G., Montero, R., Martínez, S., & Balaguer, C. (2017) · Automation in Construction · doi:10.1016/j.autcon.2017.12.001 · Cited by 219 · cited 1×
“Robotic systems in the Full Autonomy category. visual and acoustic data via cameras, laser profilers, and several nondestructive evaluation sensors (NDE) to inspect the bridge and tunnel structural deformation (La et al. 2014; Menendez et al. 2018).”
MethodLiDAR-equipped UAV path planning considering potential locations of defects for bridge inspection
Bolourian, N., & Hammad, A. (2020) · Automation in Construction · doi:10.1016/j.autcon.2020.103250 · Cited by 213 · cited 2×
“Research on path-planning algorithms improves the performance of the UAV in bridge inspection, maximizing coverage and minimizing flight time (Bolourian and Hammad 2020; Phung et al. 2017).”
BackgroundMethodWang, Z., Li, H., & Zhang, X. (2019) · Automation in Construction · doi:10.1016/j.autcon.2018.11.009 · Cited by 211 · cited 1×
“…methods based on convolutional neural networks (CNN) have been applied to identify the context of the environment — such as cracks, nails, screws, or walls (Asadi et al. 2018; Kucuksubasi and Sorguc 2018; Wang et al. 2019) — and to then generate a semantic model of the building (Adán et al. 2020).”
MethodRobotic timber construction — Expanding additive fabrication to new dimensions
Willmann, J., Knauss, M., Bonwetsch, T., Apolinarska, A. A., Gramazio, F., & Kohler, M. (2016) · Automation in Construction · doi:10.1016/j.autcon.2015.09.011 · Cited by 209 · cited 1×
“The robot fabrication assembly can handle complex designs such as timber structures, carbon-fiber winding ceiling structures, or specific concrete elements (Hasan et al. 2019; Heikkilä et al. 2015; Jovanovi´c et al. 2017; Reinhardt et al. 2019; Willmann et al. 2016).”
Duan, Y., Andrychowicz, M., Stadie, B. C., Ho, J., Schneider, J., Sutskever, I., Abbeel, P., & Zaremba, W. (2017) · arXiv (Cornell University) · doi:10.48550/arxiv.1703.07326 · Cited by 208
Construction work and risk of occupational disability: a ten year follow up of 14 474 male workers
Arndt, V, Rothenbacher, D., Daniel, U., Zschenderlein, B., Schuberth, S., & Brenner, H. (2005) · Occupational and Environmental Medicine · doi:10.1136/oem.2004.018135 · Cited by 207 · cited 1×
“Occupational hazards such as musculoskeletal disorders are also common among workers (Arndt et al. 2005).”
BackgroundTowards an autonomous real-time tracking system of near-miss accidents on construction sites
Wu, W., Yang, H., Chew, D. A. S., Yang, S.-H., Gibb, A. G. F., & Li, Q. (2010) · Automation in Construction · doi:10.1016/j.autcon.2009.11.017 · Cited by 206 · cited 1×
“…in topics such as multi-robot safety (Liang et al. 2018), worker activities identification (Liu et al. 2016; Zhang et al. 2018a), or real-time tracking of construction robot and coworkers (Wu et al. 2010) can be made to promote the deployment of collaborative robots for on-site construction.”
BackgroundRecent Advances in Imitation Learning from Observation
Torabi, F., Warnell, G., & Stone, P. (2019) · International Joint Conference on Artificial Intelligence · doi:10.24963/ijcai.2019/882 · Cited by 203
Development of a Viable Concrete Printing Process
Lim, S., Buswell, R., Le, T., Wackrow, R., Austin, S., Gibb, A., & Thorpe, T. (2011) · Proceedings of the International Symposium on Automation and Robotics in Construction (IAARC) · doi:10.22260/isarc2011/0124 · Cited by 192 · cited 1×
“Concrete is the most common material used in CC and 3D printing due to its fluidity and solid characteristics during and after the fabrication (Carneau et al. 2020; Herrmann et al. 2018; Jeon et al. 2013; Li et al. 2020; Lim et al. 2011; Panda et al. 2017; Shakor et al. 2017; Vantyghem et al. 2020).”
BackgroundYou, S., Kim, J.-H., Lee, S., Kamat, V., & Robert, L. P. (2018) · Automation in Construction · doi:10.1016/j.autcon.2018.09.008 · Cited by 191 · cited 4×
“…the new paradigm of collaborative robot teams (cobots) and human – robot collaborative teams has also been introduced and is envisioned to be deployed on future construction sites to assist or relieve human workers from hazardous, dangerous, and repetitive construction tasks (You et al. 2018).”
BackgroundInfluentialSelf-citationHuang, J., Huo, W., Xu, W., Mohammed, S., & Amirat, Y. (2015) · IEEE Transactions on Automation Science and Engineering · doi:10.1109/tase.2015.2466634 · Cited by 185 · cited 1×
“In the domestic or healthcare facility, robots are utilized to assist humans with various daily tasks such as picking up objects (van Osch et al. 2014) or rehabilitation, such as walking assistants (Wakita et al. 2013) or arm reinforcement (Huang et al. 2015).”
BackgroundMichalos, G., Makris, S., Spiliotopoulos, J., Misios, I., Tsarouchi, P., & Chryssolouris, G. (2014) · Procedia CIRP · doi:10.1016/j.procir.2014.10.079 · Cited by 175 · cited 1×
“Michalos et al. (2014) proposed the enhancement of LfD by using voice and natural language to command robots and the use of visual recognition methods and force sensors to demonstrate the tasks.”
BackgroundSaidi, K. S., Bock, T., & Georgoulas, C. (2016) · Springer Handbooks · doi:10.1007/978-3-319-32552-1_57 · Cited by 166 · cited 2×
“In addition, Saidi et al. (2016) also classified construction robots into three general categories based on the level of onboard intelligence: teleoperated systems, programmable construction machines, and intelligent systems.”
BackgroundLarge-scale 3D printing with cable-driven parallel robots
Izard, J.-B., Dubor, A., Hervé, P.-E., Cabay, E., Culla, D., Rodríguez, M., & Barrado, M. (2017) · Construction Robotics · doi:10.1007/s41693-017-0008-0 · Cited by 165 · cited 1×
“In addition to the robotic arm on the track system, the cable-driven parallel robot (Bosscher et al. 2007; Izard et al. 2017; Vukorep 2017), gantry robot (Gardiner et al. 2016), or truck-mounted concrete pump robot (Krause et al. 2018) are utilized due to their large-scale workspace.”
MethodTeaching robots to perform quasi-repetitive construction tasks through human demonstration
Liang, C., Kamat, V. R., & Menassa, C. C. (2020) · Automation in Construction · doi:10.1016/j.autcon.2020.103370 · Cited by 154 · cited 4×
“In the third category of the taxonomy, the robot Imitation Learning method, is defined as robots learning a specific task by observing demonstration from human experts (Argall et al. 2009; Liang et al. 2020a).”
BackgroundMethodInfluentialSelf-citationBock, T. A. (2006) · Autonomous Robots · doi:10.1007/s10514-006-9008-5 · Cited by 153
Vision guided autonomous robotic assembly and as-built scanning on unstructured construction sites
Feng, C., Xiao, Y., Willette, A., McGee, W., & Kamat, V. R. (2015) · Automation in Construction · doi:10.1016/j.autcon.2015.06.002 · Cited by 150 · cited 3×
“…robots has been limited and they have not been broadly employed on real construction sites due to the limitations of the hardware, the quality of the robot actuators, and, importantly, the nature of the unstructured working environments (Feng et al. 2015; Lundeen et al. 2017; Saidi et al. 2008).”
BackgroundSelf-citationAdditive manufacturing of cantilever - From masonry to concrete 3D printing
Carneau, P., Mesnil, R., Roussel, N., & Baverel, O. (2020) · Automation in Construction · doi:10.1016/j.autcon.2020.103184 · Cited by 149 · cited 1×
“Concrete is the most common material used in CC and 3D printing due to its fluidity and solid characteristics during and after the fabrication (Carneau et al. 2020; Herrmann et al. 2018; Jeon et al. 2013; Li et al. 2020; Lim et al. 2011; Panda et al. 2017; Shakor et al. 2017; Vantyghem et al. 2020).”
BackgroundGiftthaler, M., Sandy, T., Dörfler, K., Brooks, I., Buckingham, M., Rey, G., Kohler, M., Gramazio, F., & Buchli, J. (2017) · Construction Robotics · doi:10.1007/s41693-017-0003-5 · Cited by 142 · cited 1×
“The additive manufacturing and fabrication robots in the Full Autonomy category are mainly in situ fabrication mobile robots (Giftthaler et al. 2017; Hack et al. 2020).”
MethodCollaborative Welding System using BIM for Robotic Reprogramming and Spatial Augmented Reality
Tavares, P., Costa, C. M., Rocha, L. F., Malaca, P., Costa, P., Moreira, A. P., Sousa, A. J., & Veiga, G. M. (2019) · Automation in Construction · doi:10.1016/j.autcon.2019.04.020 · Cited by 139 · cited 2×
“The assembly and earthmoving robots in the Improvisatory Control category are capable of performing construction assembly tasks autonomously under human supervision remotely (Molfino et al. 2008) or projecting information by augmented reality (Tavares et al. 2019).”
BackgroundA vision-based marker-less pose estimation system for articulated construction robots
Liang, C., Lundeen, K. M., McGee, W., Menassa, C. C., Lee, S. H., & Kamat, V. R. (2019) · Automation in Construction · doi:10.1016/j.autcon.2019.04.004 · Cited by 136 · cited 6×
“…methods (Argall et al. 2009; Billard et al. 2008; Hussein et al. 2017) open avenues to new research areas of teaching robots complicated construction tasks (Liang et al. 2019a), which are typically difficult to preprogram as trajectories for the robot or to define as optimization problems.”
BackgroundMethodInfluentialSelf-citationImpedance control of a hydraulically actuated robotic excavator
Ha, Q. P., Nguyen, Q. H., Rye, D. C., & Durrant-Whyte, H. F. (2000) · Automation in Construction · doi:10.1016/s0926-5805(00)00056-x · Cited by 136 · cited 3×
“One of the purposes is energy consumption minimization (Rachkov et al. 2002), another is vibration and sway reduction (Cheng et al. 2015; Ha et al. 2000), and the other is unskilled operation assistance (Araya and Kagoshima 2001).”
BackgroundMethodVision-based integrated mobile robotic system for real-time applications in construction
Asadi, K., Ramshankar, H., Pullagurla, H., Bhandare, A., Shanbhag, S., Mehta, P., Kundu, S., Han, K., Lobaton, E., & Wu, T. (2018) · Automation in Construction · doi:10.1016/j.autcon.2018.10.009 · Cited by 128 · cited 2×
“…evolving simultaneous localization and mapping (SLAM) techniques have enhanced mobile robot navigation ability, especially for the indoor GPS-denied environment, by building the map of the environment and locating itself (Asadi et al. 2018; Kim et al. 2018b; Nemoto and Mohan 2020; Xu et al. 2020).”
BackgroundMethodForce-based variable impedance learning for robotic manipulation
Abu-Dakka, F. J., Rozo, L. D., & Caldwell, D. G. (2018) · Robotics and Autonomous Systems · doi:10.1016/j.robot.2018.07.008 · Cited by 126 · cited 1×
“The format of the demonstration can involve directly controlling the robot — e.g., kinesthetic or tele-operating (Abu-Dakka et al. 2018; Calinon et al. 2006) — or indirectly recording observations using sensors — e.g., camera or tactile sensors (Duan et al. 2017; Edmonds et al. 2017; Liu et al.…”
BackgroundKontovourkis, O., & Tryfonos, G. (2019) · Automation in Construction · doi:10.1016/j.autcon.2019.103005 · Cited by 121 · cited 1×
“Steel and clay are other types of materials for robotic 3D printing (Kerber et al. 2018; Kontovourkis and Tryfonos 2020).”
BackgroundRobot-based construction automation: An application to steel beam assembly (Part I)
Chu, B., Jung, K., Lim, M. T., & Hong, D. (2013) · Automation in Construction · doi:10.1016/j.autcon.2012.12.016 · Cited by 121
Hack, N., Dörfler, K., Walzer, A. N., Wangler, T., Mata-Falcón, J., Kumar, N., Buchli, J., Kaufmann, W., Flatt, R. J., Gramazio, F., et al. (2020) · Automation in Construction · doi:10.1016/j.autcon.2020.103197 · Cited by 120 · cited 1×
“The additive manufacturing and fabrication robots in the Full Autonomy category are mainly in situ fabrication mobile robots (Giftthaler et al. 2017; Hack et al. 2020).”
MethodBIM-based task-level planning for robotic brick assembly through image-based 3D modeling
Ding, L., Jiang, W., Zhou, Y., Zhou, C., & Liu, S. (2020) · Advanced Engineering Informatics · doi:10.1016/j.aei.2019.100993 · Cited by 116 · cited 1×
“Building information models (BIM) can also be used as the data source and combined with a cable-driven parallel robot or robotic arm to construct the masonry structures (Bruckmann et al. 2016; Ding et al. 2020; Usmanov et al. 2017).”
MethodAutomated re-prefabrication system for buildings using robotics
Kasperzyk, C., Kim, M.-K., & Brilakis, I. (2017) · Automation in Construction · doi:10.1016/j.autcon.2017.08.002 · Cited by 115 · cited 1×
“Finally, a new concept of robotic refabrication is proposed to disassemble a prefabricated structure and fabricate it into a new design by comparing the two designs and removing unnecessary components (Kasperzyk et al. 2017).”
MethodRobotics and Automation in Construction
Balaguer, C., & Abderrahim, M. (2008) · InTech eBooks · doi:10.5772/86 · Cited by 113
Localisation of a mobile robot for bridge bearing inspection
Peel, H., Luo, S., Cohn, A. G., & Fuentes, R. (2018) · Automation in Construction · doi:10.1016/j.autcon.2018.07.003 · Cited by 111
Kim, D., Lee, S. H., & Kamat, V. R. (2020) · Journal of Computing in Civil Engineering · doi:10.1061/(asce)cp.1943-5487.0000899 · Cited by 105 · cited 1×
“…studies that have addressed the issue of whether it is safe enough for the human worker to work alongside robots on unstructured construction sites via computer vision or sensors (Kim et al. 2019a, 2020; Lee and Moon 2014; Liang et al. 2019b), this is still an open research field to investigate.”
BackgroundSelf-citationKyjánek, O., Bahar, B. A., Vasey, L., Wannemacher, B., & Menges, A. (2019) · International Symposium on Automation and Robotics in Construction (ISARC) · doi:10.22260/isarc2019/0164 · Cited by 105 · cited 1×
“The human worker collaborates with the robot fabrication process through the stationary monitor or augmented reality goggles (Kyjanek et al. 2019).”
BackgroundXu, L., Feng, C., Kamat, V. R., & Menassa, C. C. (2019) · Automation in Construction · doi:10.1016/j.autcon.2019.04.011 · Cited by 104 · cited 1×
“A 3D point cloud of the environment is created in real-time to determine the navigation path (Kim et al. 2018b; Xu et al. 2019).”
BackgroundSelf-citationKim, P., Park, J., Cho, Y. K., & Kang, J. (2019) · Automation in Construction · doi:10.1016/j.autcon.2019.102918 · Cited by 101 · cited 8×
“An example includes the application of UAVs to provide additional information on the construction site to on-site mobile robots (Kim et al. 2019c) or the use of multiple robotic arms to manipulate heavy and large components, such as drywall or curtain panels, for installation at desired locations…”
BackgroundMethodInfluentialHuman adaptation to latency in teleoperated multi-robot human-agent search and rescue teams
Khasawneh, A., Rogers, H., Bertrand, J., Madathil, K. C., & Gramopadhye, A. K. (2018) · Automation in Construction · doi:10.1016/j.autcon.2018.12.012 · Cited by 97 · cited 1×
“The latency between the remote robot and the human operator needs to be overcome (Khasawneh et al. 2019).”
BackgroundEnhancing fault tolerance of autonomous mobile robots
Crestani, D., Godary-Dejean, K., & Lapierre, L. (2015) · Robotics and Autonomous Systems · doi:10.1016/j.robot.2014.12.015 · Cited by 97 · cited 1×
“Similar to the fault-tolerance paradigm in the industrial cobot system (Crestani et al. 2015; Hentout et al. 2019), the discrepancy between the design model and the actual workpiece needs to be identified by construction robots.”
ResultTrends in Robotics and Automation in Construction
Balaguer, C., & Abderrahim, M. (2008) · InTech eBooks · doi:10.5772/5865 · Cited by 95 · cited 1×
“Recent advances in hardware, software, and machine learning methods have progressed the general development in robotics, which has in turn increased the performance of construction robots (Balaguer and Abderrahim 2008).”
BackgroundAutomated construction system for high-rise reinforced concrete buildings
Wakisaka, T., Furuya, N., Inoue, Y., & Shiokawa, T. (2000) · Automation in Construction · doi:10.1016/s0926-5805(99)00039-4 · Cited by 88 · cited 1×
“The steel structure and the prefabricated, reinforced-concrete structure are two main types of construction methods for the high-rise building robot due to convenient delivery and straightforward assembly (Liang et al. 2017; Wakisaka et al. 2000).”
Autonomous motion planning and task execution in geometrically adaptive robotized construction work
Lundeen, K. M., Kamat, V. R., Menassa, C. C., & McGee, W. (2019) · Automation in Construction · doi:10.1016/j.autcon.2018.12.020 · Cited by 88 · cited 3×
“The motion-planning algorithm is applied to determine the new trajectory of the robot to complete the task based on sensors (Bock et al. 2003; Lundeen et al. 2019).”
BackgroundMethodSelf-citationTeleoperation of construction machines with haptic information for underwater applications
Hirabayashi, T., Akizono, J., Yamamoto, T., Sakai, H., & Yano, H. (2005) · Automation in Construction · doi:10.1016/j.autcon.2005.07.008 · Cited by 85 · cited 2×
“…achieved with human arm and inertial measurement unit (IMU) sensors (Kim et al. 2009a), camera to visualize the excavation scene (Okishiba et al. 2019), and haptic sensors with force feedback to augment the information of the construction machine at the remote location (Hirabayashi et al. 2006).”
BackgroundShah, R. K. (2016) · Journal of Advanced College of Engineering and Management · doi:10.3126/jacem.v2i0.16097 · Cited by 83 · cited 1×
“In addition, according to Global Construction Survey 2015, only 25% of the construction projects between 2012 and 2014 finished within 10% of their original deadline (KPMG 2015); this led to significant extra costs to the construction projects (Shah 2016).”
BackgroundKurien, M., Kim, M.-K., Kopsida, M., & Brilakis, I. (2017) · Automation in Construction · doi:10.1016/j.autcon.2017.11.005 · Cited by 82 · cited 1×
“They are either preprogrammed off-line with the trajectory and monitored by human operators through human – machine interface (Gambao et al. 2000; Iturralde and Bock 2013) or tele-operated by the operator at a remote location (Chi et al. 2012; Chung et al. 2010; Kurien et al. 2018).”
BackgroundUAV-based 3D reconstruction for hoist site mapping and layout planning in petrochemical construction
Jiang, W., Zhou, Y., Ding, L., Zhou, C., & Ning, X. (2020) · Automation in Construction · doi:10.1016/j.autcon.2020.103137 · Cited by 82 · cited 2×
“These types of robots are tele-operated along with onboard sensors or cameras supplementing information (Cigola et al. 2005; Jiang et al. 2020; Kuczmarski et al. 2003; Moghaddam and Hadi 2005; Moghaddam and Tafti 2005; Prabakaran et al. 2018; So and Chan 2002) or use virtual guides to assist…”
BackgroundMethodDevelopment of hybrid robot for construction works with pneumatic actuator
Choi, H., Han, C.-S., Lee, K.-Y., & Lee, S.-H. (2004) · Automation in Construction · doi:10.1016/j.autcon.2004.09.008 · Cited by 81 · cited 1×
“The hybrid manipulator that combines pneumatic actuator and servo motor is used to overcome the lifting of heavy panel materials (Choi et al. 2005).”
MethodUnderstanding the Determinants of Construction Robot Adoption: Perspective of Building Contractors
Pan, M., & Pan, W. (2020) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0001821 · Cited by 80 · cited 1×
“Pan and Pan (2020) surveyed stakeholders to find the determinants of construction robot adoption from the perspectives of building contractors.”
BackgroundRobot-based construction automation: An application to steel beam assembly (Part II)
Jung, K., Chu, B., & Hong, D. (2013) · Automation in Construction · doi:10.1016/j.autcon.2012.12.011 · Cited by 79 · cited 2×
“For instance, robots developed for screwing/bolting identified best with the “ connect ” basic task (Chu et al. 2013; Jung et al. 2013; Nam et al. 2007).”
BackgroundEdmonds, M., Gao, F., Xie, X., Liu, H., Qi, S., Zhu, Y., Rothrock, B. A., & Zhu, S. C. (2017) · IEEE/RSJ International Conference on Intelligent Robots and Systems (IROS) · doi:10.1109/iros.2017.8206196 · Cited by 78 · cited 1×
“…format of the demonstration can involve directly controlling the robot — e.g., kinesthetic or tele-operating (Abu-Dakka et al. 2018; Calinon et al. 2006) — or indirectly recording observations using sensors — e.g., camera or tactile sensors (Duan et al. 2017; Edmonds et al. 2017; Liu et al. 2018).”
BackgroundDevelopment of user interface for tele-operated cranes
Chi, H.-L., Chen, Y., Kang, S.-C., & Hsieh, S. (2012) · Advanced Engineering Informatics · doi:10.1016/j.aei.2012.05.001 · Cited by 78 · cited 1×
“They are either preprogrammed off-line with the trajectory and monitored by human operators through human – machine interface (Gambao et al. 2000; Iturralde and Bock 2013) or tele-operated by the operator at a remote location (Chi et al. 2012; Chung et al. 2010; Kurien et al. 2018).”
BackgroundRobot-aided tunnel inspection and maintenance system by vision and proximity sensor integration
Victores, J. G., Martínez, S., Jardón, A., & Balaguer, C. (2011) · Automation in Construction · doi:10.1016/j.autcon.2010.12.005 · Cited by 74 · cited 1×
“Vision systems such as CCD cameras or laser scanners are usually deployed with the robot to inspect the surface of the bridge/ tunnel structure and detect cracks (Chen et al. 2014; Lee et al. 2011; Victores et al. 2011; Yu et al. 2007).”
BackgroundLiu, M., Han, S., & Lee, S. H. (2016) · Construction Innovation · doi:10.1108/ci-10-2015-0054 · Cited by 71 · cited 1×
“On the other hand, promising advancements in topics such as multi-robot safety (Liang et al. 2018), worker activities identification (Liu et al. 2016; Zhang et al. 2018a), or real-time tracking of construction robot and coworkers (Wu et al. 2010) can be made to promote the deployment of…”
BackgroundRobotic data collection and simulation for evaluation of building retrofit performance
Mantha, B. R. K., Menassa, C. C., & Kamat, V. R. (2018) · Automation in Construction · doi:10.1016/j.autcon.2018.03.026 · Cited by 67 · cited 1×
“In addition to the vision-based scene understanding methods, fiducial markers or laser positioning units can help in accurate localization (Mantha et al. 2018; Nahangi et al. 2018; Tsuruta et al. 2019).”
BackgroundSelf-citationOn learning the statistical representation of a task and generalizing it to various contexts
Calinon, S., Guenter, F., & Billard, A. (2006) · Proceedings - IEEE International Conference on Robotics and Automation/Proceedings · doi:10.1109/robot.2006.1642154 · Cited by 65 · cited 1×
“The format of the demonstration can involve directly controlling the robot — e.g., kinesthetic or tele-operating (Abu-Dakka et al. 2018; Calinon et al. 2006) — or indirectly recording observations using sensors — e.g., camera or tactile sensors (Duan et al. 2017; Edmonds et al. 2017; Liu et al.…”
BackgroundToward a framework for robot-inclusive environments
Tan, N., Elara, M. R., & Watanabe, A. (2016) · Automation in Construction · doi:10.1016/j.autcon.2016.06.001 · Cited by 65 · cited 1×
“On the other hand, Tan et al. (2016) proposed a framework for formulating the robot-inclusive environments by measuring the in-clusiveness of environments to robots, developing a taxonomy of robot-environment interaction, and identifying design criteria of autonomous robots in indoor and outdoor…”
BackgroundAn autonomous robotic platform for automatic extraction of detailed semantic models of buildings
Adán, A., Quintana, B., Prieto, S. A., & Bosché, F. (2019) · Automation in Construction · doi:10.1016/j.autcon.2019.102963 · Cited by 64 · cited 1×
“…methods based on convolutional neural networks (CNN) have been applied to identify the context of the environment — such as cracks, nails, screws, or walls (Asadi et al. 2018; Kucuksubasi and Sorguc 2018; Wang et al. 2019) — and to then generate a semantic model of the building (Adán et al. 2020).”
MethodTechnology gaps in Human-Machine Interfaces for autonomous construction robots
Czarnowski, J., Dąbrowski, A., Maciaś, M., Główka, J., & Wrona, J. (2018) · Automation in Construction · doi:10.1016/j.autcon.2018.06.014 · Cited by 63 · cited 1×
“The Autonomous ground vehicle (AGV) is an example of a fully autonomous construction robot that can operate in unstructured, expansive, and harsh environments or indoor GPS-denied environments (Czarnowski et al. 2018; Madhavan and Durrant-Whyte 2004).”
BackgroundDevelopment of a wall-climbing platform with modularized wall-cleaning units
Kim, T., Jeon, Y., Yoo, S., Kim, K., Kim, H. S., & Kim, J. (2017) · Automation in Construction · doi:10.1016/j.autcon.2017.07.004 · Cited by 60 · cited 2×
“These are applied to high-rise buildings with sensors, control algorithms, and human-machine interfaces to monitor the robots (Hortig et al. 2001; Joo et al. 2019; Kim et al. 2017; Lee et al. 2018).”
BackgroundMethodLytle, A. M., Saidi, K. S., Bostelman, R. V., Stone, W. C., & Scott, N. A. (2003) · Automation in Construction · doi:10.1016/j.autcon.2003.08.009 · Cited by 57 · cited 1×
“…kinematic and dynamic model of the wood-processing robot (Bock et al. 2002c), the mechatronic slip robot (Bock et al. 2004b), the robotic crane (Lytle et al. 2004), nuclear decommissioning multi-arm mobile robot (Bakari et al. 2006), reinforced concrete box cul-vert (RCBC) chipping robot (Cho…”
MethodRemote control of backhoe at construction site with a pneumatic robot system
Sasaki, T., & Kawashima, K. (2008) · Automation in Construction · doi:10.1016/j.autcon.2008.02.004 · Cited by 57 · cited 1×
“The first group of research directly mounts (i.e., emulates) a robot inside the cabin to control the machine (Kimura et al. 2006; Lee et al. 2019; Sasaki and Kawashima 2008).”
BackgroundConstruction Robot Path-Planning for Earthwork Operations
Kim, S.-K., Russell, J. S., & Koo, K.-J. (2003) · Journal of Computing in Civil Engineering · doi:10.1061/(asce)0887-3801(2003)17:2(97 · Cited by 56 · cited 1×
“A path-planning algorithm — e.g., SensBug — is employed to generate an effective path for the robot to avoid complex obstacles (Kim et al. 2003).”
MethodMobile robot for marking free access floors at construction sites
Tsuruta, T., Miura, K., & Miyaguchi, M. (2019) · Automation in Construction · doi:10.1016/j.autcon.2019.102912 · Cited by 52 · cited 1×
“In addition to the vision-based scene understanding methods, fiducial markers or laser positioning units can help in accurate localization (Mantha et al. 2018; Nahangi et al. 2018; Tsuruta et al. 2019).”
BackgroundResearch on Construction Workers’ Activity Recognition Based on Smartphone
Zhang, M., Chen, S., Zhao, X.-F., & Yang, Z. (2018) · Italian National Conference on Sensors · doi:10.3390/s18082667 · Cited by 48
RAS: a robotic assembly system for steel structure erection and assembly
Liang, C., Kang, S.-C., & Lee, M.-H. (2017) · International Journal of Intelligent Robotics and Applications · doi:10.1007/s41315-017-0030-x · Cited by 47 · cited 1×
“The steel structure and the prefabricated, reinforced-concrete structure are two main types of construction methods for the high-rise building robot due to convenient delivery and straightforward assembly (Liang et al. 2017; Wakisaka et al. 2000).”
Self-citationRausch, C., Nahangi, M., Haas, C. T., & West, J. S. (2016) · Automation in Construction · doi:10.1016/j.autcon.2016.12.001 · Cited by 44 · cited 1×
“Even though the loose tolerance issue of the construction robot has led to several studies (Nahangi et al. 2015; Nahangi and Haas 2016; Rausch et al. 2017), there is still a research effort needed on the general approach of integrating discrepancy control into construction human – robot…”
BackgroundGrytnes, R., Grill, M., Pousette, A., Törner, M., & Nielsen, K. J. (2017) · Vocations and Learning · doi:10.1007/s12186-017-9180-0 · Cited by 44 · cited 1×
“This concept can be further extended to robot learning from human performance or demonstration, which is similar to the apprenticeship learning modality already prevalent in the construction industry for human-to-human training (Grytnes et al. 2018).”
BackgroundAutomatic Crack Detection in Built Infrastructure Using Unmanned Aerial Vehicles
Phung, M. D., Dinh, T. H., Hoang, V. T., & Ha, Q. (2017) · International Symposium on Automation and Robotics in Construction (ISARC) · doi:10.22260/isarc2017/0115 · Cited by 43 · cited 2×
“Research on path-planning algorithms improves the performance of the UAV in bridge inspection, maximizing coverage and minimizing flight time (Bolourian and Hammad 2020; Phung et al. 2017).”
BackgroundMethodRobotic fabrication of freeform foam structures with quadrilateral and puzzle shaped panels
Jovanović, M., Raković, M., Tepavčević, B., Borovać, B., & Nikolić, M. N. (2016) · Automation in Construction · doi:10.1016/j.autcon.2016.11.003 · Cited by 43 · cited 1×
“The robot fabrication assembly can handle complex designs such as timber structures, carbon-fiber winding ceiling structures, or specific concrete elements (Hasan et al. 2019; Heikkilä et al. 2015; Jovanovi´c et al. 2017; Reinhardt et al. 2019; Willmann et al. 2016).”
Kayser, M., Cai, L., Falcone, S., Bader, C., Inglessis, N., Darweesh, B., & Oxman, N. (2018) · Construction Robotics · doi:10.1007/s41693-018-0013-y · Cited by 43 · cited 2×
“Swarm robotics is one of the collaborative methods that aims to coordinate a team of numerous robots (Brambilla et al. 2013; Kayser et al. 2018).”
BackgroundMethodUAV payload with collision mitigation for contact inspection
González-deSantos, L. M., Martínez-Sánchez, J., González-Jorge, H., Navarro-Medina, F., & Arias, P. (2020) · Automation in Construction · doi:10.1016/j.autcon.2020.103200 · Cited by 42 · cited 2×
“For example, the UAV has to keep a constant distance from the structure for contact inspection (González-deSantos et al. 2020).”
BackgroundMethodTablet interface for direct vision teleoperation of an excavator for urban construction work
Okishiba, S., Fukui, R., Takagi, M., et al. (2019) · Automation in Construction · doi:10.1016/j.autcon.2019.02.003 · Cited by 41 · cited 2×
“…can be directly achieved with human arm and inertial measurement unit (IMU) sensors (Kim et al. 2009a), camera to visualize the excavation scene (Okishiba et al. 2019), and haptic sensors with force feedback to augment the information of the construction machine at the remote location…”
BackgroundTele-operated service robots: ROSE
van Osch, M., Bera, D., van Hee, K., Koks, Y., & Zeegers, H. (2013) · Automation in Construction · doi:10.1016/j.autcon.2013.06.009 · Cited by 41 · cited 1×
“In the domestic or healthcare facility, robots are utilized to assist humans with various daily tasks such as picking up objects (van Osch et al. 2014) or rehabilitation, such as walking assistants (Wakita et al. 2013) or arm reinforcement (Huang et al. 2015).”
BackgroundEnd-point impedance measurements at human hand during interactive manual welding with robot
Erden, M. S., & Billard, A. (2014) · Proceedings - IEEE International Conference on Robotics and Automation/Proceedings · doi:10.1109/icra.2014.6906599 · Cited by 41 · cited 1×
“In the manufacturing industry, humans and robots work in the shared workspace performing manufacturing tasks such as welding (Erden and Billard 2014), transporting (Levratti et al. 2016), and assembling (Cherubini et al. 2016; Matsas and Vosniakos 2017; Tsarouchi et al. 2017).”
BackgroundTransfer Learning-Based Crack Detection by Autonomous UAVs
Kucuksubasi, F., & Sorguç, A. G. (2018) · International Symposium on Automation and Robotics in Construction (ISARC) · doi:10.22260/isarc2018/0081 · Cited by 41
Automated assembly discrepancy feedback using 3D imaging and forward kinematics
Nahangi, M., Yeung, J., Haas, C. T., Walbridge, S., & West, J. S. (2015) · Automation in Construction · doi:10.1016/j.autcon.2015.04.005 · Cited by 41 · cited 1×
“Even though the loose tolerance issue of the construction robot has led to several studies (Nahangi et al. 2015; Nahangi and Haas 2016; Rausch et al. 2017), there is still a research effort needed on the general approach of integrating discrepancy control into construction human – robot…”
BackgroundA scene-adaptive descriptor for visual SLAM-based locating applications in built environments
Xu, L., Feng, C., Kamat, V. R., & Menassa, C. C. (2020) · Automation in Construction · doi:10.1016/j.autcon.2019.103067 · Cited by 40 · cited 1×
“…evolving simultaneous localization and mapping (SLAM) techniques have enhanced mobile robot navigation ability, especially for the indoor GPS-denied environment, by building the map of the environment and locating itself (Asadi et al. 2018; Kim et al. 2018b; Nemoto and Mohan 2020; Xu et al. 2020).”
BackgroundSelf-citationReal-Time Process-Level Digital Twin for Collaborative Human-Robot Construction Work
Wang, X., Liang, C., Menassa, C. C., & Kamat, V. R. (2020) · International Symposium on Automation and Robotics in Construction (ISARC) · doi:10.22260/isarc2020/0212 · Cited by 40 · cited 1×
“The robot learned the knowledge of one construction task — i.e., ceiling tile installation — based on videos of the human demonstration, and then performed the task in a virtual simulator to validate the feasibility of applying the LfD method in field construction (Wang et al. 2020).”
MethodSelf-citation“JA-WA” - A wall construction system using unilateral material application with a mobile robot
Więckowski, A. (2017) · Automation in Construction · doi:10.1016/j.autcon.2017.02.005 · Cited by 35 · cited 1×
“The concrete laying robot [Jednostronna Aplikacja-W ę druj ą cym Automatem (JA-WA)] is equipped with an on-site scaffolding track and a mobile robot on the track with a concrete injector to lay concrete on composite walls (Wi ę ckowski 2017).”
BackgroundLiang, C., McGee, W., Menassa, C. C., & Kamat, V. R. (2020) · International Symposium on Automation and Robotics in Construction (ISARC) · doi:10.22260/isarc2020/0205 · Cited by 34 · cited 4×
“In the third category of the taxonomy, the robot Imitation Learning method, is defined as robots learning a specific task by observing demonstration from human experts (Argall et al. 2009; Liang et al. 2020a).”
BackgroundMethodInfluentialSelf-citationModular data communication methods for a robotic excavator
Kim, J., Lee, S. S., Seo, J., & Kamat, V. R. (2018) · Automation in Construction · doi:10.1016/j.autcon.2018.02.007 · Cited by 34 · cited 3×
“…evolving simultaneous localization and mapping (SLAM) techniques have enhanced mobile robot navigation ability, especially for the indoor GPS-denied environment, by building the map of the environment and locating itself (Asadi et al. 2018; Kim et al. 2018b; Nemoto and Mohan 2020; Xu et al. 2020).”
BackgroundSelf-citationModeling and velocity-field control of autonomous excavator with main control valve
Kim, K.-M., Kim, M., Kim, D., & Lee, D. (2019) · Automatica · doi:10.1016/j.automatica.2019.02.041 · Cited by 33 · cited 8×
“An example includes the application of UAVs to provide additional information on the construction site to on-site mobile robots (Kim et al. 2019c) or the use of multiple robotic arms to manipulate heavy and large components, such as drywall or curtain panels, for installation at desired locations…”
BackgroundMethodInfluentialHuman-Robot Collaboration and Sensor-Based Robots in Industrial Applications and Construction
Salmi, T., Ahola, J. M., Heikkila, T. A., Kilpeläinen, P., & Malm, T. (2018) · Springer series in adaptive environments · doi:10.1007/978-3-319-70866-9_2 · Cited by 32 · cited 2×
“This category is the most prevalent form of robotics in industrial work, such as manufacturing assembly lines, which are typically carried out in safety cages with no proximity allowed to humans due to safety concerns (Salmi et al. 2018).”
BackgroundAutomation of Robotic Concrete Printing Using Feedback Control System
Panda, B., Lim, J. H., Mohamed, N. A. N., Paul, S. C., Tay, Y. W. D., & Tan, M. J. (2017) · International Symposium on Automation and Robotics in Construction (ISARC) · doi:10.22260/isarc2017/0037 · Cited by 32 · cited 1×
“Concrete is the most common material used in CC and 3D printing due to its fluidity and solid characteristics during and after the fabrication (Carneau et al. 2020; Herrmann et al. 2018; Jeon et al. 2013; Li et al. 2020; Lim et al. 2011; Panda et al. 2017; Shakor et al. 2017; Vantyghem et al. 2020).”
BackgroundHuman–robot–environment interaction interface for robotic grit-blasting of complex steel bridges
Chotiprayanakul, P., Liu, D., & Dissanayake, G. (2012) · Automation in Construction · doi:10.1016/j.autcon.2012.04.014 · Cited by 31 · cited 2×
“…or devices include haptic sensors can enhance the tele-operation by creating a human – robot environment interaction (HREI) (Cheung and Chung 2006; Chotiprayanakul et al. 2012), a nondestructive-testing (NDT) device for inspecting bonding quality (Tso and Feng 2003), a total station for…”
BackgroundAutomatic crack detection in built infrastructure using unmanned aerial vehicles
Phung, M. D., Dinh, T., Hoang, V. T., & Ha, Q. P. (2017) · UTS ePRESS (University of Technology Sydney) · Cited by 31
Physically distributed multi-robot coordination and collaboration in construction
Vasey, L., Felbrich, B., Prado, M., Tahanzadeh, B., & Menges, A. (2020) · Construction Robotics · doi:10.1007/s41693-020-00031-y · Cited by 31 · cited 2×
“In the robot fiber-laying process, the quality of the construction outcome depends on whether the UAV follows the route correctly (Vasey et al. 2020).”
BackgroundDevelopment of an Automated Freeform Construction System and its Construction Materials
Jeon, K. H., Park, M.-B., Kang, M.-K., & Kim, J. (2013) · International Symposium on Automation and Robotics in Construction (ISARC) · doi:10.22260/isarc2013/0153 · Cited by 30 · cited 1×
“Concrete is the most common material used in CC and 3D printing due to its fluidity and solid characteristics during and after the fabrication (Carneau et al. 2020; Herrmann et al. 2018; Jeon et al. 2013; Li et al. 2020; Lim et al. 2011; Panda et al. 2017; Shakor et al. 2017; Vantyghem et al. 2020).”
BackgroundSaidi, K. S., OʼBrien, J. B., & Lytle, A. M. (2008) · Springer eBooks · doi:10.1007/978-3-540-30301-5_48 · Cited by 30
Investigating the Practice of Improvisation in Construction
Hamzeh, F., Alhussein, H., & Faek, F. (2018) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000652 · Cited by 28 · cited 2×
“Further research can be conducted to enable construction robots to learn the improvisation process from human workers (Hamzeh et al. 2018), and the robot can provide the improvisation suggestion or can directly perform the improvised process with a human worker ’ s consent.”
BackgroundMethodStrategies for autonomous robots to inspect pavement distresses
Tseng, Y.-H., Kang, S.-C., Chang, J.-R., & Lee, C.-H. (2011) · Automation in Construction · doi:10.1016/j.autcon.2011.04.018 · Cited by 27
Niskanen, I., Immonen, M., Makkonen, T., Keränen, P., Tyni, P., Hallman, L. W., Hiltunen, M., Kolli, T., Louhisalmi, Y., Kostamovaara, J., et al. (2020) · Automation in Construction · doi:10.1016/j.autcon.2020.103112 · Cited by 27 · cited 1×
“To achieve automatic excavation, the pose of the excavator and the condition of the soil surface need to be tracked by computer vision and point cloud modeling methods to provide information to the controller and planner (Liang et al. 2019b; Niskanen et al. 2020).”
MethodHaptic programming in construction: Intuitive on-site robotics
Stumm, S., Devadass, P., & Brell‐Çokcan, S. (2018) · Construction Robotics · doi:10.1007/s41693-018-0015-9 · Cited by 26 · cited 1×
“Stumm et al. (2018) developed a new human – robot collaboration strategy for on-site robotic assembly, called haptic programming.”
BackgroundLAN-based building maintenance and surveillance robot
So, A. T. P., & Chan, W. L. (2002) · Automation in Construction · doi:10.1016/s0926-5805(02)00003-1 · Cited by 24 · cited 1×
“…along with onboard sensors or cameras supplementing information (Cigola et al. 2005; Jiang et al. 2020; Kuczmarski et al. 2003; Moghaddam and Hadi 2005; Moghaddam and Tafti 2005; Prabakaran et al. 2018; So and Chan 2002) or use virtual guides to assist tele-operation (David et al. 2014).”
BackgroundImplementation of a foldable 3-DOF master device to a glass window panel fitting task
Chung, J., Lee, S., Yi, B.-J., & Kim, W. (2010) · Automation in Construction · doi:10.1016/j.autcon.2010.05.004 · Cited by 24 · cited 2×
“The robots are first deployed to the stationary locations — e.g., scaffold structures (Dharmawan et al. 2017) — to fit the tiles or windows by pre-defined patterns (King et al. 2014) or tele-operation (Chung et al. 2010), then transported to the next location to perform the next round of tasks.”
BackgroundTask Allocation and Route Planning for Robotic Service Networks in Indoor Building Environments
Mantha, B. R. K., Menassa, C. C., & Kamat, V. R. (2017) · Journal of Computing in Civil Engineering · doi:10.1061/(asce)cp.1943-5487.0000687 · Cited by 22 · cited 1×
“…and IMU — to autonomously navigate inside buildings or construction sites in order to collect data such as 3D model reconstruction, wall defect detection, embankment inspection, or building retrofit evaluation (Gramegna et al. 2005; Kamiyama et al. 2018; Mantha et al. 2017; Wang and Luo 2019).”
BackgroundSelf-citationMapping and localization module in a mobile robot for insulating building crawl spaces
Cebollada, S., Payá, L., Juliá, M., et al. (2018) · Automation in Construction · doi:10.1016/j.autcon.2017.11.007 · Cited by 20 · cited 1×
“Cameras, fiducial markers, and laser scanners are deployed to localize the mobile robot and to match workpieces with the digital model (Cebollada et al. 2018; Dawod and Hanna 2019).”
BackgroundReal-time “Sense-and-Act” operation for construction robots
Kahane, B., & Rosenfeld, Y. (2004) · Automation in Construction · doi:10.1016/j.autcon.2004.05.004 · Cited by 20 · cited 1×
“The sense-and-act algorithm has also been developed for the mobile construction robot to sense the surroundings and modify the plan based on the data (Kahane and Rosenfeld 2004).”
MethodDesign of a Robotic Software Package for Modular Home Builder
Yang, C.-H., Wu, T.-H., Xiao, B., & Kang, S.-C. (2019) · International Symposium on Automation and Robotics in Construction (ISARC) · doi:10.22260/isarc2019/0163 · Cited by 20 · cited 1×
“Robotic fabrication is the second type of method in this category and includes the robot assembling or cutting components to build the structure (Andreani et al. 2012; Yang et al. 2019).”
MethodA Low-Cost Robotic System for the Efficient Visual Inspection of Tunnels
Stent, S., Girerd, C., Long, P., et al. (2015) · Proceedings of the ... ISARC · doi:10.22260/isarc2015/0070 · Cited by 18 · cited 1×
“In the tunnel inspection task, the speed of the robot is maintained by control algorithms to collect high-quality visual inspection data (Stent et al. 2015).”
MethodA control method for hydraulic manipulators in automatic emulsion filling
Wang, W., Chi, H., Zhao, S., & Du, Z. (2018) · Automation in Construction · doi:10.1016/j.autcon.2018.03.001 · Cited by 16 · cited 1×
“Control methods including a velocity-field controller and PID controller have been proposed with the input of the pose and the main control valve (MCV) (Kim et al. 2019b; Wang et al. 2018).”
MethodTeaching Robots to Perform Construction Tasks via Learning from Demonstration
Liang, C., Kamat, V. R., & Menassa, C. C. (2019) · Proceedings of the ... ISARC · doi:10.22260/isarc2019/0175 · Cited by 15 · cited 6×
“…methods (Argall et al. 2009; Billard et al. 2008; Hussein et al. 2017) open avenues to new research areas of teaching robots complicated construction tasks (Liang et al. 2019a), which are typically difficult to preprogram as trajectories for the robot or to define as optimization problems.”
BackgroundMethodInfluentialSelf-citationA lightweight bridge inspection system using a dual-cable suspension mechanism
Chen, Y.-C., Yang, C.-E., & Kang, S.-C. (2014) · Automation in Construction · doi:10.1016/j.autcon.2014.06.005 · Cited by 15 · cited 2×
“…maintenance robots remove workers from dangerous under-bridge decks and tunnels and allow them to tele-operate or monitor the process at a remote and safe location (Arai et al. 2015; Chen et al. 2000, 2014; Kim et al. 2011; Moon et al. 2011; Okano et al. 2006; Seo et al. 2007; Zied et al. 2000).”
BackgroundRobotic Fabrication of Nail Laminated Timber
Hasan, H., Reddy, A., & Tsayjacobs, A. (2019) · International Symposium on Automation and Robotics in Construction (ISARC) · doi:10.22260/isarc2019/0162 · Cited by 15 · cited 1×
“The robot fabrication assembly can handle complex designs such as timber structures, carbon-fiber winding ceiling structures, or specific concrete elements (Hasan et al. 2019; Heikkilä et al. 2015; Jovanovi´c et al. 2017; Reinhardt et al. 2019; Willmann et al. 2016).”
PyroShield - A HVAC fire curtain testing robot
Beckett, A., & Ross, R. (2017) · Automation in Construction · doi:10.1016/j.autcon.2017.06.009 · Cited by 13 · cited 1×
“First, the inspection performed at narrow and tight places, such as pipeline or duct systems, typically requires small or specially designed robots in order to fit into the environment (Beckett and Ross 2017).”
BackgroundAutomatic Wall Defect Detection Using an Autonomous Robot: A Focus on Data Collection
Wang, J., & Luo, C. (2019) · ASCE International Conference on Computing in Civil Engineering (i3CE) · doi:10.1061/9780784482438.040 · Cited by 12 · cited 2×
“…and IMU — to autonomously navigate inside buildings or construction sites in order to collect data such as 3D model reconstruction, wall defect detection, embankment inspection, or building retrofit evaluation (Gramegna et al. 2005; Kamiyama et al. 2018; Mantha et al. 2017; Wang and Luo 2019).”
Applications of Supernumerary Robotic Limbs to Construction Works: Case Studies
Seo, W., Shin, C. Y., Choi, J., Hong, D., & Han, C.-S. (2016) · International Symposium on Automation and Robotics in Construction (ISARC) · doi:10.22260/isarc2016/0125 · Cited by 12 · cited 1×
“Finally, the wearable robot has been developed to assist workers with additional force (Naito et al. 2007; Seo et al. 2016).”
MethodSimulation and Locomotion Control for the Alicia³ Climbing Robot
Longo, D., Muscato, G., & Sessa, S. (2005) · International Symposium on Automation and Robotics in Construction (ISARC) · doi:10.22260/isarc2005/0050 · Cited by 8 · cited 1×
“Bio-inspired robots or small robots are suitable for these types of applications (Gambao et al. 2005; Jung et al. 2011; Longo et al. 2005; Lozano et al. 2011; Park and Hong 2012; Popescu et al. 2006; Ragulskis et al. 2008; Schempf and Vradis 2003; Sergiu-Dan et al. 2007; Starý et al. 2020; Tavakoli…”
BackgroundTeaching Robots New Tasks through Natural Interaction
Chai, J. Y., Çakmak, M., & Sidner, C. L. (2019) · The MIT Press eBooks · doi:10.7551/mitpress/11956.003.0013 · Cited by 7
Inspecting Interior Built Environments Using Augmented Reality-Based Autonomous Robot
Wang, X., & Kwok, N. M. (2007) · International Symposium on Automation and Robotics in Construction (ISARC) · doi:10.22260/isarc2007/0021 · Cited by 4 · cited 1×
“The autonomous navigation is realized by wireless sensor networking technology to track the location of the robot (Cho and Youn 2006), and laser scanners are used for path planning and obstacle avoidance (Wang and Kwok 2007).”
MethodSelf-citationPlanar Map and 3D Model Construction Using a Mobile Robot
Gramegna, T., Attolico, G., & Distante, A. (2005) · International Symposium on Automation and Robotics in Construction (ISARC) · doi:10.22260/isarc2005/0067 · Cited by 1 · cited 1×
“…and IMU — to autonomously navigate inside buildings or construction sites in order to collect data such as 3D model reconstruction, wall defect detection, embankment inspection, or building retrofit evaluation (Gramegna et al. 2005; Kamiyama et al. 2018; Mantha et al. 2017; Wang and Luo 2019).”
Background
Cited by
Yu, J. (2025) · Transport Policy · doi:10.1016/j.tranpol.2025.05.030 · Cited by 22
Metadata
- Authors
- Liang, C.-J., Wang, X., Kamat, V. R., & Menassa, C. C.
- Venue
- Journal of Construction Engineering and Management
- Published
- 2021-10
- Volume
- 147
- Issue
- 10
- ISSN
- 0733-9364 (ISSN-L)
- 1943-7862
- OpenAlex
- W3188255222
- Cited by
- 222
- References
- 139
- FWCI
- 11.38
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.