Impact of risk management on project performance: the importance of soft skills
Open accessThe DOI matches its Crossref record; 93 of the 93 references it cites were found in a registry or an index.
Abstract
This study aims to elucidate the relationship between risk management and project success, considering the contingent effect of project complexity. This approach also combines aspects of soft and hard skills. This methodological approach involves a literature review to underpin the conceptual framework and a survey for empirical validation, using structural equation modelling. The hypotheses were tested based on a field study involving 263 projects distributed among eight industries. The fieldwork involved interviews with project managers and risk managers and an analysis of internal company documents about the projects’ performance. The structural model presented herein provides a means for correlating the hard and soft sides of risk management with project success, understanding the moderating effect of project complexity. The soft side of risk management appears most prominently and explains 10.7% of the effect on project success. Moreover, the soft side supports the hard side, since we found a significant correlation that explains 25.3% of the effect on the hard side.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Evaluating structural equation models with unobservable variables and measurement error
Fornell, C., & Larcker, D. F. (1981) · Journal of Marketing Research · doi:10.1177/002224378101800104 · Cited by 109,190
Faul, F., Erdfelder, E., Lang, A.-G., & Buchner, A. (2007) · Behavior Research Methods · doi:10.3758/bf03193146 · Cited by 65,971
Construct validity in psychological tests.
Cronbach, L. J., & Meehl, P. E. (1955) · Psychological Bulletin · doi:10.1037/h0040957 · Cited by 11,195 · cited 2×
“The reliability and validity of the measurement model were analysed using the composite reliability indicator (Henseler, Ringle, and Sinkovics 2009) and Cronbach ’ s α coef fi cient (Cronbach and Meehl 1955), respectively, in which both must be equal to or greater than 0.7.”
MethodInfluentialThe use of partial least squares path modeling in international marketing
Henseler, J., Ringle, C. M., & Sinkovics, R. R. (2009) · Advances in International Marketing · doi:10.1108/s1474-7979(2009)0000020014 · Cited by 10,926
Tenenhaus, M., Vinzi, V. E., Chatelin, Y.-M., & Lauro, C. (2005) · Computational Statistics & Data Analysis · doi:10.1016/j.csda.2004.03.005 · Cited by 6,312 · cited 8×
“The signi fi cances were estimated by bootstrapping directly on the SmartPLS software, using 1000 resamplings, which are consistent with Tenenhaus et al. (2005), who recommend a minimum of 200 resamplings.”
BackgroundMethodResultInfluentialMeasurement of Business Performance in Strategy Research: A Comparison of Approaches
Venkatraman, N., & Ramanujam, V. (1986) · The Academy of Management Review · doi:10.2307/258398 · Cited by 3,503
Revolutionizing Product Development: Quantum Leaps in Speed, Efficiency and Quality
Wheelwright, S. C., & Clark, K. B. (1992) · Cited by 3,342
Product development performance: strategy, organization, and management in the world auto industry
(1991) · Choice Reviews Online · doi:10.5860/choice.29-1591 · Cited by 2,389
Atkinson, R. (1999) · International Journal of Project Management · doi:10.1016/s0263-7863(98)00069-6 · Cited by 2,359
Statistical Strategies for Small Sample Research
Hoyle, R. H. (1999) · Cited by 2,122
Netemeyer, R., Bearden, W., & Sharma, S. (2003) · Sage eBooks · doi:10.4135/9781412985772 · Cited by 2,118
(2003) · Cited by 2,093
The “real” success factors on projects
Cooke-Davies, T. (2002) · International Journal of Project Management · doi:10.1016/s0263-7863(01)00067-9 · Cited by 1,837
Software risk management: principles and practices
Boehm, B. W. (1991) · IEEE Software · doi:10.1109/52.62930 · Cited by 1,578
Peng, D. X., & Lai, F. (2012) · Journal of Operations Management · doi:10.1016/j.jom.2012.06.002 · Cited by 1,532 · cited 2×
“The re fl ective measurement model was adopted for project success (Peng and Lai 2012), in which the direction of causality (represented by arrows) ranges from the construct or latent variable (LV) (project success) to its manifest variables (MVs) or indicators ( fi ve success dimensions).”
MethodResilience: the concept, a literature review and future directions
Bhamra, R., Dani, S., & Burnard, K. (2011) · International Journal of Production Research · doi:10.1080/00207543.2011.563826 · Cited by 1,492
Blink: the power of thinking without thinking
(2005) · Choice Reviews Online · doi:10.5860/choice.42-6795 · Cited by 1,313
A new framework for determining critical success/failure factors in projects
Belassi, W., & Tukel, O. I. (1996) · International Journal of Project Management · doi:10.1016/0263-7863(95)00064-x · Cited by 1,187
Measurement of project success
de Wit, A. (1988) · International Journal of Project Management · doi:10.1016/0263-7863(88)90043-9 · Cited by 977
Key performance indicators for measuring construction success
Chan, A. P. C., & Chan, A. P. L. (2004) · Benchmarking: An International Journal · doi:10.1108/14635770410532624 · Cited by 968
On Uncertainty, Ambiguity, and Complexity in Project Management
Pich, M. T., Loch, C. H., & Meyer, A. D. (2002) · Management Science · doi:10.1287/mnsc.48.8.1008.163 · Cited by 942
Transforming project risk management into project uncertainty management
Ward, S. C., & Chapman, C. B. (2002) · International Journal of Project Management · doi:10.1016/s0263-7863(01)00080-1 · Cited by 912
(2018) · Project Management Journal · doi:10.1002/(issn)1938-9507 · Cited by 834
One Size Does Not Fit All Projects: Exploring Classical Contingency Domains
Shenhar, A. J. (2001) · Management Science · doi:10.1287/mnsc.47.3.394.9772 · Cited by 821
Risk analysis and management in construction
Akintoye, A. S., & MacLeod, M. J. (1997) · International Journal of Project Management · doi:10.1016/s0263-7863(96)00035-x · Cited by 755
Risk Management Principles and Guidelines
Luko, S. N. (2013) · Quality Engineering · doi:10.1080/08982112.2013.814508 · Cited by 750
Project Management: Strategic Design and Implementation
Cleland, D. I. (1990) · Cited by 744
Criteria of project success: an exploratory re-examination
Lim, C. S., & Mohamed, M. Z. (1999) · International Journal of Project Management · doi:10.1016/s0263-7863(98)00040-4 · Cited by 731
Current practice in project management — an empirical study
White, D., & Fortune, J. (2002) · International Journal of Project Management · doi:10.1016/s0263-7863(00)00029-6 · Cited by 705
Fundamental uncertainties in projects and the scope of project management
Atkinson, R., Crawford, L., & Ward, S. (2006) · International Journal of Project Management · doi:10.1016/j.ijproman.2006.09.011 · Cited by 692
Construct Measurement in Organizational Strategy Research: A Critique and Proposal
Venkatraman, N., & Grant, J. H. (1986) · The Academy of Management Review · doi:10.2307/258332 · Cited by 668
Defining uncertainty in projects – a new perspective
Perminova, O., Gustafsson, M., & Wikström, K. (2007) · International Journal of Project Management · doi:10.1016/j.ijproman.2007.08.005 · Cited by 666
Fundamentos de Métodos de Pesquisa em Administração
Hair, J., Babin, B., Money, A., & Samouel, P. (2005) · CentAUR (University of Reading) · Cited by 662
Reinventing Project Management: The Diamond Approach to Successful Growth and Innovation
Markham, S. K. (2007) · Research-Technology Management · Cited by 658
Product development performance: Strategy, organization, and management in the world auto industry
Robertson, D. (1992) · Journal of Engineering and Technology Management · doi:10.1016/0923-4748(92)90013-u · Cited by 655
Information Technology Project Management
Schwalbe, K. (1999) · Cited by 654
Toor, S.-U.-R., & Ogunlana, S. O. (2010) · International Journal of Project Management · doi:10.1016/j.ijproman.2009.05.005 · Cited by 619
Toward a typological theory of project management
Shenhar, A. J., & Dvir, D. (1996) · Research Policy · doi:10.1016/0048-7333(95)00877-2 · Cited by 614
Risk management — Principles and guidelines
(2009) · doi:10.5555/iso31000:2009 · Cited by 568
Project Risk Management: Processes, Techniques and Insights
Smith, J. U. M. (1998) · Journal of the Operational Research Society · doi:10.1057/palgrave.jors.2600022 · Cited by 555
(2007) · Cited by 478
Management of risks, uncertainties and opportunities on projects: time for a fundamental shift
Jaafari, A. (2001) · International Journal of Project Management · doi:10.1016/s0263-7863(99)00047-2 · Cited by 466
Managing project uncertainty: from variation to chaos
De Meyer, A., Loch, C. H., & Pich, M. T. (2002) · IEEE Engineering Management Review · doi:10.1109/emr.2002.1032403 · Cited by 464
Assessing Project Management Maturity
Ibbs, C. W., & Kwak, Y. H. (2000) · Project Management Journal · doi:10.1177/875697280003100106 · Cited by 411
An Integrative Contingency Model of Software Project Risk Management
Barki, H., Rivard, S., & Talbot, J. (2001) · Journal of Management Information Systems · doi:10.1080/07421222.2001.11045666 · Cited by 410
Grabher, G. (2004) · European Urban and Regional Studies · doi:10.1177/0969776404041417 · Cited by 409
Use and benefits of tools for project risk management
Raz, T., & Michael, E. (2001) · International Journal of Project Management · doi:10.1016/s0263-7863(99)00036-8 · Cited by 402
Extending the risk process to manage opportunities
Hillson, D. (2002) · International Journal of Project Management · doi:10.1016/s0263-7863(01)00074-6 · Cited by 396
Components of software development risk: how to address them? A project manager survey
Ropponen, J., & Lyytinen, K. (2000) · IEEE Transactions on Software Engineering · doi:10.1109/32.841112 · Cited by 393
Risk management, project success, and technological uncertainty
Raz, T., Shenhar, A. J., & Dvir, D. (2002) · R&D Management · doi:10.1111/1467-9310.00243 · Cited by 377
Does risk management contribute to IT project success? A meta-analysis of empirical evidence
de Bakker, K., Boonstra, A., & Wortmann, H. (2010) · International Journal of Project Management · doi:10.1016/j.ijproman.2009.07.002 · Cited by 332
Significance of project management structure on development success
Larson, E. W., & Gobeli, D. H. (1989) · IEEE Transactions on Engineering Management · doi:10.1109/17.18828 · Cited by 320
Wheelwright, S. C., & Clark, K. B. (1992) · Cited by 315
Refining the search for project success factors: a multivariate, typological approach
Shenhar, A. J., Tishler, A., Dvir, D., Lipovetsky, S., & Lechler, T. (2002) · R&D Management · doi:10.1111/1467-9310.00244 · Cited by 279
Risk management for software projects
Fairley, R. E. (1994) · IEEE Software · doi:10.1109/52.281716 · Cited by 265
PROJECT PERFORMANCE AND THE LOCUS OF INFLUENCE IN THE R&D MATRIX.
Katz, R., & Allen, T. J. (1985) · Academy of Management Journal · doi:10.2307/256062 · Cited by 257
Managing Risks in Complex Projects
Thamhain, H. (2013) · Project Management Journal · doi:10.1002/pmj.21325 · Cited by 243
Adding value in product development by creating information and reducing risk
Browning, T. R., Deyst, J. J., Eppinger, S. D., & Whitney, D. E. (2002) · IEEE Transactions on Engineering Management · doi:10.1109/tem.2002.806710 · Cited by 238
Practitioner development: From trained technicians to reflective practitioners
Crawford, L., Morris, P., Thomas, J., & Winter, M. (2006) · International Journal of Project Management · doi:10.1016/j.ijproman.2006.09.010 · Cited by 237
From Critical Success Factors to Critical Success Processes
Zwikael, O., & Globerson, S. (2006) · International Journal of Production Research · doi:10.1080/00207540500536921 · Cited by 226
Linkages of project environment to performance: lessons for team leadership
Thamhain, H. J. (2004) · International Journal of Project Management · doi:10.1016/j.ijproman.2004.04.005 · Cited by 223
Software development risks to project effectiveness
Jiang, J., & Klein, G. (2000) · Journal of Systems and Software · doi:10.1016/s0164-1212(99)00128-4 · Cited by 217
Robustness testing of PLS, LISREL, EQS and ANN-based SEM for measuring customer satisfaction
Hsu, S.-H., Chen, W.-H., & Hsieh, M.-J. (2006) · Total Quality Management & Business Excellence · doi:10.1080/14783360500451465 · Cited by 215
Zwikael, O., & Ahn, M. (2011) · Risk Analysis · doi:10.1111/j.1539-6924.2010.01470.x · Cited by 215
The Perceived Value and Potential Contribution of Project Management Practices to Project Success
Besner, C., & Hobbs, B. (2006) · Project Management Journal · doi:10.1177/875697280603700305 · Cited by 214
A classified bibliography of recent research relating to project risk management
Williams, T. (1995) · European Journal of Operational Research · doi:10.1016/0377-2217(93)e0363-3 · Cited by 200
Continuous Risk Management Guidebook.
Dorofee, A. J., Walker, J. A., Alberts, C. J., Higuera, R. P., & Murphy, R. L. (1996) · doi:10.21236/ada319533 · Cited by 189
Barclay, C., & Osei-Bryson, K.-M. (2009) · International Journal of Production Economics · doi:10.1016/j.ijpe.2009.11.025 · Cited by 180
Organisational climate and project success
Gray, R. (2001) · International Journal of Project Management · doi:10.1016/s0263-7863(99)00060-5 · Cited by 178
Risks to different aspects of system success
Jiang, J. J., & Klein, G. L. (1999) · Information & Management · doi:10.1016/s0378-7206(99)00024-5 · Cited by 177
A process framework for theoretically grounded prescriptive research in the project management field
Ahlemann, F., Arbi, F. E., Kaiser, M. G., & Heck, A. (2012) · International Journal of Project Management · doi:10.1016/j.ijproman.2012.03.008 · Cited by 167
An investigation of the role of communication in IT projects
de Carvalho, M. M. (2013) · International Journal of Operations & Production Management · doi:10.1108/ijopm-11-2011-0439 · Cited by 150
Self-citationA model of information systems development project performance
Yetton, P., Martin, A., Sharma, R., & Johnston, K. D. (2000) · Information Systems Journal · doi:10.1046/j.1365-2575.2000.00088.x · Cited by 147
Effective Project Management for Strategic Innovation and Change in an Organizational Context
Kenny, J. D. (2003) · Project Management Journal · doi:10.1177/875697280303400106 · Cited by 145
Planning effort as an effective risk management tool
Zwikael, O., & Sadeh, A. (2006) · Journal of Operations Management · doi:10.1016/j.jom.2006.12.001 · Cited by 144
Can software risk management improve system development: an exploratory study
Ropponen, J., & Lyytinen, K. (1997) · European Journal of Information Systems · doi:10.1038/sj.ejis.3000253 · Cited by 129
Imperatives of the science of operations and supply‐chain management
Singhal, K., & Singhal, J. (2012) · Journal of Operations Management · doi:10.1016/j.jom.2011.11.003 · Cited by 119
Construction Project Risk Management Based on the View of Asymmetric Information
Xiang, P., Zhou, J., Zhou, X., & Ye, K. (2012) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000548 · Cited by 114
Information Technology Project Management
Kelkar, S. A., & Kelkar (2007) · Cited by 111
An evaluation of clients' needs and responsibilities in the construction process
Kometa, S. T., Olomolaiye, P. O., & HARRIS, F. C. (1995) · Engineering Construction & Architectural Management · doi:10.1108/eb021003 · Cited by 109
Estimation and evaluation of uncertainty: a minimalist first pass approach
Chapman, C. B., & Ward, S. C. (2000) · International Journal of Project Management · doi:10.1016/s0263-7863(00)00016-8 · Cited by 100
Towards an integrated measurement of IS project performance: The project performance scorecard
Barclay, C. (2008) · Information Systems Frontiers · doi:10.1007/s10796-008-9083-6 · Cited by 95
How project managers can better control the performance of design-build projects
Ling, F. Y. Y. (2003) · International Journal of Project Management · doi:10.1016/j.ijproman.2003.09.003 · Cited by 86
Toward a NASA-Specific Project Management Framework
Shenhar, A., Dvir, D., Milosevic, D., Mulenburg, J., Patanakul, P., Reilly, R., Ryan, M., Sage, A., Sauser, B., Srivannaboon, S., et al. (2005) · Engineering Management Journal · doi:10.1080/10429247.2005.11431667 · Cited by 84 · cited 3×
“In their subsequent studies, the authors sought to create other dimensions until they came up with a signi fi cant model called Diamond, which includes four dimensions: novelty, complexity, technology and stage (Shenhar et al. 2005; Shenhar and Dvir 2007).”
BackgroundMethodCauses of Bad Profit in Overseas Construction Projects
Han, S. H., Park, S. H., Kim, D. Y., Kim, H., & Kang, Y. W. (2007) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2007)133:12(932 · Cited by 75
The determinants of success of R&D projects: evidence from American–Israeli research alliances
Bizan, O. (2003) · Research Policy · doi:10.1016/s0048-7333(03)00044-1 · Cited by 73
Opportunities for developing the science of operations and supply‐chain management
Singhal, K., & Singhal, J. (2012) · Journal of Operations Management · doi:10.1016/j.jom.2011.11.002 · Cited by 72
Risk managements' communicative effects influencing IT project success
de Bakker, K., Boonstra, A., & Wortmann, J. C. (2011) · International Journal of Project Management · doi:10.1016/j.ijproman.2011.09.003 · Cited by 60
Sharma, A., & Gupta, A. (2011) · International Journal of Project Management · doi:10.1016/j.ijproman.2011.05.003 · Cited by 48
Reducing software requirement perception gaps through coordination mechanisms
Chen, H., Jiang, J. J., Klein, G. L., & Chen, V. (2008) · Journal of Systems and Software · doi:10.1016/j.jss.2008.09.032 · Cited by 35
One Size Does Not Fit All Projects
ShenharAaron, J. (2001) · Management Science · doi:10.5555/2804953.2804958 · Cited by 16
(1992)
Use of partial least squares (PLS) in strategic management research: a review of four recent studies
Hulland, J. (1999) · Strategic Management Journal · doi:10.1002/(sici)1097-0266(199902)20:2<195::aid-smj13>3.0.co;2-7
Cited by
Martens, M. L., & Carvalho, M. M. (2017) · International Journal of Project Management · doi:10.1016/j.ijproman.2016.04.004 · Cited by 459
Self-citationQazi, A., Quigley, J., Dickson, A., & Kirytopoulos, K. (2016) · International Journal of Project Management · doi:10.1016/j.ijproman.2016.05.008 · Cited by 294
Relationship banking and information technology: the role of artificial intelligence and FinTech
Jakšič, M., & Marinč, M. (2019) · Risk Management · doi:10.1057/s41283-018-0039-y · Cited by 266
Carvalho, M. M., & Rabechini, R. (2017) · International Journal of Project Management · doi:10.1016/j.ijproman.2017.02.018 · Cited by 255
Self-citationProject management and its effects on project success: Cross-country and cross-industry comparisons
Carvalho, M. M. D., Patah, L. A., & de Souza Bido, D. (2015) · International Journal of Project Management · doi:10.1016/j.ijproman.2015.04.004 · Cited by 243
Self-citation
Metadata
- Authors
- Carvalho, M. M. D., & Rabechini Junior, R.
- Venue
- International Journal of Production Research
- Publisher
- Informa UK Limited
- Published
- 2014-06-06
- Volume
- 53
- Issue
- 2
- Pages
- 321-340
- ISSN
- 0020-7543 (ISSN-L)
- 1366-588X
- OpenAlex
- W2066727432
- Cited by
- 324
- References
- 93
- FWCI
- 17.66
- Type
- journal article
- Language
- en
- Open access
- green
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.