Identification of the Critical Factors of TQM*
The DOI matches its Crossref record; 25 of the 25 references it cites were found in a registry or an index.
Abstract
Current concepts in the field of Total Quality Management (TQM) are largely based upon case studies, anecdotal evidence and the prescriptions of leading “gurus.” Consequently, there is little consensus on which factors are critical to the success of the approach. Few attempts have been made to scientifically synthesise frameworks for measuring quality management practices, and a methodology for examining the issue has yet to be established. This has meant that current TQM models, such as the Malcolm Baldrige Award, have not been constructed or validated by empirical means. This paper presents a research methodology that can be used to improve self‐assessment frameworks, such as the Baldrige Award, to better inform organisations in the development of Total Quality Systems. The research extracts a series of items from the Baldrige model and established literature. These items formed the basis of a questionnaire sent to over 200 managers. Data was examined using several well‐established analytical techniques that identified 10 critical factors of TQM. These factors were shown to be reliable and valid, and offer new insights into our understanding of TQM.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Deming, W. E. (1982) · Medical Entomology and Zoology · Cited by 7,297
Harman, H. H. (1960) · Cited by 5,148
A First Course in Factor Analysis
Comrey, A. L., & Lee, H. B. (2013) · doi:10.4324/9781315827506 · Cited by 4,546
Economic Control of Quality of Manufactured Product.
Hotelling, H., & Shewhart, W. A. (1932) · Journal of the American Statistical Association · doi:10.2307/2277676 · Cited by 3,070
Ireson, W. G., & Juran, J. M. (1952) · Journal of the American Statistical Association · doi:10.2307/2280757 · Cited by 2,849
(2007) · Encyclopedia of Measurement and Statistics · doi:10.4135/9781412952644.n300 · Cited by 2,578
Rummel, R. J. (1970) · Cited by 2,458
Aldenderfer, M. S., & Blashfield, R. K. (1984) · Cited by 2,358
The Scientific Use of Factor Analysis in Behavioral and Life Sciences
Cattell, R. B. (1978) · doi:10.1007/978-1-4684-2262-7 · Cited by 2,165
An Instrument for Measuring the Critical Factors of Quality Management
Saraph, J. V., Benson, P. G., & Schroeder, R. G. (1989) · Decision Sciences · doi:10.1111/j.1540-5915.1989.tb01421.x · Cited by 2,030
Cited by
The relationship between total quality management practices and their effects on firm performance
Kaynak, H. (2003) · Journal of Operations Management · doi:10.1016/s0272-6963(03)00004-4 · Cited by 1,893
The relationship between total quality management practices and operational performance
Samson, D., & Terziovski, M. (1999) · Journal of Operations Management · doi:10.1016/s0272-6963(98)00046-1 · Cited by 1,530
Firm's resilience to supply chain disruptions: Scale development and empirical examination
Ambulkar, S., Blackhurst, J., & Grawe, S. (2015) · Journal of Operations Management · doi:10.1016/j.jom.2014.11.002 · Cited by 1,400
Relationships between implementation of TQM, JIT, and TPM and manufacturing performance
Cua, K. O., McKone, K. E., & Schroeder, R. G. (2001) · Journal of Operations Management · doi:10.1016/s0272-6963(01)00066-3 · Cited by 1,152
Sila, I. (2007) · Journal of Operations Management · doi:10.1016/j.jom.2006.02.003 · Cited by 764
KANNAN, V (2005) · Omega · doi:10.1016/j.omega.2004.03.012 · Cited by 720
“Studies have also shown that the MBNQA framework not only provides a valid representation of constructs generally referred to under the label TQM [42], but that the constructs are consistent with those found in other studies [43].”
ResultQuality management re‐visited: a reflective review and agenda for future research
Sousa, R., & Voss, C. A. (2002) · Journal of Operations Management · doi:10.1016/s0272-6963(01)00088-2 · Cited by 718
Nair, A. (2006) · Journal of Operations Management · doi:10.1016/j.jom.2005.11.005 · Cited by 593
An empirical study of the important factors for knowledge‐management adoption in the SME sector
Yew Wong, K., & Aspinwall, E. (2005) · Journal of Knowledge Management · doi:10.1108/13673270510602773 · Cited by 563
The TQM Paradox: Relations among TQM practices, plant performance, and customer satisfaction
Choi, T. Y., & Eboch, K. (1998) · Journal of Operations Management · doi:10.1016/s0272-6963(98)00031-x · Cited by 543
Pilkington, A., & Meredith, J. (2009) · Journal of Operations Management · doi:10.1016/j.jom.2008.08.001 · Cited by 537
A replication and extension of quality management into the supply chain
Kaynak, H., & Hartley, J. L. (2008) · Journal of Operations Management · doi:10.1016/j.jom.2007.06.002 · Cited by 498
The scientific theory‐building process: a primer using the case of TQM
Handfield, R. B., & Melnyk, S. A. (1998) · Journal of Operations Management · doi:10.1016/s0272-6963(98)00017-5 · Cited by 466
The relationship between total quality management practices and organizational culture
Prajogo, D. I., & McDermott, C. M. (2005) · International Journal of Operations & Production Management · doi:10.1108/01443570510626916 · Cited by 442
Sila, I., & Ebrahimpour, M. (2002) · International Journal of Quality & Reliability Management · doi:10.1108/02656710210434801 · Cited by 441
Six sigma in small‐ and medium‐sized UK manufacturing enterprises: Some empirical observations
Antony, J., Kumar, M., & Madu, C. N. (2005) · International Journal of Quality & Reliability Management · doi:10.1108/02656710510617265 · Cited by 429
Supply chain management: an empirical study of its impact on performance
Tan, K., Kannan, V. R., Handfield, R. B., & Ghosh, S. (1999) · International Journal of Operations & Production Management · doi:10.1108/01443579910287064 · Cited by 407
Demirbag, M., Tatoglu, E., Tekinkus, M., & Zaim, S. (2006) · Journal of Manufacturing Technology Management · doi:10.1108/17410380610678828 · Cited by 402
An instrument for measuring TQM implementation for Chinese manufacturing companies
Zhang, Z., Waszink, A., & Wijngaard, J. (2000) · International Journal of Quality & Reliability Management · doi:10.1108/02656710010315247 · Cited by 396
The impact of design management and process management on quality: an empirical investigation
Ahire, S. L., & Dreyfus, P. (2000) · Journal of Operations Management · doi:10.1016/s0272-6963(00)00029-2 · Cited by 395
Critical linkages among TQM factors and business results
Sila, I., & Ebrahimpour, M. (2005) · International Journal of Operations & Production Management · doi:10.1108/01443570510626925 · Cited by 390
Santos-Vijande, M. L., & Álvarez-González, L. I. (2007) · Technovation · doi:10.1016/j.technovation.2007.05.014 · Cited by 389
Critical success factors for TQM implementation and their impact on performance of SMEs
Ismail Salaheldin, S. (2009) · International Journal of Productivity and Performance Management · doi:10.1108/17410400910938832 · Cited by 386
Critical success factors for implementing lean production: the effect of contingencies
Netland, T. H. (2016) · International Journal of Production Research · doi:10.1080/00207543.2015.1096976 · Cited by 374
The impact of total quality management on innovation: Findings from a developing country
Thai Hoang, D., Igel, B., & Laosirihongthong, T. (2006) · International Journal of Quality & Reliability Management · doi:10.1108/02656710610704230 · Cited by 366
TQM practice in maquiladora: Antecedents of employee satisfaction and loyalty
Jun, M., Cai, S., & Shin, H. (2006) · Journal of Operations Management · doi:10.1016/j.jom.2005.09.006 · Cited by 351
Critical success factors of TQM implementation in Hong Kong industries
Antony, J., Leung, K., Knowles, G., & Gosh, S. (2002) · International Journal of Quality & Reliability Management · doi:10.1108/02656710210427520 · Cited by 350
Antony, J., Jiju Antony, F., Kumar, M., & Rae Cho, B. (2007) · International Journal of Quality & Reliability Management · doi:10.1108/02656710710730889 · Cited by 344
A Contingent View of Quality Management‐The Impact of International Competition on Quality
Das, A., Handfield, R. B., Calantone, R. J., & Ghosh, S. (2000) · Decision Sciences · doi:10.1111/j.1540-5915.2000.tb00938.x · Cited by 331
Identifying and assessing critical risk factors for BIM projects: Empirical study
Chien, K.-F., Wu, Z.-H., & Huang, S.-C. (2014) · Automation in Construction · doi:10.1016/j.autcon.2014.04.012 · Cited by 317
ISO 9000/1994, ISO 9001/2000 and TQM: The performance debate revisited
Martínez‐Costa, M., Choi, T. Y., Martínez, J. A., & Martínez‐Lorente, A. R. (2009) · Journal of Operations Management · doi:10.1016/j.jom.2009.04.002 · Cited by 303
Total quality management as a forerunner of business innovation capability
Perdomo-Ortiz, J., González-Benito, J., & Galende, J. (2006) · Technovation · doi:10.1016/j.technovation.2005.09.008 · Cited by 296
Critical success factors in the alignment of IS plans with business plans
Teo, T. S. H., & Ang, J. S. K. (1999) · International Journal of Information Management · doi:10.1016/s0268-4012(99)00007-9 · Cited by 295
Sila, I., & Ebrahimpour, M. (2003) · International Journal of Production Research · doi:10.1080/0020754021000022212 · Cited by 293
Components of successful total quality management
José Tarí, J. (2005) · The TQM Magazine · doi:10.1108/09544780510583245 · Cited by 293
Rahman, S. (2001) · International Journal of Quality & Reliability Management · doi:10.1108/02656710110364486 · Cited by 292
The relationship between quality management practices and their effects on quality outcomes
Tarí, J. J., Molina, J. F., & Castejón, J. L. (2007) · European Journal of Operational Research · doi:10.1016/j.ejor.2006.10.016 · Cited by 281
Aquilani, B., Silvestri, C., Ruggieri, A., & Gatti, C. (2017) · The TQM Journal · doi:10.1108/tqm-01-2016-0003 · Cited by 273
The guidelines of improvement: Relations among organizational culture, TQM and performance
Valmohammadi, C., & Roshanzamir, S. (2015) · International Journal of Production Economics · doi:10.1016/j.ijpe.2014.12.028 · Cited by 272
Rao, S. S., Solis, L. E., & Raghunathan, T. S. (1999) · Total Quality Management · doi:10.1080/0954412997226 · Cited by 264
EXPLORING CRITICAL SUCCESS FACTORS FOR STAKEHOLDER MANAGEMENT IN CONSTRUCTION PROJECTS
Yang, J., Shen, G. Q., Ho, M., Drew, D. S., & Chan, A. P. C. (2009) · JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT · doi:10.3846/1392-3730.2009.15.337-348 · Cited by 264
An empirical investigation of the key factors for success in software process improvement
Dyba, T. (2005) · IEEE Transactions on Software Engineering · doi:10.1109/tse.2005.53 · Cited by 256
McFadden, K. L., Henagan, S. C., & Gowen, C. R. (2009) · Journal of Operations Management · doi:10.1016/j.jom.2009.01.001 · Cited by 255
A holistic model for total quality service
Sureshchandar, G. S., Rajendran, C., & Anantharaman, R. N. (2001) · International Journal of Service Industry Management · doi:10.1108/09564230110405299 · Cited by 231
Development of a measure to assess quality management in certified firms
Conca, F. J., Llopis, J., & Tarı́, J. J. (2004) · European Journal of Operational Research · doi:10.1016/s0377-2217(03)00145-0 · Cited by 225
“…Saraph, Benson and Schroeder (1989) the alpha coefficient ranges between 0.71 and 0.94; in Badri, Davis and Davis (1995), between 0.89 and 0.97; in Black and Porter (1995, 1996) between 0.68 and 0.87; in Ahire, Golhar and Waller (1996), between 0.72 and 0.92; in Grandzol and Gershon (1998)…”
BackgroundMethodInfluentialFan, H., Li, G., Sun, H., & Cheng, T. C. E. (2017) · International Journal of Production Economics · doi:10.1016/j.ijpe.2016.11.015 · Cited by 224
Shafiq, M., Lasrado, F., & Hafeez, K. (2019) · Total Quality Management & Business Excellence · doi:10.1080/14783363.2017.1283211 · Cited by 220
“For example, Bou-Llusar et al. (2009) used EFQM to develop items and Black and Porter (1996) followed malcolm baldrige national quality award (MBNQA) criteria for the development of his instrument.”
Daily, B. F., Bishop, J. W., & Steiner, R. (2011) · Journal of Applied Business Research (JABR) · doi:10.19030/jabr.v23i1.1411 · Cited by 214
“…as a key component to successful organizational performance and successful implementation of management initiated programs (Ahire et al., 1996; Black & Porter, 1996; Castellano et al., 1991; Crosby 1979; Deming, 1982; Flynn et al., 1994; Juran 1988; Juran & Gryna, 1980; Kasul and Motwani,…”
BackgroundThe relationships between soft-hard TQM factors and key business results
Calvo-Mora, A., Picón, A., Ruiz, C., & Cauzo, L. (2013) · International Journal of Operations & Production Management · doi:10.1108/ijopm-09-2012-0355 · Cited by 212
The moderating effect of buyer‐supplier relationships on quality practices and performance
Fynes, B., & Voss, C. (2002) · International Journal of Operations & Production Management · doi:10.1108/01443570210427640 · Cited by 210
“Empirical advances in the area initially focussed on the identification of core quality practices that included top management support, quality information, process management, product design, workforce management, supplier involvement and customer orientation (Flynn et al., 1994; Black and Porter, 1996).”
BackgroundRelationships between the EFQM model criteria: a study in Spanish universities
Calvo-mora, A., Leal, A., & Roldán, J. L. (2005) · Total Quality Management & Business Excellence · doi:10.1080/14783360500077708 · Cited by 208
“…group of studies is formed by those whose objective is to verify the relationships established in excellence models in different contexts such as Black & Porter (1996), Eskildsen & Kanji (1998), Flynn & Saladin (2001), Pannirselvan & Ferguson (2001), Wilson & Collier (2000) or Winn & Cameron…”
BackgroundInfluentialAdopters and non-adopters of business-to-business electronic commerce in Singapore
Teo, T. S. H., & Ranganathan, C. (2004) · Information & Management · doi:10.1016/j.im.2003.12.005 · Cited by 208
A review of operations management studies using scale development techniques
Hensley, R. L. (1999) · Journal of Operations Management · doi:10.1016/s0272-6963(98)00051-5 · Cited by 206
A Conceptual model for total quality management in service organizations
Sureshchandar, G. S., Rajendran, C., & Anantharaman, R. N. (2001) · Total Quality Management · doi:10.1080/09544120120034492 · Cited by 204
“(1994); Black and Porter (1996); (1994, 1995); Schneider and Bowen Ahire et al. (1996); Malcolm Baldrige (1995); Flynn et al. (1995); Malcolm National Quality Award Guidelines Baldrige National Quality Award (1998); Joseph et al. (1999); Samson Guidelines (1998) and Terziovski (1999) 5.”
BackgroundInfluentialMolina‐Azorín, J. F., Tarí, J. J., Claver‐Cortés, E., & López‐Gamero, M. D. (2009) · International Journal of Management Reviews · doi:10.1111/j.1468-2370.2008.00238.x · Cited by 203
Bayazit, O., & Karpak, B. (2007) · International Journal of Production Economics · doi:10.1016/j.ijpe.2005.12.009 · Cited by 200
“Dayton (2001) determined that all of the TQM critical success factors identified in the Black and Porter (1996) study were important to US quality assurance professionals as well.”
BackgroundDoes quality management foster or hinder innovation? An empirical study of Spanish companies
Martínez-Costa, M., & Martínez-Lorente, A. R. (2008) · Total Quality Management & Business Excellence · doi:10.1080/14783360701600639 · Cited by 200
“Many authors have studied its nature in the past (Saraph et al., 1989; Anderson et al., 1994; Dean & Bowen, 1994; Flynn et al., 1994; Ahire et al., 1996; Black & Porter, 1996).”
BackgroundAmundson, S. D. (1998) · Journal of Operations Management · doi:10.1016/s0272-6963(98)00018-7 · Cited by 197
Organizational culture for total quality management
Gimenez-Espin, J. A., Jiménez-Jiménez, D., & Martínez-Costa, M. (2013) · Total Quality Management & Business Excellence · doi:10.1080/14783363.2012.707409 · Cited by 196
“Finally, clan culture fosters employee and senior management commitment, customer orientation, continuous improvement and motivation and training of workers (Ahire et al., 1996; Anderson et al., 1994; Black & Porter, 1996; Dean & Bowen, 1994; Naor et al., 2008).”
BackgroundInfluentialAn empirical comparison of statistical construct validation approaches
Ahire, S. L., & Devaraj, S. (2001) · IEEE Transactions on Engineering Management · doi:10.1109/17.946530 · Cited by 194
“Several researchers have developed instruments to measure plant-level TQM implementation constructs (e.g., [ 8 ], [20]).”
BackgroundA study of total quality management and supply chain management practices
Talib, F., Rahman, Z., & Qureshi, M. N. (2011) · International Journal of Productivity and Performance Management · doi:10.1108/17410401111111998 · Cited by 191
“Black and Porter (1996), in their study of manufacturing and service industries argue that there are ten major TQM practices: (1) strategic quality management; (2) people and customer management; (3) supplier partnerships; (4) communication of improvement information; (5) customer satisfaction…”
BackgroundInfluentialExploring soft versus hard factors for TQM implementation in small and medium‐sized enterprises
Lewis, W. G., Pun, K. F., & Lalla, T. R. M. (2006) · International Journal of Productivity and Performance Management · doi:10.1108/17410400610702142 · Cited by 191
“On the other hand, the “hard” factors are tools and systems that lend support to the implementation of the “soft” factors ( Black and Porter, 1996”
BackgroundTQM and customer satisfaction in Malaysia's service sector
Sit, W., Ooi, K., Lin, B., & Yee‐Loong Chong, A. (2009) · Industrial Management & Data Systems · doi:10.1108/02635570910982300 · Cited by 185
“These factors were derived from the Malcolm Baldrige National Quality Award (MBNQA) and deduced from the model of Black and Porter (1996)”
MethodAn Instrument for Measuring the Key Factors of Success in Software Process Improvement
Dyba, T. (2000) · Empirical Software Engineering · doi:10.1023/a:1009800404137 · Cited by 182
“Only a handful of researchers have made contributions towards a scientific methodology for diagnostic assessments of TQM programs (e.g. Garvin, 1983, 1984; Saraph et al., 1989; Powell, 1995; Ahire et al., 1996; Black and Porter, 1996).”
BackgroundInfluentialInfrastructure and core quality management practices: how do they affect quality?
Zu, X. (2009) · International Journal of Quality & Reliability Management · doi:10.1108/02656710910928789 · Cited by 181
Ali, G. A., Hilman, H., & Gorondutse, A. H. (2020) · Benchmarking: An International Journal · doi:10.1108/bij-08-2019-0391 · Cited by 167
Gearing Six Sigma into UK manufacturing SMEs: results from a pilot study
Antony, J., Kumar, M., & Labib, A. (2008) · Journal of the Operational Research Society · doi:10.1057/palgrave.jors.2602437 · Cited by 166
“The CSFs used in this pilot study were derived from existing literature of TQM and Six Sigma (Badri et al, 1995; Black and Porter, 1996; Yusof and Aspinwall, 1999; Snee, 2000; Breyfogle, 2001; Antony and Banuelas, 2002; Rungasamy et al, 2002; Adams et al, 2003; Oakland, 2003; Antony, 2004).”
MethodThe impact of total quality management on supply chain management and firm's supply performance
Vanichchinchai, A., & Igel, B. (2011) · International Journal of Production Research · doi:10.1080/00207543.2010.492805 · Cited by 166
“Besides, MBNQA criteria which are acclaimed as the most accepted TQM framework (Black and Porter 1996) are referred to as criteria for performance excellence (NIST 2007).”
BackgroundJung, J. Y., & Wang, Y. J. (2006) · Technovation · doi:10.1016/j.technovation.2006.01.003 · Cited by 166
“Since then numerous versions of related studies were conducted by authors including Flynn et al. (1994); Black and Porter (1996); Choi and Eboch (1998), Samson and Terziovski (1999), and Kaynak (2003).”
BackgroundMethodSeth, D., & Tripathi, D. (2005) · International Journal of Quality & Reliability Management · doi:10.1108/02656710510582480 · Cited by 162
An instrument for measuring the critical factors of TQM in Turkish higher education
Bayraktar, E., Tatoglu, E., & Zaim, S. (2008) · Total Quality Management & Business Excellence · doi:10.1080/14783360802023921 · Cited by 160
“In a similar vein, using the Malcolm Baldrige Award criteria, Black and Porter (1996) identified ten empirically validated critical TQM factors, which include corporate quality culture, strategic quality management, quality improvement measurement systems, people and customer management, operational quality planning,…”
BackgroundMethodInfluentialAn innovation diffusion model of TQM implementation
Ahire, S. L., & Ravichandran, T. (2001) · IEEE Transactions on Engineering Management · doi:10.1109/17.969423 · Cited by 159
“undertaken to scientifically develop and validate measurement instruments for integrated quality management [4] [47], [15],”
BackgroundGreen operational performance in a high-tech industry: Role of green HRM and green knowledge
Wang, Z., Cai, S. A., Ren, S., & Singh, S. K. (2023) · Journal of Business Research · doi:10.1016/j.jbusres.2023.113761 · Cited by 54
Metadata
- Authors
- Black, S. A., & Porter, L. J.
- Venue
- Decision Sciences
- Publisher
- Wiley
- Published
- 1996-03
- Volume
- 27
- Issue
- 1
- Pages
- 1-21
- ISSN
- 0011-7315 (ISSN-L)
- 1540-5915
- OpenAlex
- W2037042994
- Cited by
- 1,021
- References
- 25
- FWCI
- 30.73
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.