A review of construction management challenges and BIM-based solutions: perspectives from the schedule, cost, quality, and safety management
The DOI matches its Crossref record; 154 of the 154 references it cites were found in a registry or an index.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
(2017) · Advances in Intelligent Systems and Computing · doi:10.1007/978-3-319-45991-2 · Cited by 1,816
Succar, B. (2009) · Automation in Construction · doi:10.1016/j.autcon.2008.10.003 · Cited by 1,741 · cited 1×
“…Kassem, 2015) ✓ Some macro-adoption models such as matrices and a chart are introduced to systematically evaluate BIM adoption across markets and inform the structured progress of country-specific BIM adoption policies Australia 2015 (Succar, 2009) ✓ The integration of BIM with ontology to…”
Sacks, R., Eastman, C., Lee, G., & Teicholz, P. (2018) · Wiley eBooks · doi:10.1002/9781119287568 · Cited by 884
Zhang, S., Teizer, J., Lee, J.-K., Eastman, C. M., & Venugopal, M. (2013) · Automation in Construction · doi:10.1016/j.autcon.2012.05.006 · Cited by 835
BIM implementation throughout the UK construction project lifecycle: An analysis
Eadie, R., Browne, M., Odeyinka, H., McKeown, C., & McNiff, S. (2013) · Automation in Construction · doi:10.1016/j.autcon.2013.09.001 · Cited by 749
Modelling global risk factors affecting construction cost performance
Baloi, D., & Price, A. D. F. (2003) · International Journal of Project Management · doi:10.1016/s0263-7863(02)00017-0 · Cited by 587 · cited 1×
“In addition, data limitations, lack of proper data management, repository maintenance and handling, and incorporation of cost uncertainties further complicate the process (Baloi & Price, 2003; Ji et al., 2011a, 2011b; Lawrence et al., 2014; Staub-french et al., 2002).”
BackgroundBuilding Information Modeling (BIM) for green buildings: A critical review and future directions
Lu, Y., Wu, Z., Chang, R., & Li, Y. (2017) · Automation in Construction · doi:10.1016/j.autcon.2017.08.024 · Cited by 555
A review of application of multi-criteria decision making methods in construction
Jato-Espino, D., Castillo-Lopez, E., Rodriguez-Hernandez, J., & Canteras-Jordana, J. C. (2014) · Automation in Construction · doi:10.1016/j.autcon.2014.05.013 · Cited by 510
A BIM-based construction quality management model and its applications
Chen, L., & Luo, H. (2014) · Automation in Construction · doi:10.1016/j.autcon.2014.05.009 · Cited by 509 · cited 3×
“…requirements in construction projects USA 2015 (Bannier & Goodrum, 2016) ✓ The integration of BIM with the knowledge of work envelope requirements to enhance the efficiency of work-space management USA 2016 (Bansal & Pal, 2014) ✓ The integration of BIM with GIS to improve construction safety by…”
BackgroundMethodFactors affecting cost performance: evidence from Indian construction projects
Iyer, K. C., & Jha, K. N. (2005) · International Journal of Project Management · doi:10.1016/j.ijproman.2004.10.003 · Cited by 504 · cited 1×
“…include poor site management, information delays, changes in scope, aggressive competition, slow decision-making due to its isolated nature, and the usage of traditional cost accounting methods and software (Iyer & Jha, 2005; Shane et al., 2009; Trost et al., 2003; Williams & Gong, 2014).”
MethodJournal of Information Technology in Construction
(2019) · Journal of Information Technology in Construction · doi:10.36680/j.itcon · Cited by 503
Feasibility Study of 4D CAD in Commercial Construction
Koo, B., & Fischer, M. A. (2000) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2000)126:4(251 · Cited by 485 · cited 1×
“To devise an effective schedule, details, such as resource and equipment allocation, time–cost trade-offs, constructability issues, and optimum productivity, should be taken into account (Koo & Fischer, 2000).”
BackgroundBosché, F. (2010) · Advanced Engineering Informatics · doi:10.1016/j.aei.2009.08.006 · Cited by 482 · cited 3×
“The results of this study showcased that this system enhances the level of quality inspection during the construction phase (Bosché, 2010).”
MethodResultInfluentialIntegrating BIM and GIS to improve the visual monitoring of construction supply chain management
Irizarry, J., Karan, E. P., & Jalaei, F. (2013) · Automation in Construction · doi:10.1016/j.autcon.2012.12.005 · Cited by 481 · cited 1×
“(Irizarry et al., 2013) ✓ The integration of BIM with GIS to monitor the supply chain status and present warning signals to assure the delivery of materials USA 2013”
BackgroundBIM-based fall hazard identification and prevention in construction safety planning
Zhang, S., Sulankivi, K., Kiviniemi, M., Romo, I., Eastman, C. M., & Teizer, J. (2015) · Safety Science · doi:10.1016/j.ssci.2014.08.001 · Cited by 447
Pantano, E., Rese, A., & Baier, D. (2017) · Journal of Retailing and Consumer Services · doi:10.1016/j.jretconser.2017.05.011 · Cited by 428
IFC and building lifecycle management
Vanlande, R., Nicolle, C., & Cruz, C. (2008) · Automation in Construction · doi:10.1016/j.autcon.2008.05.001 · Cited by 421
Collaboration in BIM-based construction networks: A bibliometric-qualitative literature review
Oraee, M., Hosseini, M. R., Papadonikolaki, E., Palliyaguru, R., & Arashpour, M. (2017) · International Journal of Project Management · doi:10.1016/j.ijproman.2017.07.001 · Cited by 415 · cited 1×
“, 2013; Smith, 2014) along with BIM-based site collaboration (Liu et al., 2017; Oraee et al., 2017), and specific management practices related to BIM (Wong et al.”
BackgroundUnderstanding effects of BIM on collaborative design and construction: An empirical study in China
Liu, Y., van Nederveen, S., & Hertogh, M. (2017) · International Journal of Project Management · doi:10.1016/j.ijproman.2016.06.007 · Cited by 411
Golparvar-Fard, M., Peña-Mora, F., & Savarese, S. (2015) · Journal of Computing in Civil Engineering · doi:10.1061/(asce)cp.1943-5487.0000205 · Cited by 404
Macro-BIM adoption: Conceptual structures
Succar, B., & Kassem, M. (2015) · Automation in Construction · doi:10.1016/j.autcon.2015.04.018 · Cited by 399 · cited 2×
“1 3 (Cheung et al., 2012) ✓ The integration of New Rule Measurement (NRM) with BIM to evaluate the economics and performance of the buildings, as well as their functionality in the design stage England 2012 (Sun et al., 2015) ✓ The integration of BIM and earned value analysis (EVA) to develop a cost and schedule risk…”
BackgroundProactive behavior-based safety management for construction safety improvement
Li, H., Lu, M., Hsu, S.-C., Gray, M., & Huang, T. (2015) · Safety Science · doi:10.1016/j.ssci.2015.01.013 · Cited by 397 · cited 3×
“(Li et al., 2015) ✓ The integration of BIM with PBBS that uses simulation and real-time location system to improve safety management Hong Kong 2015”
BackgroundMethodInfluentialJournal of computing in civil engineering
Collopy, F. (1996) · International Journal of Forecasting · doi:10.1016/0169-2070(96)88200-8 · Cited by 393
Zhang, S., Boukamp, F., & Teizer, J. (2015) · Automation in Construction · doi:10.1016/j.autcon.2015.02.005 · Cited by 392
Automated progress tracking using 4D schedule and 3D sensing technologies
Turkan, Y., Bosche, F., Haas, C. T., & Haas, R. (2012) · Automation in Construction · doi:10.1016/j.autcon.2011.10.003 · Cited by 374
Park, C.-S., Lee, D.-Y., Kwon, O.-S., & Wang, X. (2013) · Automation in Construction · doi:10.1016/j.autcon.2012.09.010 · Cited by 367 · cited 2×
“proposed a framework based on the integration of BIM with AR and an ontology-based data collection template to decrease defects occurring during the construction process (Park et al., 2013).”
MethodA framework for construction safety management and visualization system
Park, C.-S., & Kim, H.-J. (2013) · Automation in Construction · doi:10.1016/j.autcon.2012.09.012 · Cited by 348 · cited 3×
“1 3 (Cheung et al., 2012) ✓ The integration of New Rule Measurement (NRM) with BIM to evaluate the economics and performance of the buildings, as well as their functionality in the design stage England 2012 (Sun et al., 2015) ✓ The integration of BIM and earned value analysis (EVA) to develop a cost and schedule risk…”
BackgroundMethodPour Rahimian, F., Seyedzadeh, S., Oliver, S., Rodriguez, S., & Dawood, N. (2020) · Automation in Construction · doi:10.1016/j.autcon.2019.103012 · Cited by 329
Doloi, H. (2013) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000621 · Cited by 325 · cited 2×
“The key bottom lines of the AEC industry are schedule, cost, quality, and safety considerations, which is a particularly accurate assumption in the context of construction project management (Doloi, 2013; Khademi, 2014; Memon et al., 2011).”
BackgroundBIM Implementation – Global Strategies
Smith, P. (2014) · Procedia Engineering · doi:10.1016/j.proeng.2014.10.575 · Cited by 323 · cited 1×
“…efforts are being made by the researchers to further explore the possibility of BIM adoption in the construction industry (Eadie et al., 2013; Smith, 2014) along with BIM-based site collaboration (Liu et al., 2017; Oraee et al., 2017), and specific management practices related to BIM (Wong…”
BackgroundA study on software architecture for effective BIM/GIS-based facility management data integration
Kang, T. W., & Hong, C. H. (2015) · Automation in Construction · doi:10.1016/j.autcon.2015.03.019 · Cited by 317
Organizational Divisions in BIM-Enabled Commercial Construction
Dossick, C. S., & Neff, G. (2010) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000109 · Cited by 312
Construction safety and digital design: A review
Zhou, W., Whyte, J., & Sacks, R. (2012) · Automation in Construction · doi:10.1016/j.autcon.2011.07.005 · Cited by 303
Park, J., Kim, K., & Cho, Y. K. (2017) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0001223 · Cited by 300
BIM and ontology-based approach for building cost estimation
Lee, S., Kim, K.-R., & Yu, J.-H. (2013) · Automation in Construction · doi:10.1016/j.autcon.2013.10.020 · Cited by 290 · cited 2×
“(Lee et al., 2014) ✓ ✓ The integration of BIM with ontology and semantic technology to help engineers to find work items easily Korea 2013”
BackgroundMethodChanging roles of the clients, architects and contractors through BIM
Sebastian, R. (2011) · Engineering, Construction and Architectural Management · doi:10.1108/09699981111111148 · Cited by 274 · cited 1×
“…cost (5D), operation (6D), sustainability (7D), and safety (8D), which enables the extraction of project-specific data for further analysis and prediction when there are multiple dimensions within a project (Azhar et al., 2008; Hardin, 2009; Kymmell, 2008; Latiffi et al., 2014; Sebastian, 2011).”
BackgroundLi, C. Z., Zhong, R. Y., Xue, F., Xu, G., Chen, K., Huang, G. G., & Shen, G. Q. (2017) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2017.07.156 · Cited by 272 · cited 1×
“This research attempted to ensure timely project completion in prefabricated housing construction by addressing schedule risks (Li et al., 2017).”
Aligning building information model tools and construction management methods
Hartmann, T., van Meerveld, H., Vossebeld, N., & Adriaanse, A. (2012) · Automation in Construction · doi:10.1016/j.autcon.2011.12.011 · Cited by 266
Dimitrov, A., & Golparvar-Fard, M. (2014) · Advanced Engineering Informatics · doi:10.1016/j.aei.2013.11.002 · Cited by 261 · cited 1×
“…control Switzerland 2010 (Elbeltagi & Dawood, 2011) ✓ ✓ The integration of BIM with GIS to help decision-making regarding repetitive construction projects Egypt 2011 (Turkan et al., 2012) ✓ The integration of BIM with laser scanning to develop an automated progress tracking Canada 2012 (Irizarry…”
MethodConstruction risk knowledge management in BIM using ontology and semantic web technology
Ding, L. Y., Zhong, B. T., Wu, S., & Luo, H. B. (2016) · Safety Science · doi:10.1016/j.ssci.2016.04.008 · Cited by 254
BIM-based immersive Virtual Reality for construction workspace planning: A safety-oriented approach
Getuli, V., Capone, P., Bruttini, A., & Isaac, S. (2020) · Automation in Construction · doi:10.1016/j.autcon.2020.103160 · Cited by 253
Building information modeling and safety management: A systematic review
Martínez-Aires, M. D., López-Alonso, M., & Martínez-Rojas, M. (2018) · Safety Science · doi:10.1016/j.ssci.2017.08.015 · Cited by 252 · cited 1×
“BIM supports communication and collaboration, enabling the project teams to share their knowledge and propose safety improvements throughout the project life cycle (Martínez-aires et al., 2018; Zhou et al., 2012).”
BackgroundHan, K. K., & Golparvar-Fard, M. (2015) · Automation in Construction · doi:10.1016/j.autcon.2015.02.007 · Cited by 246 · cited 2×
“…et al., 2014) ✓ The integration of BIM with laser scanning to develop structural works tracking, in particular, MEP works Canada 2014 (Dimitrov & Golparvar-fard, 2014) ✓ The integration of BIM with support vector machines to classify materials from single images taken under an unknown…”
MethodTracking the Built Status of MEP Works: Assessing the Value of a Scan-vs-BIM System
Bosché, F., Guillemet, A., Türkan, Y., Haas, C. T., & Haas, R. (2013) · Journal of Computing in Civil Engineering · doi:10.1061/(asce)cp.1943-5487.0000343 · Cited by 244
Development of BIM, IoT and AR/VR technologies for fire safety and upskilling
Chen, H., Hou, L., Zhang, G. (., & Moon, S. (2021) · Automation in Construction · doi:10.1016/j.autcon.2021.103631 · Cited by 235 · cited 2×
“improved and augmented fire safety and safety upskilling through the integration of BIM, the Internet-of-Things, and AR/VR technologies (Chen et al., 2021).”
BackgroundLinking building data in the cloud: Integrating cross-domain building data using linked data
Curry, E., O’Donnell, J., Corry, E., Hasan, S., Keane, M. M., & O’Riain, S. (2012) · Advanced Engineering Informatics · doi:10.1016/j.aei.2012.10.003 · Cited by 233
Building information modeling (BIM): Benefits, risks and challenges
Baba, H. D. (2008) · Cited by 220
Dodanwala, T. C., Santoso, D. S., & Yukongdi, V. (2022) · International Journal of Construction Management · doi:10.1080/15623599.2022.2080931 · Cited by 216
Self-citationBIM integrated smart monitoring technique for building fire prevention and disaster relief
Cheng, M.-Y., Chiu, K.-C., Hsieh, Y.-M., Yang, I.-T., Chou, J.-S., & Wu, Y.-W. (2017) · Automation in Construction · doi:10.1016/j.autcon.2017.08.027 · Cited by 215
Martínez-Rojas, M., Pardo-Ferreira, M. D. C., & Rubio-Romero, J. C. (2018) · International Journal of Information Management · doi:10.1016/j.ijinfomgt.2018.07.008 · Cited by 213 · cited 1×
“However, hazard identification is not devoid of challenges ranging from inaccurate data sharing among project participants to decisionmaking based on uncertain information, as well as nonstandard procedures and unorganized tasks (Martínez-Rojas et al., 2018; Zhang et al., 2013).”
BackgroundBortolini, R., Formoso, C. T., & Viana, D. D. (2019) · Automation in Construction · doi:10.1016/j.autcon.2018.11.031 · Cited by 211
Golparvar-Fard, M., Peña-Mora, F., & Savarese, S. (2011) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000371 · Cited by 210
Turner, R., Huemann, M., & Keegan, A. (2008) · International Journal of Project Management · doi:10.1016/j.ijproman.2008.05.005 · Cited by 210
BIM-based integrated approach for detailed construction scheduling under resource constraints
Liu, H., Al-Hussein, M., & Lu, M. (2015) · Automation in Construction · doi:10.1016/j.autcon.2015.03.008 · Cited by 205
Point cloud quality requirements for Scan-vs-BIM based automated construction progress monitoring
Rebolj, D., Pučko, Z., Babič, N. Č., Bizjak, M., & Mongus, D. (2017) · Automation in Construction · doi:10.1016/j.autcon.2017.09.021 · Cited by 202
BIM-based Last Planner System tool for improving construction project management
Heigermoser, D., García de Soto, B., Abbott, E. L. S., & Chua, D. K. H. (2019) · Automation in Construction · doi:10.1016/j.autcon.2019.03.019 · Cited by 201
Cheung, W.-F., Lin, T.-H., & Lin, Y.-C. (2018) · Sensors · doi:10.3390/s18020436 · Cited by 198
Xue, X., Shen, Q., & Ren, Z. (2010) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000025 · Cited by 191
Teizer, J. (2015) · Advanced Engineering Informatics · doi:10.1016/j.aei.2015.03.006 · Cited by 188 · cited 2×
“…Hazard Detection Safety Planning and Scheduling (Malekitabar et al., 2016) ✓ A BIM-based study to help managers to detect more than 40% of potential fatalities in construction projects by providing five sets of safety risk drivers Iran 2016 (Riaz et al., 2014) ✓ The integration of BIM with…”
BackgroundMethodCoSMoS: A BIM and wireless sensor based integrated solution for worker safety in confined spaces
Riaz, Z., Arslan, M., Kiani, A. K., & Azhar, S. (2014) · Automation in Construction · doi:10.1016/j.autcon.2014.05.010 · Cited by 181
Integrated system for BIM-based collaborative design
Oh, M., Lee, J., Hong, S. W., & Jeong, Y. (2015) · Automation in Construction · doi:10.1016/j.autcon.2015.07.015 · Cited by 180 · cited 2×
“(Oh et al., 2015) ✓ An integrated BIM-based system to make a collaborative design for improving the quality and productivity of construction projects Korea 2015”
MethodNiu, Y., Lu, W., Chen, K., Huang, G. G., & Anumba, C. (2015) · Journal of Computing in Civil Engineering · doi:10.1061/(asce)cp.1943-5487.0000550 · Cited by 180 · cited 2×
“(Niu et al., 2016) ✓ ✓ The introduction on the integration of BIM with Smart Construction Objects (SCOs) to enable a safer, greener, more productive, and efficient construction system Hong Kong 2016”
BackgroundMethodA review and outlook for integrated BIM application in green building assessment
Ansah, M. K., Chen, X., Yang, H., Lu, L., & Lam, P. T. I. (2019) · Sustainable Cities and Society · doi:10.1016/j.scs.2019.101576 · Cited by 174
Towards the BIM implementation for historical building restoration sites
Biagini, C., Capone, P., Donato, V., & Facchini, N. (2016) · Automation in Construction · doi:10.1016/j.autcon.2016.03.003 · Cited by 174
Kwon, O.-S., Park, C.-S., & Lim, C.-R. (2014) · Automation in Construction · doi:10.1016/j.autcon.2014.05.005 · Cited by 173 · cited 2×
“(Kwon et al., 2014) ✓ The integration of BIM with image-matching and AR to develop a system to improve reinforced concrete defect management Korea 2014”
MethodLu, Y., Li, Y., Skibniewski, M., Wu, Z., Wang, R., & Le, Y. (2015) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000319 · Cited by 169
Informetric analysis and review of literature on the role of BIM in sustainable construction
Santos, R., Costa, A. A., Silvestre, J. D., & Pyl, L. (2019) · Automation in Construction · doi:10.1016/j.autcon.2019.02.022 · Cited by 169
Dodanwala, T. C., & Santoso, D. S. (2021) · Engineering Construction & Architectural Management · doi:10.1108/ecam-12-2020-1048 · Cited by 167
Self-citationPredicting construction cost overruns using text mining, numerical data and ensemble classifiers
Williams, T. P., & Gong, J. (2014) · Automation in Construction · doi:10.1016/j.autcon.2014.02.014 · Cited by 164 · cited 1×
“…include poor site management, information delays, changes in scope, aggressive competition, slow decision-making due to its isolated nature, and the usage of traditional cost accounting methods and software (Iyer & Jha, 2005; Shane et al., 2009; Trost et al., 2003; Williams & Gong, 2014).”
MethodThe Role of Information Technologies to Address Data Handling in Construction Project Management
Rojas, M. M., Marín, N., & Vila, M. A. (2015) · Journal of Computing in Civil Engineering · doi:10.1061/(asce)cp.1943-5487.0000538 · Cited by 164 · cited 3×
“In the recent past, modern technologies, such as Geographic Information Systems (GIS), Artificial Intelligence (AI), smart structural monitoring and sensing technologies, augmented reality, and virtual prototyping, have been quickly making their mark in the construction sector (Faghihi et al., 2015; Martinez-Rojas et…”
BackgroundInfluentialPapagiannidis, S., Pantano, E., See-To, E. W. K., & Bourlakis, M. (2013) · Journal of Marketing Management · doi:10.1080/0267257x.2013.821150 · Cited by 163
OPTIMIZING LOCATION OF TOWER CRANES ON CONSTRUCTION SITES THROUGH GIS AND BIM INTEGRATION
Irizarry, J., & Karan, E. P. (2012) · Journal of Information Technology in Construction · Cited by 163
Popov, V., Juocevicius, V., Migilinskas, D., Ustinovičius, L., & Mikalauskas, S. (2010) · Automation in Construction · doi:10.1016/j.autcon.2009.12.005 · Cited by 162
Construction quality management based on a collaborative system using BIM and indoor positioning
Ma, Z., Cai, S., Mao, N., Yang, Q., Feng, J., & Wang, P. (2018) · Automation in Construction · doi:10.1016/j.autcon.2018.03.027 · Cited by 160 · cited 2×
“The outcomes of this study demonstrated the improvement of collaboration among the construction stakeholders (Ma et al., 2018).”
BIM-based augmented reality inspection and maintenance of fire safety equipment
Chen, Y.-J., Lai, Y.-S., & Lin, Y.-H. (2020) · Automation in Construction · doi:10.1016/j.autcon.2019.103041 · Cited by 160
Braun, A., & Borrmann, A. (2019) · Automation in Construction · doi:10.1016/j.autcon.2019.102879 · Cited by 160 · cited 2×
“This system enhances image-based object detection, which is the basis of construction progress monitoring (Braun & Borrmann, 2019).”
Karan, E. P., & Irizarry, J. (2015) · Automation in Construction · doi:10.1016/j.autcon.2015.02.012 · Cited by 159
Golovina, O., Teizer, J., & Pradhananga, N. (2016) · Automation in Construction · doi:10.1016/j.autcon.2016.03.008 · Cited by 159
Construction safety risk drivers: A BIM approach
Malekitabar, H., Ardeshir, A., Sebt, M. H., & Stouffs, R. M. F. A. (2015) · Safety Science · doi:10.1016/j.ssci.2015.11.002 · Cited by 156 · cited 2×
“(Malekitabar et al., 2016) ✓ A BIM-based study to help managers to detect more than 40% of potential fatalities in construction projects by providing five sets of safety risk drivers Iran 2016”
BackgroundDemirkan, H., Bess, C., Spohrer, J., Rayes, A., Allen, D., & Moghaddam, Y. (2015) · Communications of the Association for Information Systems · doi:10.17705/1cais.03735 · Cited by 154 · cited 2×
“Modern innovations, such as digital twinning, 3D virtual reality systems, cloud solutions, mobile apps, and AI, among others, can potentially transform the future of the AEC industry (Blazquez, 2014; Demirkan, 2015; Pantano et al., 2017; Papagiannidis et al., 2013).”
BackgroundChen, C., & Tang, L. (2019) · Automation in Construction · doi:10.1016/j.autcon.2019.102944 · Cited by 154 · cited 2×
“…method to measure the point cloud quality for monitoring the construction procedure Slovenia 2017 (Bansal & Pal, 2009) ✓ The integration of BIM, and GIS to manage each stage of projects, which in turn causes an impeccable schedule India 2009 (Park et al., 2018) ✓ The integration of BIM and…”
MethodTezel, A., Taggart, M., Koskela, L., Tzortzopoulos, P., Hanahoe, J., & Kelly, M. (2019) · Canadian Journal of Civil Engineering · doi:10.1139/cjce-2018-0408 · Cited by 151
BIM Standard in Off-Site Construction
Nawari, N. O. (2012) · Journal of Architectural Engineering · doi:10.1061/(asce)ae.1943-5568.0000056 · Cited by 148 · cited 3×
“(Nawari, 2012) ✓ The integration of BIM with IDM to facilitate more reliable information exchange between project participants USA 2012”
MethodInfluentialInterior construction state recognition with 4D BIM registered image sequences
Kropp, C., Koch, C., & König, M. (2017) · Automation in Construction · doi:10.1016/j.autcon.2017.10.027 · Cited by 148
Asadi, K., Ramshankar, H., Noghabaei, M., & Han, K. K. (2019) · Journal of Computing in Civil Engineering · doi:10.1061/(asce)cp.1943-5487.0000847 · Cited by 145
Dodanwala, T. C., & Shrestha, P. (2021) · On the Horizon The International Journal of Learning Futures · doi:10.1108/oth-11-2020-0042 · Cited by 142 · cited 1×
“…climate change, weather impacts, lack of workmanship, poor quality materials, and numerous change requests continue to pose challenges to the construction managers (Awwad et al., 2016; Dodanwala & Santoso, 2022; Dodanwala & Shrestha, 2021; Dodanwala et al., 2021, 2022a, b; Turner et al., 2008).”
BackgroundSelf-citationRezgui, Y., Boddy, S., Wetherill, M., & Cooper, G. S. (2009) · Computer-Aided Design · doi:10.1016/j.cad.2009.06.005 · Cited by 137
QUANTITATIVE EVALUATION OF THE BIM-ASSISTED CONSTRUCTION DETAILED COST ESTIMATES
Shen, Z., & Issa, R. R. A. (2010) · Lincoln (University of Nebraska) · Cited by 134
Melzner, J., Zhang, S., Teizer, J., & Bargstädt, H. (2013) · Construction Management and Economics · doi:10.1080/01446193.2013.780662 · Cited by 134
Lin, Y.-C., & Cheung, W.-F. (2020) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000760 · Cited by 134 · cited 1×
“(Lin et al., 2020) ✓ The integration of BIM with Wireless Sensor Network (WSN) to develop a monitoring system for parking garages Taiwan 2020”
MethodRole of Construction Sector in Economic Growth: Empirical Evidence from Nigeria
Oladinrin, O. T., Ogunsemi, D. R., & Aje, I. O. (2012) · FUTY Journal of the Environment · doi:10.4314/fje.v7i1.4 · Cited by 134
Braun, A., Tuttas, S., Borrmann, A., & Stilla, U. (2015) · Journal of Information Technology in Construction · Cited by 131
Decision support for tower crane selection with building information models and genetic algorithms
Marzouk, M. M., & Abubakr, A. (2015) · Automation in Construction · doi:10.1016/j.autcon.2015.09.008 · Cited by 131 · cited 1×
“…organization, and process data definition structure China 2014 (Choi et al., 2014a) ✓ The use of BIM to enhance workspace problem detection and status representation Korea 2014 (Hartmann et al., 2012) ✓ The introduction of two BIM-based tools to support risk management activities in a…”
MethodCost-benefit analysis of BIM-enabled design clash detection and resolution
Chahrour, R., Hafeez, M. A., Ahmad, A. M., et al. (2020) · Construction Management and Economics · doi:10.1080/01446193.2020.1802768 · Cited by 124
Automation in construction scheduling: a review of the literature
Faghihi, V., Nejat, A., Reinschmidt, K. F., & Kang, J. H. (2015) · The International Journal of Advanced Manufacturing Technology · doi:10.1007/s00170-015-7339-0 · Cited by 123
A review of cloud-based BIM technology in the construction sector
Wong, J. K. W., Wang, X., Li, H., Chan, G., & Li, H. (2014) · ORCA Online Research @Cardiff (Cardiff University) · Cited by 123
Hamledari, H., Azar, E. R., & McCabe, B. Y. (2017) · Journal of Computing in Civil Engineering · doi:10.1061/(asce)cp.1943-5487.0000727 · Cited by 117
Integrating Building Information Modeling and Health and Safety for Onsite Construction
Ganah, A. A., & John, G. A. (2014) · Safety and Health at Work · doi:10.1016/j.shaw.2014.10.002 · Cited by 116 · cited 1×
“Ganah and John suggested adopting BIM in toolbox talks (Ganah & John, 2015).”
BackgroundAutomatic Indoor Construction Process Monitoring for Tiles Based on BIM and Computer Vision
Deng, H. F., Hong, H., Luo, D., Deng, Y., & Su, C. (2019) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0001744 · Cited by 112 · cited 1×
“(Deng et al., 2020) ✓ The integration of BIM with computer vision to develop an automated progress monitoring of tiles China 2020”
MethodAn estimation framework for building information modeling (BIM)-based demolition waste by type
Kim, Y.-C., Hong, W., Park, J., & Cha, G.-W. (2017) · Waste Management & Research The Journal for a Sustainable Circular Economy · doi:10.1177/0734242x17736381 · Cited by 109
Automated planning of concrete joint layouts with 4D-BIM
Sheikhkhoshkar, M., Rahimian, F. P., Kaveh, M. H., Hosseini, M. R., & Edwards, D. J. (2019) · Automation in Construction · doi:10.1016/j.autcon.2019.102943 · Cited by 108
Niknam, M., & Karshenas, S. (2015) · Automation in Construction · doi:10.1016/j.autcon.2015.04.003 · Cited by 105 · cited 2×
“Niknam and Karshenas integrated BIM and semantic web service technologies, as well as ontology inference processes to improve the accuracy of cost estimation (Niknam & Karshenas, 2015).”
BackgroundMethodA Review on BIM-based automated code compliance checking system
Ismail, A. S., Ali, K. N., & Iahad, N. A. (2017) · International Conference on Research and Innovation in Information Systems · doi:10.1109/icriis.2017.8002486 · Cited by 104 · cited 1×
“…(Ansah et al., 2019; Ayman et al., 2020; Chang & Hsieh, 2020; Kwok et al., 2019; Lu et al., 2017; Santos et al., 2019), building fire safety (Davidson & Gales, 2021), automation of code checking process (Ismail, 2017), are some of the common themes touched upon in literature review papers.”
BackgroundChen, Q., Adey, B. T., Haas, C. T., & Hall, D. (2020) · Construction Innovation · doi:10.1108/ci-11-2019-0133 · Cited by 100
Automated hazardous area identification using laborers' actual and optimal routes
Kim, H., Lee, H., Park, M., Chung, B., & Hwang, S. (2016) · Automation in Construction · doi:10.1016/j.autcon.2016.01.006 · Cited by 96
Use of Building Information Modeling in Design to Prevent Construction Worker Falls
Qi, J., Issa, R. R. A., Olbina, S. J., & Hinze, J. (2013) · Journal of Computing in Civil Engineering · doi:10.1061/(asce)cp.1943-5487.0000365 · Cited by 95
Knowledge-based schedule generation and evaluation
Mikulakova, E., König, M., Tauscher, E., & Beucke, K. E. (2010) · Advanced Engineering Informatics · doi:10.1016/j.aei.2010.06.010 · Cited by 95 · cited 3×
“This method combined BIM and construction processes with past data from successfully executed projects to determine the project duration (Mikulakova et al., 2010).”
BackgroundMethodInfluentialThe Development of Building Information Modeling (BIM) Definition
Latiffi, A. A., Brahim, J., & Fathi, M. S. (2014) · Applied Mechanics and Materials · doi:10.4028/www.scientific.net/amm.567.625 · Cited by 90 · cited 3×
“There has been a growing interest in the use of BIM for schedule management, cost management, safety management, and quality management in the AEC industry (Azhar et al., 2008; Latiffi et al., 2014).”
BackgroundAdoption and Use of Interorganizational ICT in a Construction Project
Adriaanse, A., Voordijk, H., & Dewulf, G. P. M. R. (2010) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000201 · Cited by 89
The role of construction in economic growth and development
Wells, J. (1985) · Habitat International · doi:10.1016/0197-3975(85)90033-5 · Cited by 89 · cited 2×
“The Architectural, Engineering, and Construction (AEC) industry plays a crucial role in the socio-economic development of a country (Oladinrin et al., 2012), (Wells, 1985).”
BackgroundMethodIntegrated visualized time control system for repetitive construction projects
Elbeltagi, E. E., & Dawood, M. (2011) · Automation in Construction · doi:10.1016/j.autcon.2011.03.012 · Cited by 89 · cited 2×
“The proposed method reduces potential defects of repetitive actions during the decisionmaking process (Elbeltagi & Dawood, 2011).”
MethodMobile BIM implementation and lean interaction on construction site
Köseoğlu, O., & Nurtan-Gunes, E. T. (2018) · Engineering Construction & Architectural Management · doi:10.1108/ecam-08-2017-0188 · Cited by 87
Prediction of product design decision Making: An investigation of eye movements and EEG features
Wang, Y., Yu, S., Ma, N., Wang, J., Hu, Z., Liu, Z., & Hu, J. (2020) · Advanced Engineering Informatics · doi:10.1016/j.aei.2020.101095 · Cited by 86
Predicting BIM labor cost with random forest and simple linear regression
Huang, C.-H., & Hsieh, S. (2020) · Automation in Construction · doi:10.1016/j.autcon.2020.103280 · Cited by 84 · cited 1×
“…✓ The integration of BIM with cost-based progress curve (called S-curve) to combine schedule and cost management for data acquisition and storage Taiwan 2016 (Huang & Hsieh, 2020) ✓ ✓ The integration of BIM with random forest and simple linear regression to predict BIM labor cost Taiwan…”
MethodPorwal, A., Parsamehr, M., Szostopal, D., Ruparathna, R., & Hewage, K. (2020) · International Journal of Construction Management · doi:10.1080/15623599.2020.1854930 · Cited by 83
Self-citationBIM-Based Construction Scheduling Method Using Optimization Theory for Reducing Activity Overlaps
HyounSeok, M., Kim, H.-S., Kamat, V. R., & Kang, L.-S. (2013) · Journal of Computing in Civil Engineering · doi:10.1061/(asce)cp.1943-5487.0000342 · Cited by 83 · cited 3×
“BIM-based schedule management is gaining significant traction today (Aredah et al., 2019; Curry et al., 2013; Liu et al., 2015; Moon et al., 2015; Song et al., 2012; Wang, 2019; Wang & Song, 2016).”
BackgroundMethodInfluentialHan, S., Lee, S. H., & Pena-Mora, F. A. (2013) · Journal of Computing in Civil Engineering · doi:10.1061/(asce)cp.1943-5487.0000339 · Cited by 81
Chang, Y., & Hsieh, S. (2020) · Journal of Information Technology in Construction · doi:10.36680/j.itcon.2020.001 · Cited by 80 · cited 1×
“Evaluations of building sustainability (Ansah et al., 2019; Ayman et al., 2020; Chang & Hsieh, 2020; Kwok et al., 2019; Lu et al., 2017; Santos et al., 2019), building fire safety (Davidson & Gales, 2021), automation of code checking process (Ismail, 2017), are some of the common themes touched…”
BackgroundFire Safety in Tall Timber Building: A BIM-Based Automated Code-Checking Approach
Kincelova, K., Boton, C., Blanchet, P., & Dagenais, C. (2020) · Buildings · doi:10.3390/buildings10070121 · Cited by 79
A web-based system for managing construction information
Chassiakos, A. P., & Sakellaropoulos, S. (2008) · Advances in Engineering Software · doi:10.1016/j.advengsoft.2008.05.006 · Cited by 76 · cited 4×
“BIM is effective in implementing modern management techniques, such as lean construction to reduce defects, clashes, and wastage of time during construction projects (Chassiakos & Sakellaropoulos, 2008; Forcada et al., 2007).”
BackgroundMethodInfluentialCost estimation model for building projects using case-based reasoning
Ji, S., Park, M., & Lee, H. (2011) · Canadian Journal of Civil Engineering · doi:10.1139/l11-016 · Cited by 76
Abbasi, S., Taghizade, K., & Noorzai, E. (2020) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0001940 · Cited by 76
BIM-based approach for the cost-optimization of seismic retrofit strategies on existing buildings
Vitiello, U., Ciotta, V., Salzano, A., Asprone, D., Manfredi, G., & Cosenza, E. (2018) · Automation in Construction · doi:10.1016/j.autcon.2018.10.023 · Cited by 66
Time Overrun in Construction Projects from the Perspective of Project Management Consultant (PMC)
Memon, A. H., Rahman, I. B. A., Abdullah, M. R., & Azis, A. A. A. (2011) · Journal of Surveying Construction & Property · doi:10.22452/jscp.vol2no1.4 · Cited by 65 · cited 1×
“The key bottom lines of the AEC industry are schedule, cost, quality, and safety considerations, which is a particularly accurate assumption in the context of construction project management (Doloi, 2013; Khademi, 2014; Memon et al., 2011).”
BackgroundThe mediating role of work–family conflict on role overload and job stress linkage
Dodanwala, T. C., Santoso, D. S., & Shrestha, P. (2022) · Built Environment Project and Asset Management · doi:10.1108/bepam-12-2021-0153 · Cited by 65
Self-citationA neural network approach to predicting the net costs associated with BIM adoption
Hong, Y., Hammad, A. W. A., Akbarnezhad, A., & Arashpour, M. (2020) · Automation in Construction · doi:10.1016/j.autcon.2020.103306 · Cited by 62
Database-Supported and Web-Based Visualization for Daily 4D BIM
Park, J., Cai, H., Dunston, P. S., & Ghasemkhani, H. (2017) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0001392 · Cited by 61
Kubicki, S., Guerriero, A., Schwartz, L., Daher, E., & Idris, B. (2019) · Automation in Construction · doi:10.1016/j.autcon.2018.12.009 · Cited by 56 · cited 2×
“(Kubicki et al., 2019) ✓ The integration of BIM with Smart Whiteboard systems to make synchronous interactive devices for enhancing coordination between participants Luxembourg 2019”
BackgroundMethodAdoption of web databases for document management in SMEs of the construction sector in Spain
Forcada, N., Casals, M., Roca, X., & Gangolells, M. (2006) · Automation in Construction · doi:10.1016/j.autcon.2006.07.011 · Cited by 55
PERCEPTIONS OF AUTOMATED DATA COLLECTION TECHNOLOGY USE IN THE CONSTRUCTION INDUSTRY
Sardroud, J. M. (2014) · Journal of Civil Engineering and Management · doi:10.3846/13923730.2013.802734 · Cited by 54 · cited 1×
“…Engineering, University of Windsor, 401 Sunset Ave, Windsor, ON, Canada 2 Department of Civil Engineering, University of Moratuwa, Bandaranayake Mawatha, Moratuwa 10400, Sri Lanka 1 3 collaborative work nature (Ahuja et al., 2010; Lam et al., 2010; Martínez-rojas et al., 2016; Sardroud, 2015).”
Data Fusion Process Management for Automated Construction Progress Estimation
Shahi, A., Safa, M., Haas, C. T., & West, J. S. (2014) · Journal of Computing in Civil Engineering · doi:10.1061/(asce)cp.1943-5487.0000436 · Cited by 51
Analysis and comparison of environmental impacts and cost of bio-based house versus concrete house
Krasny, E., Klarić, S., & Korjenić, A. (2017) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2017.05.103 · Cited by 49
Information Retrieval Framework for Hazard Identification in Construction
Kim, H., Lee, H., Park, M., Chung, B., & Hwang, S. (2013) · Journal of Computing in Civil Engineering · doi:10.1061/(asce)cp.1943-5487.0000340 · Cited by 47
BIM-based draft schedule generation in reinforced concrete-framed buildings
Wang, Z., & Azar, E. R. (2019) · Construction Innovation · doi:10.1108/ci-11-2018-0094 · Cited by 46 · cited 2×
“BIM-based schedule management is gaining significant traction today (Aredah et al., 2019; Curry et al., 2013; Liu et al., 2015; Moon et al., 2015; Song et al., 2012; Wang, 2019; Wang & Song, 2016).”
BackgroundMethodChen, K., & Lu, W. (2019) · Engineering Construction & Architectural Management · doi:10.1108/ecam-05-2018-0206 · Cited by 46 · cited 2×
“…concrete defect management Korea 2014 (Chen & Luo, 2014) ✓ The use of BIM to develop a model in a product, organization, and process data definition structure China 2014 (Yan, 2017) ✓ The use of BIM to design prefabricated and assembled concrete structures for improving construction…”
MethodUSE OF BIM APPROACH TO ENHANCE CONSTRUCTION INTERFACE MANAGEMENT: A CASE STUDY
Lin, Y. (2015) · Journal of Civil Engineering and Management · doi:10.3846/13923730.2013.802730 · Cited by 42 · cited 3×
“This method aids users in mitigating defects during the pre-construction phase (Lin, 2015).”
BackgroundMethodInfluentialBIM and project planning integration for on-site safety induction
Ganah, A. A., & John, G. A. (2017) · Journal of Engineering Design and Technology · doi:10.1108/jedt-02-2016-0012 · Cited by 41 · cited 1×
“…interface and automatically remove any hazardous gas Taiwan 2018 (Mihić et al., 2018) ✓ The integration of BIM with specially developed construction hazards database to decrease the number of accidents and injuries by an automated hazard detection Croatia 2018 (Cheng et al., 2017) ✓ The…”
MethodBIM-Based Decision-Making Framework for Scaffolding Planning
Kim, K., Cho, Y. K., & Kim, K. (2018) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000656 · Cited by 41
A CBR-based Decision Support System Framework for Construction Supply Chain Risk Management
Kumar, V., & Viswanadham, N. (2007) · IEEE International Conference on Automation Science and Engineering (CASE) · doi:10.1109/coase.2007.4341831 · Cited by 40 · cited 1×
“Among the most common methods adopted in CBR is Monte Carlo simulation (Kumar & Viswanadham, 2007).”
MethodObjective-driven and Pareto Front analysis: Optimizing time, cost, and job-site movements
Faghihi, V., Reinschmidt, K. F., & Kang, J. H. (2016) · Automation in Construction · doi:10.1016/j.autcon.2016.06.003 · Cited by 40
Dodanwala, T. C., Shrestha, P., & Santoso, D. S. (2021) · Construction Economics and Building · doi:10.5130/ajceb.v21i4.7609 · Cited by 39
Self-citationPredicting the Future Using Web Knowledge: State of the Art Survey
Mosavi, A. H., Bathla, Y., & Várkonyi-Kóczy, A. R. (2017) · Advances in intelligent systems and computing · doi:10.1007/978-3-319-67459-9_42 · Cited by 37 · cited 1×
“Moreover, the potential implications of decisions must also be analyzed to optimize the solution (Mosavi et al., 2018).”
BackgroundBringing Information to the Field: Automated Photo Registration and 4D BIM
Park, J., Cai, H., & Perissin, D. (2017) · Journal of Computing in Civil Engineering · doi:10.1061/(asce)cp.1943-5487.0000740 · Cited by 36 · cited 2×
“(Park et al., 2018) ✓ The integration of BIM and Content-Based Image Retrieval (CBIR) to automatically register daily photos and determine BIM objects USA 2018”
MethodInternational Journal of Informative & Futuristic Research
Journals, P. P. (2015) · ADVANCED SCIENCES INDEX · Cited by 36
A framework for comparing multiple cost estimation methods using an automated visualization toolkit
Mittas, N., Mamalikidis, I., & Angelis, L. (2014) · Information and Software Technology · doi:10.1016/j.infsof.2014.05.010 · Cited by 35
Scenarios for Integrating IPS–IMU System with BIM Technology in Construction Safety Control
Liu, D., Jin, Z., & Gambatese, J. (2019) · Practice Periodical on Structural Design and Construction · doi:10.1061/(asce)sc.1943-5576.0000465 · Cited by 34
Mashayekhi, A. N., & Heravi, G. (2020) · Journal of Building Engineering · doi:10.1016/j.jobe.2020.101653 · Cited by 33 · cited 1×
“…2020 (Vandenbergh & Pyl, 2020) ✓ ✓ The integration of BIM with Life Cycle Costing (LCC) to improve the economic dimension of the sustainability concept Belgium 2020 (Mashayekhi & Heravi, 2020) ✓ The integration of BIM with Management Information Systems (MIS) to optimize cost trade-off and…”
BackgroundFreimuth, H., & König, M. (2019) · Sensors · doi:10.3390/s19204513 · Cited by 31 · cited 1×
“…a framework to make safe scaffolding plans without excessive manual effort USA 2018 (Kim et al., 2018) ✓ ✓ The use of BIM to develop a scaffolding plan that considers workflow, cost, and duration and, at the same time, minimizes safety hazards USA 2018 (Jeewoong Park et al., 2017) ✓ ✓ The…”
MethodReview of Selected Methods of Supporting Decision-Making Process in the Construction Industry
Dziadosz, A., & Kończak, A. (2016) · Archives of Civil Engineering · doi:10.1515/ace-2015-0055 · Cited by 29 · cited 1×
“This mechanism aids managers in analyzing complex scenarios and enables them to undertake appropriate precautions prior to the commencement of a project (proactive approach as opposed to a conventional corrective approach) (Dziadosz & Konczak, 2016).”
BackgroundConstruction of a 5D duration and cost optimisation model based on genetic algorithm and BIM
He, W. Z., Shi, Y., & Kong, D. (2019) · Journal of Engineering Design and Technology · doi:10.1108/jedt-12-2018-0214 · Cited by 27
Application of Decision Tree Technique to Analyze Construction Project Data
Desai, V. S., & Joshi, S. (2010) · Communications in computer and information science · doi:10.1007/978-3-642-12035-0_30 · Cited by 17 · cited 1×
“Joshi employed a decision tree to analyze the labor productivity in construction projects (Joshi, 2010).”
MethodMejlænder-Larsen, Ø. (2019) · Engineering Construction & Architectural Management · doi:10.1108/ecam-12-2017-0273 · Cited by 10
Case Study of Construction Cost Estimation in China Electric Power Industry Based on BIM Technology
Liu, R., & Hu, X. (2016) · International Journal of Grid and Distributed Computing · doi:10.14257/ijgdc.2016.9.10.16 · Cited by 7 · cited 1×
“…of BIM and API to propose an innovative management workflow design to implement an efficient schedule of building fabric maintenance China 2019 (Biagini et al., 2016) ✓ The integration of BIM and LSD to develop an innovative approach regarding restoration of historical building management…”
MethodTime Overrun Analysis in North Cyprus Building Construction Projects
Khademi, S. S. (2014) · Eastern Mediterranean University Institutional Repository (Eastern Mediterranean University) · Cited by 4
Metadata
- Authors
- Parsamehr, M., Perera, U. S., Dodanwala, T. C., Perera, P., & Ruparathna, R.
- Venue
- Asian Journal of Civil Engineering
- Published
- 2022-09-23
- Volume
- 24
- Issue
- 1
- Pages
- 353-389
- ISSN
- 1563-0854 (ISSN-L)
- 2522-011X
- OpenAlex
- W4297199158
- Cited by
- 193
- References
- 154
- FWCI
- 14.35
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.