The DOI matches its Crossref record; 77 of the 77 references it cites were found in a registry or an index.
Faster, better, cheaper: A study of NPD project efficiency and performance tradeoffs
Abstract
In this paper, we develop a theory of efficiency and performance tradeoffs for new product development (NPD) projects. Data from 137 completed NPD projects are analyzed for evidence pointing to tradeoffs in performance patterns manifested in the data. In addition, we investigate hypothesized relationships between certain NPD practices and a holistic, efficiency based measure of NPD performance. We demonstrate a new approach to the operationalization of holistic new product development (NPD) project performance, employing a sequential data envelopment analysis (DEA) methodology that simultaneously incorporates multiple factors including new product development cost, product cost, product quality, and project lead time. The results of the data analysis support our hypothesis that tradeoffs among NPD performance outcomes are manifested more strongly in highly efficient projects when compared to inefficient projects. The presence of three distinct subgroups in highly efficient projects is suggestive of several modes of efficiency which appear to achieve equally effective market success. The absence of such patterns in less efficient projects supports a theory of performance frontiers that may impose the need for tradeoffs more strongly as NPD projects achieve higher levels of efficiency. The findings also point to the importance of project management experience, balanced management commitment, and cross‐functional integration in achieving high levels of NPD project efficiency. We discuss the implications of the findings for practice and for future research.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
The Knowledge-Creating Company: How Japanese Companies Create the Dynamics of Innovation
Nonaka, I., & Takeuchi, H. (1995) · doi:10.1093/oso/9780195092691.001.0001 · Cited by 18,010
Some Models for Estimating Technical and Scale Inefficiencies in Data Envelopment Analysis
Banker, R. D., Charnes, A., & Cooper, W. W. (1984) · Management Science · doi:10.1287/mnsc.30.9.1078 · Cited by 16,729
The Knowledge-Creating Company
Nonaka, I. (1998) · The Economic Impact of Knowledge · doi:10.1016/b978-0-7506-7009-8.50016-1 · Cited by 14,619
Estimating Nonresponse Bias in Mail Surveys
Armstrong, J. S., & Overton, T. S. (1977) · Journal of Marketing Research · doi:10.2307/3150783 · Cited by 12,222
Organizational Information Requirements, Media Richness and Structural Design
Daft, R. L., & Lengel, R. H. (1986) · Management Science · doi:10.1287/mnsc.32.5.554 · Cited by 9,868
Organizational innovation: A meta-analysis of effects of determinants and moderators
Damanpour, F. (1991) · Academy of Management Journal · doi:10.2307/256406 · Cited by 6,542
Product development: Past research, present findings and future directions
Brown, S. L., & Eisenhardt, K. M. (1995) · The Academy of Management Review · doi:10.2307/258850 · Cited by 3,777
Data Envelopment Analysis: Theory, Methodology, and Applications
Charnes, A., Cooper, W. W., Lewin, A. Y., & Seiford, L. M. (1994) · Springer eBooks · doi:10.1007/978-94-011-0637-5 · Cited by 2,871
Aldenderfer, M. S. (1984) · Cited by 2,502
Accelerating Adaptive Processes: Product Innovation in the Global Computer Industry
Eisenhardt, K. M., & Tabrizi, B. N. (1995) · Administrative Science Quarterly · doi:10.2307/2393701 · Cited by 2,426
Aldenderfer, M., & Blashfield, R. (1984) · Sage eBooks · doi:10.4135/9781412983648 · Cited by 2,137
Product Development Decisions: A Review of the Literature
Krishnan, V., & Ulrich, K. T. (2001) · Management Science · doi:10.1287/mnsc.47.1.1.10668 · Cited by 1,701
The new new product development game
(1986) · Journal of Product Innovation Management · doi:10.1016/0737-6782(86)90053-6 · Cited by 1,573
THE LEARNING CURVE: HISTORICAL REVIEW AND COMPREHENSIVE SURVEY
Yelle, L. E. (1979) · Decision Sciences · doi:10.1111/j.1540-5915.1979.tb00026.x · Cited by 1,541
Why Some New Products are More Successful than Others
Henard, D. H., & Szymanski, D. M. (2001) · Journal of Marketing Research · doi:10.1509/jmkr.38.3.362.18861 · Cited by 1,467
Determinants of New Product Performance: A Review and Meta‐Analysis
Montoya‐Weiss, M. M., & Calantone, R. (1994) · Journal of Product Innovation Management · doi:10.1016/0737-6782(94)90029-9 · Cited by 1,359
Lasting improvements in manufacturing performance: In search of a new theory
Ferdows, K., & De Meyer, A. (1990) · Journal of Operations Management · doi:10.1016/0272-6963(90)90094-t · Cited by 1,230
Project Success: A Multidimensional Strategic Concept
Shenhar, A. J., Dvir, D., Levy, O., & Maltz, A. C. (2001) · Long Range Planning · doi:10.1016/s0024-6301(01)00097-8 · Cited by 1,222
Applied data envelopment analysis
Boussofiane, A., Dyson, R. G., & Thanassoulis, E. (1991) · European Journal of Operational Research · doi:10.1016/0377-2217(91)90331-o · Cited by 968
Rosenzweig, E. D., Roth, A. V., & Dean, J. W. (2003) · Journal of Operations Management · doi:10.1016/s0272-6963(03)00037-8 · Cited by 885
PDMA Success Measurement Project: Recommended Measures for Product Development Success and Failure
Griffin, A., & Page, A. L. (1996) · Journal of Product Innovation Management · doi:10.1016/s0737-6782(96)00052-5 · Cited by 854
A Model of New Product Development: An Empirical Test
Zirger, B. J., & Maidique, M. A. (1990) · Management Science · doi:10.1287/mnsc.36.7.867 · Cited by 837
Clark, K. B. (1989) · Management Science · doi:10.1287/mnsc.35.10.1247 · Cited by 817
On theory in operations management
Schmenner, R. W., & Swink, M. L. (1998) · Journal of Operations Management · doi:10.1016/s0272-6963(98)00028-x · Cited by 811
Self-citationAntecedents and Consequences of Project Team Cross-Functional Cooperation
Pinto, M. B., Pinto, J. K., & Prescott, J. E. (1993) · Management Science · doi:10.1287/mnsc.39.10.1281 · Cited by 701
Factors for success in R&D projects and new product innovation: a contextual framework
Balachandra, R., & Friar, J. H. (1997) · IEEE Transactions on Engineering Management · doi:10.1109/17.618169 · Cited by 660
Tatikonda, M. V., & Rosenthal, S. R. (2000) · IEEE Transactions on Engineering Management · doi:10.1109/17.820727 · Cited by 634
The Effect of Project and Process Characteristics on Product Development Cycle Time
Griffin, A. (1997) · Journal of Marketing Research · doi:10.1177/002224379703400103 · Cited by 621
A Model-Based Framework to Overlap Product Development Activities
Krishnan, V., Eppinger, S. D., & Whitney, D. E. (1997) · Management Science · doi:10.1287/mnsc.43.4.437 · Cited by 605
Groups That Work (And Those That Don't): Creating Conditions for Effective Teamwork
Mathiasen, D. G., & Hackman, J. R. (1991) · Journal of Policy Analysis and Management · doi:10.2307/3325003 · Cited by 567
Effects of Process Maturity on Quality, Cycle Time, and Effort in Software Product Development
Harter, D. E., Krishnan, M. S., & Slaughter, S. A. (2000) · Management Science · doi:10.1287/mnsc.46.4.451.12056 · Cited by 507
New Product Development: The Performance and Time-to-Market Tradeoff
Cohen, M. A., Eliasberg, J., & Ho, T.-H. (1996) · Management Science · doi:10.1287/mnsc.42.2.173 · Cited by 504
Modeling impacts of process architecture on cost and schedule risk in product development
Browning, T. R., & Eppinger, S. D. (2002) · IEEE Transactions on Engineering Management · doi:10.1109/tem.2002.806709 · Cited by 499
The Factory as a Learning Laboratory
LEONARDBARTON, D. (2000) · Strategic Learning in a Knowledge Economy · doi:10.1016/b978-0-7506-7223-8.50007-1 · Cited by 432
A Predictive Model of Sequential Iteration in Engineering Design
Smith, R. P., & Eppinger, S. D. (1997) · Management Science · doi:10.1287/mnsc.43.8.1104 · Cited by 412
Moenaert, R. K., & Souder, W. E. (1990) · Journal of Product Innovation Management · doi:10.1016/0737-6782(90)90052-g · Cited by 410
Predevelopment activities determine new product success
Cooper, R. G. (1988) · Industrial Marketing Management · doi:10.1016/0019-8501(88)90007-7 · Cited by 400
New Product Quality and Product Development Teams
Sethi, R. (2000) · Journal of Marketing · doi:10.1509/jmkg.64.2.1.17999 · Cited by 384
MANUFACTURING STRATEGY: AT THE INTERSECTION OF TWO PARADIGM SHIFTS
Hayes, R. H., & Pisano, G. P. (1996) · Production and Operations Management · doi:10.1111/j.1937-5956.1996.tb00383.x · Cited by 359
An Evaluation of Research on Integrated Product Development
Gerwin, D., & Barrowman, N. J. (2002) · Management Science · doi:10.1287/mnsc.48.7.938.2818 · Cited by 356
The Development Factory: Unlocking the Potential of Process Innovation
Pisano, G. P. (1996) · Cited by 353
The integration of manufacturing and marketing/sales decisions: impact on organizational performance
O’Leary‐Kelly, S. W., & Flores, B. E. (2002) · Journal of Operations Management · doi:10.1016/s0272-6963(02)00005-0 · Cited by 342
Metrics for Measuring Product Development Cycle Time
Griffin, A. (1993) · Journal of Product Innovation Management · doi:10.1016/0737-6782(93)90003-9 · Cited by 338
Product Innovativeness and Entry Strategy: Impact on Cycle Time and Break‐even Time
Ali, A., Krapfel, R., & LaBahn, D. (1995) · Journal of Product Innovation Management · doi:10.1016/0737-6782(94)00027-d · Cited by 329
Groups that work (and those that don't): creating conditions for effective teamwork
(1990) · Choice Reviews Online · doi:10.5860/choice.27-5200 · Cited by 315
Atuahene-Gima, K. (2003) · Academy of Management Journal · doi:10.2307/30040629 · Cited by 306
Developing Products in Half the Time: New Rules, New Tools
Smith, P. G., & Reinertsen, D. G. (1997) · Medical Entomology and Zoology · Cited by 291
The development factory: Unlocking the potential of process innovation
Bessant, J. (1997) · Research Policy · doi:10.1016/s0048-7333(97)80235-1 · Cited by 286
Threats to new product manufacturability and the effects of development team integration processes
Swink, M. (1999) · Journal of Operations Management · doi:10.1016/s0272-6963(99)00027-3 · Cited by 272
Self-citationControllable Factors of New Product Success: A Cross-National Comparison
Calantone, R. J., Schmidt, J. B., & Song, X. M. (1996) · Marketing Science · doi:10.1287/mksc.15.4.341 · Cited by 265
Swink, M. L. (2000) · Journal of Product Innovation Management · doi:10.1016/s0737-6782(00)00040-0 · Cited by 251
Self-citationA Model to Evaluate Variables Impacting the Productivity of Software Maintenance Projects
Banker, R. D., Datar, S. M., & Kemerer, C. F. (1991) · Management Science · doi:10.1287/mnsc.37.1.1 · Cited by 243
The effect of acceleration techniques on product development time
Zirger, B. J., & Hartley, J. L. (1996) · IEEE Transactions on Engineering Management · doi:10.1109/17.509980 · Cited by 233
Measuring the Effectiveness of Overlapping Development Activities
Terwiesch, C., & Loch, C. H. (1999) · Management Science · doi:10.1287/mnsc.45.4.455 · Cited by 229
The Effect of Project and Process Characteristics on Product Development Cycle Time
Griffin, A. (1997) · Journal of Marketing Research · doi:10.2307/3152062 · Cited by 219
Data Envelopment Analysis in the Presence of Both Quantitative and Qualitative Factors
Cook, W. D., Kress, M., & Seiford, L. M. (1996) · Journal of the Operational Research Society · doi:10.1057/jors.1996.120 · Cited by 205
Optimal Timing of Reviews in Concurrent Design for Manufacturability
Ha, A. Y., & Porteus, E. L. (1995) · Management Science · doi:10.1287/mnsc.41.9.1431 · Cited by 193
COMPETING THROUGH MANUFACTURING AND THE NEW MANUFACTURING PARADIGM: IS MANUFACTURING STRATEGY PASSE?
Clark, K. B. (1996) · Production and Operations Management · doi:10.1111/j.1937-5956.1996.tb00384.x · Cited by 188
A Field Study of Scale Economies in Software Maintenance
Banker, R. D., & Slaughter, S. A. (1997) · Management Science · doi:10.1287/mnsc.43.12.1709 · Cited by 171
Expected Development Time Reductions in the German Mechanical Engineering Industry
Murmann, P. (1994) · Journal of Product Innovation Management · doi:10.1016/0737-6782(94)90006-x · Cited by 170
New Product Development Structures and Time-to-Market
Datar, S. M., Jordan, C. C., Kekre, S., Rajiv, S., & Srinivasan, K. (1997) · Management Science · doi:10.1287/mnsc.43.4.452 · Cited by 131
Completing projects on-time: how project acceleration affects new product development
Swink, M. L. (2003) · Journal of Engineering and Technology Management · doi:10.1016/j.jengtecman.2003.08.002 · Cited by 126
Self-citationUsing Industrial Key Informants: Some Guidelines
Mitchell, V. (1994) · Market Research Society Journal · doi:10.1177/147078539403600206 · Cited by 110
Design for Manufacturability and Time‐to‐Market, Part 1: Theoretical Foundations
Youssef, M. A. (1994) · International Journal of Operations & Production Management · doi:10.1108/01443579410072337 · Cited by 106
Determinants of Technical Success in Product Development When Innovative Radicalness Is Considered
Lee, M., & Na, D. (1994) · Journal of Product Innovation Management · doi:10.1016/0737-6782(94)90119-8 · Cited by 103
The theory of performance frontiers
Vastag, G. (2000) · Journal of Operations Management · doi:10.1016/s0272-6963(99)00024-8 · Cited by 92
Sánchez, Á. M., & Pérez, M. P. (2003) · Journal of Product Innovation Management · doi:10.1111/1540-5885.201005 · Cited by 87
Tightening the belt: methods for reducing development costs associated with new product innovation
Kessler, E. H. (2000) · Journal of Engineering and Technology Management · doi:10.1016/s0923-4748(99)00020-x · Cited by 84
Design-Manufacturing Integration as a Mediator of Antecedents to New Product Design Quality
Swink, M. L., & Calantone, R. J. (2004) · IEEE Transactions on Engineering Management · doi:10.1109/tem.2004.835088 · Cited by 80
Self-citationTeece, D. J. (1977) · Management Science · doi:10.1287/mnsc.23.8.830 · Cited by 65
New product development cycle time
LaBahn, D. W., Ali, A., & Krapfel, R. E. (1996) · Journal of Business Research · doi:10.1016/0148-2963(95)00120-4 · Cited by 62
Cost targets and time pressure during new product development
Everaert, P. C., & Bruggeman, W. (2002) · International Journal of Operations & Production Management · doi:10.1108/01443570210452039 · Cited by 59
Technological Level and Product Development Cycle Time
Karlsson, C., & Åhlström, P. (1999) · Journal of Product Innovation Management · doi:10.1016/s0737-6782(98)00066-6 · Cited by 59
Anthony, M., & McKay, J. (1992) · Journal of Product Innovation Management · doi:10.1016/0737-6782(92)90005-w · Cited by 53
Product Development—Faster, On-Time
Swink, M. L. (2002) · Research-Technology Management · doi:10.1080/08956308.2002.11671511 · Cited by 43
Self-citationEffects of funding and its return on product quality in new ventures
Lévesque, M. (2000) · IEEE Transactions on Engineering Management · doi:10.1109/17.820729 · Cited by 16
Cited by
The impact of standards and regulation on innovation in uncertain markets
Blind, K., Petersen, S. S., & Riillo, C. A. F. (2017) · Research Policy · doi:10.1016/j.respol.2016.11.003 · Cited by 366
Entrepreneurial orientation and performance: Is innovation speed a missing link?
Shan, P., Song, M., & Ju, X. (2016) · Journal of Business Research · doi:10.1016/j.jbusres.2015.08.032 · Cited by 339
Understanding antecedents of new product development speed: A meta‐analysis
Chen, J., Damanpour, F., & Reilly, R. R. (2010) · Journal of Operations Management · doi:10.1016/j.jom.2009.07.001 · Cited by 329
Value creation and capture mechanisms in innovation ecosystems: a comparative case study
Ritala, P., Agouridas, V., Assimakopoulos, D., & Gies, O. (2013) · International Journal of Technology Management · doi:10.1504/ijtm.2013.056900 · Cited by 325
Capabilities that enhance outcomes of an episodic supply chain collaboration
Zacharia, Z. G., Nix, N. W., & Lusch, R. F. (2011) · Journal of Operations Management · doi:10.1016/j.jom.2011.02.001 · Cited by 321
Metadata
- Authors
- Swink, M., Talluri, S., & Pandejpong, T.
- Venue
- Journal of Operations Management
- Publisher
- Wiley
- Published
- 2005-12-20
- Volume
- 24
- Issue
- 5
- Pages
- 542-562
- ISSN
- 0272-6963 (ISSN-L)
- 1873-1317
- OpenAlex
- W2119552276
- Cited by
- 265
- References
- 77
- FWCI
- 9.94
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.