A comparative study of causes of time overruns in Hong Kong construction projects
The DOI matches its Crossref record; 9 of the 9 references it cites were found in a registry or an index.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Causes of Delay in Large Building Construction Projects
Assaf, S. A., Al-Khalil, M., & Al-Hazmi, M. (1995) · Journal of Management in Engineering · doi:10.1061/(asce)0742-597x(1995)11:2(45 · Cited by 544
Causes of delay and cost overruns in Nigerian construction projects
Mansfield, N., Ugwu, O., & Doran, T. (1994) · International Journal of Project Management · doi:10.1016/0263-7863(94)90050-7 · Cited by 457
Attributes of UK construction clients influencing project consultants' performance
Kometa, S. T., Olomolaiye, P. O., & HARRIS, F. C. (1994) · Construction Management and Economics · doi:10.1080/01446199400000053 · Cited by 322
Causes of High Costs of Construction in Nigeria
Okpala, D. C., & Aniekwu, A. N. (1988) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(1988)114:2(233 · Cited by 234
Reasons for delays in public projects in Turkey
Arditi, D., Akan, G. T., & Gurdamar, S. (1985) · Construction Management and Economics · doi:10.1080/01446198500000013 · Cited by 198
Ireland, V. (1985) · Construction Management and Economics · doi:10.1080/01446198500000006 · Cited by 157
Causes of Delay in the Construction Industry
Baldwin, J. R., Manthei, J. M., Rothbart, H. A., & Harris, R. B. (1971) · Journal of the Construction Division · doi:10.1061/jcceaz.0000305 · Cited by 118
Payne, A. C., Chelsom, J. V., & Reavill, L. R. P. (1996) · Medical Entomology and Zoology · Cited by 64
A survey of time-cost relationships in Hong Kong construction projects
Chan, D. W. M., & Kumaraswamy, M. (1982) · The HKU Scholars Hub (University of Hong Kong) · Cited by 21
Self-citation
Cited by
Causes of delay in large construction projects
Assaf, S. A., & Al-Hejji, S. (2006) · International Journal of Project Management · doi:10.1016/j.ijproman.2005.11.010 · Cited by 1,705
Causes and effects of delays in Malaysian construction industry
Sambasivan, M., & Soon, Y. W. (2007) · International Journal of Project Management · doi:10.1016/j.ijproman.2006.11.007 · Cited by 1,422
Analysing factors affecting delays in Indian construction projects
Doloi, H., Sawhney, A., Iyer, K. C., & Rentala, S. (2012) · International Journal of Project Management · doi:10.1016/j.ijproman.2011.10.004 · Cited by 745
Criteria of project success: an exploratory re-examination
Lim, C. S., & Mohamed, M. Z. (1999) · International Journal of Project Management · doi:10.1016/s0263-7863(98)00040-4 · Cited by 731
The effects of construction delays on project delivery in Nigerian construction industry
Aibinu, A. A., & Jagboro, G. O. (2002) · International Journal of Project Management · doi:10.1016/s0263-7863(02)00028-5 · Cited by 597
Factors affecting cost performance: evidence from Indian construction projects
Iyer, K. C., & Jha, K. N. (2005) · International Journal of Project Management · doi:10.1016/j.ijproman.2004.10.003 · Cited by 504
Olawale, Y. A., & Sun, M. (2010) · Construction Management and Economics · doi:10.1080/01446191003674519 · Cited by 478
“This four‐point scale was converted to a relative importance index (RII) for each individual factor, using the following formula, as adopted by Chan and Kumaraswamy ( 1997 ) and Kumaraswamy and Chan ( 1998 ), Assaf et al .”
MethodWilliams, T. (2005) · IEEE Transactions on Engineering Management · doi:10.1109/tem.2005.856572 · Cited by 456
What Causes Cost Overrun in Transport Infrastructure Projects?
FLYVBJERG, B., SKAMRIS HOLM, M. K., & BUHL, S. L. (2004) · Transport Reviews · doi:10.1080/0144164032000080494a · Cited by 455
Eriksson, P. E., & Westerberg, M. (2011) · International Journal of Project Management · doi:10.1016/j.ijproman.2010.01.003 · Cited by 363
Construction Delays and Their Causative Factors in Nigeria
Aibinu, A. A., & Odeyinka, H. A. (2006) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2006)132:7(667 · Cited by 348
Taxonomy for change causes and effects in construction projects
Sun, M., & Meng, X. (2009) · International Journal of Project Management · doi:10.1016/j.ijproman.2008.10.005 · Cited by 331
Machine learning algorithms for construction projects delay risk prediction
Gondia, A., Siam, A., El-Dakhakhni, W., & Nassar, A. H. (2020) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0001736 · Cited by 327
Doloi, H. (2013) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000621 · Cited by 325
Problems causing delays in major construction projects in Thailand
Toor, S.-U.-R., & Ogunlana, S. (2008) · Construction Management and Economics · doi:10.1080/01446190801905406 · Cited by 307
Collaborative relationships in construction: the UK contractors' perception
Akintoye, A., & Main, J. (2007) · Engineering, Construction and Architectural Management · doi:10.1108/09699980710829049 · Cited by 248
“, 1999) and time cost overruns in projects (Chan and Kumaraswamy, 1997).”
BackgroundCauses of delays on construction projects: a comprehensive list
Durdyev, S., & Hosseini, M. R. (2019) · International Journal of Managing Projects in Business · doi:10.1108/ijmpb-09-2018-0178 · Cited by 245
Commitment, coordination, competence and the iron triangle
Jha, K. N., & Iyer, K. C. (2007) · International Journal of Project Management · doi:10.1016/j.ijproman.2006.11.009 · Cited by 243
“This in itself lends credibility to test results [38,39], yet the analysis results were tested with post analysis structured interviews and case study of 20 live construction projects.”
ResultGhosh, S., & Jintanapakanont, J. (2004) · International Journal of Project Management · doi:10.1016/j.ijproman.2004.05.004 · Cited by 242
Causes, Effects, Benefits, and Remedies of Change Orders on Public Construction Projects in Oman
Alnuaimi, A. S., Taha, R. A., Al Mohsin, M., & Al-Harthi, A. S. (2010) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000154 · Cited by 233
Ranking of delay factors in construction projects after Egyptian revolution
Aziz, R. F. (2013) · Alexandria Engineering Journal · doi:10.1016/j.aej.2013.03.002 · Cited by 209
Compressing construction durations: lessons learned from Hong Kong building projects
W.M. Chan, D., & M. Kumaraswamy, M. (2002) · International Journal of Project Management · doi:10.1016/s0263-7863(00)00032-6 · Cited by 209
Barriers to implement extensive green roof systems: A Hong Kong study
Zhang, X., Shen, L., Tam, V. W. Y., & Lee, W. W. Y. (2012) · Renewable and Sustainable Energy Reviews · doi:10.1016/j.rser.2011.07.157 · Cited by 207
Root-Cause Analysis of Construction-Cost Overruns
Rosenfeld, Y. (2014) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000789 · Cited by 187
Development of sustainable assessment criteria for building materials selection
Akadiri, P. O., & Olomolaiye, P. O. (2012) · Engineering, Construction and Architectural Management · doi:10.1108/09699981211277568 · Cited by 182
Causes of delay in the global construction industry: a meta analytical review
Sanni-Anibire, M. O., Mohamad Zin, R., & Olatunji, S. O. (2022) · International Journal of Construction Management · doi:10.1080/15623599.2020.1716132 · Cited by 173
Critical Success Factors for Value Management Studies in Construction
Shen, Q., & Liu, G. (2003) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2003)129:5(485 · Cited by 172
Analysis of pre‐qualification criteria in contractor selection and their impacts on project success
Doloi, H. (2009) · Construction Management and Economics · doi:10.1080/01446190903394541 · Cited by 170
“Chan and Kumaraswamy ( 1997 ) suggested that the mean and standard deviation of each individual attribute are not reliable statistics to assess the overall rankings.”
BackgroundCost and Schedule Risk Analysis of Bridge Construction in Pakistan: Establishing Risk Guidelines
Choudhry, R. M., Aslam, M. A., Hinze, J. W., & Arain, F. M. (2014) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000857 · Cited by 158
Manzoor, B., Othman, I., Durdyev, S., Ismail, S., & Wahab, M. (2021) · Applied System Innovation · doi:10.3390/asi4030052 · Cited by 118
“The project will have entered a new phase when construction is completed, known as operation, and the construction team will begin the operation process when this project is up and running [68,69].”
BackgroundPark, Y., & Papadopoulou, T. C. (2012) · Built Environment Project and Asset Management · doi:10.1108/20441241211280873 · Cited by 91
Metadata
- Authors
- Chan, D. W., & Kumaraswamy, M. M.
- Venue
- International Journal of Project Management
- Publisher
- Elsevier BV
- Published
- 1997-02
- Volume
- 15
- Issue
- 1
- Pages
- 55-63
- ISSN
- 0263-7863 (ISSN-L)
- OpenAlex
- W2058556832
- Cited by
- 831
- References
- 9
- FWCI
- 7.71
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.