A literature review of empirical research methodology in lean manufacturing
The DOI matches its Crossref record; 230 of the 232 references it cites were found in a registry or an index.
Abstract
Purpose: – The purpose of this paper is to review the existing literature on empirical research in lean manufacturing (LM). It provides a critical assessment of empirical research methodology of 178 research articles published from 1990 to 2009. Design/methodology/approach: – The article reviewed a set of 178 empirical research articles in LM research with respect to empirical research design and its related facets. The 236 empirical research articles which are published in 70 journals during 1990-2009 are collected from four major management science publishers, namely, Emerald Online, Science Direct, Springer Link and Taylor & Francis. In total 178 research articles published in 24 journals are selected for critical review of empirical research methodology in LM. The approach for the critical review of 178 empirical research articles in LM is based on empirical research approach given by Flynn et al. (1990). The critical review discusses the current status of empirical research in LM and future directions. Findings: – It is concluded from the analysis of the results that: the number of empirical research articles in LM is increasing at a faster pace than ever before; theory building and theory verification articles are equally advanced; the researchers have also unexplored various aspects of empirical research such as importance of triangulation of data, alternate research designs other than survey and case studies; contextual focus is mostly on the manufacturing industry; more focus required on other aspects of empirical research such as collecting the samples from developing and undeveloped countries, larger sample size, longitudinal data collection methods. Finally, it concludes that there is a need of LM frameworks, which gives the stepwise process to remove all kinds of wastes from any organization. Originality/value: – To the knowledge of the authors, it is the first of its kind attempt to critically review the empirical research articles in LM. The review analysis entirely focussed on descriptive statistics of empirical research in LM. The sample size is one of the unique features of this research as the number of shortlisted articles is 178 in 24 journals published over a time span of 20 years (1990-2009).
Overview
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
Claims other papers make about this one
Each is checked against this paper’s own text: does it say what the citing paper says it does?
In the citing paper
“Lean manufacturing has as a goal to eliminate waste and it succeeds in it without having to define additional requirements of resources [34, 35].”
From Lean and Kaizen: The Past and the Future of the Methodologies (2021) · cites this paper as [35]
Citations
Cites
(1984) · Cited by 81,983
The Discovery of Grounded Theory: Strategies for Qualitative Research.
Wagner, H. R., Glaser, B. G., & Strauss, A. L. (1968) · Social Forces · doi:10.2307/2575405 · Cited by 46,361
The Structure of Scientific Revolutions
Kuhn, T. S., & Schlegel, R. (1963) · Physics Today · doi:10.1063/1.3050879 · Cited by 35,538
The Discovery of Grounded Theory: Strategies for Qualitative Research
Glaser, B. G., & Strauss, A. L. (2017) · Aldine (Routledge reprint) · doi:10.4324/9780203793206 · Cited by 25,789
Theory Building From Cases: Opportunities And Challenges
Eisenhardt, K. M., & Graebner, M. E. (2007) · Academy of Management Journal · doi:10.5465/amj.2007.24160888 · Cited by 16,670
(2010) · Sociology for Pharmacists · doi:10.4324/9780203381175_chapter_9 · Cited by 14,152
Mail and internet surveys : the tailored design method
Dillman, D. A. (2007) · Cited by 9,587
The Structure of Scientific Revolutions
Kuhn, T. S. (1996) · doi:10.7208/chicago/9780226458106.001.0001 · Cited by 7,281
Educational Research: Quantitative, Qualitative, and Mixed Approaches
Johnson, R. B., & Christensen, L. B. (2007) · Cited by 7,190
The machine that changed the world
(1992) · Long Range Planning · doi:10.1016/0024-6301(92)90400-v · Cited by 5,805
What Constitutes a Theoretical Contribution?
Whetten, D. A. (1989) · The Academy of Management Review · doi:10.2307/258554 · Cited by 4,129
Business Research: A Practical Guide for Undergraduate and Postgraduate Students
Collis, J., & Hussey, R. (2009) · Cited by 3,850
Defining and developing measures of lean production
Shah, R., & Ward, P. T. (2007) · Journal of Operations Management · doi:10.1016/j.jom.2007.01.019 · Cited by 2,399
Lean Thinking—Banish Waste and Create Wealth in your Corporation
Womack, J. P., & Jones, D. T. (1997) · Journal of the Operational Research Society · doi:10.1057/palgrave.jors.2600967 · Cited by 2,122
Couper, M. P. (2000) · Public Opinion Quarterly · doi:10.1086/318641 · Cited by 2,078
Empirical research methods in operations management
Flynn, B. B., Sakakibara, S., Schroeder, R. G., Bates, K. A., & Flynn, E. J. (1990) · Journal of Operations Management · doi:10.1016/0272-6963(90)90098-x · Cited by 1,634
The genealogy of lean production
Holweg, M. (2007) · Journal of Operations Management · doi:10.1016/j.jom.2006.04.001 · Cited by 1,480
Salas, M. N. J., & Kaplan, A. (1967) · Revista española de la opinión pública · doi:10.2307/40180865 · Cited by 1,360
Determinants of New Product Performance: A Review and Meta‐Analysis
Montoya‐Weiss, M. M., & Calantone, R. (1994) · Journal of Product Innovation Management · doi:10.1016/0737-6782(94)90029-9 · Cited by 1,359
An assessment of survey research in POM: from constructs to theory
Malhotra, M. K., & Grover, V. (1998) · Journal of Operations Management · doi:10.1016/s0272-6963(98)00021-7 · Cited by 1,313
Cross-Sectional versus longitudinal survey research: concepts, findings, and guidelines
Rindfleisch, A., Malter, A. J., Ganesan, S., & Moorman, C. (2008) · Journal of Marketing Research · doi:10.1509/jmkr.45.3.261 · Cited by 1,305 · cited 1×
“Longitudinal studies are more time and cost consuming studies than cross-sectional studies (Rindfleisch et al., 2008).”
BackgroundWacker, J. G. (1998) · Journal of Operations Management · doi:10.1016/s0272-6963(98)00019-9 · Cited by 1,042
Toyota Production System: An Integrated Approach to Just-In-Time
Monden, Y. (1993) · Cited by 957
Bhasin, S., & Burcher, P. (2006) · Journal of Manufacturing Technology Management · doi:10.1108/17410380610639506 · Cited by 872
Lean or agile: A solution for supply chain management in the textiles and clothing industry?
Bruce, M., Daly, L., & Towers, N. (2004) · International Journal of Operations & Production Management · doi:10.1108/01443570410514867 · Cited by 722
Disentangling leanness and agility: An empirical investigation
Narasimhan, R., Swink, M., & Kim, S. W. (2006) · Journal of Operations Management · doi:10.1016/j.jom.2005.11.011 · Cited by 680
Preventing the premature death of relationship marketing.
Fournier, S. M., Dobscha, S., & Mick, D. G. (1998) · PubMed · Cited by 668
Defining lean production: some conceptual and practical issues
Pettersen, J. (2009) · The TQM Journal · doi:10.1108/17542730910938137 · Cited by 642
Lean production and sustainable competitive advantage
Lewis, M. A. (2000) · International Journal of Operations & Production Management · doi:10.1108/01443570010332971 · Cited by 578
The impact of Lean production and related new systems of work organization on worker health
Landsbergis, P. A., Cahill, J., & Schnall, P. (1999) · Journal of Occupational Health Psychology · doi:10.1037/1076-8998.4.2.108 · Cited by 528
Case Study Research and Theory Building
Dooley, L. M. (2002) · Advances in Developing Human Resources · doi:10.1177/15222302004003007 · Cited by 526
A Comparison of Mail, Fax and Web-Based Survey Methods
Cobanoglu, C., Moreo, P. J., & Warde, B. (2001) · International Journal of Market Research · doi:10.1177/147078530104300401 · Cited by 504
Lean manufacturing, non‐financial performance measures, and financial performance
Fullerton, R. R., & Wempe, W. F. (2009) · International Journal of Operations & Production Management · doi:10.1108/01443570910938970 · Cited by 492
Implementing the Lean Sigma framework in an Indian SME: a case study
Kumar, M., Antony, J., Singh, R. K., Tiwari, M. K., & Perry, D. (2006) · Production Planning & Control · doi:10.1080/09537280500483350 · Cited by 473
Lean and agile manufacturing: external and internal drivers and performance outcomes
Hallgren, M., & Olhager, J. (2009) · International Journal of Operations & Production Management · doi:10.1108/01443570910993456 · Cited by 458
The role of communication and management support in a lean manufacturing implementation
Worley, J. M., & Doolen, T. L. (2006) · Management Decision · doi:10.1108/00251740610650210 · Cited by 411
Lean indicators and manufacturing strategies
Martínez Sánchez, A., & Pérez Pérez, M. (2001) · International Journal of Operations & Production Management · doi:10.1108/01443570110407436 · Cited by 397
Reconceptualizing the effects of lean on production costs with evidence from the F‐22 program
Browning, T. R., & Heath, R. D. (2009) · Journal of Operations Management · doi:10.1016/j.jom.2008.03.009 · Cited by 361
Seth *, D., & Gupta, V. (2005) · Production Planning & Control · doi:10.1080/09537280512331325281 · Cited by 348
The effects of Lean production on worker job stress
Conti, R., Angelis, J., Cooper, C., Faragher, B., & Gill, C. (2006) · International Journal of Operations & Production Management · doi:10.1108/01443570610682616 · Cited by 336
Kaizen in Japan: an empirical study
Paul Brunet, A., & New, S. (2003) · International Journal of Operations & Production Management · doi:10.1108/01443570310506704 · Cited by 332
Lean transformation in the pure service environment: the case of the call service centre
Piercy, N., & Rich, N. (2009) · International Journal of Operations & Production Management · doi:10.1108/01443570910925361 · Cited by 321
Review of supply chain management and logistics research
Sachan, A., & Datta, S. (2005) · International Journal of Physical Distribution & Logistics Management · doi:10.1108/09600030510632032 · Cited by 309
The linkage between supply chain integration and manufacturing improvement programmes
Cagliano, R., Caniato, F., & Spina, G. (2006) · International Journal of Operations & Production Management · doi:10.1108/01443570610646201 · Cited by 305
In pursuit of implementation patterns: the context of Lean and Six Sigma
Shah, R., Chandrasekaran, A., & Linderman, K. (2008) · International Journal of Production Research · doi:10.1080/00207540802230504 · Cited by 296
The effect of inventory management on firm performance
Koumanakos, D. P. (2008) · International Journal of Productivity and Performance Management · doi:10.1108/17410400810881827 · Cited by 281
Value chain analysis: an approach to supply chain improvement in agri‐food chains
Taylor, D. H. (2005) · International Journal of Physical Distribution & Logistics Management · doi:10.1108/09600030510634599 · Cited by 275
Lean manufacturing performance in China: assessment of 65 manufacturing plants
Taj, S. (2008) · Journal of Manufacturing Technology Management · doi:10.1108/17410380810847927 · Cited by 268
Work organization in lean production and traditional plants: What are the differences?
Forza, C. (1996) · International Journal of Operations & Production Management · doi:10.1108/01443579610109839 · Cited by 256
A model for evaluating the degree of leanness of manufacturing firms
Soriano‐Meier, H., & Forrester, P. L. (2002) · Integrated Manufacturing Systems · doi:10.1108/09576060210415437 · Cited by 251
Applying the lessons learned from 27 lean manufacturers.
Panizzolo, R. (1998) · International Journal of Production Economics · doi:10.1016/s0925-5273(98)00066-8 · Cited by 251
Empirical research in business process management – analysis of an emerging field of research
Houy, C., Fettke, P., & Loos, P. (2010) · Business Process Management Journal · doi:10.1108/14637151011065946 · Cited by 244
Chen, J. C., Li, Y., & Shady, B. D. (2010) · International Journal of Production Research · doi:10.1080/00207540802484911 · Cited by 239
Lean supply chain and its effect on product cost and quality: a case study on Ford Motor Company
Wee, H. M., & Wu, S. (2009) · Supply Chain Management: An International Journal · doi:10.1108/13598540910980242 · Cited by 238
Leanness: experiences from the journey to date
Papadopoulou, T. C., & Özbayrak, M. (2005) · Journal of Manufacturing Technology Management · doi:10.1108/17410380510626196 · Cited by 236
The Toyota Production System and art: making highly customized and creative products the Toyota way
Lander, E., & Liker, J. K. (2007) · International Journal of Production Research · doi:10.1080/00207540701223519 · Cited by 232
The just-in-time philosophy: A literature review
GOLHAR, D. Y., & STAMM, C. L. (1991) · International Journal of Production Research · doi:10.1080/00207549108930094 · Cited by 230
An evaluation of the value stream mapping tool
Serrano Lasa, I., Ochoa Laburu, C., & de Castro Vila, R. (2008) · Business Process Management Journal · doi:10.1108/14637150810849391 · Cited by 227
A business process change framework for examining lean manufacturing: a case study
Motwani, J. (2003) · Industrial Management & Data Systems · doi:10.1108/02635570310477398 · Cited by 225
Implementation of TQM and lean Six Sigma tools in local government: a framework and a case study
Furterer, S., & Elshennawy, A. K. (2005) · Total Quality Management & Business Excellence · doi:10.1080/14783360500236379 · Cited by 218
Utilising Simulation to Enhance Value Stream Mapping: A Manufacturing Case Application
McDonald, T., Van Aken, E. M., & Rentes, A. F. (2002) · International Journal of Logistics Research and Applications · doi:10.1080/13675560210148696 · Cited by 216
The Supply Chain Strategy Conundrum: To be Lean Or Agile or To be Lean And Agile?
Towill, D., & Christopher, M. (2002) · International Journal of Logistics Research and Applications · doi:10.1080/1367556021000026736 · Cited by 215
Theory building in the human resource development profession
Lynham, S. A. (2000) · Human Resource Development Quarterly · doi:10.1002/1532-1096(200022)11:2<197::aid-hrdq8>3.0.co;2-w · Cited by 214
Theory building in the human resource development profession
Lynham, S. A. (2000) · Human Resource Development Quarterly · doi:10.1002/1532-1096(200022)11:2<159::aid-hrdq5>3.0.co;2-e · Cited by 214
Yusuf, Y. Y., & Adeleye, E. O. (2002) · International Journal of Production Research · doi:10.1080/00207540210157141 · Cited by 212
Critical success factors for human resource outcomes in Kaizen events: An empirical study
Farris, J. A., Van Aken, E. M., Doolen, T. L., & Worley, J. (2009) · International Journal of Production Economics · doi:10.1016/j.ijpe.2008.08.051 · Cited by 209
Change processes towards lean production: the role of the remuneration system
Karlsson, C., & Åhlström, P. (1995) · International Journal of Operations & Production Management · doi:10.1108/01443579510102918 · Cited by 205
Lean manufacturing: a perspective of lean suppliers
Chun Wu, Y. (2003) · International Journal of Operations & Production Management · doi:10.1108/01443570310501880 · Cited by 202
Lean Production: Experience among Australian Organizations
Sohal, A. S., & Egglestone, A. (1994) · International Journal of Operations & Production Management · doi:10.1108/01443579410068639 · Cited by 200
Value stream mapping: A distribution industry application
Hines, P., Rich, N., & Esain, A. (1999) · Benchmarking: An International Journal · doi:10.1108/14635779910258157 · Cited by 196
The Limits of Lean Management Thinking:
Cox, A. M., & Chicksand, D. (2005) · European Management Journal · doi:10.1016/j.emj.2005.10.010 · Cited by 194
An empirical study of lean production in the ceramic tile industry in Spain
Bonavia, T., & Marin, J. A. (2006) · International Journal of Operations & Production Management · doi:10.1108/01443570610659883 · Cited by 193
Transferring Japanese kaizen activities to overseas plants in China
Aoki, K. (2008) · International Journal of Operations & Production Management · doi:10.1108/01443570810875340 · Cited by 191
Leagile manufacturing: a proposed corporate infrastructure
Krishnamurthy, R., & Yauch, C. A. (2007) · International Journal of Operations & Production Management · doi:10.1108/01443570710750277 · Cited by 188
Literature review of JIT-KANBAN system
Sendil Kumar, C., & Panneerselvam, R. (2007) · The International Journal of Advanced Manufacturing Technology · doi:10.1007/s00170-005-0340-2 · Cited by 188
A REVIEW OF THE KANBAN PRODUCTION CONTROL RESEARCH LITERATURE
Berkley, B. J. (1992) · Production and Operations Management · doi:10.1111/j.1937-5956.1992.tb00004.x · Cited by 188
Jayaram, J., Vickery, S., & Droge, C. (2008) · International Journal of Production Research · doi:10.1080/00207540701429942 · Cited by 186
Lean supply: the design and cost reduction dimensions
McIvor, R. (2001) · European Journal of Purchasing & Supply Management · doi:10.1016/s0969-7012(01)00004-1 · Cited by 174
Taylor, D. H. (2006) · Supply Chain Management: An International Journal · doi:10.1108/13598540610662185 · Cited by 166
An assessment of managerial commitment to lean production
Boyer, K. K. (1996) · International Journal of Operations & Production Management · doi:10.1108/01443579610125589 · Cited by 164
An empirical analysis of just-in-time production in Japanese manufacturing companies
Matsui, Y. (2007) · International Journal of Production Economics · doi:10.1016/j.ijpe.2006.12.035 · Cited by 161
Gupta, S. K., Verma, R., & Victorino, L. (2006) · Production and Operations Management · doi:10.1111/j.1937-5956.2006.tb00256.x · Cited by 161
Fearne, A., & Fowler, N. (2006) · Supply Chain Management: An International Journal · doi:10.1108/13598540610671725 · Cited by 160
Seth, D., Seth, N., & Goel, D. (2008) · Journal of Manufacturing Technology Management · doi:10.1108/17410380810869950 · Cited by 159
Kobayashi, K., Fisher, R., & Gapp, R. (2008) · Total Quality Management & Business Excellence · doi:10.1080/14783360701600704 · Cited by 159
Implementing lean manufacturing with cellular layout: a case study
Pattanaik, L. N., & Sharma, B. P. (2008) · The International Journal of Advanced Manufacturing Technology · doi:10.1007/s00170-008-1629-8 · Cited by 157
The Effect of Just‐in‐Time with Customers on Organizational Design and Performance
Claycomb, C., Dröge, C., & Germain, R. (1999) · The International Journal of Logistics Management · doi:10.1108/09574099910805923 · Cited by 155
Redesigning an assembly line through lean manufacturing tools
Álvarez, R., Calvo, R., Peña, M. M., & Domingo, R. (2008) · The International Journal of Advanced Manufacturing Technology · doi:10.1007/s00170-008-1772-2 · Cited by 152
Lean philosophy: implementation in a forging company
Sahoo, A. K., Singh, N. K., Shankar, R., & Tiwari, M. (2007) · The International Journal of Advanced Manufacturing Technology · doi:10.1007/s00170-006-0870-2 · Cited by 150
Samuel, D., Found, P., & Williams, S. J. (2015) · International Journal of Operations & Production Management · doi:10.1108/ijopm-12-2013-0555 · Cited by 146
Evaluation of value stream mapping in manufacturing system redesign
Serrano, I., Ochoa, C., & Castro, R. D. (2008) · International Journal of Production Research · doi:10.1080/00207540601182302 · Cited by 145
Arbós, L. C. (2002) · International Journal of Production Economics · doi:10.1016/s0925-5273(02)00316-x · Cited by 144
Applicability of lean principles and practices in industrialized housing production
Höök, M., & Stehn, L. (2008) · Construction Management and Economics · doi:10.1080/01446190802422179 · Cited by 141
Does size matter for Six Sigma implementation?: Findings from the survey in UK SMEs
Kumar, M., Antony, J., & Douglas, A. (2009) · The TQM Journal · doi:10.1108/17542730910995882 · Cited by 140
Lean‐kaizen public service: an empirical approach in Spanish local governments
Suarez Barraza, M. F., Smith, T., & Mi Dahlgaard‐Park, S. (2009) · The TQM Journal · doi:10.1108/17542730910938146 · Cited by 138
Improving Quality through Value Stream Mapping: A Case Study of a Physician's Clinic
Lummus, R. R., Vokurka, R. J., & Rodeghiero, B. (2006) · Total Quality Management & Business Excellence · doi:10.1080/14783360600748091 · Cited by 137
Lean, Agile and traditional supply: how do they impact manufacturing performance?
Cagliano, R., Caniato, F. F. A., & Spina, G. (2004) · Journal of Purchasing and Supply Management · doi:10.1016/j.pursup.2004.11.001 · Cited by 137
Just‐in‐time purchasing and supply: a review of the literature
Waters‐Fuller, N. (1995) · International Journal of Operations & Production Management · doi:10.1108/01443579510099751 · Cited by 132
Organizing for continuous improvement: Structures and roles in automotive components plants
Delbridge, R., & Barton, H. (2002) · International Journal of Operations & Production Management · doi:10.1108/01443570210427686 · Cited by 131
Kaizen events and organizational performance: a field study
Doolen, T. L., Aken, E. M. V., Farris, J. A., Worley, J. M., & Huwe, J. (2008) · International Journal of Productivity and Performance Management · doi:10.1108/17410400810916062 · Cited by 128
A review and classification of empirical research in operations management
Scudder, G. D., & Hill, C. A. (1998) · Journal of Operations Management · doi:10.1016/s0272-6963(97)00008-9 · Cited by 123
The mutation of the Toyota Production System: adapting the TPS at Hyundai Motor Company
Lee, B.-H., & Jo, H.-J. (2007) · International Journal of Production Research · doi:10.1080/00207540701223493 · Cited by 121
A sustainable continuous improvement methodology at an aerospace company
Bhuiyan, N., Baghel, A., & Wilson, J. (2006) · International Journal of Productivity and Performance Management · doi:10.1108/17410400610710206 · Cited by 119
Total system JIT outcomes: inventory, organization and financial effects
Claycomb, C., Germain, R., & Dröge, C. (1999) · International Journal of Physical Distribution & Logistics Management · doi:10.1108/09600039910299940 · Cited by 117
Kaizen costing for lean manufacturing: a case study
Modarress, B., Ansari *, A., & Lockwood, D. L. (2005) · International Journal of Production Research · doi:10.1080/00207540500034174 · Cited by 116
Applications of Empirical Science in Manufacturing and Service Operations
Roth, A. V. (2007) · Manufacturing & Service Operations Management · doi:10.1287/msom.1070.0197 · Cited by 116
Nabhani, F., & Shokri, A. (2009) · Journal of Manufacturing Technology Management · doi:10.1108/17410380910984221 · Cited by 116
Slomp, J., Bokhorst, J. A. C., & Germs, R. (2009) · Production Planning & Control · doi:10.1080/09537280903086164 · Cited by 114
An empirical study of time‐based competition in the North American automotive supplier industry
Jayaram, J., Vickery, S. K., & Dröge, C. (1999) · International Journal of Operations & Production Management · doi:10.1108/01443579910287055 · Cited by 112
Achieving lean supply through agile manufacturing
McCullen, P., & Towill, D. (2001) · Integrated Manufacturing Systems · doi:10.1108/eum0000000006232 · Cited by 108
Extent of the use of Lean concepts proposed for a value stream mapping application
Serrano Lasa, I., Castro, R. D., & Laburu, C. O. (2009) · Production Planning & Control · doi:10.1080/09537280802685322 · Cited by 104
Taj, S., & Berro, L. (2006) · International Journal of Productivity and Performance Management · doi:10.1108/17410400610653264 · Cited by 103
Applying lean assessment tools in Chinese hi‐tech industries
Taj, S. (2005) · Management Decision · doi:10.1108/00251740510593602 · Cited by 103
Exploration of internal service systems using lean principles
Maleyeff, J. (2006) · Management Decision · doi:10.1108/00251740610668914 · Cited by 101
JIT implementation in Egyptian manufacturing firms: some empirical evidence
Ismail Salaheldin, S. (2005) · International Journal of Operations & Production Management · doi:10.1108/01443570510585543 · Cited by 99
Sriparavastu, L., & Gupta, T. (1997) · International Journal of Operations & Production Management · doi:10.1108/01443579710182954 · Cited by 99
The perceived impact of JIT implementation on firms’ financial/growth performance
Ahmad, A., Mehra, S., & Pletcher, M. (2004) · Journal of Manufacturing Technology Management · doi:10.1108/09576060410513715 · Cited by 98
Ulusoy, G. (2003) · International Journal of Production Economics · doi:10.1016/s0925-5273(03)00064-1 · Cited by 98
The application of JIT philosophy to construction: a case study in site layout
Pheng, L. S., & Hui, M. S. (1999) · Construction Management and Economics · doi:10.1080/014461999371268 · Cited by 96
A Review of Literature Relating to JIT
Sohal, A. S., Keller, A. Z., & Fouad, R. H. (1989) · International Journal of Operations & Production Management · doi:10.1108/eum0000000001228 · Cited by 94
JIT in services: a review of current practices and future directions for research
Duclos, L. K., Sih, S. M., & Lummus, R. R. (1995) · International Journal of Service Industry Management · doi:10.1108/09564239510101518 · Cited by 94
Origins of profitability through JIT processes in the supply chain
Mistry, J. J. (2005) · Industrial Management & Data Systems · doi:10.1108/02635570510606987 · Cited by 93
A comparative analysis and review of JIT “implementation” research
Ramarapu, N. K., Mehra, S., & Frolick, M. N. (1995) · International Journal of Operations & Production Management · doi:10.1108/01443579510077188 · Cited by 92
Lean and reflective production: the dynamic nature of production models
Pil, F. K., & Fujimoto, T. (2007) · International Journal of Production Research · doi:10.1080/00207540701223659 · Cited by 92
Relationship among organizational support, JIT implementation, and performance
Chong, H., White, R. E., & Prybutok, V. (2001) · Industrial Management & Data Systems · doi:10.1108/eum0000000005576 · Cited by 88
Sanderson, J., & Cox, A. M. (2008) · Supply Chain Management An International Journal · doi:10.1108/13598540810850283 · Cited by 88
Development of a framework for implementation of lean manufacturing systems
Anand, G., & Kodali, R. (2010) · International Journal of Management Practice · doi:10.1504/ijmp.2010.029705 · Cited by 87
Self-citationAn empirical examination of the best practices to ensure manufacturing flexibility: Lean alignment
Boyle, T. A., & Scherrer‐Rathje, M. (2009) · Journal of Manufacturing Technology Management · doi:10.1108/17410380910936792 · Cited by 85
Materials flow improvement in a lean assembly line: a case study
Domingo, R., Alvarez, R., Melodía Peña, M., & Calvo, R. (2007) · Assembly Automation · doi:10.1108/01445150710733379 · Cited by 85
Developing a lean production organization: an Australian case study
Sohal, A. S. (1996) · International Journal of Operations & Production Management · doi:10.1108/01443579610109866 · Cited by 84
A lean and global smaller firm?
Karlsson, C., & Åhlström, P. (1997) · International Journal of Operations & Production Management · doi:10.1108/01443579710176915 · Cited by 84
Business strategies and manufacturing decisions: An empirical examination of linkages
Ward, P. T., McCreery, J. K., & Anand, G. (2007) · International Journal of Operations & Production Management · doi:10.1108/01443570710775810 · Cited by 83
Pheng, L. S., & Chuan, C. J. (2001) · Integrated Manufacturing Systems · doi:10.1108/eum0000000006107 · Cited by 81
Christensen, W. J., Germain, R., & Birou, L. (2005) · Journal of Operations Management · doi:10.1016/j.jom.2004.10.007 · Cited by 81
Gunasekaran, A. (1999) · International Journal of Production Economics · doi:10.1016/s0925-5273(98)00025-5 · Cited by 79
Employee reactions to JIT manufacturing practices: a two‐phase investigation
Mullarkey, S., Jackson, P. R., & Parker, S. K. (1995) · International Journal of Operations & Production Management · doi:10.1108/01443579510102909 · Cited by 78
An exploration of the impact of TQM and JIT on ISO 9000 registered companies
Withers, B. E., Ebrahimpour, M., & Hikmet, N. (1997) · International Journal of Production Economics · doi:10.1016/s0925-5273(97)00118-7 · Cited by 78
Just‐in‐time and performance measurement systems
Upton, D. (1998) · International Journal of Operations & Production Management · doi:10.1108/01443579810231688 · Cited by 78
A pro-active and collaborative approach to reverse logistics—a case study
Chan, H. K. (2007) · Production Planning & Control · doi:10.1080/09537280701318736 · Cited by 77
JIT Systems and External Logistics Suppliers
Spencer, M. S., Rogers, D. S., & Daugherty, P. J. (1994) · International Journal of Operations & Production Management · doi:10.1108/01443579410062095 · Cited by 77
JIT purchasing: attribute classification and literature review
STAMM, C. L., & Golhar, D. Y. (1993) · Production Planning & Control · doi:10.1080/09537289308919445 · Cited by 74
A lean route to manufacturing survival
Lee‐Mortimer, A. (2006) · Assembly Automation · doi:10.1108/01445150610705155 · Cited by 73
Innovation and hybridization: Managing the introduction of lean production into Volvo do Brazil
Wallace, T. (2004) · International Journal of Operations & Production Management · doi:10.1108/01443570410548239 · Cited by 70
A conceptual framework for effective implementation of JIT
Wafa, M. A., & Yasin, M. M. (1998) · International Journal of Operations & Production Management · doi:10.1108/01443579810231697 · Cited by 70
Impact of lean practices on performance measures in context to Indian machine tool industry
Sharma, V., Dixit, A. R., & Qadri, M. A. (2015) · Journal of Manufacturing Technology Management · doi:10.1108/jmtm-11-2014-0118 · Cited by 70
PERSPECTIVE: An Analysis of 22 Years of Research in JPIM*
Guo, L. (2008) · Journal of Product Innovation Management · doi:10.1111/j.1540-5885.2008.00298.x · Cited by 68
The satisfied customer: winners and losers in the battle for buyer preference
(2008) · Choice Reviews Online · doi:10.5860/choice.45-5079 · Cited by 67
Applying lean thinking: a case study of an Indian steel plant
Dhandapani, V., Potter, A., & Naim, M. (2004) · International Journal of Logistics Research and Applications · doi:10.1080/13675560412331298491 · Cited by 66
A critical review of empirical research methodology in supply chain management
Soni, G., & Kodali, R. (2012) · Journal of Manufacturing Technology Management · doi:10.1108/17410381211253326 · Cited by 66
Self-citationA study of the effect of manufacturing proactivity on business performance
Benito, J. G. (2005) · International Journal of Operations & Production Management · doi:10.1108/01443570510581844 · Cited by 66
The role of organizational context and infrastructure practices in JIT implementation
Bayo‐Moriones, A., Bello‐Pintado, A., & Merino‐Díaz‐de‐Cerio, J. (2008) · International Journal of Operations & Production Management · doi:10.1108/01443570810910188 · Cited by 64
Defining Critical Elements in JIT Implementation: A Survey
Zhu, Z., Meredith, P. H., & Makboonprasith, S. (1994) · Industrial Management & Data Systems · doi:10.1108/02635579410063252 · Cited by 61
An exploration of the components of JIT: Case study and survey results
Spencer, M. S., & Guide, V. D. R. (1995) · International Journal of Operations & Production Management · doi:10.1108/01443579510083677 · Cited by 60
Value chain analysis in the UK beef foodservice sector
Francis, M., Simons, D. W., & Bourlakis, M. (2008) · Supply Chain Management An International Journal · doi:10.1108/13598540810850346 · Cited by 60
Quality and continuous improvement in medical device manufacturing
Brown, A., Eatock, J., Dixon, D., Meenan, B. J., & Anderson, J. (2008) · The TQM Journal · doi:10.1108/17542730810909329 · Cited by 57
Managing lean manufacturing in material handling operations
Green, J. C., Lee, J., & Kozman, T. A. (2010) · International Journal of Production Research · doi:10.1080/00207540902791819 · Cited by 57
A study of operations management constructs and their relationships
Tan, K. C., & Wisner, J. D. (2003) · International Journal of Operations & Production Management · doi:10.1108/01443570310501862 · Cited by 57
Lean thinking in the UK red meat industry: A systems and contingency approach
Simons, D. W., & Taylor, D. (2006) · International Journal of Production Economics · doi:10.1016/j.ijpe.2006.04.003 · Cited by 55
The European auto components industry: Manufacturing performance and practice
Oliver, N., Delbridge, R., & Lowe, J. (1996) · International Journal of Operations & Production Management · doi:10.1108/01443579610131474 · Cited by 53
Chaplin, L., Heap, J., & O'Rourke, S. T. J. (2016) · International Journal of Productivity and Performance Management · doi:10.1108/ijppm-02-2015-0034 · Cited by 51
A longitudinal examination of JIT purchasing practices
Giunipero, L. C., Pillai, K. G., Chapman, S. N., & Clark, R. A. (2005) · The International Journal of Logistics Management · doi:10.1108/09574090510617358 · Cited by 51
An empirical examination of factors influencing JIT success
Yasin, M. M., & Wafa, M. A. (1996) · International Journal of Operations & Production Management · doi:10.1108/01443579610106337 · Cited by 50
Relative importance of contingency variables for advanced manufacturing technology
Das, A., & Jayaram, J. (2003) · International Journal of Production Research · doi:10.1080/00207540310001595819 · Cited by 50
The making of a lean aerospace supply chain
Michaels, L. (1999) · Supply Chain Management An International Journal · doi:10.1108/13598549910279585 · Cited by 50
Complementarities between JIT purchasing practices: An economic analysis based on transaction costs
Benito, J. G., González, I. S., & Spring, M. (2000) · International Journal of Production Economics · doi:10.1016/s0925-5273(00)00032-3 · Cited by 49
Just‐in‐time implementation issues among automotive suppliers in the southern USA
Matson, J. E., & Matson, J. O. (2007) · Supply Chain Management: An International Journal · doi:10.1108/13598540710826362 · Cited by 49
Benchmarking performance measures in traditional and just‐in‐time companies
Meybodi, M. Z. (2009) · Benchmarking An International Journal · doi:10.1108/14635770910936531 · Cited by 48
Just‐in‐time labour supply in the hotel sector
Lai, P., & Baum, T. G. (2005) · Employee Relations · doi:10.1108/01425450510569328 · Cited by 47
Lean information management: the use of observational data in health care
Castle, A., & Harvey, R. (2009) · International Journal of Productivity and Performance Management · doi:10.1108/17410400910938878 · Cited by 47
How ‘just-in-time’ wastages can be quantified: case study of a private condominium project
Pheng, L. S., & Tan, S. K. L. (1998) · Construction Management and Economics · doi:10.1080/014461998371926 · Cited by 47
Using lean principles to streamline the quotation process: a case study
Buzby, C. M., Gerstenfeld, A., Voss, L. E., & Zeng, A. Z. (2002) · Industrial Management & Data Systems · doi:10.1108/02635570210450190 · Cited by 46
The impact of JIT‐II‐selling on organizational performance
Green, K. W., & Inman, R. A. (2007) · Industrial Management & Data Systems · doi:10.1108/02635570710816720 · Cited by 45
Supply chain management and suppliers' HRM practice
Othman, R., & Ghani, R. A. (2008) · Supply Chain Management An International Journal · doi:10.1108/13598540810882143 · Cited by 44
Effect of the characteristics of the purchased products in JIT purchasing implementation
Benito, J. G. (2002) · International Journal of Operations & Production Management · doi:10.1108/01443570210436181 · Cited by 42
Lean principles and premium brands: conflict or complement?
Oliver, N., Schab, L., & Holweg, M. (2007) · International Journal of Production Research · doi:10.1080/00207540701223600 · Cited by 41
Implementation of just-in-time in a small company: A case study
Gunasekaran, A., & Lyu, J. (1997) · Production Planning & Control · doi:10.1080/095372897235217 · Cited by 41
Total Effectiveness in a Just‐in‐Time System
Karlsson, C., & Norr, C. (1994) · International Journal of Operations & Production Management · doi:10.1108/01443579410058522 · Cited by 41
Lean thinking implementation at a safari park
Julien, D. M., & Tjahjono, B. (2009) · Business Process Management Journal · doi:10.1108/14637150910960585 · Cited by 41
Just‐in‐time manufacturing in Ghana
Amoako‐Gyampah, K., & Gargeya, V. B. (2001) · Industrial Management & Data Systems · doi:10.1108/02635570110386562 · Cited by 40
A continuing lean journey: an electronic manufacturer's adopting of Kanban
Lee‐Mortimer, A. (2008) · Assembly Automation · doi:10.1108/01445150810863662 · Cited by 40
Creating a lean supplier network: a distribution industry case
Hines, P., Rich, N., & Esain, A. (1998) · European Journal of Purchasing & Supply Management · doi:10.1016/s0969-7012(98)00015-x · Cited by 40
The perspective of suppliers on lean supply in a developing country context
Arkader, R. (2001) · Integrated Manufacturing Systems · doi:10.1108/09576060110384280 · Cited by 39
The Impact of Implementing JIT on Employees′ Job Attitudes
Groebner, D. F., & Merz, C. M. (1994) · International Journal of Operations & Production Management · doi:10.1108/01443579410049289 · Cited by 37
Just‐in‐time and context: Predictors of electronic data interchange technology adoption
Germain, R., & Dröge, C. (1995) · International Journal of Physical Distribution & Logistics Management · doi:10.1108/09600039510080126 · Cited by 36
″Just-in-Time″ Manufacturing Systems: A Literature Review
Keller, A. Z., & Kazazi, A. (1993) · Industrial Management & Data Systems · doi:10.1108/02635579310044254 · Cited by 36
Implementing leagility in reverse logistics channels
Banomyong, R., Veerakachen, V., & Supatn, N. (2007) · International Journal of Logistics Research and Applications · doi:10.1080/13675560701403651 · Cited by 36
Zero inventory management: facts or fiction? Lessons from Japan
de Haan, J. A. C., & Yamamoto, M. (1999) · International Journal of Production Economics · doi:10.1016/s0925-5273(98)00022-x · Cited by 34
Factors underlying operational JIT purchasing practices: Results of an empirical research
Nassimbeni, G. (1996) · International Journal of Production Economics · doi:10.1016/0925-5273(95)00190-5 · Cited by 34
Design or development? Beyond the LP‐STS debate; inputs from a Volvo truck case
Kuipers, B. S., de Witte, M. C., & van der Zwaan, A. H. (2004) · International Journal of Operations & Production Management · doi:10.1108/01443570410548257 · Cited by 32
JIT purchasing: Literature review and implications for Indian industry
Garg, D. (1999) · Production Planning & Control · doi:10.1080/095372899233235 · Cited by 32
Just-in-time: Implementation within the hotel industry—a case study
Barlow, G. (2002) · International Journal of Production Economics · doi:10.1016/s0925-5273(02)00315-8 · Cited by 31
How relevant is OM research to managerial practice?
de‐Margerie, V., & Jiang, B. (2011) · International Journal of Operations & Production Management · doi:10.1108/01443571111104737 · Cited by 31
A study on just‐in‐time practices in Singapore
Hum, S., & Ng, Y. (1995) · International Journal of Operations & Production Management · doi:10.1108/01443579510090309 · Cited by 29
Internal and external integration of assembly manufacturing activities
Vargas, G., Cárdenas, L., & Matarranz, J. L. (2000) · International Journal of Operations & Production Management · doi:10.1108/01443570010330784 · Cited by 29
Vamsi Krishna Jasti, N., & Kodali, R. (2014) · International Journal of Lean Six Sigma · doi:10.1108/ijlss-12-2013-0057 · Cited by 28
Self-citationTaylor, D. H. (2008) · International Journal of Logistics Research and Applications · doi:10.1080/13675560802141812 · Cited by 27
Mazany, P. (1995) · International Journal of Operations & Production Management · doi:10.1108/01443579510099788 · Cited by 27
Is just‐in‐time applicable in paper industry logistics?
Lehtonen, J., & Holmström, J. (1998) · Supply Chain Management An International Journal · doi:10.1108/13598549810200906 · Cited by 26
A synergistic analysis of joint JIT-TQM implementation
Lau, R. S. M. (2000) · International Journal of Production Research · doi:10.1080/002075400188483 · Cited by 26
Value chain development: An account of some implementation problems
Barker, R. C. (1996) · International Journal of Operations & Production Management · doi:10.1108/01443579610130673 · Cited by 25
Research works printed but not linked: 2
- Dubin, R. (1978), Theory Building, Free Press, New York, NY.
- Groves, R.M. , Fowler, F.J. , Couper, M.P. , Lepkowski, J.M. , Singer, E. and Tourangeau, R. (2009), Survey Methodology, John Wiley & Sons, Hoboken, NJ.
Cited by
Lean production: literature review and trends
Jasti, N. V. K., & Kodali, R. (2015) · International Journal of Production Research · doi:10.1080/00207543.2014.937508 · Cited by 485
Self-citationA Systematic Literature Review on Recent Lean Research: State‐of‐the‐art and Future Directions
Danese, P., Manfè, V., & Romano, P. (2018) · International Journal of Management Reviews · doi:10.1111/ijmr.12156 · Cited by 345
Prajogo, D., Oke, A., & Olhager, J. (2016) · International Journal of Operations & Production Management · doi:10.1108/ijopm-03-2014-0129 · Cited by 253
Yadav, G., Luthra, S., Huisingh, D., Mangla, S. K., Narkhede, B. E., & Liu, Y. (2020) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2019.118726 · Cited by 228
Lean services: a systematic review
Gupta, S., Sharma, M., & Sunder M., V. (2016) · International Journal of Productivity and Performance Management · doi:10.1108/ijppm-02-2015-0032 · Cited by 219
Metadata
- Authors
- Vamsi Krishna Jasti, N., & Kodali, R.
- Affiliations
- National Institute of Technology Jamshedpur (IN)
- Venue
- International Journal of Operations & Production Management
- Publisher
- Emerald
- Published
- 2014-07-29
- Volume
- 34
- Issue
- 8
- Pages
- 1080-1122
- ISSN
- 0144-3577 (ISSN-L)
- OpenAlex
- W1981197533
- Cited by
- 178
- References
- 232
- Citations by year
- 2026: 2 · 2025: 10 · 2024: 13 · 2023: 19 · 2022: 14 · 2021: 26 · 2020: 24 · 2019: 24 · 2018: 19 · 2017: 10 · 2016: 10 · 2015: 5 · 2014: 2
- FWCI
- 19.88
- Type
- journal article
- Language
- en
- Open access
- closed
- Licence
- www.emerald.com/insight/site-policies (tdm)
- Locations
- International Journal of Operations & Production Management (publishedVersion)
- Topics
- Social Sciences › Business, Management and Accounting › Management Information Systems › Quality and Supply Management
- Social Sciences › Business, Management and Accounting › Strategy and Management › Business Strategies and Management Research
- Social Sciences › Business, Management and Accounting › Strategy and Management › Management and Optimization Techniques
- Keywords
- lean manufacturing, empirical methods, research design, triangulation, sample size, longitudinal data collection, developing countries, waste removal, theory development, case studies, surveys
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.