NPD Planning Activities and Innovation Performance: The Mediating Role of Process Management and the Moderating Effect of Product Innovativeness
The DOI matches its Crossref record; 88 of the 88 references it cites were found in a registry or an index.
Abstract
The aim of this study is to investigate the effects of planning and control on the performance of new product development (NPD) projects. It is hypothesized that (1) thorough business planning at the beginning of a project creates a basis for proficient project and risk planning; (2) the proficiency of project planning, risk planning, and process management activities each improves innovation performance directly; (3) the relationship of planning and success is mediated by process management; and (4) the strength of these relationships is moderated by uncertainty, as determined by the degree of innovativeness. To test the hypotheses, data from 132 NPD projects were collected and analyzed. A measurement model was used to establish valid and reliable constructs, a path model to test the main effects, and a multiple‐moderated regression analysis for the moderator hypotheses. The results suggest that the proficiency of project planning and process management is important predictors of NPD performance. Specifically, project risk planning and goal stability throughout the development process are found to enhance performance significantly. Business planning proves to be an important antecedent of the more development‐related planning activities such as project planning and risk planning. Additionally, the results lend support to the hypotheses regarding the mediating role of process management in the planning–performance relationship. Project planning and risk planning support the quality of process management and thus impact NPD performance indirectly. Only to a limited extent are the strengths of these relationships moderated by the degree of innovativeness of the NPD project.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Evaluating structural equation models with unobservable variables and measurement error
Fornell, C., & Larcker, D. F. (1981) · Journal of Marketing Research · doi:10.1177/002224378101800104 · Cited by 109,190
Hu, L., & Bentler, P. M. (1999) · Structural Equation Modeling A Multidisciplinary Journal · doi:10.1080/10705519909540118 · Cited by 108,788
Structural equation modeling in practice: A review and recommended two-step approach
Anderson, J. C., & Gerbing, D. W. (1988) · Psychological Bulletin · doi:10.1037/0033-2909.103.3.411 · Cited by 41,941
Multiple regression: testing and interpreting interactions
(1992) · Choice Reviews Online · doi:10.5860/choice.29-3352 · Cited by 36,654
Herne, H., Cooley, W. W., & Lohnes, P. R. (1973) · Journal of the Royal Statistical Society. Series A (General) · doi:10.2307/2344428 · Cited by 35,697
A Paradigm for Developing Better Measures of Marketing Constructs
Churchill, G. A. (1979) · Journal of Marketing Research · doi:10.1177/002224377901600110 · Cited by 20,602
(1997) · Chemometrics in Environmental Analysis · doi:10.1002/352760216x.ch5 · Cited by 18,653
Hu, L.-T., & Bentler, P. M. (1998) · Psychological Methods · doi:10.1037/1082-989x.3.4.424 · Cited by 12,298
The Effect of a Market Orientation on Business Profitability
Narver, J. C., & Slater, S. F. (1990) · Journal of Marketing · doi:10.1177/002224299005400403 · Cited by 7,947
Burns, T., & Stalker, G. M. (1994) · doi:10.1093/acprof:oso/9780198288787.001.0001 · Cited by 7,250
Ambidextrous Organizations: Managing Evolutionary and Revolutionary Change
Tushman, M. L., & O'Reilly, C. A. (1996) · California Management Review · doi:10.2307/41165852 · Cited by 4,950
Brown, S. L., & Eisenhardt, K. M. (1997) · Administrative Science Quarterly · doi:10.2307/2393807 · Cited by 4,282
Product development: Past research, present findings and future directions
Brown, S. L., & Eisenhardt, K. M. (1995) · The Academy of Management Review · doi:10.2307/258850 · Cited by 3,777 · cited 2×
“ally, the rational plan approach to NPD (Brown and Eisenhardt, 1995) presumes that development activities are relatively predictable and are best managed as”
BackgroundA Conceptual Framework for the Design of Organizational Control Mechanisms
Ouchi, W. G. (1979) · Management Science · doi:10.1287/mnsc.25.9.833 · Cited by 3,707
Garcia, R., & Calantone, R. (2002) · Journal of Product Innovation Management · doi:10.1111/1540-5885.1920110 · Cited by 3,470 · cited 2×
“First, by accounting for different dimensions of innovativeness, and, second, by including a macro perspective of innovativeness through assessing specifically the fit with external resources (Garcia and Calantone, 2002), it was possi-”
BackgroundDess, G. G., & Robinson, R. B. (1984) · Strategic Management Journal · doi:10.1002/smj.4250050306 · Cited by 3,337
Statistical difficulties of detecting interactions and moderator effects.
McClelland, G. H., & Judd, C. M. (1993) · Psychological Bulletin · doi:10.1037/0033-2909.114.2.376 · Cited by 3,270 · cited 2×
“Range restriction on the innovativeness measure may be a potential artifact that influences the power of the multiple moderated regression analysis performed in this study (Aguinis, 1995; McClelland and Judd, 1993).”
BackgroundMethodThe rise and fall of strategic planning
(1995) · Long Range Planning · doi:10.1016/0024-6301(95)92105-2 · Cited by 3,008
Accelerating Adaptive Processes: Product Innovation in the Global Computer Industry
Eisenhardt, K. M., & Tabrizi, B. N. (1995) · Administrative Science Quarterly · doi:10.2307/2393701 · Cited by 2,426
Galbraith, J. R. (1977) · Cited by 2,180
Handbook of Organization Studies
Hubbell, L., Clegg, S. R., Hardy, C., & Nord, W. R. (1997) · Public Productivity & Management Review · doi:10.2307/3380686 · Cited by 1,983
Stage-gate systems: A new tool for managing new products
Cooper, R. G. (1990) · Business Horizons · doi:10.1016/0007-6813(90)90040-i · Cited by 1,834
Project management — A managerial approach
(1989) · European Journal of Operational Research · doi:10.1016/0377-2217(89)90451-7 · Cited by 1,547
van de Ven, & Haines, A. (1999) · Medical Entomology and Zoology · Cited by 1,421
The rise and fall of strategic planning
Lawrence, M. (1994) · International Journal of Forecasting · doi:10.1016/0169-2070(94)90036-1 · Cited by 1,350
Benchmarking the Firm's Critical Success Factors in New Product Development
Cooper, R. G., & Kleinschmidt, E. J. (1995) · Journal of Product Innovation Management · doi:10.1016/0737-6782(95)00059-3 · Cited by 1,226
Meeting the Challenge of Disruptive Change
Christensen, C. M., & Overdorf, M. (2000) · Cited by 1,062
Revolutionizing product development
Wheelwright, S. C. (1992) · Cited by 1,061
Gatignon, H., Tushman, M. L., Smith, W., & Anderson, P. (2002) · Management Science · doi:10.1287/mnsc.48.9.1103.174 · Cited by 947
Developing products in half the time
(1991) · Choice Reviews Online · doi:10.5860/choice.28-5737 · Cited by 912
Discontinuous Innovation and the New Product Development Process
Veryzer, R. W. (1998) · Journal of Product Innovation Management · doi:10.1016/s0737-6782(97)00105-7 · Cited by 860
The Convergence of Planning and Execution: Improvisation in New Product Development
Moorman, C., & Miner, A. S. (1998) · Journal of Marketing · doi:10.1177/002224299806200301 · Cited by 857
One Size Does Not Fit All Projects: Exploring Classical Contingency Domains
Shenhar, A. J. (2001) · Management Science · doi:10.1287/mnsc.47.3.394.9772 · Cited by 821
Danneels, E., & Kleinschmidtb, E. J. (2001) · Journal of Product Innovation Management · doi:10.1016/s0737-6782(01)00109-6 · Cited by 776
An Interim Report on Measuring Product Development Success and Failure
Griffin, A., & Page, A. L. (1993) · Journal of Product Innovation Management · doi:10.1016/0737-6782(93)90072-x · Cited by 744
The Fuzzy Front End of New Product Development for Discontinuous Innovations: A Theoretical Model
Reid, S. E., & De Brentani, U. (2004) · Journal of Product Innovation Management · doi:10.1111/j.0737-6782.2004.00068.x · Cited by 707
Towards Holistic “Front Ends” In New Product Development
Khurana, A., & Rosenthal, S. R. (1998) · Journal of Product Innovation Management · doi:10.1016/s0737-6782(97)00066-0 · Cited by 706
Portfolio management for new product development: results of an industry practices study
Cooper, R., Edgett, S., & Kleinschmidt, E. (2001) · R&D Management · doi:10.1111/1467-9310.00225 · Cited by 702
Managing radical innovation: an overview of emergent strategy issues
McDermott, C. J. (2002) · Journal of Product Innovation Management · doi:10.1016/s0737-6782(02)00174-1 · Cited by 692
Atuahene‐Gima, K. (1995) · Journal of Product Innovation Management · doi:10.1016/0737-6782(95)00027-q · Cited by 675
Radical Innovation: How Mature Companies Can Outsmart Upstarts
Leifer, R. P. (2000) · Cited by 661
Tatikonda, M. V., & Rosenthal, S. R. (2000) · IEEE Transactions on Engineering Management · doi:10.1109/17.820727 · Cited by 634
The Effect of Project and Process Characteristics on Product Development Cycle Time
Griffin, A. (1997) · Journal of Marketing Research · doi:10.1177/002224379703400103 · Cited by 621
Tatikonda, M. V., & Montoya-Weiss, M. M. (2001) · Management Science · doi:10.1287/mnsc.47.1.151.10669 · Cited by 599
Variations in Critical Success Factors Over the Stages in the Project Life Cycle
Pinto, J. K., & Prescott, J. E. (1988) · Journal of Management · doi:10.1177/014920638801400102 · Cited by 581
Revolutionizing product development
Burda, M. (1993) · Journal of Engineering and Technology Management · doi:10.1016/0923-4748(93)90032-e · Cited by 571
The Effect of “Front‐Loading” Problem‐Solving on Product Development Performance
Thomke, S. H., & Fujimoto, T. (2000) · Journal of Product Innovation Management · doi:10.1016/s0737-6782(99)00031-4 · Cited by 515
An empirical analysis of the relationship between project planning and project success
Dvir, D., Raz, T., & Shenhar, A. J. (2003) · International Journal of Project Management · doi:10.1016/s0263-7863(02)00012-1 · Cited by 498
Radical Innovation: How Mature Companies can Outsmart Upstarts
Bessant, J. (2001) · Technovation · doi:10.1016/s0166-4972(01)00043-8 · Cited by 469
Management of risks, uncertainties and opportunities on projects: time for a fundamental shift
Jaafari, A. (2001) · International Journal of Project Management · doi:10.1016/s0263-7863(99)00047-2 · Cited by 466
Olson, E. M., Walker, O. C., Ruekerf, R. W., & Bonnerd, J. M. (2001) · Journal of Product Innovation Management · doi:10.1016/s0737-6782(01)00091-1 · Cited by 463
Statistical power problems with moderated multiple regression in management research
Aguinis, H. (1995) · Journal of Management · doi:10.1016/0149-2063(95)90026-8 · Cited by 458
Assessing a Multidimensional Measure of Radical Technological Innovation
Green, S. G., Gavin, M. B., & Aiman-Smith, L. (1995) · IEEE Transactions on Engineering Management · doi:10.1109/17.403738 · Cited by 457
Atuahene‐Gima, K. (1995) · Journal of Product Innovation Management · doi:10.1111/1540-5885.1240275 · Cited by 449
The impact of grand strategy and planning formality on financial performance
Pearce, J. A., Robbins, D. K., & Robinson, R. B. (1987) · Strategic Management Journal · doi:10.1002/smj.4250080204 · Cited by 435
Atuahene-Gima, K. (2004) · Academy of Management Journal · doi:10.2307/20159603 · Cited by 414
Upper management control of new product development projects and project performance
Bonner, J. (2002) · Journal of Product Innovation Management · doi:10.1016/s0737-6782(02)00139-x · Cited by 413
PRODUCT DEVELOPMENT TENSIONS: EXPLORING CONTRASTING STYLES OF PROJECT MANAGEMENT.
Lewis, M. W., Welsh, M. A., Dehler, G. E., & Green, S. G. (2002) · Academy of Management Journal · doi:10.2307/3069380 · Cited by 409
Managing radical innovation: an overview of emergent strategy issues
McDermott, C. M., & O'Connor, G. C. (2002) · Journal of Product Innovation Management · doi:10.1111/1540-5885.1960424 · Cited by 385
Risk management, project success, and technological uncertainty
Raz, T., Shenhar, A. J., & Dvir, D. (2002) · R&D Management · doi:10.1111/1467-9310.00243 · Cited by 377
Statistical Power with Moderated Multiple Regression in Management Research
Aguinis, H. (1995) · Journal of Management · doi:10.1177/014920639502100607 · Cited by 358
Chapman, R. J. (2001) · International Journal of Project Management · doi:10.1016/s0263-7863(99)00070-8 · Cited by 352
Agile Product Development: Managing Development Flexibility in Uncertain Environments
Thomke, S., & Reinertsen, D. (1998) · California Management Review · doi:10.2307/41165973 · Cited by 333
Dawes, J. G. (1999) · Adelaide Research & Scholarship (AR&S) (University of Adelaide) · Cited by 322
Refining the search for project success factors: a multivariate, typological approach
Shenhar, A. J., Tishler, A., Dvir, D., Lipovetsky, S., & Lechler, T. (2002) · R&D Management · doi:10.1111/1467-9310.00244 · Cited by 279
Souder, W. E., & Moenaert, R. K. (1992) · Journal of Management Studies · doi:10.1111/j.1467-6486.1992.tb00675.x · Cited by 248
Critical Development Activities for Really New versus Incremental Products
Song, X. M., & Montoya‐Weiss, M. M. (1998) · Journal of Product Innovation Management · doi:10.1111/1540-5885.1520124 · Cited by 242
Technological interweavement: a means of achieving innovation success
Gemünden, H. G., Heydebreck, P., & Herden, R. (1992) · R&D Management · doi:10.1111/j.1467-9310.1992.tb01206.x · Cited by 240
Self-citationAdding value in product development by creating information and reducing risk
Browning, T. R., Deyst, J. J., Eppinger, S. D., & Whitney, D. E. (2002) · IEEE Transactions on Engineering Management · doi:10.1109/tem.2002.806710 · Cited by 238
PLANNING AND TACTICAL FACTORS IN THE PROJECT IMPLEMENTATION PROCESS
Pinto, J. K., & Prescott, J. E. (1990) · Journal of Management Studies · doi:10.1111/j.1467-6486.1990.tb00249.x · Cited by 234
The role of flexibility in the development of new products: An empirical study
Thomke, S. H. (1997) · Research Policy · doi:10.1016/s0048-7333(96)00918-3 · Cited by 226
(2017) · Project Management for Engineering, Business and Technology · doi:10.4324/9781315676319-22 · Cited by 212
Managing Product Definition in High-Technology Industries: A Pilot Study
Bacon, G. C., Beckman, S. L., Mowery, D. C., & Wilson, E. (1994) · California Management Review · doi:10.2307/41165754 · Cited by 197
Project Management Characteristics and New Product Survival
Jeffrey Thieme, R., Michael Song, X., & Shin, G. (2003) · Journal of Product Innovation Management · doi:10.1111/1540-5885.2002004 · Cited by 196
An empirical comparison of statistical construct validation approaches
Ahire, S. L., & Devaraj, S. (2001) · IEEE Transactions on Engineering Management · doi:10.1109/17.946530 · Cited by 194
Planned Flexibility: Linking Anticipation and Reaction in Product Development Projects
Verganti, R. (1999) · Journal of Product Innovation Management · doi:10.1016/s0737-6782(98)00067-8 · Cited by 193
Dougherty, D. J. (1999) · SAGE Publications Ltd eBooks · doi:10.4135/9781446218563.n9 · Cited by 182
Salomo, S., Steinhoff, F., & Trommsdorff, V. (2003) · International Journal of Technology Management · doi:10.1504/ijtm.2003.003417 · Cited by 159
Self-citationProject visioning: Its components and impact on new product success
Lynn, G. S., & Akgünb, A. E. (2001) · Journal of Product Innovation Management · doi:10.1016/s0737-6782(01)00110-2 · Cited by 157
Research notes and communications what is planning anyway?
Mintzberg, H. (1981) · Strategic Management Journal · doi:10.1002/smj.4250020308 · Cited by 138
Adherence to plans, risk taking, and environment as predictors of firm growth
Covin, J. G., & Slevin, D. P. (1998) · The Journal of High Technology Management Research · doi:10.1016/s1047-8310(98)90005-0 · Cited by 118
A method for exploring the effects of attrition in randomized experiments with dichotomous outcomes
Shadish, W., Hu, X.-G., Glaser, R., Kownacki, R. J., & Wong, S. (1998) · Psychological Methods · doi:10.1037/1082-989x.3.1.3 · Cited by 105
The Project Management Institute, project management handbook
Pinto, J. K. (1998) · Jossey-Bass Publishers eBooks · Cited by 52
Integrating Operations and Marketing Perspectives of Product Innovation
TatikondaMohan, V., & Montoya‐Weiss, M. M. (2001) · Management Science · doi:10.5555/2789870.2789881 · Cited by 31
Dynamisches Schnittstellenmanagement radikaler Innovationsvorhaben
Salomo, S., Gemünden, H. G., & Billing, F. (2007) · Gabler eBooks · doi:10.1007/978-3-8349-9293-2_11 · Cited by 22
Self-citationDynamisches Schnittstellenmanagement radikaler Innovationsvorhaben
Salomo, S., Gemünden, H. G., & Billing, F. (2003) · Gabler Verlag eBooks · doi:10.1007/978-3-322-96471-7_9 · Cited by 11
Self-citation(1973) · Medical Entomology and Zoology
Cited by
Relationship between quality management practices and innovation
Kim, D., Kumar, V., & Kumar, U. (2012) · Journal of Operations Management · doi:10.1016/j.jom.2012.02.003 · Cited by 703
Innovation indicators throughout the innovation process: An extensive literature analysis
Dziallas, M., & Blind, K. (2019) · Technovation · doi:10.1016/j.technovation.2018.05.005 · Cited by 651
Success Factors of Product Innovation: An Updated Meta‐Analysis
Evanschitzky, H., Eisend, M., Calantone, R. J., & Jiang, Y. (2012) · Journal of Product Innovation Management · doi:10.1111/j.1540-5885.2012.00964.x · Cited by 476
Aksoy, H. (2017) · Technology in Society · doi:10.1016/j.techsoc.2017.08.005 · Cited by 261
Verworn, B., Herstatt, C., & Nagahira, A. (2008) · R&D Management · doi:10.1111/j.1467-9310.2007.00492.x · Cited by 253
Metadata
- Authors
- Salomo, S., Weise, J., & Gemünden, H. G.
- Venue
- Journal of Product Innovation Management
- Publisher
- Wiley
- Published
- 2007-06-18
- Volume
- 24
- Issue
- 4
- Pages
- 285-302
- ISSN
- 0737-6782 (ISSN-L)
- 1540-5885
- OpenAlex
- W2096093623
- Cited by
- 303
- References
- 88
- FWCI
- 23.44
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.