The DOI matches its Crossref record; 166 of the 166 references it cites were found in a registry or an index.
Construction and demolition waste management contributing factors coupled with reduce, reuse, and recycle strategies for effective waste management: A review
Open accessAbstract
Abstract Construction and demolition waste (C&DW) as a direct consequence of rapid urbanization is increasing around the world. C&DW generation has been identified as one of the major issues in the construction industry due to its direct impacts on the environment as well as the efficiency of construction industry. It is estimated that an overall of 35% of C&DW is landfilled globally, therefore, effective C&DW management is crucial in order to minimize detrimental impacts of C&DW for the environment. As the industry cannot continue to practice if the resources on which it depends are depleted, C&DW management needs to be implemented in an effective way. Despite considering many well-developed strategies for C&DW management, the outputs of the implementation of these strategies is far from optimum. The main reason of this inefficiency is due to inadequate understanding of principal factors, which play a vital role in C&DW management. Therefore, the aim of this research is to critically scrutinize the concept of C&DW and its managerial issues in a systematic way to come up with the effective C&DW management. In order to achieve this aim, and based on a systematic review of 97 research papers relevant to effective C&DW management, this research considers two main categories as fundamental factors affecting C&DW management namely, C&DW management hierarchy including reduce, reuse, and recycle strategies, and effective C&DW management contributing factors, including C&DW management from sustainability perspective, C&DW stakeholders’ attitudes, C&DW project life cycle, and C&DW management tools. Subsequently, these factors are discussed in detail and findings are scrutinized in order to clarify current and future practices of C&DW management from both academic and practical perspectives.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Decision making with the analytic hierarchy process
Saaty, T. L. (2008) · International Journal of Services Sciences · doi:10.1504/ijssci.2008.017590 · Cited by 10,301
Comparison of PubMed, Scopus, Web of Science, and Google Scholar: strengths and weaknesses
Falagas, M. E., Pitsouni, E. I., Malietzis, G. A., & Pappas, G. (2008) · The FASEB Journal · doi:10.1096/fj.07-9492lsf · Cited by 5,039
Beyond the Business Case for Corporate Sustainability
Dyllick, T., & Hockerts, K. (2002) · Business Strategy and the Environment · doi:10.1002/bse.323 · Cited by 4,029
Economics of Natural Resources and the Environment
Segerson, K., Pearce, D. W., & Turner, R. K. (1991) · Land Economics · doi:10.2307/3146419 · Cited by 2,308
Solid waste management challenges for cities in developing countries
Guerrero, L. A., Maas, G., & Hogland, W. (2013) · Waste Management · doi:10.1016/j.wasman.2012.09.008 · Cited by 2,008
A review of the circular economy in China: moving from rhetoric to implementation
Su, B., Heshmati, A., Geng, Y., & Yu, X. (2013) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2012.11.020 · Cited by 1,429
Akhtar, A., & Sarmah, A. K. (2018) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2018.03.085 · Cited by 1,250
Circular economy for the built environment: A research framework
Pomponi, F., & Moncaster, A. (2017) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2016.12.055 · Cited by 1,169
Construction and demolition waste management in China through the 3R principle
Huang, B., Wang, X., Kua, H., Geng, Y., Bleischwitz, R., & Ren, J. (2018) · Resources, Conservation and Recycling · doi:10.1016/j.resconrec.2017.09.029 · Cited by 1,047
Construction and demolition waste best management practice in Europe
Gálvez-Martos, J.-L., Styles, D., Schoenberger, H., & Zeschmar-Lahl, B. (2018) · Resources, Conservation and Recycling · doi:10.1016/j.resconrec.2018.04.016 · Cited by 816
Enhancing environmental sustainability over building life cycles through green BIM: A review
Wong, J. K. W., & Zhou, J. (2015) · Automation in Construction · doi:10.1016/j.autcon.2015.06.003 · Cited by 671
Yeheyis, M., Hewage, K., Alam, M. S., Eskicioglu, C., & Sadiq, R. (2013) · Clean Technologies and Environmental Policy · doi:10.1007/s10098-012-0481-6 · Cited by 640
Towards adoption of prefabrication in construction
Tam, V. W. Y., Tam, C. M., Zeng, S. X., & Ng, W. C. Y. (2007) · Building and Environment · doi:10.1016/j.buildenv.2006.10.003 · Cited by 628
Self-citationEpstein, M. J., Buhovac, A. R., Elkington, J., & Leonard, H. B. ". (2017) · Routledge eBooks · doi:10.4324/9781351276443 · Cited by 620
Jaillon, L., Poon, C. S., & Chiang, Y. H. (2009) · Waste Management · doi:10.1016/j.wasman.2008.02.015 · Cited by 592
Construction Waste: Quantification and Source Evaluation
Bossink, B. A. G., & Brouwers, H. J. H. (1996) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(1996)122:1(55 · Cited by 578
Trend of the research on construction and demolition waste management
Yuan, H., & Shen, L. (2011) · Waste Management · doi:10.1016/j.wasman.2010.10.030 · Cited by 574
A review on current situation and challenges of construction and demolition waste management
Menegaki, M., & Damigos, D. (2018) · Current Opinion in Green and Sustainable Chemistry · doi:10.1016/j.cogsc.2018.02.010 · Cited by 512
Arulrajah, A., Piratheepan, J., Disfani, M. M., & Bo, M. W. (2013) · Journal of Materials in Civil Engineering · doi:10.1061/(asce)mt.1943-5533.0000652 · Cited by 503
Architects’ perspectives on construction waste reduction by design
Osmani, M., Glass, J., & Price, A. D. F. (2008) · Waste Management · doi:10.1016/j.wasman.2007.05.011 · Cited by 496
Life cycle of buildings, demolition and recycling potential: A case study in Turin, Italy
Blengini, G. A. (2009) · Building and Environment · doi:10.1016/j.buildenv.2008.03.007 · Cited by 492
Banihashemi, S., Hosseini, M. R., Golizadeh, H., & Sankaran, S. (2017) · International Journal of Project Management · doi:10.1016/j.ijproman.2017.01.014 · Cited by 441
Material Waste in Building Industry: Main Causes and Prevention
Formoso, C. T., Soibelman, L., De Cesare, C., & Isatto, E. L. (2002) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2002)128:4(316 · Cited by 434
Wang, Q., & Waltman, L. (2016) · Journal of Informetrics · doi:10.1016/j.joi.2016.02.003 · Cited by 417
A BIM-based system for demolition and renovation waste estimation and planning
Cheng, J. C. P., & Ma, L. Y. H. (2013) · Waste Management · doi:10.1016/j.wasman.2013.01.001 · Cited by 402
Jin, R., Li, B., Zhou, T., Wanatowski, D., & Piroozfar, P. (2017) · Resources, Conservation and Recycling · doi:10.1016/j.resconrec.2017.07.034 · Cited by 401
Quantifying construction and demolition waste: An analytical review
Wu, Z., Yu, A. T. W., Shen, L., & Liu, G. (2014) · Waste Management · doi:10.1016/j.wasman.2014.05.010 · Cited by 400
A comprehensive review of the development of zero waste management: lessons learned and guidelines
Zaman, A. U. (2015) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2014.12.013 · Cited by 387
Marzouk, M., & Azab, S. (2014) · Resources, Conservation and Recycling · doi:10.1016/j.resconrec.2013.10.015 · Cited by 383
Jin, R., Yuan, H., & Chen, Q. (2019) · Resources, Conservation and Recycling · doi:10.1016/j.resconrec.2018.09.029 · Cited by 380
Implementation of environmental management in the Hong Kong construction industry
Shen, L. Y., & Tam, V. W. Y. (2002) · International Journal of Project Management · doi:10.1016/s0263-7863(01)00054-0 · Cited by 367
Self-citationA Spanish model for quantification and management of construction waste
Solís-Guzmán, J., Marrero, M., Montes-Delgado, M. V., & Ramírez-de-Arellano, A. (2009) · Waste Management · doi:10.1016/j.wasman.2009.05.009 · Cited by 359
Status quo and future directions of construction and demolition waste research: A critical review
Wu, H., Zuo, J., Zillante, G., Wang, J., & Yuan, H. (2019) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2019.118163 · Cited by 358
A framework for understanding waste management studies in construction
Lu, W., & Yuan, H. (2011) · Waste Management · doi:10.1016/j.wasman.2011.01.018 · Cited by 353
Estimation of construction waste generation and management in Thailand
Kofoworola, O. F., & Gheewala, S. H. (2009) · Waste Management · doi:10.1016/j.wasman.2008.07.004 · Cited by 346
The use of recycled aggregate in concrete in Hong Kong
Poon, C.-S., & Chan, D. (2007) · Resources, Conservation and Recycling · doi:10.1016/j.resconrec.2006.06.005 · Cited by 321
Attitude and behavioral factors in waste management in the construction industry of Malaysia
Begum, R. A., Siwar, C., Pereira, J. J., & Jaafar, A. H. (2009) · Resources, Conservation and Recycling · doi:10.1016/j.resconrec.2009.01.005 · Cited by 315
Akinade, O. O., Oyedele, L. O., Ajayi, S. O., Bilal, M., Alaka, H. A., Owolabi, H. A., Bello, S. A., Jaiyeoba, B. E., & Kadiri, K. O. (2017) · Waste Management · doi:10.1016/j.wasman.2016.08.017 · Cited by 310
A theory of waste behaviour in the construction industry
Teo, M. M. M., & Loosemore, M. (2001) · Construction Management and Economics · doi:10.1080/01446190110067037 · Cited by 310
Critical success factors for on-site sorting of construction waste: A china study
Wang, J., Yuan, H., Kang, X., & Lu, W. (2010) · Resources, Conservation and Recycling · doi:10.1016/j.resconrec.2010.01.012 · Cited by 291
Building waste assessment score: design-based tool
Ekanayake, L. L., & Ofori, G. (2004) · Building and Environment · doi:10.1016/j.buildenv.2004.01.007 · Cited by 289
Silva, R. V., de Brito, J., & Dhir, R. K. (2017) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2016.12.070 · Cited by 289
Ajayi, S. O., Oyedele, L. O., Bilal, M., Akinade, O. O., Alaka, H. A., Owolabi, H. A., & Kadiri, K. O. (2015) · Resources, Conservation and Recycling · doi:10.1016/j.resconrec.2015.06.001 · Cited by 282
Esa, M. R., Halog, A., & Rigamonti, L. (2017) · Journal of Material Cycles and Waste Management · doi:10.1007/s10163-016-0516-x · Cited by 275
Waste minimisation through deconstruction: A BIM based Deconstructability Assessment Score (BIM-DAS)
Akinade, O. O., Oyedele, L. O., Bilal, M., Ajayi, S. O., Owolabi, H. A., Alaka, H. A., & Bello, S. A. (2015) · Resources, Conservation and Recycling · doi:10.1016/j.resconrec.2015.10.018 · Cited by 272
Huang, T., Shi, F., Tanikawa, H., Fei, J., & Han, J. (2013) · Resources, Conservation and Recycling · doi:10.1016/j.resconrec.2012.12.013 · Cited by 269
Ding, Z., Yi, G., Tam, V. W. Y., & Huang, T. (2016) · Waste Management · doi:10.1016/j.wasman.2016.03.001 · Cited by 268
Self-citationOn the effectiveness in implementing a waste-management-plan method in construction
Tam, V. W. Y. (2008) · Waste Management · doi:10.1016/j.wasman.2007.04.007 · Cited by 263
Self-citationMapping Approach for Examining Waste Management on Construction Sites
Shen, L. Y., Tam, V. W. Y., Tam, C. M., & Drew, D. (2004) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2004)130:4(472 · Cited by 261
Self-citationSolid Wastes: Engineering Principles And Management Issues
Tchobanoglous, G., Theisen, H., & Eliassen, R. (1977) · Medical Entomology and Zoology · Cited by 258
Source Evaluation of Solid Waste in Building Construction
Gavilan, R. M., & Bernold, L. E. (1994) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(1994)120:3(536 · Cited by 257
Ghisellini, P., Ji, X., Liu, G., & Ulgiati, S. (2018) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2018.05.084 · Cited by 244
Life cycle assessment of construction and demolition waste management
Butera, S., Christensen, T. H., & Astrup, T. F. (2015) · Waste Management · doi:10.1016/j.wasman.2015.07.011 · Cited by 240
Exploring critical success factors for waste management in construction projects of China
Lu, W., & Yuan, H. (2010) · Resources, Conservation and Recycling · doi:10.1016/j.resconrec.2010.09.010 · Cited by 239
Yuan, H. (2017) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2017.04.137 · Cited by 225
Sustainable Industrial Design and Waste Management: Cradle-to-Cradle for Sustainable Development
El‐Haggar, S. M. (2007) · Medical Entomology and Zoology · Cited by 224
A study conducted to reduce construction waste generation in Turkey
Esin, T., & Cosgun, N. (2007) · Building and Environment · doi:10.1016/j.buildenv.2006.02.008 · Cited by 222
A CHECKLIST FOR ASSESSING SUSTAINABILITY PERFORMANCE OF CONSTRUCTION PROJECTS
Shen, L., Hao, J. L., Tam, V. W. Y., & Hong, Y. (2007) · Journal of Civil Engineering and Management · doi:10.3846/13923730.2007.9636447 · Cited by 222
Self-citationWon, J., & Cheng, J. C. P. (2017) · Automation in Construction · doi:10.1016/j.autcon.2017.02.002 · Cited by 221
Minimizing waste on construction project sites
FANIRAN, O. O., & CABAN, G. (1998) · Engineering, Construction and Architectural Management · doi:10.1108/eb021073 · Cited by 220
Wang, J., Li, Z., & Tam, V. W. Y. (2014) · Resources, Conservation and Recycling · doi:10.1016/j.resconrec.2013.11.003 · Cited by 218
Self-citationManagement of construction waste in public housing projects in Hong Kong
Poon, C. S., Yu, A. T. W., Wong, S. W., & Cheung, E. (2004) · Construction Management and Economics · doi:10.1080/0144619042000213292 · Cited by 218
Sustainable construction: construction and demolition waste reconsidered
del Río Merino, M., Izquierdo Gracia, P., & Weis Azevedo, I. S. (2010) · Waste Management & Research: The Journal for a Sustainable Circular Economy · doi:10.1177/0734242x09103841 · Cited by 216
Won, J., Cheng, J. C. P., & Lee, G. (2016) · Waste Management · doi:10.1016/j.wasman.2015.12.026 · Cited by 204
Reza, B., Sadiq, R., & Hewage, K. (2011) · Construction and Building Materials · doi:10.1016/j.conbuildmat.2010.11.041 · Cited by 203
Characterization of building-related construction and demolition debris in the United States
Response, E., & Associates, F. (1998) · Medical Entomology and Zoology · Cited by 202
Critical Management Practices Influencing On-Site Waste Minimization in Construction Projects
Ajayi, S. O., Oyedele, L. O., Bilal, M., Akinade, O. O., Alaka, H. A., & Owolabi, H. A. (2017) · Waste Management · doi:10.1016/j.wasman.2016.10.040 · Cited by 200
Improving waste management in construction projects: An Australian study
Udawatta, N., Zuo, J., Chiveralls, K., & Zillante, G. (2015) · Resources, Conservation and Recycling · doi:10.1016/j.resconrec.2015.05.003 · Cited by 199
Lu, W., & Yuan, H. (2013) · Renewable and Sustainable Energy Reviews · doi:10.1016/j.rser.2013.08.048 · Cited by 196
Ajayi, S. O., & Oyedele, L. O. (2017) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2017.01.075 · Cited by 191
Wang, J., Wu, H., Tam, V. W. Y., & Zuo, J. (2019) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2018.09.170 · Cited by 191
Self-citationStrategies for minimizing construction and demolition wastes in Malaysia
Esa, M. R., Halog, A., & Rigamonti, L. (2017) · Resources, Conservation and Recycling · doi:10.1016/j.resconrec.2016.12.014 · Cited by 186
(2008) · Choice Reviews Online · doi:10.5860/choice.46-0995 · Cited by 186
Big data analytics to identify illegal construction waste dumping: A Hong Kong study
Lu, W. (2019) · Resources, Conservation and Recycling · doi:10.1016/j.resconrec.2018.10.039 · Cited by 183
Attitudes and perceptions of construction workforce on construction waste in Sri Lanka
Kulatunga, U., Amaratunga, D., Haigh, R., & Rameezdeen, R. (2006) · Management of Environmental Quality: An International Journal · doi:10.1108/14777830610639440 · Cited by 182
Challenges and Opportunities in Transforming a City into a “Zero Waste City”
Zaman, A. U., & Lehmann, S. (2011) · Challenges · doi:10.3390/challe2040073 · Cited by 181
Big data architecture for construction waste analytics (CWA): A conceptual framework
Bilal, M., Oyedele, L. O., Akinade, O. O., Ajayi, S. O., Alaka, H. A., Owolabi, H. A., Qadir, J., Pasha, M., & Bello, S. A. (2016) · Journal of Building Engineering · doi:10.1016/j.jobe.2016.03.002 · Cited by 181
Park, J., & Tucker, R. (2017) · International Journal of Construction Management · doi:10.1080/15623599.2016.1192248 · Cited by 180
A checklist for assessing sustainability performance of construction projects
Shen, L., Hao, J. L., Tam, V. W. Y., & Yao, H. (2007) · doi:10.1080/13923730.2007.9636447 · Cited by 179
Self-citationMaterial Waste in the UAE Construction Industry: Main Causes and Minimization Practices
Al-Hajj, A., & Hamani, K. (2011) · Architectural Engineering and Design Management · doi:10.1080/17452007.2011.594576 · Cited by 173
Benchmarking construction waste management performance using big data
Lu, W., Chen, X., Peng, Y. M., & Shen, L. (2015) · Resources Conservation and Recycling · doi:10.1016/j.resconrec.2015.10.013 · Cited by 173
A review of performance assessment methods for construction and demolition waste management
Wu, H., Zuo, J., Yuan, H., Zillante, G., & Wang, J. (2019) · Resources, Conservation and Recycling · doi:10.1016/j.resconrec.2019.104407 · Cited by 171
A model for evaluating the social performance of construction waste management
Yuan, H. (2012) · Waste Management · doi:10.1016/j.wasman.2012.01.028 · Cited by 170
Reducing waste to landfill: A need for cultural change in the UK construction industry
Ajayi, S. O., Oyedele, L. O., Akinade, O. O., Bilal, M., Owolabi, H. A., Alaka, H. A., & Kadiri, K. O. (2016) · Journal of Building Engineering · doi:10.1016/j.jobe.2015.12.007 · Cited by 170
Borghi, G., Pantini, S., & Rigamonti, L. (2018) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2018.02.287 · Cited by 166
Duan, H., Wang, J., & Huang, Q. (2015) · Renewable and Sustainable Energy Reviews · doi:10.1016/j.rser.2014.11.069 · Cited by 163
Wu, H., Duan, H., Zheng, L., Wang, J., Niu, Y., & Zhang, G. (2016) · Construction and Building Materials · doi:10.1016/j.conbuildmat.2016.03.130 · Cited by 161
Key indicators for assessing the effectiveness of waste management in construction projects
Yuan, H. (2012) · Ecological Indicators · doi:10.1016/j.ecolind.2012.07.022 · Cited by 159
Sáez, P. V., Merino, M. D. R., González, A. S.-A., & Porras-Amores, C. (2013) · Resources Conservation and Recycling · doi:10.1016/j.resconrec.2013.03.009 · Cited by 154
Life cycle assessment of the end-of-life phase of a residential building
Vitale, P., Arena, N., Di Gregorio, F., & Arena, U. (2017) · Waste Management · doi:10.1016/j.wasman.2016.10.002 · Cited by 153
Identifying factors influencing demolition waste generation in Hong Kong
Chen, X., & Lu, W. (2016) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2016.09.164 · Cited by 152
Towards improved construction waste minimisation: a need for improved supply chain integration?
Dainty, A., & Brooke, R. J. (2004) · International Journal of Building Pathology and Adaptation · doi:10.1108/02630800410533285 · Cited by 149
Yu, A. T. W., Poon, C. S., Wong, A., Yip, R., & Jaillon, L. C. (2012) · Waste Management · doi:10.1016/j.wasman.2012.09.023 · Cited by 147
Xu, J., Shi, Y., Xie, Y., & Zhao, S. (2019) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2019.04.158 · Cited by 147
Lingard, H. C., Graham, P., & Smithers, G. (2000) · Construction Management and Economics · doi:10.1080/01446190050024806 · Cited by 144
Construction in Developing Countries
Ofori, G. (2007) · Construction Management and Economics · doi:10.1080/01446190601114134 · Cited by 144
Li, H., Chen, Z., Liang, Y. Q., & Kong, S. C. W. (2004) · Automation in Construction · doi:10.1016/j.autcon.2004.08.007 · Cited by 142
Construction and Demolition Waste Recycling Plants Revisited: Management Issues
Ulubeyli, S., Kazaz, A., & Arslan, V. (2017) · Procedia Engineering · doi:10.1016/j.proeng.2017.02.139 · Cited by 140
Lu, W., Chen, X., Ho, D. C. W., & Wang, H. (2015) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2015.06.106 · Cited by 139
Gamil, Y., & Rahman, I. B. A. (2017) · Emerging Science Journal · doi:10.28991/ijse-01121 · Cited by 139
Gangolells, M., Casals, M., Forcada, N., & Macarulla, M. (2014) · Resources Conservation and Recycling · doi:10.1016/j.resconrec.2014.10.006 · Cited by 136
Bibliometric analysis of research trends on solid waste reuse and recycling during 1992–2016
Li, N., Han, R., & Lü, X. (2017) · Resources Conservation and Recycling · doi:10.1016/j.resconrec.2017.11.008 · Cited by 136
Kabirifar, K., & Mojtahedi, M. (2019) · Buildings · doi:10.3390/buildings9010015 · Cited by 136
Self-citationCalvo, N., Varela-Candamio, L., & Novo‐Corti, I. (2014) · Sustainability · doi:10.3390/su6010416 · Cited by 135
Life cycle assessment of construction and demolition waste management systems: a Spanish case study
Mercante, I. T., Bovea, M. D., Ibáñez‐Forés, V., & Arena, A. P. (2011) · The International Journal of Life Cycle Assessment · doi:10.1007/s11367-011-0350-2 · Cited by 135
Lachimpadi, S. K., Pereira, J. J., Taha, M. R., & MOKHTAR, M. B. (2012) · Resources Conservation and Recycling · doi:10.1016/j.resconrec.2012.08.011 · Cited by 135
Implementation of waste management and minimisation in the construction industry of Malaysia
Begum, R. A., Siwar, C., Pereira, J. J., & Jaafar, A. H. (2006) · Resources Conservation and Recycling · doi:10.1016/j.resconrec.2006.09.004 · Cited by 131
A web-based Decision Support System for the optimal management of construction and demolition waste
Banias, G., Achillas, C., Vlachokostas, C., MOUSSIOPOULOS, N., & Papaioannou, I. (2011) · Waste Management · doi:10.1016/j.wasman.2011.07.018 · Cited by 130
Manowong, E. (2010) · Waste Management & Research The Journal for a Sustainable Circular Economy · doi:10.1177/0734242x10387012 · Cited by 125
Blaisi, N. I. (2019) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2019.02.264 · Cited by 124
Marrero, M., Manuel, P., Rivero-Camacho, C., Guerrero, A. F., & Solís-Guzmán, J. (2016) · Resources Conservation and Recycling · doi:10.1016/j.resconrec.2016.10.020 · Cited by 121
Tam, V. W. Y., & Lu, W. (2016) · Sustainability · doi:10.3390/su8020190 · Cited by 120
Self-citationPoon, C. S. (2007) · Waste Management · doi:10.1016/j.wasman.2007.08.013 · Cited by 118
Poon, C. S., Yu, A. T. W., Wong, A., & Yip, R. (2013) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000631 · Cited by 117
Construction and demolition waste research: A bibliometric analysis
Wu, H., Zuo, J., Zillante, G., Wang, J., & Yuan, H. (2019) · Architectural Science Review · doi:10.1080/00038628.2018.1564646 · Cited by 115
Managerial Areas of Construction and Demolition Waste: A Scientometric Review
Chen, J., Su, Y., Si, H., & Chen, J. (2018) · International Journal of Environmental Research and Public Health · doi:10.3390/ijerph15112350 · Cited by 111
Lu, H. R., Hanandeh, A. E., & Gilbert, B. P. (2017) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2017.08.065 · Cited by 110
An investigation of construction wastes: an empirical study in Shenzhen
Wang, J., Kang, X.-P., & Tam, V. W. Y. (2008) · Journal of Engineering Design and Technology · doi:10.1108/17260530810918252 · Cited by 99
Self-citationUdawatta, N., Zuo, J., Chiveralls, K., & Zillante, G. (2015) · International Journal of Construction Management · doi:10.1080/15623599.2015.1033815 · Cited by 96
Managing construction waste on‐site through system dynamics modelling: the case of Hong Kong
Hao, J. L., Hill, M. J., & Shen, L. (2008) · Engineering Construction & Architectural Management · doi:10.1108/09699980810852646 · Cited by 93
Stakeholders’ willingness to pay for enhanced construction waste management: A Hong Kong study
Lu, W., Peng, Y. M., Webster, C. J., & Zuo, J. (2015) · Renewable and Sustainable Energy Reviews · doi:10.1016/j.rser.2015.03.008 · Cited by 89
The promise and the performance of the world's first two zero carbon eco-cities
Premalatha, M., Tauseef, S. M., Abbasi, T., & Abbasi, S. A. (2013) · Renewable and Sustainable Energy Reviews · doi:10.1016/j.rser.2013.05.011 · Cited by 88
Küçükvar, M., Eğilmez, G., & Tatari, O. (2016) · Sustainability · doi:10.3390/su8010089 · Cited by 86
An economic analysis of the processing technologies in CDW recycling platforms
Neto, R. O., Gastineau, P., Cazacliu, B. G., Guen, L. L., Paranhos, R. S., & Petter, C. O. (2016) · Waste Management · doi:10.1016/j.wasman.2016.08.011 · Cited by 83
Yuan, H. (2013) · Project Management Journal · doi:10.1002/pmj.21349 · Cited by 80
Trust and productivity in Australian construction projects: a subcontractor perspective
Chalker, M., & Loosemore, M. (2016) · Engineering Construction & Architectural Management · doi:10.1108/ecam-06-2015-0090 · Cited by 79
Reducing waste to landfill in the UK: identifying impediments and critical solutions
Oyedele, L. O., Regan, M., von Meding, J. K., Ahmed, A. A., Ebohon, O. J., & Elnokaly, A. (2013) · World Journal of Science Technology and Sustainable Development · doi:10.1108/20425941311323136 · Cited by 78
Yuan, H., Wu, H., & Zuo, J. (2018) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000642 · Cited by 75
State of green construction in India: drivers and challenges
Arif, M., Egbu, C., Haleem, A., Kulonda, D. J., & Khalfan, M. M. A. (2009) · Journal of Engineering Design and Technology · doi:10.1108/17260530910975005 · Cited by 73
Distribution of materials in construction and demolition waste in Portugal
Coelho, A., & de Brito, J. (2010) · Waste Management & Research The Journal for a Sustainable Circular Economy · doi:10.1177/0734242x10370240 · Cited by 73
Development and validation of a building design waste reduction model
Llatas, C., & Osmani, M. (2016) · Waste Management · doi:10.1016/j.wasman.2016.05.026 · Cited by 73
Application of low waste technologies for design and construction: A case study in Hong Kong
Zhang, X., Wu, Y., & Shen, L. (2012) · Renewable and Sustainable Energy Reviews · doi:10.1016/j.rser.2012.02.020 · Cited by 71
Adoption of Big Data analytics in construction: development of a conceptual model
Ram, J., Afridi, N. K., & Khan, K. A. (2019) · Built Environment Project and Asset Management · doi:10.1108/bepam-05-2018-0077 · Cited by 70
Sung, H., Kim, J., & Han, J.-Y. (2009) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2009)135:7(647 · Cited by 69
Identifying Causes of Construction Waste - Case of Central Region of Peninsula Malaysia
Nagapan, S., Rahman, I. B. A., Asmi, A., Memon, A. H., & Zin, R. M. (2012) · International Journal of Integrated Engineering · Cited by 69
Wu, H., Duan, H., Wang, J., Wang, T., & Wang, X. (2015) · Journal of Material Cycles and Waste Management · doi:10.1007/s10163-015-0404-9 · Cited by 65
An integrated model for factors affecting construction and demolition waste management in Iran
Nikmehr, B., Hosseini, M. R., Rameezdeen, R., Chileshe, N., Ghoddousi, P., & Arashpour, M. (2017) · Engineering Construction & Architectural Management · doi:10.1108/ecam-01-2016-0015 · Cited by 65
Eco‐costing of construction waste
Yahya, K., & Boussabaine, A. (2006) · Management of Environmental Quality An International Journal · doi:10.1108/14777830610639404 · Cited by 64
Construction Research Congress 2014: Construction in a Global Network
Castro‐Lacouture, D., Irizarry, J., & Ashuri, B. (2014) · Cited by 63
The Effectiveness of the UK Landfill Tax
Martin, A., & SCOTT, I. (2003) · Journal of Environmental Planning and Management · doi:10.1080/0964056032000138436 · Cited by 63
Lu, W., Chen, X., Peng, Y. M., & Liu, X. (2018) · Waste Management · doi:10.1016/j.wasman.2018.07.030 · Cited by 62
MAJOR FACTORS IMPEDING THE IMPLEMENTATION OF WASTE MANAGEMENT IN AUSTRALIAN CONSTRUCTION PROJECTS
Udawatta, N., Zuo, J., Chiveralls, K., Yuan, H., Zillante, G., & Elmualim, A. A. (2018) · Journal of Green Building · doi:10.3992/1943-4618.13.3.101 · Cited by 62
Krystofik, M., Wagner, J., & Gaustad, G. G. (2015) · Resources Conservation and Recycling · doi:10.1016/j.resconrec.2015.02.005 · Cited by 61
Managing emergency construction and demolition waste in Syria using GIS
Madi, N. J., & Srour, I. (2018) · Resources Conservation and Recycling · doi:10.1016/j.resconrec.2018.10.018 · Cited by 61
Building Deconstruction and Material Recovery in Iran: An Analysis of Major Determinants
Saghafi, M. D., & Teshnizi, Z. (2011) · Procedia Engineering · doi:10.1016/j.proeng.2011.11.2087 · Cited by 60
Yazdanbakhsh, A. (2018) · Waste Management · doi:10.1016/j.wasman.2018.04.024 · Cited by 53
Capacity building for post disaster construction and demolition waste management
Karunasena, G., & Amaratunga, D. (2016) · Disaster Prevention and Management An International Journal · doi:10.1108/dpm-09-2014-0172 · Cited by 50
Rate of Reusable and Recyclable Waste in Construction
Tam, V. W. Y. (2011) · The Open Waste Management Journal · doi:10.2174/1876400201104010028 · Cited by 48
Self-citationCritical factors for waste management in office building retrofit projects in Australia
Li, M., & Yang, J. (2014) · Resources Conservation and Recycling · doi:10.1016/j.resconrec.2014.10.007 · Cited by 47
Pilot-based assessment of the economics of recycling construction demolition waste
Srour, I., Chehab, G. R., El‐Fadel, M., & Tamraz, S. (2013) · Waste Management & Research The Journal for a Sustainable Circular Economy · doi:10.1177/0734242x13479430 · Cited by 42
Waste Management Models and Their Applications on Construction Sites
Dajadian, S. A., Koch, D. C., & Bechtel Corp (2014) · International Journal of Construction Engineering and Management · Cited by 40
Waste Management Issues in the Northern Region of Malaysia
Hassan, S. H., Ahzahar, N. B., Fauzi, M. A., & Eman, J. (2012) · Procedia - Social and Behavioral Sciences · doi:10.1016/j.sbspro.2012.04.179 · Cited by 38
Sustainable Construction Waste Management in Australia: A Motivation Perspective
Li, R. Y. M., & Du, H. (2014) · Risk engineering · doi:10.1007/978-3-319-12430-8_1 · Cited by 36
Seror, N., Hareli, S., & Portnov, B. A. (2014) · Waste Management · doi:10.1016/j.wasman.2014.03.026 · Cited by 34
Davison, S., Thompson, K., Sharp, A. R., & Dawson, D. (2013) · Routledge eBooks · doi:10.4324/9780203146057 · Cited by 33
Strategies and measures for implementing eco-labelling schemes in Singapore's construction industry
Low, S. P., Gao, S., & See, Y. L. (2014) · Resources Conservation and Recycling · doi:10.1016/j.resconrec.2014.06.002 · Cited by 32
Resistance and Motivation to Share Sustainable Development Knowledge by Web 2.0
Li, R. Y. M., & Pak, D. H. A. (2010) · Journal of Information & Knowledge Management · doi:10.1142/s0219649210002656 · Cited by 32
Jain, M. (2012) · Cited by 26
Guidelines to Improve Construction and Demolition Waste Management in Portugal
Couto, A. B., & Pedro, J. (2010) · InTech eBooks · doi:10.5772/8456 · Cited by 22
The Efficacy of Waste Management Plans in Australian Commercial Construction Refurbishment Projects
Hardie, M., Khan, S. A., O'Donnell, A., & Miller, G. (2012) · Construction Economics and Building · doi:10.5130/ajceb.v7i2.2988 · Cited by 18
Liu, J., & Wang, Y. (2011) · Systems Engineering Procedia · doi:10.1016/j.sepro.2011.08.025 · Cited by 12
Marinelli, M., Dolan, M., Spillane, J. P., & Konanahalli, A. (2014) · Arrow@dit (Dublin Institute of Technology) · doi:10.34961/2796 · Cited by 12
Oyenuga, A. A. (2016) · Research Open (London South Bank University) · doi:10.18744/pub.001810 · Cited by 11
Levis, J. W. (2008) · NCSU Libraries Repository (North Carolina State University Libraries) · doi:10.13140/rg.2.2.12714.88005 · Cited by 7
Reconsidering sustainable building and design: lessons from China, Germany and Australia
Chiveralls, K., Palmer, J., Zillante, G., Zuo, J., Wilson, L., & Pullen, S. (2012) · Adelaide Research & Scholarship (AR&S) (University of Adelaide) · Cited by 5
Sustainable Construction And Demolition Waste Management In Malaysia: Current Issues
Ghafourian, K., Mohamed, Z., Ismail, S. B., Abolghasemi, M., & Bavafa, A. A. (2017) · Cited by 4
Cited by
A Comprehensive Review on Recycled Aggregate and Recycled Aggregate Concrete
Wang, B., Yan, L., Fu, Q., & Kasal, B. (2021) · Resources, Conservation and Recycling · doi:10.1016/j.resconrec.2021.105565 · Cited by 999
Zhang, C., Hu, M., Di Maio, F., Sprecher, B., Yang, X., & Tukker, A. (2022) · Science of The Total Environment · doi:10.1016/j.scitotenv.2021.149892 · Cited by 514
Wang, M., Wang, C. C., Sepasgozar, S., & Zlatanova, S. (2020) · Buildings · doi:10.3390/buildings10110204 · Cited by 357
Self-citationShahmansouri, A. A., Yazdani, M., Ghanbari, S., Akbarzadeh Bengar, H., Jafari, A., & Farrokh Ghatte, H. (2021) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2020.123697 · Cited by 353
Yazdani, M., Kabirifar, K., Frimpong, B. E., Shariati, M., Mirmozaffari, M., & Boskabadi, A. (2021) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2020.124138 · Cited by 300
Self-citation
Metadata
- Authors
- Kabirifar, K., Mojtahedi, M., Wang, C., & Tam, V. W. Y.
- Venue
- Journal of Cleaner Production
- Publisher
- Elsevier BV
- Published
- 2020-08
- Volume
- 263
- Pages
- 121265
- ISSN
- 0959-6526 (ISSN-L)
- OpenAlex
- W3015397302
- Cited by
- 695
- References
- 166
- FWCI
- 35.53
- Type
- journal article
- Language
- en
- Open access
- green
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.