The construction industry as a loosely coupled system: implications for productivity and innovation
The DOI matches its Crossref record; 37 of the 37 references it cites were found in a registry or an index.
Abstract
Previous research suggests that the construction industry is characterized by (1) particular complexity factors owing to industry specific uncertainties and interdependences, and (2) inefficiency of operations. The aim of this study was to analyse the operations and behaviour of firms as a means of dealing with complexity. The observations made indicate that the industry as a whole is featured as a loosely coupled system. Taking this as a starting point, the couplings among activities, resources and actors were analysed in different dimensions. The pattern of couplings builds on two interdependent layers: tight couplings in individual projects and loose couplings based on collective adaptations in the permanent network. It is concluded that the pattern of couplings seems to favour short term productivity while hampering innovation and learning.
Overview
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
Claims other papers make about this one
Each is checked against this paper’s own text: does it say what the citing paper says it does?
In the citing paper
“but also on the fact that the construction industry is characterized by slow adaptation to new technologies (Dubois and Gadde 2002 )”
From A review of LLMs and their applications in the architecture, engineering and construction industry (2025) · cites this paper as Dubois and Gadde 2002
Citations
Cites
Educational Organizations as Loosely Coupled Systems
Weick, K. E. (1976) · Administrative Science Quarterly · doi:10.2307/2391875 · Cited by 5,142
Organizations and Environments
Hougland, J. G., Shepard, J. M., & Aldrich, H. E. (1980) · The Academy of Management Review · doi:10.2307/257814 · Cited by 2,862
Capturing Value from Knowledge Assets: The New Economy, Markets for Know-How, and Intangible Assets
Teece, D. J. (1998) · California Management Review · doi:10.2307/41165943 · Cited by 2,617 · cited 1×
“According to Teece (1998) the opportunities for learning are closely related to previous activities and experiences: if many aspects of a rm’s learning environment change simultaneously the ability to form cognitive structures favouring learning becomes severely restricted.”
BackgroundLoosely Coupled Systems: A Reconceptualization
Orton, J. D., & Weick, K. E. (1990) · The Academy of Management Review · doi:10.2307/258154 · Cited by 2,431 · cited 5×
“Researchers should not simplify the concept but invoke it: ‘what elements are loosely coupled, what domains are they coupled on, and what are the characteristics of the couplings and decouplings?’ (Orton and Weick, 1990).”
BackgroundInfluentialIf Only We Knew What We Know: Identification and Transfer of Internal Best Practices
O'Dell, C., & Grayson, C. J. (1998) · California Management Review · doi:10.2307/41165948 · Cited by 1,543
von Krogh, G. (1998) · California Management Review · doi:10.2307/41165947 · Cited by 1,453
Managing Business Relationships
(2017) · Project Management · doi:10.1201/9780203710739-11 · Cited by 1,307
Powell, W. W. (1998) · California Management Review · doi:10.2307/41165952 · Cited by 1,096 · cited 3×
“These conditions differ from the situation in many other industries (Powell, 1998).”
BackgroundInfluentialBrown, J. S., & Duguid, P. (1998) · California Management Review · doi:10.2307/41165945 · Cited by 911
The four roles of supply chain management in construction
Vrijhoef, R., & Koskela, L. (2000) · European Journal of Purchasing & Supply Management · doi:10.1016/s0969-7012(00)00013-7 · Cited by 862 · cited 6×
“They are loose in terms of the coupling between the production of building materials and what is done on site; see e.g. Vrijhoef and Koskela (2000) and Akintoye et al. (2000).”
BackgroundInfluential
Research works printed but not linked: 6
- Björkegren, C. Learning for the next project. Proceedings of the 3rd Conference on Organisational Learning. Edited by: Easterby-Smith, M., Araujo, I. and Burgoyne, J. pp.107–123. Lancaster University.
- Crichtori C., 1966, Interdependence and Uncertainly: A Study of the Building Industry
- Gadde L. E., 2001, Supply Newwork Strategies
- Meyer J., 1975, Notes on a structure of educational organizations; quoted in Weick (1976)
- Powell W., 1991, Markets, Hierarchies & Networks, 265
- Winch G., 1987, Managing Construction Worldwide, Vol. 2, Productivity and Human factors
Cited by
Items 101–200 of 1,000
Structuring the context for construction robot development through integrated scenario approach
Pan, M., Linner, T., Pan, W., Cheng, H., & Bock, T. A. (2020) · Automation in Construction · doi:10.1016/j.autcon.2020.103174 · Cited by 89
Industrial renewal within the construction network
Håkansson, H., & Havenvid, M. I. (2012) · Construction Management and Economics · doi:10.1080/01446193.2012.737470 · Cited by 84
Does the Current Constraints in Funding Promote Failure in Humanitarian Supply Chains?
Jahre, M., & Heigh, I. (2008) · Supply Chain Forum an International Journal · doi:10.1080/16258312.2008.11517198 · Cited by 82
“Apart from Dubois & Gadde (2002), who discuss coordination and linkages within and between temporary solutions and more permanent networks in the construction sector, we have not identified prior literature that covers this particular aspect directly.”
BackgroundConstruction logistics governing guidelines in urban development projects
Janné, M., & Fredriksson, A. (2019) · Construction Innovation · doi:10.1108/ci-03-2018-0024 · Cited by 88
Managing construction project change: a knowledge management perspective
Senaratne, S., & Sexton, M. G. (2008) · Construction Management and Economics · doi:10.1080/01446190802621044 · Cited by 103
“Therefore, learning is centred on individuals within construction projects (Dubois and Gadde, 2002). Thus, in order to reflect process-based views that exist in construction, this research modifies Nonaka and Takeuchi’s (1995) knowledge conversion model while capturing Snowden’s (2002) ideas on natural flow of knowled…”
BackgroundMethodApplying HRO and resilience engineering to construction: Barriers and opportunities
Harvey, E. J., Waterson, P. E., & Dainty, A. (2016) · Safety Science · doi:10.1016/j.ssci.2016.08.019 · Cited by 87
Understanding the Determinants of Construction Robot Adoption: Perspective of Building Contractors
Pan, M., & Pan, W. (2020) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0001821 · Cited by 80
Revisiting the Three Peculiarities of Production in Construction
Vrijhoef, R., & Koskela, L. (2005) · University of Huddersfield Repository (University of Huddersfield) · Cited by 129
Matching supply networks to a modular product architecture in the house-building industry
Hofman, E., Voordijk, H., & Halman, J. I. M. (2009) · Building Research & Information · doi:10.1080/09613210802628003 · Cited by 90
“For certain products and services in construction, arm’s-length transactions could be replaced by relationships based on partnering and integrated working; approaches that stimulate adaptation and joint development between buyers and suppliers (Dubois and Gadde, 2002; Storer et al., 2003).”
BackgroundDecision model for planning material supply channels in construction
Jaśkowski, P., Sobotka, A., & Czarnigowska, A. (2018) · Automation in Construction · doi:10.1016/j.autcon.2018.02.026 · Cited by 78
Thunberg, M., Rudberg, M., & Gustavsson, T. K. (2017) · Construction Innovation · doi:10.1108/ci-10-2015-0059 · Cited by 77
Thunberg, M., & Fredriksson, A. (2018) · Construction Management and Economics · doi:10.1080/01446193.2017.1394579 · Cited by 87
Toppinen, A., Sauru, M., Pätäri, S., Lähtinen, K., & Tuppura, A. (2018) · Construction Management and Economics · doi:10.1080/01446193.2018.1513162 · Cited by 85
“The purpose of the “formal standardization initiated by the industry” and the applicability of the construction components independently from suppliers enhances, for example, efficiency and cost-competitiveness (e.g. Dubois and Gadde 2002).”
BackgroundIndustry 4.0 in a project context: Introducing 3D printing in construction projects
Olsson, N. O. E., Arica, E., Woods, R., & Madrid, J. A. (2021) · Project Leadership and Society · doi:10.1016/j.plas.2021.100033 · Cited by 89
An SCO-Enabled Logistics and Supply Chain–Management System in Construction
Niu, Y., Lu, W., Liu, D., Chen, K., Anumba, C., & Huang, G. G. (2016) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0001232 · Cited by 81
The bureaucratization of the project manager function: The case of the construction industry
Styhre, A. (2006) · International Journal of Project Management · doi:10.1016/j.ijproman.2006.01.002 · Cited by 87
Formal and informal relations within BIM-enabled supply chain partnerships
Papadonikolaki, E., Verbraeck, A., & Wamelink, H. (2017) · Construction Management and Economics · doi:10.1080/01446193.2017.1311020 · Cited by 88
“Dulaimi et al. (2002) emphasized the need for various actors – from designers to suppliers – to adopt compatible information systems (IS) to exchange information and integrate the design and construction processes.”
BackgroundThe role of supplier information availability for construction supply chain performance
Bäckstrand, J., & Fredriksson, A. (2020) · Production Planning & Control · doi:10.1080/09537287.2020.1837933 · Cited by 81
“…relates to the absence of coordination with suppliers and subcontractors in the planning process (Al-Hussein et al. 2008; Ballard 2000; Dainty, Millett, and Briscoe 2001), lack of communication among supply chain members (Meng 2012; Dubois and Gadde 2002), and lack of trust (Doloi 2009).”
BackgroundMurphy, M., Perera, S., & Heaney, G. (2015) · Construction Management and Economics · doi:10.1080/01446193.2015.1031684 · Cited by 79
“They are also the project participants whose competency can adversely impact on the implementation process (Anderson and Manseau, 1999; Moore and Dainty, 2001; Dubois and Gadde, 2002; Miozzo and Dewick, 2002; Blayse and Manley, 2004).”
BackgroundKeeping it real? Constituting partnering through boundary objects
Bresnen, M. (2010) · Construction Management and Economics · doi:10.1080/01446191003587711 · Cited by 94
“Of particular importance in the construction context is the seemingly perennial problem of attempting to achieve effective integration between organizationally separated commissioning, design and construction processes (Dubois and Gadde, 2002 ; Briscoe and Dainty, 2005 ).”
BackgroundIntelligent Systems Research in the Construction Industry
Irani, Z., & Kamal, M. M. (2013) · Expert Systems with Applications · doi:10.1016/j.eswa.2013.06.061 · Cited by 82
Applicability and benefits of the ecosystem concept in the construction industry
Pulkka, L., Ristimäki, M., Rajakallio, K., & Junnila, S. (2016) · Construction Management and Economics · doi:10.1080/01446193.2016.1179773 · Cited by 93
“Disintegration or fragmentation due to barriers between actors, lack of cooperation, separation of design and production and isolated craft unions are detrimental to productivity and innovativeness in construction (Nam and Tatum, 1992; Dubois and Gadde, 2000, 2002).”
BackgroundInfluentialHow does open innovation enhance productivity? An exploration in the construction ecosystem
Greco, M., Grimaldi, M., Locatelli, G., & Serafini, M. (2021) · Technological Forecasting and Social Change · doi:10.1016/j.techfore.2021.120740 · Cited by 80
Alliances in construction: Investigating initiatives and barriers for long‐term collaboration
Ingirige, B., & Sexton, M. G. (2006) · Engineering Construction & Architectural Management · doi:10.1108/09699980610690774 · Cited by 94
“The project-based arrangement therefore has pushed construction industry away from long-term learning and has forced it to focus on short-term productivity (Dubois and Gadde, 2002; Miozzo and Ivory, 2000).”
BackgroundAnalyzing the dynamics of the global construction industry: past, present and future
Ibrahim, A. R. B., Roy, M. H., Ahmed, Z. U., & Imtiaz, G. (2010) · Benchmarking An International Journal · doi:10.1108/14635771011036320 · Cited by 103
Breathing walls: The design of porous materials for heat exchange and decentralized ventilation
Craig, S., & Grinham, J. (2017) · Energy and Buildings · doi:10.1016/j.enbuild.2017.05.036 · Cited by 76
“Modern buildings are made up of many different materials and technologies, and it is rare for one member of the design team to have a complete picture of the functional interdependencies between all parts [24].”
BackgroundA review of LLMs and their applications in the architecture, engineering and construction industry
Kampelopoulos, D., Tsanousa, A., Vrochidis, S., & Kompatsiaris, I. (2025) · Artificial Intelligence Review · doi:10.1007/s10462-025-11241-7 · Cited by 69
“This can be attributed to the relatively recent development and growth of LLMs leaving not much time for research - ers to fully adopt them in all fields, but also on the fact that the construction industry is characterized by slow adaptation to new technologies (Dubois and Gadde 2002 ) (Table 1 ).”
Adoption of innovative products on Australian road infrastructure projects
Rose, T. M., & Manley, K. (2012) · Construction Management and Economics · doi:10.1080/01446193.2012.665173 · Cited by 89
“These unfavourable conditions include a disjointed and fragmented production system, which is based on temporary projects, resulting in knowledge development and transfer discontinuities within and between organizations (Dubois and Gadde, 2002).”
Backgroundde Vries, H. J., & Verhagen, W. P. (2016) · Technovation · doi:10.1016/j.technovation.2016.01.008 · Cited by 69
The overworked site manager: gendered ideologies in the construction industry
Styhre, A. (2011) · Construction Management and Economics · doi:10.1080/01446193.2011.588955 · Cited by 90
“Representatives of the industry and researchers tend to portray the industry as conservative and unwilling to adapt to new conditions (Kadefors, 1995; Dubois and Gadde, 2002).”
BackgroundThe systemic nature of the construction industry
Fernández-Solís, J. L. (2008) · Architectural Engineering and Design Management · doi:10.3763/aedm.2008.s807 · Cited by 114
Implementing innovation: a stakeholder competency-based approach for BIM
Murphy, M. (2014) · Construction Innovation · doi:10.1108/ci-01-2014-0011 · Cited by 84
Liu, H., Skibniewski, M. J., & Mengjun, W. A. N. G. (2015) · Journal of Civil Engineering and Management · doi:10.3846/13923730.2014.975739 · Cited by 67
Jacobsson, M., Linderoth, H. C. J., & Rowlinson, S. (2017) · Construction Management and Economics · doi:10.1080/01446193.2017.1315148 · Cited by 78
“Characteristics of the AEC industry are for example that relations among actors are characterised by short-term market based interactions (Gann, 1996; Dubois and Gadde, 2002);”
BackgroundInfluentialNeurobehavioral assessment of force feedback simulation in industrial robotic teleoperation
Zhu, Q., Du, J., Shi, Y., & Wei, P. (2021) · Automation in Construction · doi:10.1016/j.autcon.2021.103674 · Cited by 69
Construction supply chain management : concepts and case studies
Pryke, S. D. (2009) · Wiley-Blackwell eBooks · Cited by 135
Transactional hazards, institutional change, and capabilities: Integrating the theories of the firm
Brahm, F., & Tarziján, J. (2013) · Strategic Management Journal · doi:10.1002/smj.2094 · Cited by 72
Addressing effective construction logistics through the lens of vehicle movements
Ying, F., Tookey, J., & Roberti, J. (2014) · Engineering Construction & Architectural Management · doi:10.1108/ecam-06-2013-0058 · Cited by 64
Chen, K., & Lu, W. (2018) · Sustainability · doi:10.3390/su10072211 · Cited by 64
Partnering the Construction of a Swedish Pharmaceutical Plant: Case Study
Eriksson, P. E., & Nilsson, T. (2008) · Journal of Management in Engineering · doi:10.1061/(asce)0742-597x(2008)24:4(227 · Cited by 64
Gluch, P. (2009) · Construction Management and Economics · doi:10.1080/01446190903179728 · Cited by 88
“…the temporary and the permanent can, however, be problematic; for example in the areas of knowledge management (Styhre et al. , 2004), organizational change processes (Bresnen et al ., 2005), management practices (Labuschagne and Brent, 2005) and adoption of innovations (Dubois and Gadde, 2002).”
BackgroundInfluentialLoux, P., Aubry, M., Tran, S., & Baudoin, E. (2019) · Industrial Marketing Management · doi:10.1016/j.indmarman.2019.07.001 · Cited by 72
Systematic impact of institutional pressures on safety climate in the construction industry
He, Q., Dong, S. S., Rose, T. M., Li, H., Yin, Q., & Cao, D. (2015) · Accident Analysis & Prevention · doi:10.1016/j.aap.2015.11.034 · Cited by 72
Transforming the construction sector: an institutional complexity perspective
Oti‐Sarpong, K., Parn, E. A., Burgess, G., & Zaki, M. (2021) · Construction Innovation · doi:10.1108/ci-04-2021-0071 · Cited by 87
The non-adoption of supply chain management
Fernie, S., & Tennant, S. (2013) · Construction Management and Economics · doi:10.1080/01446193.2013.830186 · Cited by 77
“Lost among these arguments is a counterargument that industry structure is shaped by market demands for, and benefits from, flexibility (Üsdiken et al., 1988; Dubois and Gadde, 2002).”
BackgroundKnowledge Governance Strategies in Project-based Organizations
Pemsel, S., Müller, R., & Söderlund, J. (2016) · Long Range Planning · doi:10.1016/j.lrp.2016.01.001 · Cited by 70
Wu, H., Zhang, P., Li, H., Zhong, B., Fung, I. W. H., & Lee, Y. Y. R. (2022) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0002380 · Cited by 67
Technology transfer in the construction industry
Uusitalo, P., & Lavikka, R. H. (2020) · The Journal of Technology Transfer · doi:10.1007/s10961-020-09820-7 · Cited by 59
Organisation, ‘anchoring’ of knowledge, and innovative activity in construction
Drejer, I., & Vinding, A. L. (2006) · Construction Management and Economics · doi:10.1080/01446190600799166 · Cited by 59
“Dubois and Gadde ( 2002 ) specifically relate the loose couplings in the construction industry outside individual projects—as opposed to the tight couplings within projects—to a focus on short‐term productivity in individual projects.”
BackgroundInfluentialCritical Criteria on Client and Customer Satisfaction for the Issue of Performance Measurement
Rashvand, P., & Majid, M. Z. A. (2013) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000183 · Cited by 65
The importance of hard project management and team motivation for construction project performance
Larsson, J., Eriksson, P. E., & Pesämaa, O. (2018) · International Journal of Managing Projects in Business · doi:10.1108/ijmpb-04-2017-0035 · Cited by 73
Interactional perspective on environmental communication in construction projects
Gluch, P., & Räisänen, C. (2009) · Building Research & Information · doi:10.1080/09613210802632849 · Cited by 73
“These findings show how actors and mediating tools contribute to the tendency discussed by Dubois and Gadde (2002) of projects becoming decoupled from the permanent organization.”
BackgroundFeldmann, F. G. (2022) · Sustainability · doi:10.3390/su141912944 · Cited by 68
“In addition, it enables an OEM-like industry structure known from the manufacturing industry [42], as opposed to the fragmented supply chain design in conventional construction [40].”
BackgroundAntecedents of project partnering in the construction industry — The impact of relationship history
Crespin‐Mazet, F., Havenvid, M. I., & Linné, Å. (2015) · Industrial Marketing Management · doi:10.1016/j.indmarman.2015.07.018 · Cited by 79
Vihemäki, H., Ludvig, A., Toivonen, R., Toppinen, A., & Weiss, G. (2019) · Wood Material Science and Engineering · doi:10.1080/17480272.2019.1641741 · Cited by 61
Hetemi, E., Ordieres-Meré, J. B., & Nuur, C. (2020) · Sustainability · doi:10.3390/su12093893 · Cited by 64
ADOPTION PROCESSES FOR EDM, EDI AND BIM TECHNOLOGIES IN THE CONSTRUCTION INDUSTRY
Samuelson, O., & Björk, B. (2014) · Journal of Civil Engineering and Management · doi:10.3846/13923730.2013.801888 · Cited by 55
Development of a purchasing portfolio model for the construction industry: an empirical study
Ferreira, L. M. D. F., Arantes, A., & Kharlamov, A. A. (2014) · Production Planning & Control · doi:10.1080/09537287.2014.906679 · Cited by 65
“Taking into consideration the characteristics of procurement in the construction industry, it is recommended that companies should avoid a ‘one-size-fits-all’ strategy for procurement (Dyer, Cho, and Chu 1998; Dubois and Gadde 2002).”
BackgroundResultInfluentialBrahm, F., & Tarziján, J. (2016) · Journal of Supply Chain Management · doi:10.1111/jscm.12110 · Cited by 59
Assessing construction innovation: theoretical and practical perspectives
Davis, P. R., Gajendran, T., Vaughan, J., & Owi, T. (2016) · Construction Economics and Building · doi:10.5130/ajceb.v16i3.5178 · Cited by 59
“…structure of a project may affect interorganizational relationships negatively, whilst a converse positive effect was suggested to Davis, Gajendran, Vaughan and Owi 106 encompass creativity and problem-solving techniques within (different) projects (Dubois and Gadde, 2002; Miozzo and Dewick, 2004).”
BackgroundManagement von Netzwerkorganisationen – Zum Stand der Forschung
Sydow, J. (2010) · Gabler Verlag eBooks · doi:10.1007/978-3-8349-8593-4_12 · Cited by 93
Ontology-based manufacturability analysis automation for industrialized construction
Cao, J., Vakaj, E., Soman, R. K., & Hall, D. (2022) · Automation in Construction · doi:10.1016/j.autcon.2022.104277 · Cited by 53
Client perceived barriers to change of the construction process
Vennström, A., & Eriksson, P. E. (2010) · Construction Innovation · doi:10.1108/14714171011037156 · Cited by 53
Renewal in construction projects: tracing effects of client requirements
Havenvid, M. I., Hulthén, K., Linné, Å., & Sundquist, V. (2016) · Construction Management and Economics · doi:10.1080/01446193.2016.1208364 · Cited by 53
A transition to green buildings in Norway
Nykamp, H. A. (2016) · Environmental Innovation and Societal Transitions · doi:10.1016/j.eist.2016.10.006 · Cited by 60
Supply chain integration for low-carbon buildings: A critical interdisciplinary review
Kesidou, S., & Sovacool, B. K. (2019) · Renewable and Sustainable Energy Reviews · doi:10.1016/j.rser.2019.109274 · Cited by 53
“The aim is to create “tight couplings” [22] between supply chain actors, leading to long term relationships and thus greater levels of integration beyond individual projects.”
BackgroundGabriela Gutierrez-Huerter, O., Gold, S., & Trautrims, A. (2021) · Journal of Business Ethics · doi:10.1007/s10551-021-05013-w · Cited by 60
“Albeit a fragmented and loosely coupled sector operationally (Dubois & Gadde, 2002), UK construction can be considered a centralized field (Furnari, 2018).”
BackgroundThe reluctance of construction purchasers towards project partnering
Crespin‐Mazet, F., & Portier, P. (2010) · Journal of Purchasing and Supply Management · doi:10.1016/j.pursup.2010.06.001 · Cited by 50
Applying the dynamic capabilities framework in the case of a large public construction client
Adam, A., & Lindahl, G. (2017) · Construction Management and Economics · doi:10.1080/01446193.2017.1309441 · Cited by 62
“This might be explained on the ground that projects in construction have a unique component to them, a structure often characterized as loosely coupled (Dubois and Gadde 2002).”
BackgroundMcCoy, A. P., Thabet, W. Y., & Badinelli, R. D. (2009) · European Journal of Innovation Management · doi:10.1108/14601060910928193 · Cited by 49
“Site variability in construction is typically described as a site-specific, project-based activity implemented by multi-party networks in which significant decision-making is decentralized closer to project sites and production procedures are standardized to achieve efficiency and quality control ( Dubois and Gadde, 2…”
BackgroundSupplier development initiatives and their impact on the consistency of project performance
Gosling, J., Naim, M. M., TOWILL, D. R., Abouarghoub, W., & Moone, B. (2015) · Construction Management and Economics · doi:10.1080/01446193.2015.1028956 · Cited by 49
Wuni, I. Y., & Shen, Q. (2021) · Smart and Sustainable Built Environment · doi:10.1108/sasbe-03-2021-0051 · Cited by 56
Pham, T., & Pham, H. T. (2021) · Sustainable Production and Consumption · doi:10.1016/j.spc.2021.01.004 · Cited by 56
Briefing: Cost of accidents in the construction industry of Oman
Umar, T. (2016) · Proceedings of the Institution of Civil Engineers - Municipal Engineer · doi:10.1680/jmuen.16.00032 · Cited by 48
Salmi, A., Jussila, J., & Hämäläinen, M. (2022) · Construction Management and Economics · doi:10.1080/01446193.2022.2037145 · Cited by 48
“…frameworks for construction (Gluch and Svensson 2018, Vihem€aki et al. 2020), as well as interdependencies between actors in construction (Gann and Salter 2000, Dubois and Gadde 2002, Bengtson and Håkansson 2008, Fellows and Liu 2012, Bygballe and Ingemansson 2014, Steinhardt et al. 2020).”
BackgroundTemporality, temporariness and keystone actor capabilities in innovation ecosystems
Poblete, L. A., Kadefors, A., Rådberg, K. K., & Gluch, P. (2022) · Industrial Marketing Management · doi:10.1016/j.indmarman.2022.01.012 · Cited by 58
Green construction logistics – a multi-actor challenge
Fredriksson, A., & Huge‐Brodin, M. (2022) · Research in Transportation Business & Management · doi:10.1016/j.rtbm.2022.100830 · Cited by 47
Decoupling and standardization in the projectification of a company
Bergman, I., Gunnarson, S., & Räisänen, C. (2013) · International Journal of Managing Projects in Business · doi:10.1108/17538371311291053 · Cited by 54
Bemelmans, J., Voordijk, H., Vos, B., & Buter, J. I. H. (2011) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000418 · Cited by 47
Yusof, N., Kamal, E. M., Kong-Seng, L., & Iranmanesh, M. (2014) · SAGE Open · doi:10.1177/2158244014552424 · Cited by 47
“Also, the lack of long-term relationships (Dubois & Gadde, 2000, 2002) and integration in the supply chain (Akintoye, McIntosh, & Fitzgerald, 2000) are pointed to as inhibiting innovations.”
BackgroundIMP thinking and IMM: Co-creating value for business marketing
Möller, K., & Halinen, A. (2018) · Industrial Marketing Management · doi:10.1016/j.indmarman.2018.01.025 · Cited by 60
Characterizing third-party logistics setups in the context of construction
Fredriksson, A., Janné, M., & Rudberg, M. (2021) · International Journal of Physical Distribution & Logistics Management · doi:10.1108/ijpdlm-03-2019-0078 · Cited by 51
“The natural choice was a multiple case study since a comparison of a few specific variables informed the research questions (Dubois and Gadde, 2002b).”
BackgroundMethodInfluentialInfluences on Innovation Benefits during Implementation: Client’s Perspective
Ling, F. Y. Y., Hartmann, A., Kumaraswamy, M. M., & DULAIMI, M. F. (2007) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2007)133:4(306 · Cited by 46
Organization Learning in Non-writing Communities: The Case of Construction Workers
Styhre, A., Josephson, P., & Knauseder, I. (2006) · Management Learning · doi:10.1177/1350507606060983 · Cited by 67
Procurement innovation for public construction projects
Lu, W., Liu, A. M. M., Wang, H., & Zhongbing, W. (2013) · Engineering Construction & Architectural Management · doi:10.1108/ecam-09-2011-0084 · Cited by 45
“…projects, no matter whether it is in developing or developed worlds, there have been widespread problems discovered such as cost overrun, late delivery, overstaffed organizations, and low efficiency (Latham, 1994; Egan, 1998; Egan, 2002; Bresnen and Marshall, 2000; Dubois and Gadde, 2002).”
BackgroundMethodThird-party logistics in construction: perspectives from suppliers and transport service providers
Ekeskär, A., & Rudberg, M. (2020) · Production Planning & Control · doi:10.1080/09537287.2020.1837932 · Cited by 54
“Therefore the construction process is carried out in temporary organisations (Bakker 2010), establishing temporary supply chains (Behera, Mohanty, and Prakash 2015; Dubois and Gadde 2002; Vrijhoef and Koskela 2000).”
BackgroundInfluentialSepasgozar, S. M. E., & Davis, S. (2019) · Buildings · doi:10.3390/buildings9070158 · Cited by 50
“Other di ff erences are the environment in which construction takes place [57], the number of interaction parts of the work flow, involvement of several sub-contractors and external companies, complexity and uniformity of tasks and teams to place and time, and the uniqueness of every project.”
BackgroundAs above, not so below: developing social procurement practices on strategic and operative levels
Troje, D., & Andersson, T. (2020) · Equality Diversity and Inclusion An International Journal · doi:10.1108/edi-03-2020-0054 · Cited by 49
Inter-Organizational Knowledge Flow and Innovation Diffusion in Project-Based Industries
Taylor, J. E., & Levitt, R. E. (2005) · Hawaii International Conference on System Sciences (HICSS) · doi:10.1109/hicss.2005.334 · Cited by 45
“DuBois and Gadde [18] claim that the construction industry meets the criteria of a loosely-coupled organization and therefore " localized adaptations can be expected, but the spread of advantageous mutations are forestalled.”
Pelli, P. (2021) · Cleaner Engineering and Technology · doi:10.1016/j.clet.2021.100061 · Cited by 48
Holmström, J., Singh, V., & Främling, K. (2014) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000305 · Cited by 47
“Using Holland’s (1995) conceptualization of linear and closed-loop production systems, the outcome of a BIM-based intervention can be characterized in terms of more effective activities, as well as more capable systems.”
MethodThe Self-Destruction and Renewal of Lean Construction Theory: A Prediction From Boyd's Theory
Abdelhamid, T. S. (2004) · Cited by 44
Molloy, C., Bankins, S., Kriz, A., & Barnes, L. (2020) · Journal of Product Innovation Management · doi:10.1111/jpim.12527 · Cited by 50
Antecedents and benefits of obtaining preferred customer status
Bemelmans, J., Voordijk, H., Vos, B., & Dewulf, G. P. M. R. (2015) · International Journal of Operations & Production Management · doi:10.1108/ijopm-07-2012-0263 · Cited by 44
Balancing value creating logics in construction
Bygballe, L. E., & Jahre, M. (2009) · Construction Management and Economics · doi:10.1080/01446190903096609 · Cited by 57
“Another exception is Dubois and Gadde ( 2000 , 2002a ), who discuss how construction companies may coordinate both a temporary project network by establishing long‐term relationships and adaptations in the permanent network, while simultaneously loosening couplings in the temporary project network.”
BackgroundJäkel, J., Fischerkeller, F., Oberhoff, T., & Klemt‐Albert, K. (2024) · Journal of Information Technology in Construction · doi:10.36680/j.itcon.2024.034 · Cited by 48
“In this context, the construction sector can adapt developments and standards from other sectors as inspirations for improvement (Dubois and Gadde, 2002; Ribeirinho et al., 2020; Uusitalo and Lavikka, 2021).”
Environmental responsibility in building design: an Italian regional study
Annunziata, E., Testa, F., Iraldo, F., & Frey, M. (2015) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2015.07.137 · Cited by 43
Utilizing the innovation potential of suppliers in construction projects
Sariola, R. (2018) · Construction Innovation · doi:10.1108/ci-06-2017-0050 · Cited by 43
The role of proto-institutions within the change of service ecosystems
Kleinaltenkamp, M., Corsaro, D., & Sebastiani, R. (2018) · Journal of Service Theory and Practice · doi:10.1108/jstp-12-2017-0241 · Cited by 51
Shurrab, H., Jönsson, P., & Johansson, M. I. (2020) · Production Planning & Control · doi:10.1080/09537287.2020.1829147 · Cited by 43
Metadata
- Authors
- Dubois, A., & Gadde, L.-E.
- Affiliations
- Chalmers University of Technology (SE)
- ORCID
- Dubois, Anna
- Venue
- Construction Management and Economics
- Publisher
- Informa UK Limited
- Published
- 2002-10
- Volume
- 20
- Issue
- 7
- Pages
- 621-631
- ISSN
- 0144-6193 (ISSN-L)
- 1466-433X
- OpenAlex
- W2162531320
- Cited by
- 1,041
- References
- 36
- Citations by year
- 2026: 48 · 2025: 47 · 2024: 32 · 2023: 41 · 2022: 66 · 2021: 66 · 2020: 71 · 2019: 73 · 2018: 72 · 2017: 56 · 2016: 61 · 2015: 53 · 2014: 59 · 2013: 59 · 2012: 47
- FWCI
- 12.62
- Type
- journal article
- Language
- en
- Open access
- closed
- Locations
- Construction Management and Economics (publishedVersion)
- RePEc: Research Papers in Economics (submittedVersion)
- Topics
- Social Sciences › Decision Sciences › Management Science and Operations Research › Construction Project Management and Performance
- Social Sciences › Business, Management and Accounting › Management of Technology and Innovation › Product Development and Customization
- Physical Sciences › Engineering › Building and Construction › BIM and Construction Integration
- Keywords
- construction industry, loosely coupled systems, tight coupling, project networks, interorganizational networks, complexity, uncertainty, productivity, innovation, organizational learning
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.