The construction industry as a loosely coupled system: implications for productivity and innovation
The DOI matches its Crossref record; 37 of the 37 references it cites were found in a registry or an index.
Abstract
Previous research suggests that the construction industry is characterized by (1) particular complexity factors owing to industry specific uncertainties and interdependences, and (2) inefficiency of operations. The aim of this study was to analyse the operations and behaviour of firms as a means of dealing with complexity. The observations made indicate that the industry as a whole is featured as a loosely coupled system. Taking this as a starting point, the couplings among activities, resources and actors were analysed in different dimensions. The pattern of couplings builds on two interdependent layers: tight couplings in individual projects and loose couplings based on collective adaptations in the permanent network. It is concluded that the pattern of couplings seems to favour short term productivity while hampering innovation and learning.
Overview
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
Claims other papers make about this one
Each is checked against this paper’s own text: does it say what the citing paper says it does?
In the citing paper
“but also on the fact that the construction industry is characterized by slow adaptation to new technologies (Dubois and Gadde 2002 )”
From A review of LLMs and their applications in the architecture, engineering and construction industry (2025) · cites this paper as Dubois and Gadde 2002
Citations
Cites
Educational Organizations as Loosely Coupled Systems
Weick, K. E. (1976) · Administrative Science Quarterly · doi:10.2307/2391875 · Cited by 5,142
Organizations and Environments
Hougland, J. G., Shepard, J. M., & Aldrich, H. E. (1980) · The Academy of Management Review · doi:10.2307/257814 · Cited by 2,862
Capturing Value from Knowledge Assets: The New Economy, Markets for Know-How, and Intangible Assets
Teece, D. J. (1998) · California Management Review · doi:10.2307/41165943 · Cited by 2,617 · cited 1×
“According to Teece (1998) the opportunities for learning are closely related to previous activities and experiences: if many aspects of a rm’s learning environment change simultaneously the ability to form cognitive structures favouring learning becomes severely restricted.”
BackgroundLoosely Coupled Systems: A Reconceptualization
Orton, J. D., & Weick, K. E. (1990) · The Academy of Management Review · doi:10.2307/258154 · Cited by 2,431 · cited 5×
“Researchers should not simplify the concept but invoke it: ‘what elements are loosely coupled, what domains are they coupled on, and what are the characteristics of the couplings and decouplings?’ (Orton and Weick, 1990).”
BackgroundInfluentialIf Only We Knew What We Know: Identification and Transfer of Internal Best Practices
O'Dell, C., & Grayson, C. J. (1998) · California Management Review · doi:10.2307/41165948 · Cited by 1,543
von Krogh, G. (1998) · California Management Review · doi:10.2307/41165947 · Cited by 1,453
Managing Business Relationships
(2017) · Project Management · doi:10.1201/9780203710739-11 · Cited by 1,307
Powell, W. W. (1998) · California Management Review · doi:10.2307/41165952 · Cited by 1,096 · cited 3×
“These conditions differ from the situation in many other industries (Powell, 1998).”
BackgroundInfluentialBrown, J. S., & Duguid, P. (1998) · California Management Review · doi:10.2307/41165945 · Cited by 911
The four roles of supply chain management in construction
Vrijhoef, R., & Koskela, L. (2000) · European Journal of Purchasing & Supply Management · doi:10.1016/s0969-7012(00)00013-7 · Cited by 862 · cited 6×
“They are loose in terms of the coupling between the production of building materials and what is done on site; see e.g. Vrijhoef and Koskela (2000) and Akintoye et al. (2000).”
BackgroundInfluential
Research works printed but not linked: 6
- Björkegren, C. Learning for the next project. Proceedings of the 3rd Conference on Organisational Learning. Edited by: Easterby-Smith, M., Araujo, I. and Burgoyne, J. pp.107–123. Lancaster University.
- Crichtori C., 1966, Interdependence and Uncertainly: A Study of the Building Industry
- Gadde L. E., 2001, Supply Newwork Strategies
- Meyer J., 1975, Notes on a structure of educational organizations; quoted in Weick (1976)
- Powell W., 1991, Markets, Hierarchies & Networks, 265
- Winch G., 1987, Managing Construction Worldwide, Vol. 2, Productivity and Human factors
Cited by
Items 201–300 of 1,000
Brooks, T., Gunning, J. G., Spillane, J. P., & Cole, J. (2021) · Construction Management and Economics · doi:10.1080/01446193.2021.1983186 · Cited by 43
Lundberg, O., Nylén, D., & Sandberg, J. (2021) · Construction Management and Economics · doi:10.1080/01446193.2021.1980896 · Cited by 48
“Moreover, in their daily work internal users utilized two main IT-systems in addition to the IMS: an enterprise resource planning (ERP) system, and a customer relationship management (CRM) system.”
BackgroundMethodInfluentialAchieving Change in Construction
Koskela, L., Ballard, G., & Howell, G. A. (2003) · Cited by 49
Tanskanen, K., Holmström, J., & Öhman, M. (2015) · Journal of Business Logistics · doi:10.1111/jbl.12089 · Cited by 50
Avoiding the innovation island in infrastructure mega-project
Chen, H., Su, Q., Zeng, S., Sun, D., & Jonathan Jingsheng, S. H. I. (2018) · Frontiers of Engineering Management · doi:10.15302/j-fem-2018073 · Cited by 47
Chen, K., & Lu, W. (2019) · Engineering Construction & Architectural Management · doi:10.1108/ecam-05-2018-0206 · Cited by 46
“In order to be well managed, it requires 99 superiorly performed coordination and sets a high standard for the elimination and handling of 100 uncertainty and interdependence between activities (Dubois and Gadde, 2002).”
BackgroundHybrid project delivery processes observed in constructor BIM innovation adoption
Gledson, B. (2016) · Construction Innovation · doi:10.1108/ci-04-2015-0020 · Cited by 42
“Other prominent factors include industry structure and complexity, product and process uncertainty, and the communication networks that envelop collaborations between actors within Temporary Project Organisations (Dubois and Gadde, 2002; Gann and Salter, 2000; Taylor and Levitt, 2004; Winch, 1998).”
BackgroundArchitects’ perception of the innovativeness of the Swedish construction industry
Hemström, K., Mahapatra, K., & Gustavsson, L. (2017) · Construction Innovation · doi:10.1108/ci-06-2015-0038 · Cited by 46
John, R., Smith, A. J., Chotipanich, S., & Pitt, M. (2014) · Journal of Facilities Management · doi:10.1108/jfm-07-2013-0039 · Cited by 41
“The Construction industry is no exception, it is a project based industry (Fellows et al, 2002), characterised by complex operations of building or assembling of infrastructures onsite or offsite (Dubois and Gadde, 2001).”
BackgroundAligning Misaligned Systemic Innovations: Probing Inter-Firm Effects Development in Project Networks
Alin, P., Maunula, A., Taylor, J. E., & Smeds, R. (2013) · Project Management Journal · doi:10.1002/pmj.21316 · Cited by 51
“Dubois and Gadde (2002) speculated that innovation difficulties in project networks occur because the networks are loosely coupled systems whose decentralized structures hamper interaction and knowledge exchange across firm boundaries.”
BackgroundNordin, F., Öberg, C., Kollberg, B., & Nord, T. (2010) · Construction Management and Economics · doi:10.1080/01446193.2010.494680 · Cited by 45
What tensions obstruct an alignment between project and environmental management practices?
Gluch, P., & Räisänen, C. (2012) · Engineering Construction & Architectural Management · doi:10.1108/09699981211206070 · Cited by 41
“Insert Figure 3 here Figure 3: Tensions caused by contradictions between central elements of the activity system As Dubois and Gadde (2002) and Lindkvist (2004) have argued, the loose coupling between temporary project organising and the permanent organization has over time established an almost…”
BackgroundInfluentialSupply Chain Management in SMEs: a case study
Singh, R. K., Kumar, R., & Shankar, R. (2012) · International Journal of Manufacturing Research · doi:10.1504/ijmr.2012.046801 · Cited by 41
“According to Dubois and Gadde (2002), the construction industry has missed carrying over techniques of other industries such as JIT, partnering with suppliers and SCM.”
Governance factors enabling knowledge transfer in interorganisational development projects
Bosch‐Sijtsema, P. M., & Postma, T. J. B. M. (2010) · Technology Analysis and Strategic Management · doi:10.1080/09537325.2010.488064 · Cited by 47
“Several studies discuss the difficulties of projects and transfer of knowledge from the project towards the firm (Dubois and Gadde 2002; Gann and Salter 2000; Taylor and Levitt 2005; Winch 1998).”
Background“Considerate construction”: case studies of current practice
Glass, J., & Simmonds, M. (2007) · Engineering Construction & Architectural Management · doi:10.1108/09699980710731263 · Cited by 41
Wang, H., Zhao, L., Zhang, H., Qian, Y., Xiang, Y., Luo, Z., & Wang, Z. (2023) · Energy and Buildings · doi:10.1016/j.enbuild.2023.113708 · Cited by 42
“However, it is important to consider that PCs are indivisible products [26], characterized by larger dimensions and higher storage demands, compared to scattered building materials.”
Gluch, P., Johansson, K., & Räisänen, C. (2012) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2012.10.020 · Cited by 40
Collaboration Enables Innovative Timber Structure Adoption in Construction
Gosselin, A., Blanchet, P., Lehoux, N., & Cimon, Y. (2018) · Buildings · doi:10.3390/buildings8120183 · Cited by 43
Zhang, Y., Wei, H.-H., Zhao, D. F., Han, Y., & Chen, J. (2020) · Frontiers of Engineering Management · doi:10.1007/s42524-019-0082-8 · Cited by 40
Effects of employing third-party logistics arrangements in construction projects
Janné, M., & Rudberg, M. (2020) · Production Planning & Control · doi:10.1080/09537287.2020.1821925 · Cited by 42
“This means that with every new construction project, a new supply chain is created, focussing on the individual projects’ success (Dubois and Gadde 2002).”
BackgroundInfluentialDaniel, C., Daniel, P. A., & Smyth, H. (2022) · International Journal of Project Management · doi:10.1016/j.ijproman.2022.07.003 · Cited by 47
The “rain dance” of selection in construction: rationality as ritual and the logic of informality
Lockyer, C., & Scholarios, D. (2007) · Personnel Review · doi:10.1108/00483480710752786 · Cited by 40
Cooperation and partnering in facilities construction – empirical application of prisoner's dilemma
Eriksson, P. E. (2007) · Facilities · doi:10.1108/02632770710716902 · Cited by 53
“The strong emphasis on individual projects favors a narrow perspective, both in time and scope ( Dubois and Gadde, 2002”
BackgroundDiffusion characteristics of private sector financed innovation in Sweden
Widén, K., & Hansson, B. (2007) · Construction Management and Economics · doi:10.1080/01446190601089104 · Cited by 49
“In construction, that bigger picture is very complex and characterized by a systemic nature with uncertainties and interdependencies (Dubois and Gadde, 2002).”
BackgroundResultInfluentialBuilt environment procurement practice: Impediments to innovation and opportunities for changes
Miller, G., Furneaux, C. W., Davis, P. R., Love, P. E. D., & O’Donnell, A. M. (2009) · QUT ePrints (Queensland University of Technology) · Cited by 40
Coordinated construction logistics: an innovation perspective
Hedborg, S. (2018) · Construction Management and Economics · doi:10.1080/01446193.2018.1528372 · Cited by 39
“However, interorganizational collaboration to increase innovation is difficult in the project-based construction industry due to the loose ties between projects and companies (Dubois and Gadde 2002).”
BackgroundGetting innovations adopted in the housing sector
van Oorschot, J. A. W. H., Halman, J. I. M., & Hofman, E. (2020) · Construction Innovation · doi:10.1108/ci-11-2018-0095 · Cited by 43
A critical discussion of models for conceptualizing the economic logic of construction
Bygballe, L. E., Håkansson, H., & Jahre, M. (2012) · Construction Management and Economics · doi:10.1080/01446193.2012.745645 · Cited by 39
Achieving Construction Innovation through Academia-Industry Cooperation—Keys to Success
Shapira, A., & Rosenfeld, Y. (2010) · Journal of Professional Issues in Engineering Education and Practice · doi:10.1061/(asce)ei.1943-5541.0000057 · Cited by 39
Charting corporate greening: environmental management trends in Sweden
Gluch, P., Gustafsson, M., Thuvander, L., & Baumann, H. (2013) · Building Research & Information · doi:10.1080/09613218.2014.855873 · Cited by 49
“…measures, since these involve a high degree of top-down control, administration and structure, which automatically leads to an increased need for bureaucracy, something that contradicts the decentralized and autonomous decision-making culture within the industry (Dubois & Gadde, 2002; Gluch, 2005).”
BackgroundConflicting and conflated discourses? Project management, organisational change and learning
Bresnen, M. (2006) · doi:10.1007/978-0-230-20929-9_4 · Cited by 39
Srivastava, S., Iyer‐Raniga, U., & Misra, S. (2021) · Sustainability · doi:10.3390/su14010197 · Cited by 38
BIM Adoption: A Case of Institutional Pressures and Top Management Support
Tavallaei, R., Mashayekhi, A., Harrison, N., Talebian, M., & Moser, R. (2022) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0002331 · Cited by 43
Koolwijk, J. S. J., van Oel, C. J., & Moreno, J. C. G. (2020) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000796 · Cited by 43
“…from a lack of performance feedback from external sources, which in turn can lower team effectiveness (Katz 1982, Pesämaa et al. 2018) Alternatively, this result might also emphasize the fragmented nature of project teams in the construction industry (Dubois and Gadde 2002, Suprapto et al. 2015).”
BackgroundArantes, A., Ferreira, L. M. D. F., & Costa, A. A. (2015) · Supply Chain Management An International Journal · doi:10.1108/scm-06-2014-0207 · Cited by 38
Orchestrating deviations in global projects: Projects-as-practice observations
Hällgren, M., & Söderholm, A. (2010) · Scandinavian Journal of Management · doi:10.1016/j.scaman.2010.09.002 · Cited by 44
Buyer-supplier relationships in industrialized building
Bildsten, L. (2013) · Construction Management and Economics · doi:10.1080/01446193.2013.812228 · Cited by 37
Integration of the Construction Knowledge and Expertise in Front-End Planning
Oh, E. H., Naderpajouh, N., Hastak, M., & Gokhale, S. B. (2015) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0001050 · Cited by 37
“Learning in construction happens at the project level, and firms have a problem in retaining the lessons learned (Dubois and Gadde 2002).”
BackgroundInfluentialDeveloping a Framework for Supply Chain Planning in Construction
Thunberg, M. (2016) · Linköping studies in science and technology. Dissertations · doi:10.3384/diss.diva-131617 · Cited by 51
“Dubois and Gadde (2002) argue that the loosely coupled nature of the construction industry can be a reason for the communication difficulties.”
BackgroundRelationship between Innovation and Organizational Performance in Construction Industry in Malaysia
Tajuddin, M. Z. M., Iberahim, H., & Ismail, N. (2015) · Universal Journal of Industrial and Business Management · doi:10.13189/ujibm.2015.030402 · Cited by 36
“They were adapted from Bossink [54], Dubois and Gadde [55], Blayse and Manley [22], Dewick and Miozzo [56], Peansupap [23], Panuwatwanich et al.”
MethodThe role of formal and informal mechanisms in implementing lean principles in construction projects
Bygballe, L. E., Endresen, M., & Fålun, S. (2018) · Engineering Construction & Architectural Management · doi:10.1108/ecam-07-2017-0138 · Cited by 36
Optimisation of resource management in construction projects: a big data approach
Kusimo, H., Oyedele, L. O., Akinadé, O. O., Oyedele, A. O., Abioye, S., Agboola, A. O., & Mohammed-Yakub, N. (2019) · World Journal of Science Technology and Sustainable Development · doi:10.1108/wjstsd-05-2018-0044 · Cited by 41
Lean Principles in Construction
Akanbi, O. A., Oyedolapo, O., & Goulding, J. S. (2019) · Elsevier eBooks · doi:10.1016/b978-0-12-811749-1.00010-9 · Cited by 36
Beyond Policies and Social Washing: How Social Procurement Unfolds in Practice
Troje, D., & Gluch, P. (2020) · Sustainability · doi:10.3390/su12124956 · Cited by 38
“individual decision-making, while simultaneously collaborating with other actors [38].”
BackgroundA scientometric analysis and review of construction labour productivity research
Adebowale, O. J., & Agumba, J. N. (2022) · International Journal of Productivity and Performance Management · doi:10.1108/ijppm-09-2021-0505 · Cited by 36
Innovation and small residential builders: an Australian study
Thorpe, D., Ryan, N. F., & Charles, M. B. (2009) · Construction Innovation · doi:10.1108/14714170910950821 · Cited by 44
Mapping site-based construction workers’ motivation: Expectancy theory approach
Ghoddousi, P., Bahrami, N., Chileshe, N., & Hosseini, M. R. (2014) · Construction Economics and Building · doi:10.5130/ajceb.v14i1.3712 · Cited by 47
Innovation, Procurement and Construction Industry Development
de Valence, G. (2010) · Construction Economics and Building · doi:10.5130/ajceb.v10i4.1883 · Cited by 36
“In particular, the combination of individual procurement of heterogeneous products by clients and increasing specialisation and sub-contracting within the industry significantly limits the scope and potential for positive knowledge externalities, as argued by Dubois and Gadde (2002).”
BackgroundLow-carbon innovation in non-domestic buildings: The importance of supply chain integration
Kesidou, S., & Sorrell, S. (2018) · Energy Research & Social Science · doi:10.1016/j.erss.2018.07.018 · Cited by 37
“And where the relationship between integration and innovation is explored, innovation is typically conceptualised as a single construct, thereby bypassing the intricacies of delivering different types of innovations in projects [22,23].”
BackgroundNewly graduated students’ role as ambassadors for digitalisation in construction firms
Jacobsson, M., & Linderoth, H. C. J. (2021) · Construction Management and Economics · doi:10.1080/01446193.2021.1955398 · Cited by 37
“Fragmented value chains, lack of replication, ephemeral relationships, and decentralisation are often highlighted as hindrances originating from the project-based nature of the industry (Dubois and Gadde 2002).”
BackgroundSocial identity in construction: enactments and outcomes
Löwstedt, M., & Räisänen, C. (2014) · Construction Management and Economics · doi:10.1080/01446193.2014.956132 · Cited by 58
“This oft-repeated notion is probably the origin of the ‘uniquely backward’ label voiced in the research community, by politicians and policymakers (e.g. Kadefors, 1995; Dubois and Gadde, 2002; Hayes, 2002; Winch, 2003; Woudhuysen and Abley, 2004).”
BackgroundThe diffusion of innovations within a UKCI context: an explanatory framework
Larsen, G. D., & Ballal, T. (2005) · Construction Management and Economics · doi:10.1080/0144619042000287750 · Cited by 42
Guichardaz, R., Bach, L., & Pénin, J. (2019) · Industry and Innovation · doi:10.1080/13662716.2018.1561357 · Cited by 43
Assessing the impact of social procurement policies for Indigenous people
Denny‐Smith, G., Williams, M., & Loosemore, M. (2020) · Construction Management and Economics · doi:10.1080/01446193.2020.1795217 · Cited by 38
“Furthermore, although the construction industry operates in remote communities, construction is an inherently site-specific, project-based activity (Dubois and Gadde 2002), which creates a nomadic lifestyle likely to cause strain for Indigenous people, by conflicting with Indigenous notions of…”
BackgroundThe analysis of information flow interdependencies within projects
Bashir, H. A., Ojiako, U., Marshall, A. J., Chipulu, M., & Yousif, A. A. (2020) · Production Planning & Control · doi:10.1080/09537287.2020.1821115 · Cited by 34
“However, Dubois and Gadde (2002) point out that the complex nature of interdependencies between activities on most infrastructure projects tends to favour the use of stand-ardised plans, which may be adjusted to local conditions.”
BackgroundDesign for manufacture and assembly: A case study for a prefabricated bathroom wet wall panel
Vaz‐Serra, P., Wasim, M., & Egglestone, S. (2021) · Journal of Building Engineering · doi:10.1016/j.jobe.2021.102849 · Cited by 38
A conceptual approach to studying the organisational culture of construction projects
Gajendran, T., Brewer, G. J., Dainty, A., & Runeson, G. (2012) · Construction Economics and Building · doi:10.5130/ajceb.v12i2.2434 · Cited by 43
Lindhard, S. M., & Wandahl, S. (2014) · International Journal of Project Organisation and Management · doi:10.1504/ijpom.2014.065258 · Cited by 34
“Moreover, the construction process itself is complex (Aritua, Smith and Bower 2009; Dubois and Gadde 2002; Ballard 1998; Bertelsen 2003a; Bertelsen and Koskela 2004; Salem et al. 2004; Salem et al. 2006).”
BackgroundExploratory Framework for Application of Analytics in the Construction Industry
Naderpajouh, N., Choi, J., & Hastak, M. (2015) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000409 · Cited by 35
Energy policy instruments and technical change in the residential building sector
Beerepoot, W. M. C. (2007) · Research Repository (Delft University of Technology) · Cited by 37
Killip, G., Owen, A. M., & Topouzi, M. (2019) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2019.119205 · Cited by 33
Human motion prediction for intelligent construction: A review
Xia, X., Zhou, T., Du, J. K., & Li, N. (2022) · Automation in Construction · doi:10.1016/j.autcon.2022.104497 · Cited by 36
Power relations in the finance of infrastructure public-private partnership projects
Liu, L. X., Clegg, S. R., & Pollack, J. (2022) · International Journal of Project Management · doi:10.1016/j.ijproman.2022.08.002 · Cited by 33
From visions to practice – The role of sensemaking, institutional logic and pragmatic practice
Linderoth, H. C. J. (2016) · Construction Management and Economics · doi:10.1080/01446193.2016.1250930 · Cited by 33
“In building and construction there is a lack of a single authoritative force (Harty 2005), implying that site managers have a great influence on what is going on in the construction site (see e.g. Dubois and Gadde 2002).”
BackgroundTransforming construction: the multi-scale challenges of changing and innovating in construction
Glass, J., Bygballe, L. E., & Hall, D. (2022) · Construction Management and Economics · doi:10.1080/01446193.2022.2141432 · Cited by 33
“We also expressed an interest in hearing about reconceptualization of the industry and its participants, to facilitate an understanding of the overarching dynamics of transformation (Dubois and Gadde 2002, Koskela 2003, Green and Schweber 2008, Meacham and Van Straalen 2018).”
BackgroundGajendran, T., Brewer, G. J., & Marimuthu, M. (2013) · Construction Economics and Building · doi:10.5130/ajceb.v13i2.3321 · Cited by 40
“The loosely coupled and transient nature of construction projects (Dubois and Gadde, 2002) manifests the construction project supply chains to be somewhat different to manufacturing supply chains.”
BackgroundLiu, Y., Amini-Abyaneh, A., Hertogh, M. J. C. M., Houwing, E.-J., & Bakker, H. (2021) · Engineering Construction & Architectural Management · doi:10.1108/ecam-01-2020-0078 · Cited by 37
A graph-based approach for module library development in industrialized construction
Cao, J., Bucher, D. F., Hall, D., & Eggers, M. (2022) · Computers in Industry · doi:10.1016/j.compind.2022.103659 · Cited by 32
Greening Construction Transport as a Sustainability Enabler for New Zealand: A Research Framework
Dhawan, K., Tookey, J., GhaffarianHoseini, A., & Ghaffarianhoseini, A. (2022) · Frontiers in Built Environment · doi:10.3389/fbuil.2022.871958 · Cited by 42
Component manufacturers' perceptions of managing innovation
Larsson, B., Sundqvist, J., & Emmitt, S. (2006) · Building Research & Information · doi:10.1080/09613210600822253 · Cited by 32
“Even though Dubois and Gadde (2002) and Winch (2003) have shown that there is no convincing evidence supporting this accusation, there still is a need to understand better and hence improve innovation systems if the sector's image is to be improved and productivity increased.”
BackgroundSupply chain integration with BIM: a graph-based model
Papadonikolaki, E., Vrijhoef, R., & Wamelink, H. (2015) · International Journal of Building Pathology and Adaptation · doi:10.1108/ss-01-2015-0001 · Cited by 32
Stakeholder competency in evaluating the environmental impacts of infrastructure projects using BIM
Murphy, M., & Nahod, M.-M. (2017) · Engineering Construction & Architectural Management · doi:10.1108/ecam-07-2015-0106 · Cited by 32
Innovative Capability of Building Information Modeling in Construction Design
Çıdık, M. S., Boyd, D., & Thurairajah, N. (2017) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0001337 · Cited by 38
“Construction projects are characterised with social and organisational complexity (Dubois and Gadde 2002; Harty 2005).”
BackgroundPerformance Improvement in Construction Management
Kadefors, A., & Laan, A. (2009) · Routledge eBooks · doi:10.4324/9780203876084 · Cited by 32
Diffusion of innovation in a contractor company
Lundberg, M., Engström, S., & Lidelöw, H. (2019) · Construction Innovation · doi:10.1108/ci-08-2018-0061 · Cited by 32
‘Playing back-spin balls’: narrating organizational change in construction
Löwstedt, M., & Räisänen, C. (2012) · Construction Management and Economics · doi:10.1080/01446193.2012.693189 · Cited by 51
A Framework for Coordination Process into Construction Projects
Alaloul, W. S., Liew, M. S., & Zawawi, N. A. W. A. (2016) · MATEC Web of Conferences · doi:10.1051/matecconf/20166600079 · Cited by 31
“However, production can be conceptualized in three complementary way in construction projects as; Transformation “is the production of inputs into outputs”, or Flow “is a movement that is smooth and uninterrupted from one crew to the next”, and Value generation “What the customer is actually paying for the project to…”
BackgroundZeng, N., Liu, Y., Mao, C., & König, M. (2018) · Sustainability · doi:10.3390/su10103581 · Cited by 33
“Compared with the manufacturing supply chain, the downstream of construction supply chain is unobvious and upstream material flows are often invisible, which may lead to excessive material production and wasteful resource allocation as construction projects progressing [17,18].”
BackgroundAssessment of performance of teamwork in construction projects delivery in South-Southern Nigeria
Adu, E., & Opawole, A. (2019) · Journal of Engineering Design and Technology · doi:10.1108/jedt-01-2019-0025 · Cited by 31
Papachristos, G., Papadonikolaki, E., & Morgan, B. (2024) · Technovation · doi:10.1016/j.technovation.2024.102967 · Cited by 36
Sternberg, H. S., Germann, T. C., & Klaas-Wissing, T. (2013) · International Journal of Logistics Research and Applications · doi:10.1080/13675567.2013.856391 · Cited by 31
“The industrial network approach was applied to the two case studies inspired by previous studies (Dubois and Gadde 2002; Insanic and Gadde 2013), i.e. by focusing on capturing and depicting the actors, resources and the activities in the case setups.”
BackgroundMethodHybrid Recommendation Approach for Behavior Modification in the Chinese Construction Industry
Guo, S., Ding, L., Zhang, Y., Skibniewski, M. J., & Liang, K. (2019) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0001665 · Cited by 31
Mokhlesian, S. (2014) · Sustainability · doi:10.3390/su6074133 · Cited by 34
“A tightly-coupled system is needed to overcome this problem [76].”
BackgroundTowards the dynamics of trust in the relationship between project-based firms and suppliers
Xu, J., Smyth, H., & Žerjav, V. (2020) · International Journal of Project Management · doi:10.1016/j.ijproman.2020.09.005 · Cited by 37
Managing value creation: the business model approach in construction
Pekuri, A., Suvanto, M., Haapasalo, H. J. O., & Pekuri, L. (2013) · International Journal of Business Innovation and Research · doi:10.1504/ijbir.2014.058045 · Cited by 30
The construction productivity debate and the measurement of service qualities
Sezer, A. A., & Bröchner, J. (2013) · Construction Management and Economics · doi:10.1080/01446193.2013.831464 · Cited by 30
“This challenge of the ‘loosely coupled system’ (Dubois and Gadde, 2002) is shared by construction and many services.”
BackgroundPROCUREMENT PROCEDURES FOR SUPPLIER INTEGRATION AND OPEN INNOVATION IN MATURE INDUSTRIES
Sjödin, D., & Eriksson, P. E. (2010) · International Journal of Innovation Management · doi:10.1142/s1363919610002817 · Cited by 33
Ganguly, I., Koebel, C. T., & Cantrell, R. A. (2009) · Technological Forecasting and Social Change · doi:10.1016/j.techfore.2009.10.011 · Cited by 37
Liu, L., Wang, X., & Sheng, Z. (2012) · Construction Management and Economics · doi:10.1080/01446193.2012.679948 · Cited by 35
“Many scholars believe that the temporary and decentralized nature of projects and the loose couplings among construction organizations lead to a short-term focus on productivity and efficiency, and represent major obstacles to innovation (Dubois and Gadde, 2002 ; Harty, 2008 ).”
BackgroundContagion and learning in business networks
Peters, L. D., Pressey, A. D., & Johnston, W. J. (2016) · Industrial Marketing Management · doi:10.1016/j.indmarman.2016.06.011 · Cited by 31
“Learning processes in construction network relationships are interesting because they can change radically from project to project and thus the ability of members to form cognitive structures that support learning is problematic (Dubois and Gadde, 2002).”
BackgroundGustavsson, T. K. (2018) · Construction Management and Economics · doi:10.1080/01446193.2018.1464197 · Cited by 35
“Literature and empirical material have challenged each other during the interpretation process in what Dubois and Gadde (2002a) would call an “abductive” process.”
BackgroundEffects of institutional practices on delays in construction – views of Finnish homebuilder families
Jussila, J., & Lähtinen, K. (2019) · Housing Studies · doi:10.1080/02673037.2019.1651831 · Cited by 31
“Due to the complexity of the construction projects (e.g. Dubois & Gadde, 2002, Blayse & Manley, 2004), the use of prefabrication has become more common to streamline construction operations for enhancing speed of the processes through more efficient division of work, for example.”
BackgroundConstruction Logistics Centres Proposing Kitting Service: Organization Analysis and Cost Mapping
Moussaoui, S. E., Lafhaj, Z., Leite, F. L., Fléchard, J., & Linéatte, B. (2021) · Buildings · doi:10.3390/buildings11030105 · Cited by 29
Browne, M. J., Dubois, A., & Hulthén, K. (2022) · International Journal of Sustainable Transportation · doi:10.1080/15568318.2022.2103756 · Cited by 29
“However, standardization of parts or tasks in a system may also work as a decoupling mechanism in that it can enable independence between (certain) elements and in that case foster loose couplings (Dubois & Gadde, 2002).”
BackgroundSelf-citationDigital transformation in a cross-laminated timber business network
Hämäläinen, M., & Salmi, A. (2022) · Journal of Business and Industrial Marketing · doi:10.1108/jbim-01-2022-0003 · Cited by 34
Sustainability Transitions in the Construction Sector: A Bibliometric Review
Cândido, L. F., Filho, J. C. L. D. S., Silva, A. O. D. F. E., & Neto, J. D. P. B. (2023) · Sustainability · doi:10.3390/su151712814 · Cited by 34
Sloot, R. N. F., Troje, D., Voordijk, J. T., & Volker, L. (2024) · International Journal of Project Management · doi:10.1016/j.ijproman.2024.102589 · Cited by 34
Managerial identity work in action: performative narratives and anecdotal stories of innovation
Sergeeva, N., & Green, S. D. (2019) · Construction Management and Economics · doi:10.1080/01446193.2019.1566625 · Cited by 41
“Dubois and Gadde (2002) further contend that individual projects are only loosely coupled into the overall system, thereby limiting the permeation of sector-level innovation.”
BackgroundRiggio, M., Alhariri, N., & Hansen, E. (2019) · Architectural Engineering and Design Management · doi:10.1080/17452007.2019.1617672 · Cited by 29
“Contrary to temporary firm coalitions typical of the construction sector (the so-called ‘loose couplings’ observed by Dubois & Gadde, 2002), more stable partnerships were observed in the cases analyzed.”
BackgroundRevisiting the adoption of innovative products on Australian road infrastructure projects
Rose, T. M., & Manley, K. (2014) · Construction Management and Economics · doi:10.1080/01446193.2014.938670 · Cited by 28
“This finding supports broader construction innovation literature arguing that the facilitation of innovation knowledge flows through ongoing formal and informal organizational interactions is essential to promote innovation (Dubois and Gadde, 2002; Miozzo and Dewick, 2002; Keast and Hampson, 2007).”
Background
Metadata
- Authors
- Dubois, A., & Gadde, L.-E.
- Affiliations
- Chalmers University of Technology (SE)
- ORCID
- Dubois, Anna
- Venue
- Construction Management and Economics
- Publisher
- Informa UK Limited
- Published
- 2002-10
- Volume
- 20
- Issue
- 7
- Pages
- 621-631
- ISSN
- 0144-6193 (ISSN-L)
- 1466-433X
- OpenAlex
- W2162531320
- Cited by
- 1,041
- References
- 36
- Citations by year
- 2026: 48 · 2025: 47 · 2024: 32 · 2023: 41 · 2022: 66 · 2021: 66 · 2020: 71 · 2019: 73 · 2018: 72 · 2017: 56 · 2016: 61 · 2015: 53 · 2014: 59 · 2013: 59 · 2012: 47
- FWCI
- 12.62
- Type
- journal article
- Language
- en
- Open access
- closed
- Locations
- Construction Management and Economics (publishedVersion)
- RePEc: Research Papers in Economics (submittedVersion)
- Topics
- Social Sciences › Decision Sciences › Management Science and Operations Research › Construction Project Management and Performance
- Social Sciences › Business, Management and Accounting › Management of Technology and Innovation › Product Development and Customization
- Physical Sciences › Engineering › Building and Construction › BIM and Construction Integration
- Keywords
- construction industry, loosely coupled systems, tight coupling, project networks, interorganizational networks, complexity, uncertainty, productivity, innovation, organizational learning
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.