The construction industry as a loosely coupled system: implications for productivity and innovation
The DOI matches its Crossref record; 37 of the 37 references it cites were found in a registry or an index.
Abstract
Previous research suggests that the construction industry is characterized by (1) particular complexity factors owing to industry specific uncertainties and interdependences, and (2) inefficiency of operations. The aim of this study was to analyse the operations and behaviour of firms as a means of dealing with complexity. The observations made indicate that the industry as a whole is featured as a loosely coupled system. Taking this as a starting point, the couplings among activities, resources and actors were analysed in different dimensions. The pattern of couplings builds on two interdependent layers: tight couplings in individual projects and loose couplings based on collective adaptations in the permanent network. It is concluded that the pattern of couplings seems to favour short term productivity while hampering innovation and learning.
Overview
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
Claims other papers make about this one
Each is checked against this paper’s own text: does it say what the citing paper says it does?
In the citing paper
“but also on the fact that the construction industry is characterized by slow adaptation to new technologies (Dubois and Gadde 2002 )”
From A review of LLMs and their applications in the architecture, engineering and construction industry (2025) · cites this paper as Dubois and Gadde 2002
Citations
Cites
Educational Organizations as Loosely Coupled Systems
Weick, K. E. (1976) · Administrative Science Quarterly · doi:10.2307/2391875 · Cited by 5,142
Organizations and Environments
Hougland, J. G., Shepard, J. M., & Aldrich, H. E. (1980) · The Academy of Management Review · doi:10.2307/257814 · Cited by 2,862
Capturing Value from Knowledge Assets: The New Economy, Markets for Know-How, and Intangible Assets
Teece, D. J. (1998) · California Management Review · doi:10.2307/41165943 · Cited by 2,617 · cited 1×
“According to Teece (1998) the opportunities for learning are closely related to previous activities and experiences: if many aspects of a rm’s learning environment change simultaneously the ability to form cognitive structures favouring learning becomes severely restricted.”
BackgroundLoosely Coupled Systems: A Reconceptualization
Orton, J. D., & Weick, K. E. (1990) · The Academy of Management Review · doi:10.2307/258154 · Cited by 2,431 · cited 5×
“Researchers should not simplify the concept but invoke it: ‘what elements are loosely coupled, what domains are they coupled on, and what are the characteristics of the couplings and decouplings?’ (Orton and Weick, 1990).”
BackgroundInfluentialIf Only We Knew What We Know: Identification and Transfer of Internal Best Practices
O'Dell, C., & Grayson, C. J. (1998) · California Management Review · doi:10.2307/41165948 · Cited by 1,543
von Krogh, G. (1998) · California Management Review · doi:10.2307/41165947 · Cited by 1,453
Managing Business Relationships
(2017) · Project Management · doi:10.1201/9780203710739-11 · Cited by 1,307
Powell, W. W. (1998) · California Management Review · doi:10.2307/41165952 · Cited by 1,096 · cited 3×
“These conditions differ from the situation in many other industries (Powell, 1998).”
BackgroundInfluentialBrown, J. S., & Duguid, P. (1998) · California Management Review · doi:10.2307/41165945 · Cited by 911
The four roles of supply chain management in construction
Vrijhoef, R., & Koskela, L. (2000) · European Journal of Purchasing & Supply Management · doi:10.1016/s0969-7012(00)00013-7 · Cited by 862 · cited 6×
“They are loose in terms of the coupling between the production of building materials and what is done on site; see e.g. Vrijhoef and Koskela (2000) and Akintoye et al. (2000).”
BackgroundInfluential
Research works printed but not linked: 6
- Björkegren, C. Learning for the next project. Proceedings of the 3rd Conference on Organisational Learning. Edited by: Easterby-Smith, M., Araujo, I. and Burgoyne, J. pp.107–123. Lancaster University.
- Crichtori C., 1966, Interdependence and Uncertainly: A Study of the Building Industry
- Gadde L. E., 2001, Supply Newwork Strategies
- Meyer J., 1975, Notes on a structure of educational organizations; quoted in Weick (1976)
- Powell W., 1991, Markets, Hierarchies & Networks, 265
- Winch G., 1987, Managing Construction Worldwide, Vol. 2, Productivity and Human factors
Cited by
Items 701–800 of 1,000
Understanding Construction as a Complex and Dynamic System: An Adaptive Network Approach
Vrijhoef, R., & Tong, M. K. (2004) · TNO Repository · Cited by 4
Exploiting suppliers' potential in construction innovations
Sariola, R. (2017) · IEEE International Conference on Engineering, Technology and Innovation (ICE/ITMC) · doi:10.1109/ice.2017.8279950 · Cited by 4
“Earlier research suggests that contractors should request standardized solutions because it is easier for a contractor to evaluate different offers [33].”
BackgroundDealing with deviations : Investigating coupling mechanisms in project management
Hällgren, M. (2007) · Cited by 4
Okodi-Iyah, E. Y. (2012) · Cited by 5
"Innovation of Unique, Complex Products"
Sheffer, D. A., Katila, R., Levitt, R. E., & Taylor, J. E. (2013) · Academy of Management Proceedings · doi:10.5465/ambpp.2013.13385abstract · Cited by 4
“Further, in the liberal market economy of the US, the composition of project teams, typically selected by competitive bidding at the component level, tends to shift dramatically from project to project (Dubois & Gadde, 2002; J. E. Taylor & Levitt, 2007).”
BackgroundBuilding bridges: A study of coordination in projects
Hemphill, L. (2009) · Deep Blue (University of Michigan) · Cited by 8
Gerth, R. (2013) · KTH Publication Database DiVA (KTH Royal Institute of Technology) · Cited by 15
Forman, M., Gottlieb, S. C., & Haugbølle, K. (2012) · VBN Forskningsportal (Aalborg Universitet) · Cited by 3
Sloot, R. N. F., Volker, L., & Voordijk, J. T. (2025) · Journal of Purchasing and Supply Management · doi:10.1016/j.pursup.2025.101074 · Cited by 4
Coşkun, H., & Sancar, S. (2025) · Reliability Engineering & System Safety · doi:10.1016/j.ress.2025.111686 · Cited by 3
Ekeskär, A., & Havenvid, M. I. (2025) · Journal of Business and Industrial Marketing · doi:10.1108/jbim-06-2024-0426 · Cited by 3
Evaluation of optimal storage time of tuberculous lesions stored in sodium borate
Morato, F., Ikuta, C. Y., Gonçales, A. P., de Souza, G. O., Amaku, M., Cortéz, A., Heinemann, M. B., & Neto, J. S. F. (2016) · Semina Ciências Agrárias · doi:10.5433/1679-0359.2016v37n5supl2p3685 · Cited by 3
Social Procurement in the Construction Industry
Moshood, A. A. (2025) · doi:10.38124/ijisrt/25mar071 · Cited by 3
Shriharsha, Jagadeesha Pai, B., & Hungund, S. S. (2025) · Results in Engineering · doi:10.1016/j.rineng.2025.106193 · Cited by 3
Rosander, L., Kadefors, A., & Eriksson, P. E. (2025) · Project Management Journal · doi:10.1177/87569728251372844 · Cited by 3
“In practice, however, functions at the permanent level in client organizations are often weak and have dif fi culties in capturing experiences from a multitude of project-based initiatives and experiences (Dubois & Gadde, 2002; Eriksson et al., 2017; Swan et al., 2010).”
Breaking Barriers to Circularity: Understanding Multi-Actor Misalignment in Planning Practices
Fredriksson, A., Eriksson, L., Janné, M., & Lundberg, K. (2026) · Circular Economy and Sustainability · doi:10.1007/s43615-026-00775-9 · Cited by 4
Leghissa, G., Sage, D. J., & Dainty, A. (2016) · Loughborough University Institutional Repository (Loughborough University) · Cited by 3
The Legacies of Manufacturing and Factories of Industrialised Construction
Couper, R., Maxwell, D. W., & Aitchison, M. (2019) · Modular and Offsite Construction (MOC) Summit Proceedings · doi:10.29173/mocs100 · Cited by 3
Exploring Logistics Strategy in Construction
Rudberg, M., & Maxwell, D. W. (2019) · IFIP advances in information and communication technology · doi:10.1007/978-3-030-30000-5_65 · Cited by 3
Osipov, V. S. (2019) · IOP Conference Series Materials Science and Engineering · doi:10.1088/1757-899x/698/2/022084 · Cited by 3
Knowledge Transfer in Supply Chains
Smyth, H., & Duryan, M. (2019) · Wiley eBooks · doi:10.1002/9781119450535.ch14 · Cited by 3
Horizontal Inter-Organizational Collaboration : The Case of Third-Party Logistics
Ekeskär, A., Havenvid, M. I., & Gustavsson, T. K. (2019) · Diva portal (Dalarna University Library) · Cited by 3
Preliminary Study of the Implications of 3D Printing on the Construction Supply Chain
Ramani, A., & de Soto, B. G. (2020) · Rilem bookseries · doi:10.1007/978-3-030-49916-7_101 · Cited by 3
Flow Dimensions at Swedish Construction Contractors
Wernicke, B., Lidelöw, H., & Simu, K. (2019) · DiVA (Luleå University of Technology) · Cited by 5
The effect of quantitative easing on Asian construction firms’ performance
Dinh, T. N., Kuo, K.-C., Lu, W., & Nguyen, D. T. (2020) · International Journal of Construction Management · doi:10.1080/15623599.2020.1846887 · Cited by 4
“Therefore, understanding operation and measuring the performance in CI are necessary (Dubois and Gadde 2002; Xue et al. 2008).”
BackgroundSyndicated leadership in urban development projects: the case of the River City Gothenburg project
Styhre, A., & Brorström, S. (2022) · Construction Management and Economics · doi:10.1080/01446193.2022.2137881 · Cited by 3
“…construction projects are loosely coupled organizations wherein the different participants can preserve a high degree of autonomy in their work (Dubois and Gadde 2002, Dor�ee and Holmen 2004), and that this situation demands communication skills (Hossain 2009, Whyte and Lobo 2010) and the…”
BackgroundIntegrating Facilities Management knowledge in municipal school building: Swedish case studies
Molén, J., Kadefors, A., & Troje, D. (2023) · IOP Conference Series Earth and Environmental Science · doi:10.1088/1755-1315/1176/1/012033 · Cited by 3
Examining the Gap Between Construction Software Modules and Lean Contractor Practices
Stevens, M., & Olayiwola, K. (2023) · Annual Conference of the International Group for Lean Construction · doi:10.24928/2023/0103 · Cited by 3
“to implementing an industry improvement (Dubois and Gadde 2002).”
Developing future skills for the engineering sector: evidence from the UK
Daniel, E. I., Oshodi, O. S., & Gomez, J. M. (2024) · Proceedings of the Institution of Civil Engineers - Management Procurement and Law · doi:10.1680/jmapl.24.00005 · Cited by 3
Understanding the polarized perspectives in BIM enabled projects
Çıdık, M. S., Boyd, D., & Thurairajah, N. (2013) · Research Open (London South Bank University) · Cited by 3
Understanding the creation of ICT-value in the building and construction industry
Linderoth, H. C. J., & Elbanna, A. R. (2016) · Jonkoping University Library (Jönköping University) · Cited by 6
Hemström, K., Mahapatra, K., & Gustavsson, L. (2010) · Cited by 3
Fernández-Solís, J. L., & Rybkowski, Z. K. (2015) · OakTrust (Texas A&M University Libraries) · Cited by 3
Enablers of Innovation in the Construction Material Industry
Wandahl, S., Lassen, A. H., Jacobsen, A., & Poulsen, S. B. (2014) · Lecture notes in production engineering · doi:10.1007/978-3-319-04271-8_15 · Cited by 3
“This finding is supported by several studies pinpointing that industry relationships, both up and down stream in the supply chain, have a significant impact on innovation [26, 27].”
MethodResultAchieving effective project delivery through improved supplier relationship management
Pala, M., Edum‐Fotwe, F. T., Ruikar, K. D., Doughty, N., & Peters, C. (2012) · Loughborough University Research Repository (Loughborough University) · Cited by 3
Lundkvist, R., & Meiling, J. (2011) · Diva portal (Dalarna University Library) · Cited by 3
Learning by Experience:A Game Approach to Teaching Construction Scheduling
Lindhard, S. M. (2014) · International Conference on Construction and Real Estate Management (ICCREM) · doi:10.1061/9780784413777.066 · Cited by 3
Analyzing the Barriers Influencing the Application of Real Options in the Construction Industry
Andalib, M. S., Tavakolan, M., & Gatmiri, B. (2016) · ASCE Construction Research Congress (CRC) · doi:10.1061/9780784479827.182 · Cited by 3
Bushnell, T., Lehtinen, T., Kokkonen, A. H., Lavikka, R. H., Neelappa, A., & Senescu, R. R. (2013) · Cited by 3
The fourth industrial revolution, an opportunity for Civil Engineering
Giraldo, J. M. G., & Palacio, L. G. (2020) · Iberian Conference on Information Systems and Technologies (CISTI) · doi:10.23919/cisti49556.2020.9140930 · Cited by 3
“Los procesos administrativos de las empresas que se encargan de ejecutar proyectos de ingeniería civil son en su mayoría complejos debido a: el alto número de personas involucradas en su desarrollo, la gran cantidad de procesos y subprocesos interrelacionados entre sí, el tiempo limitado para su ejecución, la diversid…”
BackgroundImplementation of innovation : the inertia of implementing the open building concept in practice
van Oorschot, J. A. W. H., Durmišević, E., & Halman, J. I. M. (2011) · Management and Innovation for a Sustainable Built Environment MISBE 2011, Amsterdam, The Netherlands, June 20-23, 2011 · Cited by 5
Managing infrastructure transitions: a complex adaptive systems perspective
Furneaux, C. W., Brown, K. A., & Gudmundsson, A. J. (2009) · QUT ePrints (Queensland University of Technology) · Cited by 3
Barlow, C. (2012) · University of Salford Institutional Repository (University of Salford) · Cited by 3
Modular and architectural innovation in loosely coupled networks
Nijhof-Leusink, J. (2010) · doi:10.3990/1.9789036531016 · Cited by 3
Innovationsbiographien in der BauwirtschaftPreprint
Butzin, A., & Rehfeld, D. (2008) · RePEc: Research Papers in Economics · Cited by 3
Buyer-supplier relationship management in the construction industry
Bemelmans, J. (2011) · doi:10.3990/1.9789036533041 · Cited by 3
Commercialization for Innovative Products in the Residential Construction Industry
McCoy, A. P., Thabet, W. Y., Badinelli, R. D., Beliveau, Y. J., & Koebel, C. T. (2008) · VTechWorks (Virginia Tech) · Cited by 3
Improving productivity in construction: a contractor perspective
Polesie, P. (2011) · Chalmers Publication Library (Chalmers University of Technology) · Cited by 3
Kytömäki, O. (2020) · KTH Publication Database DiVA (KTH Royal Institute of Technology) · doi:10.13140/rg.2.2.15713.48485 · Cited by 21
The influence of resource dependency on collaboration in the construction supply chain
Donato, M., Ahsan, K., & Shee, H. (2013) · Victoria University Research Repository (Victoria University) · Cited by 7
Supply chain management in building and construction industry: case of Australian residential sector
Petrovic-Lazarevic, S. Y. O., Matanda, M. J., & Worthy, R. (2017) · Figshare · doi:10.26180/5072482 · Cited by 2
Risks in Transitioning to a Circular Economy in the Construction Sector
Witt, E. D. Q. (2025) · Digital innovations in architecture, engineering and construction · doi:10.1007/978-3-031-87224-2_33 · Cited by 2
Guanxi and innovation in China: insights from the (bio-based) construction sector
Losacker, S., Becker, T., & Shang, Y. (2025) · Innovation and Development · doi:10.1080/2157930x.2025.2518825 · Cited by 2
“Secondly, our findings inform the, in our view, very scarce literature on innovation in the construction sector (Butzin and Rehfeld 2013; Dubois and Gadde 2002; Harty 2008), a sector that deserves more attention in innovation research.”
InfluentialFinanciers’ Perspectives on Wooden Multistory Construction in Finland
Jussila, J., Heikkinen, K., & Toivonen, R. (2025) · Journal of Forest Economics · doi:10.1561/112.00000594 · Cited by 2
Developing Data-Driven, Sustainable Construction Material Transportation Logistics
Tookey, J., & Dhawan, K. (2025) · Sustainability · doi:10.3390/su18010263 · Cited by 3
Binsaddig, R. O., Ruzieh, A. S., Razia, B. S., Khamis, R., & Awwad, B. (2026) · Logistics · doi:10.3390/logistics10080185 · Cited by 2
“This structural fragmentation poses severe challenges to logistics management and supply chain integration, directly impinging on project schedules, delivery budgets, and overall execution quality [6,7].”
The Impact of Innovation of the Construction Industry in Ghana
Adow, A.-A. M. O., Allotey, S. E., & Arthur-Aidoo, B. M. (2013) · Journals & Books Hosting (International Knowledge Sharing Platform) · Cited by 2
Safety Management in Construction and Engineering: An Introduction
Zou, P. X. W., & Sunindijo, R. Y. (2015) · Wiley eBooks · doi:10.1002/9781118839362.ch1 · Cited by 2
Repositioning in supply networks – implementing supplier partnering in the construction industry
Sundquist, V., Hulthén, K., & Gadde, L. (2012) · Chalmers Publication Library (Chalmers University of Technology) · Cited by 2
Self-citationIl settore costruzioni in Italia: crisi e opportunità nell’ultimo decennio.
Rugiero, S., Travaglini, G., & Federici, A. (2018) · ARGOMENTI · doi:10.14276/1971-8357.1505 · Cited by 2
Risk Management and Supply Chain Risk Management Procedures in Construction Companies
Shahriari, M. (2019) · Studies in systems, decision and control · doi:10.1007/978-3-030-14730-3_15 · Cited by 2
Bozhanova, V., Кононова, О., & Shpatakova, O. (2019) · Technology audit and production reserves · doi:10.15587/2312-8372.2019.178483 · Cited by 2
“as a factor in the growth and development of the construction industry in Europe is studied by the authors of [5].”
BackgroundInnovation in Construction Techniques on Earth versus Space: Similarities and Differences
Subedi, S., & Pradhananga, N. (2021) · ASCE International Conference on Engineering, Science, Construction, and Operations in Challenging Environments (Earth and Space) · doi:10.1061/9780784483374.113 · Cited by 2
Introduction to Entrepreneurship in the Creative Industries
McIntyre, P., Fulton, J., Kerrigan, S., & Meany, M. M. (2023) · Springer eBooks · doi:10.1007/978-3-031-19455-9_1 · Cited by 2
Atashgah, K. M., Ghousi, R., Abbasi, A. M., & Nasrabadi, A. T. (2023) · The Baltic Journal of Road and Bridge Engineering · doi:10.7250/bjrbe.2023-18.592 · Cited by 2
Joya, E. R., Buan, A., & Noroña, M. I. (2021) · International Conference on Industrial Engineering and Operations Management (IEOM) · doi:10.46254/an11.20210966 · Cited by 2
Building Trust for a Stronger Construction Industry: Exploring the Role of Trust in Project Success
Hoots, A., Lyons, A., Dunn, C., & Clarke, S. N. (2024) · EPiC series in built environment · doi:10.29007/nwnr · Cited by 2
Impact Assessment of Logistics on Project Management
Vodenicharova, M. S. (2024) · Economic Alternatives · doi:10.37075/ea.2024.2.06 · Cited by 2
Users Like You and Me : Understanding the User-Driven Data Economy from a Human-Centric Perspective
Mileros, M. D. (2025) · Linköping studies in science and technology. Dissertations · doi:10.3384/9789180759960 · Cited by 2
Li, K., Griffin, M. A., & Chong, H. (2025) · Engineering Construction & Architectural Management · doi:10.1108/ecam-05-2024-0550 · Cited by 3
Mental Health in Construction 4.0: Enhancing Workplace Social Support Through Prefabrication
Lim, H. W., & Xiao, M. (2025) · CIB Conferences · doi:10.7771/3067-4883.1960 · Cited by 2
Xiao-chun, X., Versendaal, J., van den Akker, M., & de Bevere, B. (2011) · Journal of the Association for Information Systems · Cited by 2
Pedeliento, G., Trio, O., & Andreini, D. (2012) · Aisberg (University of Bergamo) · Cited by 2
Public procurement of innovation in construction: A design science approach
Lenderink, B., Halman, J. I. M., & Voordijk, H. (2016) · IEEE International Conference on Management of Innovation and Technology (ICMIT) · doi:10.1109/icmit.2016.7605043 · Cited by 2
“location, budget, stakeholders, and requirements[24, 25].”
Risk Management and Enterprise Risk Management
Zhao, X., Hwang, B., & Low, S. P. (2015) · Springer eBooks · doi:10.1007/978-981-287-549-5_3 · Cited by 2
REQUIREMENTS OF AN INTER-PROJECT DIGITAL INSPECTION SYSTEM
Lundkvist, R., & Vennström, A. (2010) · KTH Publication Database DiVA (KTH Royal Institute of Technology) · Cited by 2
AN INVESTIGATION OF CONSTRUCTION PROJECT PERFORMANCE IN BOTSWANA USING TIME PREDICTABILITY
Swarnadhipathi, K., & Boyd, D. (2007) · Cited by 2
INDUSTRIALISATION AS A TOOL FOR REDUCING UNCERTAINTY IN CONSTRUCTION
Sardén, Y., & Stehn, L. (2006) · Diva portal (Dalarna University Library) · Cited by 2
Connecting Parts to Wholes in Construction Education and Practice.
Boyd, D. (2011) · BCU Open Access Repository (Birmingham City University) · Cited by 2
EXPLORING THE KNOWLEDGE FUNCTION IN THE ADOPTION OF ICT IN SITE MANAGEMENT IN SOUTH AFRICA
Ozumba, A. O. U., & Shakantu, W. W. M. (2014) · Journal of Construction Project Management and Innovation · doi:10.36615/jcpmi.v4i2.70 · Cited by 2
“The construction industry is a complex set of loosely connected components, with individual degrees of autonomy, which still function together in project and site focused environments (Dubois and Gadde, 2002).”
A systems approach to strategic infrastructure delivery
Potts, M., McDermott, P., & Stephenson, A. (2016) · Proceedings of the Institution of Civil Engineers - Management Procurement and Law · doi:10.1680/jmapl.15.00026 · Cited by 2
Bosch‐Sijtsema, P. M., & Postma, T. J. B. M. (2006) · Cited by 2
An Empirical Study on the Influencing Factors of Knowledge Sharing in Project Context
Wei, D., & Li, H. (2014) · 系统科学与信息学报(英文) · doi:10.1515/jssi-2014-0154 · Cited by 2
Construction Industry Ignorance to Disaster Risk Reduction
Prihantony, D. I., Afrizal, A., Hadiguna, R. A., & Ophiyandri, T. (2019) · International Journal on Advanced Science Engineering and Information Technology · doi:10.18517/ijaseit.9.6.8176 · Cited by 2
“In line with that, Dubois and Gadde [19]considered that a temporary organization like construction project does not support the process of adding knowledge to its members.”
BackgroundModeling of the Management System for the Small Hotels Construction
Shchepak, V., Senenko, N., & Сененко, І. А. (2018) · International Journal of Engineering & Technology · doi:10.14419/ijet.v7i3.2.14559 · Cited by 2
“A greater degree of freedom in a loosely related system means that its components face different interaction problems, and thus contribute to the diversity of the development of the construction industry system and the use of innovations [1].”
BackgroundHavenvid, M. I., & Linné, Å. (2016) · Cited by 2
Johannes, K., Voordijk, H., Adriaanse, A. M., & Aranda‐Mena, G. (2018) · Data Archiving and Networked Services (DANS) · Cited by 2
Rutten, M. E. J., Dorée, A. G., & Halman, J. I. M. (2019) · Engineering Project Organization Journal · doi:10.25219/epoj.2018.00111 · Cited by 2
Project managers as involuntary policy implementers? : The case of implementing BIM
Lindblad, H., & Gustavsson, T. K. (2018) · Cited by 2
An Evaluation of the use of ADR in the Nigerian Public Construction Project Disputes
Idowu, F. O., Ogunbiyi, O. E., & Hungbo, A. A. (2015) · International Journal of Sustainable Construction Engineering Technology · Cited by 2
Offsite manufacturing: Envisioning the future agenda
Goulding, J. S., & Rahimian, F. P. (2019) · Wolverhampton Intellectual Repository and E-Theses (University of Wolverhampton) · Cited by 2
Rosander, L., & Kadefors, A. (2019) · KTH Publication Database DiVA (KTH Royal Institute of Technology) · Cited by 6
Prioritizing the Enablers of Construction Supply Chain in the Industry 4.0 Environment
Agrawal, V., Yadav, S. K., Mohanty, R. P., & Agrawal, A. M. (2020) · Advances in logistics, operations, and management science book series · doi:10.4018/978-1-7998-2867-9.ch007 · Cited by 2
Lawani, K. O., Okoro, C. S., Tong, M. K., & Hare, B. (2020) · Sustainability · doi:10.3390/su122410238 · Cited by 2
“, attitudinal barriers), a lack of knowledge amongst the contractors regarding the available systems and their use, and manufacturing capacity, that are somewhat unreliable are considered as some of the obvious concerns that are usually raised with OSM timber kit using telescopic crane erection, coupled with the rigid…”
BackgroundMethodCreating an environmental sustainability profession
Månsson, S. (2021) · Chalmers Research (Chalmers University of Technology) · Cited by 2
The Interplay of Site and Construction Systems Decisions for Complex Urban Infrastructures
Moser, B. R., Bellew, C., Cadario, A., & de Filippi, R. (2019) · Advances in transdisciplinary engineering · doi:10.3233/atde190157 · Cited by 2
Overview of Project Management
Golpîra, H. (2021) · Springer eBooks · doi:10.1007/978-3-030-81123-5_1 · Cited by 2
Pranandya, I. M. B., Maisarah, F. S. C. S., & Abduh, M. (2022) · Lecture notes in civil engineering · doi:10.1007/978-981-16-7924-7_68 · Cited by 2
Alignment of Partnering with Construction IT
Papadonikolaki, E. (2016) · Architecture and the Built Environment · doi:10.59490/abe.2016.20.1414 · Cited by 3
Innovation in the building sector - promoting energy efficiency in Sweden and Denmark
Rozite, V. (2006) · Lund University Publications Student Papers (Lund University) · Cited by 2
Metadata
- Authors
- Dubois, A., & Gadde, L.-E.
- Affiliations
- Chalmers University of Technology (SE)
- ORCID
- Dubois, Anna
- Venue
- Construction Management and Economics
- Publisher
- Informa UK Limited
- Published
- 2002-10
- Volume
- 20
- Issue
- 7
- Pages
- 621-631
- ISSN
- 0144-6193 (ISSN-L)
- 1466-433X
- OpenAlex
- W2162531320
- Cited by
- 1,041
- References
- 36
- Citations by year
- 2026: 48 · 2025: 47 · 2024: 32 · 2023: 41 · 2022: 66 · 2021: 66 · 2020: 71 · 2019: 73 · 2018: 72 · 2017: 56 · 2016: 61 · 2015: 53 · 2014: 59 · 2013: 59 · 2012: 47
- FWCI
- 12.62
- Type
- journal article
- Language
- en
- Open access
- closed
- Locations
- Construction Management and Economics (publishedVersion)
- RePEc: Research Papers in Economics (submittedVersion)
- Topics
- Social Sciences › Decision Sciences › Management Science and Operations Research › Construction Project Management and Performance
- Social Sciences › Business, Management and Accounting › Management of Technology and Innovation › Product Development and Customization
- Physical Sciences › Engineering › Building and Construction › BIM and Construction Integration
- Keywords
- construction industry, loosely coupled systems, tight coupling, project networks, interorganizational networks, complexity, uncertainty, productivity, innovation, organizational learning
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.