The construction industry as a loosely coupled system: implications for productivity and innovation
The DOI matches its Crossref record; 37 of the 37 references it cites were found in a registry or an index.
Abstract
Previous research suggests that the construction industry is characterized by (1) particular complexity factors owing to industry specific uncertainties and interdependences, and (2) inefficiency of operations. The aim of this study was to analyse the operations and behaviour of firms as a means of dealing with complexity. The observations made indicate that the industry as a whole is featured as a loosely coupled system. Taking this as a starting point, the couplings among activities, resources and actors were analysed in different dimensions. The pattern of couplings builds on two interdependent layers: tight couplings in individual projects and loose couplings based on collective adaptations in the permanent network. It is concluded that the pattern of couplings seems to favour short term productivity while hampering innovation and learning.
Overview
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
Claims other papers make about this one
Each is checked against this paper’s own text: does it say what the citing paper says it does?
In the citing paper
“but also on the fact that the construction industry is characterized by slow adaptation to new technologies (Dubois and Gadde 2002 )”
From A review of LLMs and their applications in the architecture, engineering and construction industry (2025) · cites this paper as Dubois and Gadde 2002
Citations
Cites
Educational Organizations as Loosely Coupled Systems
Weick, K. E. (1976) · Administrative Science Quarterly · doi:10.2307/2391875 · Cited by 5,142
Organizations and Environments
Hougland, J. G., Shepard, J. M., & Aldrich, H. E. (1980) · The Academy of Management Review · doi:10.2307/257814 · Cited by 2,862
Capturing Value from Knowledge Assets: The New Economy, Markets for Know-How, and Intangible Assets
Teece, D. J. (1998) · California Management Review · doi:10.2307/41165943 · Cited by 2,617 · cited 1×
“According to Teece (1998) the opportunities for learning are closely related to previous activities and experiences: if many aspects of a rm’s learning environment change simultaneously the ability to form cognitive structures favouring learning becomes severely restricted.”
BackgroundLoosely Coupled Systems: A Reconceptualization
Orton, J. D., & Weick, K. E. (1990) · The Academy of Management Review · doi:10.2307/258154 · Cited by 2,431 · cited 5×
“Researchers should not simplify the concept but invoke it: ‘what elements are loosely coupled, what domains are they coupled on, and what are the characteristics of the couplings and decouplings?’ (Orton and Weick, 1990).”
BackgroundInfluentialIf Only We Knew What We Know: Identification and Transfer of Internal Best Practices
O'Dell, C., & Grayson, C. J. (1998) · California Management Review · doi:10.2307/41165948 · Cited by 1,543
von Krogh, G. (1998) · California Management Review · doi:10.2307/41165947 · Cited by 1,453
Managing Business Relationships
(2017) · Project Management · doi:10.1201/9780203710739-11 · Cited by 1,307
Powell, W. W. (1998) · California Management Review · doi:10.2307/41165952 · Cited by 1,096 · cited 3×
“These conditions differ from the situation in many other industries (Powell, 1998).”
BackgroundInfluentialBrown, J. S., & Duguid, P. (1998) · California Management Review · doi:10.2307/41165945 · Cited by 911
The four roles of supply chain management in construction
Vrijhoef, R., & Koskela, L. (2000) · European Journal of Purchasing & Supply Management · doi:10.1016/s0969-7012(00)00013-7 · Cited by 862 · cited 6×
“They are loose in terms of the coupling between the production of building materials and what is done on site; see e.g. Vrijhoef and Koskela (2000) and Akintoye et al. (2000).”
BackgroundInfluential
Research works printed but not linked: 6
- Björkegren, C. Learning for the next project. Proceedings of the 3rd Conference on Organisational Learning. Edited by: Easterby-Smith, M., Araujo, I. and Burgoyne, J. pp.107–123. Lancaster University.
- Crichtori C., 1966, Interdependence and Uncertainly: A Study of the Building Industry
- Gadde L. E., 2001, Supply Newwork Strategies
- Meyer J., 1975, Notes on a structure of educational organizations; quoted in Weick (1976)
- Powell W., 1991, Markets, Hierarchies & Networks, 265
- Winch G., 1987, Managing Construction Worldwide, Vol. 2, Productivity and Human factors
Cited by
Items 601–700 of 1,000
A systemic BIM innovation model in the construction supply chain
Murguía, D., Demian, P., & Soetanto, R. (2017) · Loughborough University Institutional Repository (Loughborough University) · Cited by 10
Autonomous Trucks: A Supply Chain Adoption Perspective
Sternberg, H. S., Chen, H., Hofmann, E., & Prockl, G. G. (2020) · Hawaii International Conference on System Sciences (HICSS) · doi:10.24251/hicss.2020.554 · Cited by 9
“When applying the industrial network approach to analyze control structures in supply chains, the focus is mainly on three components [17]: • Actors, i.”
MethodContext awareness in construction management - key issues & enabling technologies
Fathi, M. S., Anumba, C., & Carrillo, P. M. (2006) · Cited by 7
Economic logics in the construction industry
Håkansson, H., & Jahre, M. (2005) · Lund University Publications (Lund University) · Cited by 7
Lessing, J., & Stehn, L. (2019) · Routledge eBooks · doi:10.1201/9781315147321-5 · Cited by 7
A Social Capital Perspective to Innovation Management in Construction
van der Vlies, R. D., & Maas, G. J. (2009) · International Symposium on Automation and Robotics in Construction (ISARC) · doi:10.22260/isarc2009/0008 · Cited by 7
Influences on construction innovation : a brief overview of recent literature
Blayse, A. M., & Manley, K. (2003) · QUT ePrints (Queensland University of Technology) · Cited by 7
Special issue: Connectivity and innovation in construction
Havenvid, M. I., Hugosson, M., & Ørstavik, F. (2024) · Construction Management and Economics · doi:10.1080/01446193.2024.2418018 · Cited by 7
“…engaged in demonstrating organizational fragmentation and pro-cessual discontinuities, such as those following from the temporary nature of projects and the – often short-lived – coalitions of firms created around mega-projects (e.g. Dubois and Gadde 2002; Miozzo and Dewick 2002; Flyvbjerg 2017).”
InfluentialSoltani, S., Gestri, L. G., Souper, F. A. P., & Maxwell, D. W. (2025) · Smart and Sustainable Built Environment · doi:10.1108/sasbe-11-2024-0458 · Cited by 8
Dominidiato, M., Hjelmgren, D., & Lind, F. (2025) · Journal of Business and Industrial Marketing · doi:10.1108/jbim-11-2024-0879 · Cited by 8
Construction project trouble factors influencing project success in Iraq
Mahdi, A. M., & Erzaij, K. R. (2024) · AIP conference proceedings · doi:10.1063/5.0205030 · Cited by 6
TAKING INDUSTRY SERIOUSLY IN ICT RESEARCH - THE CASE OF BUILDING AND CONSTRUCTION INDUSTRY
Linderoth, H. C. J., Jacobsson, M., & Rowlinson, S. (2011) · Cited by 6
Salonen, N., Mäkinen, R., Ahonen, M. H., Mäkitalo-Keinonen, T., Pelto-Huikko, A., & Latva, M. (2022) · Frontiers in Built Environment · doi:10.3389/fbuil.2022.1075009 · Cited by 6
“In addition, the project-based construction industry is strongly dependent on competitive tendering which makes the implementation of innovative solutions challenging (Dubois and Gadde 2002; Aouad et al., 2010; Bygballe and Ingemansson, 2014; Hemström et al., 2017).”
BackgroundMethodBui, N., Merschbrock, C., & Munkvold, B. E. (2024) · Construction Innovation · doi:10.1108/ci-07-2022-0167 · Cited by 6
Vestola, E. N., Larsson, J., & Hedgren, E. (2024) · Construction Management and Economics · doi:10.1080/01446193.2024.2376580 · Cited by 7
“Partly because the linkage between the project’s permanent and temporary contexts offers a problematic situation for innovation in construction (Dubois and Gadde, 2002; Crespin-Mazet et al., 2021).”
The Dynamics of a Variably Coupled Social System
Kleymann, B., Malloch, H., Redman, T., & Angot, J. (2008) · Journal of Management Inquiry · doi:10.1177/1056492607311647 · Cited by 7
“On the other hand loose coupling can create blockages against interventions in local decision making, and the diffusion of knowledge (Weick, 1976; Dubois and Gadde, 2002).”
BackgroundInfluentialTowards a Framework for Process Mapping and Performance Measurement in Construction Supply Chains
Thunberg, M. (2013) · Linköping University Electronic Press eBooks · doi:10.3384/lic.diva-101964 · Cited by 6
The Idealization of an Integrated BIM, Lean, and Green Model (BLG)
Fernández-Solís, J. L., & Mutis, I. (2010) · Advances in civil and industrial engineering book series · doi:10.4018/978-1-60566-928-1.ch014 · Cited by 6
The potential of digital technology to improve construction productivity
Madanayake, U., & Çıdık, M. S. (2019) · CentAUR (University of Reading) · Cited by 6
Construction transport efficiency from the perspective of Main Contractor and Transporter
Naz, F. (2022) · Linköping studies in science and technology. Thesis · doi:10.3384/9789179292744 · Cited by 6
The Adoption of 3D Printing as a Construction Methodology in South Africa: What Are the Barriers?
Windapo, A. O., Yende, M., Kala, O., Maboreke, L., & Matshidze, L. (2022) · Lecture notes in civil engineering · doi:10.1007/978-3-030-97748-1_7 · Cited by 6
Kuitert, L. (2021) · Architecture and the Built Environment · doi:10.59490/abe.2021.07.5750 · Cited by 6
Cooperative Engagement to Define and Deliver Client Value in the Construction Industry
Nord, T. (2011) · Contributions to management science · doi:10.1007/978-3-7908-2747-7_6 · Cited by 6
Supplier selection in the Malaysian telecommunications industry
Rahim, S. B. A. (2013) · Cited by 6
Driving sustainable innovation through procurement of complex products and systems in construction
Haugbølle, K., Forman, M., & Gottlieb, S. C. (2012) · VBN Forskningsportal (Aalborg Universitet) · Cited by 6
Cracks in the Mirror: Conceptualizing the Ongoing Aec Industry Re-Organization
Hall, D. (2018) · Repository for Publications and Research Data (ETH Zurich) · doi:10.3929/ethz-b-000275328 · Cited by 11
Understanding Trust in Construction Supply Chain Relationships
Xu, J. (2019) · Wiley eBooks · doi:10.1002/9781119450535.ch15 · Cited by 8
“Structuration theory provided general guideline and mechanisms to explain local findings, but these mechanisms and concepts are subjective to revision (Dubois and Gadde, 2002a).”
BackgroundInvestigating Vertical Integration Strategies in Modular Construction
Eldamnhoury, E. S., & Hanna, A. S. (2020) · ASCE Construction Research Congress (CRC) · doi:10.1061/9780784482889.131 · Cited by 6
On the Design of a Decision Support System for Robotic Equipment Adoption in Construction Processes
Marcher, C., Giusti, A., & Matt, D. T. (2021) · Applied Sciences · doi:10.3390/app112311415 · Cited by 8
“The lack of available data concerns both the conventional processes, where we have a lack of standardised work processes that cause uncertainty [14], and the processes that employ new technologies, which have not yet been sufficiently tested in real world scenarios [26].”
BackgroundStyhre, A., Brorström, S., & Gluch, P. (2022) · Construction Management and Economics · doi:10.1080/01446193.2021.2018719 · Cited by 6
“This finding is consistent with the claim that the construction industry is a “loosely coupled” one that routinely relies on cross-sector collaborations (Dubois and Gadde 2002, Harty 2008).”
ResultUnderstanding the innovation adoption process of construction clients
Hartmann, A., Dewulf, G. P. M. R., & Reymen, I. M. M. J. (2006) · TU/e Research Portal · Cited by 6
Yun, G. (2008) · University of Salford Institutional Repository (University of Salford) · Cited by 8
UREÑA, J. F. C. (2012) · RiuNet (Universitat Politècnica de València) · doi:10.4995/thesis/10251/14719 · Cited by 6
A study of innovation perception within the construction industry
Abadi, A. (2014) · Research Explorer (The University of Manchester) · Cited by 12
Chen, R., & Govik, L. (2025) · Supply Chain Management An International Journal · doi:10.1108/scm-12-2024-0796 · Cited by 5
Lindblad, F., & Gustafsson, Å. (2026) · Environmental Development · doi:10.1016/j.envdev.2026.101463 · Cited by 7
Exploring the work practices of site managers as processes of embodiment
Sandberg, R., Räisänen, C., & Löwstedt, M. (2016) · Nottingham Trent University's Institutional Repository (Nottingham Trent Repository) · Cited by 5
Robey, M. W., & Issa, R. R. A. (2015) · Modular and Offsite Construction (MOC) Summit Proceedings · doi:10.29173/mocs162 · Cited by 5
Façade innovation: an industry perspective
Sangiorgio, A. (2022) · Elsevier eBooks · doi:10.1016/b978-0-12-822477-9.00011-5 · Cited by 7
Social extended reality—use case entities on property life cycle
Lounakoski, M., Puhto, J., Jalo, H., Torro, O., & Pirkkalainen, H. (2022) · Journal of Information Technology in Construction · doi:10.36680/j.itcon.2022.025 · Cited by 6
“Moreover, the industry is fragmented (Dubois and Gadde 2002), providing ample opportunities for applying SXR to more quickly help organisations come to a mutual understanding in projects.”
BackgroundSingh, V., & Bolpagni, M. (2023) · Construction Management and Economics · doi:10.1080/01446193.2023.2186454 · Cited by 5
“Though the construction industry is believed to be slow and reluctant to change and innovate (Dubois and Gadde 2002, Loosemore 2015), the COVID-19 global pandemic situation referred to as COVID in the rest of the article, has shown that the construction industry is also capable of timely innovation.”
BackgroundFranz, S., Giroud, A., & Ivarsson, I. (2023) · Multinational Business Review · doi:10.1108/mbr-07-2022-0093 · Cited by 6
Developing a novel energy-based approach for measuring mental workload
Alotaibi, A., Gambatese, J., & Nnaji, C. A. (2024) · Heliyon · doi:10.1016/j.heliyon.2024.e24828 · Cited by 7
Giustolisi, A. (2024) · Industry and Innovation · doi:10.1080/13662716.2024.2400978 · Cited by 5
“As the paper showcases novel roles and the underlying mechanism of a highly studied actor group, it adapts an abductive research approach (Dubois and Gadde 2002; Elzinga et al. 2023).”
A socio-mathematical definition of innovation – The distinction with ordinary change
DeJong, W., & de Vries, H. J. (2025) · Technovation · doi:10.1016/j.technovation.2025.103220 · Cited by 5
Gunawardana, K. A. P., Sandanayake, Y., Karunasena, G., & Jayawickrama, T. S. (2021) · World Construction Symposium (WCS) · doi:10.31705/wcs.2021.40 · Cited by 5
“Dubois and Gadde (2002) and Decarolis and Palumbo (2015) explored the problems of the PP Process that are prevailing in construction industry as late delivery, risk and cost overrun and low efficiency.”
BackgroundThe culture of complaint in construction: affirmative reflections on its role and function
Styhre, A. (2010) · Construction Management and Economics · doi:10.1080/01446191003789457 · Cited by 7
Knowledge Sharing Across Professional Boundaries in Construction: Facilitators and Hindrances
Johansson, K. (2012) · Chalmers Research (Chalmers University of Technology) · Cited by 11
Dansoh, A., Frimpong, S., & Oteng, D. (2017) · International Journal of Technological Learning Innovation and Development · doi:10.1504/ijtlid.2017.082756 · Cited by 5
Tolstoy, D., & Axelsson, B. (2017) · International Journal of Construction Management · doi:10.1080/15623599.2017.1301027 · Cited by 5
Innovation Management in the Construction Supply Chain
O’Brien, W. J., Formoso, C. T., Vrijhoef, R., & London, K. (2008) · CRC Press eBooks · doi:10.1201/9781420047462-20 · Cited by 5
Production Strategy in Project Based Production within a House-Building Context
Jonsson, H. (2017) · Linköping studies in science and technology. Dissertations · doi:10.3384/diss.diva-143262 · Cited by 5
Goulding, J. S., Ezcan, V., & Sutrisna, M. (2018) · Journal of Financial Management of Property and Construction · doi:10.1108/jfmpc-10-2017-0040 · Cited by 5
“Reflecting on these issues today, it is interesting to note that things do not seem to have changed see early reports by Emerson (1962); Latham (1994); Egan (1998). Perhaps AEC is in a continual torus, with no ‘tangible’ end in sight? But then again, perhaps there is light at the end of the tunnel? Although industry c…”
BackgroundInfluentialIntegration in loosely coupled garment supply chains
Arroyo, P. E., Holmén, E., & de Boer, L. (2018) · Journal of Global Operations and Strategic Sourcing · doi:10.1108/jgoss-10-2017-0042 · Cited by 5
Degradation Monitoring Systems for a BIM Maintenance Approach
Romano, P., & Brito, P. (2019) · IntechOpen eBooks · doi:10.5772/intechopen.81433 · Cited by 6
“These variability and fragmentation constitute a challenge for the efficient coordination of projects, limit the possibility of learning from experience, make it difficult to implement a process of continuous improvement through repetition, and impose complex coordination of communication and exchange of information b…”
BackgroundSocial practices, structure and agency: Effects on environmental management in construction projects
Gluch, P., Baumann, H., & Räisänen, C. (2006) · Chalmers Research (Chalmers University of Technology) · Cited by 5
Inter-organizational Integration in the AEC/FM Industry
Camposano, J. C., & Smolander, K. (2019) · Lecture notes in computer science · doi:10.1007/978-3-030-21290-2_5 · Cited by 5
Social procurement in the real world: How employment requirements unfold in construction projects
Troje, D., & Gluch, P. (2019) · Chalmers Research (Chalmers University of Technology) · Cited by 7
Investigation of Innovation during Bid Evaluation Process in the Road Construction Industry
Oad, P. K., Kajewski, S. L., Kumar, A., & Xia, B. (2021) · Civil Engineering Journal · doi:10.28991/cej-2021-03091676 · Cited by 5
“A road consultant is often regionalized in impermanent project administrations [20-22], and innovations produced from imaginative or inspired problem-solving at the site location do not typically move to other construction-related projects, which could hamper their dissemination.”
BackgroundEconomic deals in the construction industry
Havenvid, M. I., Håkansson, H., & Linné, Å. (2016) · IMP Journal · doi:10.1108/imp-08-2015-0047 · Cited by 5
Young, B. E., Harty, C. F., Lu, S., & Davies, R. (2015) · Research Open (London South Bank University) · Cited by 5
Fernández-Solís, J. L. (2009) · Lean Construction Journal · doi:10.60164/e8e9b4h5d · Cited by 7
Industrie 4.0 in der Wertschöpfungskette Bau – Ferne Vision oder greifbare Realität?
Oesterreich, T. D., & Teuteberg, F. (2017) · Edition HMD · doi:10.1007/978-3-658-18165-9_6 · Cited by 11
Productivity, Challenges, and Applying Mass Customization in the Building and Construction Industry
Jensen, K. N., Nielsen, K., Brunoe, T. D., & Larsen, J. K. (2018) · Springer proceedings in business and economics · doi:10.1007/978-3-319-77556-2_34 · Cited by 5
Generating Value in Alliance Contracts Through the Lean Concept
Vilasini, N. (2014) · Tuwhera (Auckland University of Technology) · Cited by 8
Procurement Contracts, Innovation and Productivity in the Construction Sector : Five Studies
Borg, L. (2015) · DiVA (Digitala Vetenskapliga Arkivet) · Cited by 5
Nord, T. (2008) · DiVA (Luleå University of Technology) · Cited by 5
Applying Enterprise Architecture to Business Networks
Bakhtiyari, M. A. R. Z. (2017) · Queensland University of Technology · doi:10.5204/thesis.eprints.109490 · Cited by 7
No relationship is an island: long-term partnering and resource adaptation across project networks
Havenvid, M. I., Linné, Å., Sundquist, V., & Wagrell, S. (2025) · International Journal of Managing Projects in Business · doi:10.1108/ijmpb-11-2024-0290 · Cited by 4
“Contrary to Dubois and Gadde (2002a) characterization of construction relationships as primarily marked by low involvement, which is often the case, this paper highlights a scenario where the partnering relationship is defined by high involvement across projects.”
Olawumi, T. O., Ojo, S., Muftaudeen, S. T., Odeh, A. O., & Amoo, T. (2025) · Computers in Industry · doi:10.1016/j.compind.2025.104429 · Cited by 5
Cross-industry innovation: exploring the dynamics of an innovation network in construction
Happalad, M. M., Bosch‐Sijtsema, P. M., Claeson-Jonsson, C., & Sundquist, V. (2026) · Construction Management and Economics · doi:10.1080/01446193.2025.2605102 · Cited by 4
“Studying the dynamics of an innovation process thus requires an approach that can capture the continuously changing and developing features of an innovation network consisting of different actors and resources relevant to the success of the innovation (Dubois and Gadde 2002a, Duodu et al. 2024).”
InfluentialDhawan, K., Tookey, J., Fredriksson, A., & Tetik, M. (2026) · Construction Innovation · doi:10.1108/ci-06-2025-0285 · Cited by 4
Sumanarathna, N., Duodu, B., Memon, S. A., & Rowlinson, S. (2023) · Construction Innovation · doi:10.1108/ci-01-2023-0004 · Cited by 4
Transaction costs and innovation outcomes: lessons from early adopters of housebuilding innovations
Kavaarpuo, G., Tiwari, P. K., & Martel, A. (2024) · Construction Innovation · doi:10.1108/ci-01-2024-0005 · Cited by 4
Liu, W., Long, S., & Wang, J. (2024) · Industrial Management & Data Systems · doi:10.1108/imds-03-2024-0166 · Cited by 4
Kavaarpuo, G., Tiwari, P. K., & Martel, A. (2025) · Habitat International · doi:10.1016/j.habitatint.2025.103295 · Cited by 4
Construction Innovation Systems - A Sector Approach
Andersson, N., & Widén, K. (2005) · Lund University Publications (Lund University) · Cited by 4
Exploring the Dynamics of Supplier Innovation Diffusion
Lindgren, J., & Widén, K. (2019) · Emerald Group Publishing Limited eBooks · doi:10.1108/s2516-285320190000002048 · Cited by 4
Cuccia, S. Á. (2020) · TEC Empresarial · doi:10.18845/te.v14i1.4955 · Cited by 4
Research methodologies for studying the informal aspects of construction project organisations
Gajendran, T., Brewer, G. J., Runeson, G., & Dainty, A. (2011) · Research Repository (Delft University of Technology) · Cited by 4
Bähr, M., & Laszig, L. (2021) · Civil Engineering and Urban Planning An International Journal (CiVEJ) · doi:10.5121/civej.2021.8201 · Cited by 4
Lägg ut! Lägg ut! Entreprenad och nya former av arbetsorganisation i svensk byggindustri
Ahlstrand, R. (2024) · Arbetsmarknad & Arbetsliv · doi:10.58236/aa.25554 · Cited by 7
Rhee, M., Park, J. S., & Yoo, T. (2015) · Technology Analysis and Strategic Management · doi:10.1080/09537325.2015.1060312 · Cited by 4
Productivity and Efficiency in the Development of the Swedish Construction Sector
Landin, A., & Öberg, M. (2014) · American Journal of Industrial and Business Management · doi:10.4236/ajibm.2014.46038 · Cited by 4
“Several studies have highlighted the need to understand complexity factors applicable to construction (see, for example, Dubois and Gadde [43] and Hossain [44]).”
BackgroundDifferentiation value through services in a manufacturer's delivery chain
Huttu, E., & Martinsuo, M. M. (2015) · Service Industries Journal · doi:10.1080/02642069.2015.1080692 · Cited by 4
“The involvement of many different actors complicates the delivery chain of construction projects; this complex setting is typical also in our case study context, and similar contexts have been characterized in earlier research (e.g. Dubois & Gadde, 2002).”
BackgroundResultInfluentialHolt, G. D., & Goulding, J. S. (2016) · International Journal of Construction Management · doi:10.1080/15623599.2016.1166544 · Cited by 4
Stehling, M. P., & Arantes, E. M. (2014) · PARC Pesquisa em Arquitetura e Construção · doi:10.20396/parc.v5i1.8634542 · Cited by 4
Debs, L., Brunese, P., & Shaurette, M. (2016) · International Journal of Construction Education and Research · doi:10.1080/15578771.2016.1226214 · Cited by 4
Liberating the Semantics: Embodied Work(Man)ship in Construction
Sandberg, R., Räisänen, C., Löwstedt, M., & Raiden, A. B. (2018) · Springer eBooks · doi:10.1007/978-3-319-73996-0_4 · Cited by 4
Social Considerations in Selection of Sustainable Pavement Designs
Inti, S., Sharma, M., & Tandon, V. (2018) · Sustainable civil infrastructures · doi:10.1007/978-3-319-95759-3_7 · Cited by 4
FinTechs as Service Innovators - Understanding the Service Innovation Stack
Riikkinen, M., Saraniemi, S., & Still, K. (2018) · International Journal of E-Business Research · doi:10.4018/ijebr.2019010102 · Cited by 4
Tvedt, I. M. (2019) · Annual Conference of the International Group for Lean Construction · doi:10.24928/2019/0159 · Cited by 4
Shojaei, A., Moud, H. I., & Flood, I. (2018) · ASCE International Conference on Engineering, Science, Construction, and Operations in Challenging Environments (Earth and Space) · doi:10.1061/9780784481899.026 · Cited by 4
Arbitration as an Alternative to Litigation in Construction Projects
Henry, A., & Okereke, R. A. (2020) · International Journal of Management and Humanities · doi:10.35940/ijmh.i0860.054920 · Cited by 4
Diffusion of platform thinking as an innovation in the construction supply chain
Grabham, S., & Manu, E. (2021) · Proceedings of the Institution of Civil Engineers - Management Procurement and Law · doi:10.1680/jmapl.21.00019 · Cited by 4
Merschbrock, C., & Wahid, F. (2013) · European Conference on Information Systems · Cited by 4
Pastoral power in leadership work: the relational leadership idiom in the construction industry
Styhre, A., Fasth, J., & Löwstedt, M. (2022) · Qualitative Research in Organizations and Management An International Journal · doi:10.1108/qrom-10-2021-2224 · Cited by 4
Naz, F., & Fredriksson, A. (2023) · IFIP advances in information and communication technology · doi:10.1007/978-3-031-43670-3_10 · Cited by 4
Development of SCM competencies in construction: lessons learned from New Zealand
Ying, F., Tookey, J., & Roberti, H. (2014) · Tuwhera (Auckland University of Technology) · Cited by 4
An emergent form of client-led supply chain governance in UK construction: CLANS
Tennant, S., & Fernie, S. (2012) · International Journal of Construction Supply Chain Management · doi:10.14424/ijcscm201012-01-16 · Cited by 9
Metadata
- Authors
- Dubois, A., & Gadde, L.-E.
- Affiliations
- Chalmers University of Technology (SE)
- ORCID
- Dubois, Anna
- Venue
- Construction Management and Economics
- Publisher
- Informa UK Limited
- Published
- 2002-10
- Volume
- 20
- Issue
- 7
- Pages
- 621-631
- ISSN
- 0144-6193 (ISSN-L)
- 1466-433X
- OpenAlex
- W2162531320
- Cited by
- 1,041
- References
- 36
- Citations by year
- 2026: 48 · 2025: 47 · 2024: 32 · 2023: 41 · 2022: 66 · 2021: 66 · 2020: 71 · 2019: 73 · 2018: 72 · 2017: 56 · 2016: 61 · 2015: 53 · 2014: 59 · 2013: 59 · 2012: 47
- FWCI
- 12.62
- Type
- journal article
- Language
- en
- Open access
- closed
- Locations
- Construction Management and Economics (publishedVersion)
- RePEc: Research Papers in Economics (submittedVersion)
- Topics
- Social Sciences › Decision Sciences › Management Science and Operations Research › Construction Project Management and Performance
- Social Sciences › Business, Management and Accounting › Management of Technology and Innovation › Product Development and Customization
- Physical Sciences › Engineering › Building and Construction › BIM and Construction Integration
- Keywords
- construction industry, loosely coupled systems, tight coupling, project networks, interorganizational networks, complexity, uncertainty, productivity, innovation, organizational learning
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.