Abstract
Previous research suggests that the construction industry is characterized by (1) particular complexity factors owing to industry specific uncertainties and interdependences, and (2) inefficiency of operations. The aim of this study was to analyse the operations and behaviour of firms as a means of dealing with complexity. The observations made indicate that the industry as a whole is featured as a loosely coupled system. Taking this as a starting point, the couplings among activities, resources and actors were analysed in different dimensions. The pattern of couplings builds on two interdependent layers: tight couplings in individual projects and loose couplings based on collective adaptations in the permanent network. It is concluded that the pattern of couplings seems to favour short term productivity while hampering innovation and learning.
Overview
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
Claims other papers make about this one
Each is checked against this paper’s own text: does it say what the citing paper says it does?
In the citing paper
“but also on the fact that the construction industry is characterized by slow adaptation to new technologies (Dubois and Gadde 2002 )”
From A review of LLMs and their applications in the architecture, engineering and construction industry (2025) · cites this paper as Dubois and Gadde 2002
Citations
Cites
Educational Organizations as Loosely Coupled Systems
Weick, K. E. (1976) · Administrative Science Quarterly · doi:10.2307/2391875 · Cited by 5,142
Organizations and Environments
Hougland, J. G., Shepard, J. M., & Aldrich, H. E. (1980) · The Academy of Management Review · doi:10.2307/257814 · Cited by 2,862
Capturing Value from Knowledge Assets: The New Economy, Markets for Know-How, and Intangible Assets
Teece, D. J. (1998) · California Management Review · doi:10.2307/41165943 · Cited by 2,617 · cited 1×
“According to Teece (1998) the opportunities for learning are closely related to previous activities and experiences: if many aspects of a rm’s learning environment change simultaneously the ability to form cognitive structures favouring learning becomes severely restricted.”
BackgroundLoosely Coupled Systems: A Reconceptualization
Orton, J. D., & Weick, K. E. (1990) · The Academy of Management Review · doi:10.2307/258154 · Cited by 2,431 · cited 5×
“Researchers should not simplify the concept but invoke it: ‘what elements are loosely coupled, what domains are they coupled on, and what are the characteristics of the couplings and decouplings?’ (Orton and Weick, 1990).”
BackgroundInfluentialIf Only We Knew What We Know: Identification and Transfer of Internal Best Practices
O'Dell, C., & Grayson, C. J. (1998) · California Management Review · doi:10.2307/41165948 · Cited by 1,543
von Krogh, G. (1998) · California Management Review · doi:10.2307/41165947 · Cited by 1,453
Managing Business Relationships
(2017) · Project Management · doi:10.1201/9780203710739-11 · Cited by 1,307
Powell, W. W. (1998) · California Management Review · doi:10.2307/41165952 · Cited by 1,096 · cited 3×
“These conditions differ from the situation in many other industries (Powell, 1998).”
BackgroundInfluentialBrown, J. S., & Duguid, P. (1998) · California Management Review · doi:10.2307/41165945 · Cited by 911
The four roles of supply chain management in construction
Vrijhoef, R., & Koskela, L. (2000) · European Journal of Purchasing & Supply Management · doi:10.1016/s0969-7012(00)00013-7 · Cited by 862 · cited 6×
“They are loose in terms of the coupling between the production of building materials and what is done on site; see e.g. Vrijhoef and Koskela (2000) and Akintoye et al. (2000).”
BackgroundInfluential
Research works printed but not linked: 6
- Björkegren, C. Learning for the next project. Proceedings of the 3rd Conference on Organisational Learning. Edited by: Easterby-Smith, M., Araujo, I. and Burgoyne, J. pp.107–123. Lancaster University.
- Crichtori C., 1966, Interdependence and Uncertainly: A Study of the Building Industry
- Gadde L. E., 2001, Supply Newwork Strategies
- Meyer J., 1975, Notes on a structure of educational organizations; quoted in Weick (1976)
- Powell W., 1991, Markets, Hierarchies & Networks, 265
- Winch G., 1987, Managing Construction Worldwide, Vol. 2, Productivity and Human factors
Cited by
Items 401–500 of 1,000
High reliability organizing at the boundary of the CM domain
Scholtenhuis, L. O., & Dorée, A. G. (2014) · Construction Management and Economics · doi:10.1080/01446193.2014.913801 · Cited by 23
“Examples of where this has happened in the CM arena include: transaction costs economics (e.g. Winch, 1989); loosely coupled systems theory (e.g. Dubois and Gadde, 2002; Dorée and Holmen, 2004); supply chain (e.g. Cheng et al., 2001; Love et al., 2004) and trust and partnering (e.g. Wood et al.,…”
BackgroundAbdirad, H. (2021) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000988 · Cited by 20
The design and implementation of product development process models in construction companies
Tzortzopoulos, P. (2004) · University of Huddersfield Repository (University of Huddersfield) · Cited by 35
Domestic retrofit: understanding capabilities of micro-enterprise building practitioners
Simpson, K., Murtagh, N., & Owen, A. M. (2021) · Buildings and Cities · doi:10.5334/bc.106 · Cited by 25
Slack in Construction - Part 1: Core Concepts
Formoso, C. T., Tommelein, I. D., Saurin, T. A., Koskela, L., Fireman, M. C. T., Barth, K. B., Bataglin, F. S., Viana, D. D., Coelho, R. V., Singh, V. V., et al. (2021) · Annual Conference of the International Group for Lean Construction · doi:10.24928/2021/0183 · Cited by 19
“Structural complexity is strongly related to the degree of coupling between two units, (Dubois and Gadde, 2002).”
BackgroundManaging mistrust in construction using DLT: a review of use-case categories for technical decisions
Hunhevicz, J., & Hall, D. (2019) · Computing in construction · doi:10.35490/ec3.2019.171 · Cited by 21
Dispersed Manufacturing Networks: Challenges for Research and Practice
Dekkers, R. (2009) · Springer eBooks · doi:10.1007/978-1-84882-468-3 · Cited by 21
Hardie, M., Miller, G., Manley, K., & McFallan, S. (2006) · Portland International Conference on Management of Engineering and Technology (PICMET) · doi:10.1109/picmet.2005.1509697 · Cited by 19
“Construction has been described as a “loosely coupled system” characterized by continuously increasing complexity in projects [13].”
BackgroundBühler, M. M., Nübel, K., Jelinek, T., Köhler, L., & Hollenbach, P. (2025) · Buildings · doi:10.3390/buildings15162899 · Cited by 25
Hossain, M. A., Bissenova, A., & Kim, J. R. (2019) · Buildings · doi:10.3390/buildings9050113 · Cited by 18
Papadonikolaki, E. (2019) · Wiley eBooks · doi:10.1002/9781119450535.ch2 · Cited by 19
The influence of multiple logics on the work of sustainability professionals
Gluch, P., & Hellsvik, S. (2023) · Construction Management and Economics · doi:10.1080/01446193.2023.2214252 · Cited by 25
“The decentralized nature of projects implies a decoupling of temporary projects and the permanent organization (Dubois and Gadde 2002), the latter of which follows a corporate business logic.”
BackgroundKnowledge externalities and demand pull: The European evidence
Antonelli, C., & Gehringer, A. (2015) · Economic Systems · doi:10.1016/j.ecosys.2015.03.001 · Cited by 18
Level of satisfaction and issues with procurement systems used in the Malaysian public sector
Jaafar, M., & Radzi, N. M. (2013) · Construction Economics and Building · doi:10.5130/ajceb.v13i1.2830 · Cited by 18
Can knowledge sharing mitigate the effect of construction project complexity?
Cooke, T. (2013) · Construction Innovation · doi:10.1108/14714171311296093 · Cited by 18
Construction Innovation: Addressing the Project-Product Gap in the Swedish Construction Sector
Rundquist, J., Emmitt, S., Halila, F., Hjort, B., & Larsson, B. (2013) · International Journal of Innovation Science · doi:10.1260/1757-2223.5.1.1 · Cited by 18
“However, the complexity of the sector suggests that these methods could be inapplicable or even counterproductive [16].”
BackgroundInfluentialResource-loaded piping spool fabrication scheduling: material-supply-driven optimization
Liu, J., Soleimanifar, M., & Lu, M. (2017) · Visualization in Engineering · doi:10.1186/s40327-017-0044-3 · Cited by 18
Systemic Innovation of Complex One-off Products: The Case of Green Buildings
Katila, R., Levitt, R. E., & Sheffer, D. A. (2018) · Emerald Group Publishing Limited eBooks · doi:10.1108/s0742-332220180000040011 · Cited by 21
Ogunrinde, O., Nnaji, C. A., & Amirkhanian, A. N. (2020) · Journal of Infrastructure Systems · doi:10.1061/(asce)is.1943-555x.0000595 · Cited by 18
New Business Models for Industrialized Construction
Hall, D., Lessing, J., & Whyte, J. K. (2021) · Structural integrity · doi:10.1007/978-3-030-82430-3_13 · Cited by 18
The Potential of Improving Construction Transport Time Efficiency—A Freight Forwarder Perspective
Naz, F., Fredriksson, A., & Ivert, L. K. (2022) · Sustainability · doi:10.3390/su141710491 · Cited by 18
“[34] suggest that the root cause of inefficient construction transport is a lack of transport planning and organizing among the involved actors, such as contractors, sub-contractors, material suppliers and transporters.”
BackgroundInfluentialCao, D., Teng, X., Chen, Y., Tan, D., & Wang, G. (2023) · Asia Pacific Journal of Innovation and Entrepreneurship · doi:10.1108/apjie-02-2023-0027 · Cited by 28
The integration of human relationships in capital development projects: A case study of BSF scheme
Ndoni, D. H., & Elhag, T. (2010) · International Journal of Managing Projects in Business · doi:10.1108/17538371011056093 · Cited by 22
Mechanisms of deviations: observations of projects in practice
Hällgren, M. (2009) · International Journal of Managing Projects in Business · doi:10.1108/17538370910991188 · Cited by 21
Contingent factors affecting network learning
Peters, L. D., Pressey, A. D., & Johnston, W. J. (2016) · Journal of Business Research · doi:10.1016/j.jbusres.2016.02.020 · Cited by 18
“…from project to project and loose network couplings, inhibiting the ability of members to form sustained cognitive structures that support learning (Dubois & Gadde, 2002); and (3) short-lived site-specific project-based activity and uncertainty due to a lack of complete specification (Dubois &…”
BackgroundResultInfluentialCreating relationship continuity across projects in the construction industry
Havenvid, M. I., Holmén, E., Linné, Å., & Pedersen, A. (2017) · IMP Journal · doi:10.1108/imp-07-2016-0015 · Cited by 18
Beyond Project Closure: Why Some Business Relationships Recur in Subsequent Projects
Bengtson, A., Havila, V., & Åberg, S. (2018) · Project Management Journal · doi:10.1177/875697281804900206 · Cited by 18
Competition versus interaction as a way to promote innovation in the construction industry
Havenvid, M. I. (2015) · IMP Journal · doi:10.1108/imp-02-2015-0005 · Cited by 18
Daniel, E. I., Oshodi, O. S., Dabara, D. I., & Dimka, N. (2023) · Construction Innovation · doi:10.1108/ci-06-2022-0148 · Cited by 21
Biersteker, E., & van Marrewijk, A. H. (2023) · Construction Management and Economics · doi:10.1080/01446193.2023.2210695 · Cited by 17
Hunhevicz, J., Hall, D., Brasey, P.-A., Bonanomi, M. M. M., & Fischer, M. A. (2024) · Project Leadership and Society · doi:10.1016/j.plas.2024.100132 · Cited by 24
Project delivery models — situational or fixed design?
Klakegg, O. J. (2017) · IEEE International Conference on Computer Sciences and Information Technologies (CSIT) · doi:10.1109/stc-csit.2017.8099449 · Cited by 17
Effects of procurement on construction project performance
Eriksson, P. E., & Westerberg, M. (2009) · DiVA (Luleå University of Technology) · Cited by 17
A systematic approach to develop risk registry frameworks for complex projects
Khallaf, R., Naderpajouh, N., & Hastak, M. (2018) · Built Environment Project and Asset Management · doi:10.1108/bepam-08-2017-0051 · Cited by 20
The optimal tuning, within carbon limits, of thermal mass in naturally ventilated buildings
Craig, S. (2019) · Building and Environment · doi:10.1016/j.buildenv.2019.106373 · Cited by 17
Zhu, Q., Wei, P., Shi, Y., & Du, J. (2020) · ASCE Construction Research Congress (CRC) · doi:10.1061/9780784482858.015 · Cited by 21
UNDERSTANDING COMPLEXITY IN THE AEC INDUSTRY
Wood, H. L., Piroozfar, P. A. E., & Farr, E. R. P. (2013) · University of Brighton Repository (University of Brighton) · Cited by 23
Counterfeiting Risk Governance in the Capital Projects Supply Chain
Naderpajouh, N., Hastak, M., Gokhale, S. B., Bayraktar, M. E., Iyer, A. V., & Arif, F. (2014) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000943 · Cited by 20
Investigating informality in construction: philosophy, paradigm and practice
Gajendran, T., Brewer, G. J., Runeson, G., & Dainty, A. (2011) · Construction Economics and Building · doi:10.5130/ajceb.v11i2.2201 · Cited by 24
Hunhevicz, J., Brasey, P.-A., Bonanomi, M. M. M., Hall, D., & Fischer, M. A. (2022) · arXiv (Cornell University) · doi:10.48550/arxiv.2207.07002 · Cited by 21
Ouyang, T., Liu, F., & Huang, B. (2022) · Scientific Reports · doi:10.1038/s41598-022-22374-y · Cited by 16
Nigra, M., & Bossink, B. A. G. (2023) · Journal of Construction Engineering and Management · doi:10.1061/jcemd4.coeng-12881 · Cited by 17
Zhou, S. (2023) · Building Research & Information · doi:10.1080/09613218.2023.2200157 · Cited by 16
“These mean, high interdependences across modules, and relevant technologies, and tasks (Barlow et al., 2003; Gann, 1996), and uncertainties due to a lack of understanding of the resources and site environment (Dubois & Gadde, 2002).”
BackgroundFang, Y., & Gao, S. (2024) · Construction Innovation · doi:10.1108/ci-12-2023-0302 · Cited by 17
Razak, A. R. A., Othman, A. A., & Sundram, V. P. K. (2015) · Procedia Economics and Finance · doi:10.1016/s2212-5671(15)01209-5 · Cited by 16
Reframing construction within the built environment sector
de Valence, G. (2018) · Engineering Construction & Architectural Management · doi:10.1108/ecam-02-2018-0088 · Cited by 22
Effect of Construction Project Performance on Economic Development of Nigeria
Olatunji, S. O., Oke, A. E., Aghimien, D. O., & Seidu, S. A. (2016) · Journal of Economics and Sustainable Development · Cited by 24
Canonico, P., Nito, E. D., Esposito, V., Iacono, M. P., & Mangia, G. (2020) · Management Decision · doi:10.1108/md-10-2019-1515 · Cited by 18
Dhawan, K., Tookey, J., GhaffarianHoseini, A., & Ghaffarianhoseini, A. (2022) · Smart and Sustainable Built Environment · doi:10.1108/sasbe-08-2021-0151 · Cited by 16
An IoT System for Real-Time Monitoring of DC Motor Overload
Radonjić, M., Zečević, Ž., & Krstajić, B. (2022) · Electronics · doi:10.3390/electronics11101555 · Cited by 16
Wilde, K., & Hermans, F. (2024) · Environmental Innovation and Societal Transitions · doi:10.1016/j.eist.2024.100814 · Cited by 20
Improving Onsite Scheduling: Looking Into the Limits of the Last Planner System
Lindhard, S. M., & Wandahl, S. (2013) · VBN Forskningsportal (Aalborg Universitet) · Cited by 16
Erbil, Y., Akıncıtürk, N., & Acar, E. (2012) · Architectural Engineering and Design Management · doi:10.1080/17452007.2012.738038 · Cited by 16
“Interviewees share the common view in the literature that the latter group is usually more ‘conservative’ and difficult to communicate about innovations (Dubois & Gadde, 2002; Miozzo & Dewick, 2004; Pries & Janszen, 1995), as they are less likely to abandon the conventional technical solutions.”
BackgroundOthman, A. A., & Rahman, S. A. (2010) · Journal of Surveying Construction & Property · doi:10.22452/jscp.vol1no1.2 · Cited by 25
Ekeskär, A. (2016) · Linköping University Electronic Press eBooks · doi:10.3384/lic.diva-128820 · Cited by 25
Measuring cash flow and overdraft for fuzzy project networks with overlapping activities
Yu, M.-C., Yeh, H.-C., & Van-Loi, D. A. N. G. (2017) · Journal of Civil Engineering and Management · doi:10.3846/13923730.2016.1210215 · Cited by 16
“Dubois and Gadde (2002) regarded the construction project as a loosely coupled system wherein an overlap of construction elements could happen due to the complexity and uncertainty in the industry.”
BackgroundProjects as creators of the preconditions for standardized and routinized operations in use
Smyth, H. (2018) · International Journal of Project Management · doi:10.1016/j.ijproman.2018.08.004 · Cited by 17
“This is clearer once project execution is seen as part of a broader network, system or ecosystem (Gadde and Dubois, 2002; Kardes, et al., 20913; Badi, et al., 2017).”
BackgroundInterorganizational R&D projects in clustering contexts: A resource interaction perspective
Silvestri, R., Bocconcelli, R., Carloni, E., & Pagano, A. (2022) · Journal of Business Research · doi:10.1016/j.jbusres.2022.04.067 · Cited by 15
Organizing coopetitive tensions: Collaborative consumption in project ecologies
Naderpajouh, N., Zolghadr, A., & Clegg, S. R. (2024) · International Journal of Project Management · doi:10.1016/j.ijproman.2024.102586 · Cited by 18
Mazzoni, F., & Losacker, S. (2024) · Progress in Economic Geography · doi:10.1016/j.peg.2024.100023 · Cited by 16
Management Challenges within Multiple Project Environments: Lessons for Developing Countries
Hashim, N. I., Chileshe, N., & Baroudi, B. (2013) · Australasian Journal of Construction Economics and Building - Conference Series · doi:10.5130/ajceb-cs.v1i2.3163 · Cited by 15
An Industrial Network Perspective on Innovation in Construction
Bygballe, L. E., Håkansson, H., & Havenvid, M. I. (2014) · Construction Innovation · doi:10.1002/9781118655689.ch7 · Cited by 15
The value of project execution services: a problem and uncertainty perspective
Hellström, M., Wikström, R., Gustafsson, M., & Luotola, H. (2016) · Construction Management and Economics · doi:10.1080/01446193.2016.1151062 · Cited by 15
Experimental and numerical prototyping of a complex cement column formwork for construction
Dakhli, Z., & Lafhaj, Z. (2016) · Architectural Engineering and Design Management · doi:10.1080/17452007.2016.1226745 · Cited by 15
“At the same time, the construction industry is facing problems such as high rates of accidents on construction sites, quality and work efficiency (Dubois & Gadde, 2002).”
BackgroundBlueprinting construction logistics services for quality improvement
Gremyr, I., Bäckstrand, J., Fredriksson, A., Gatenholm, G., & Halldórsson, Á. (2022) · Construction Management and Economics · doi:10.1080/01446193.2022.2130384 · Cited by 15
“A key challenge for quality improvements in a construction context has long been argued to be the temporary project-based nature (Dubois and Gadde 2002), due to which improvements are difficult to sustain from one project to another (Smyth 2010, Backlund and Sundqvist 2018).”
BackgroundMethodInfluentialGopal, S., Viswanathan, K. K., & Sambasivan, M. (2018) · Engineering Management Journal · doi:10.1080/10429247.2018.1485000 · Cited by 17
“Dubois and Gadde (2002) highlighted that processes and systems in the construction industry hamper innovation.”
BackgroundGłodziński, E. (2021) · Measuring Business Excellence · doi:10.1108/mbe-06-2019-0051 · Cited by 15
Framework for enhanced third-party relationships in project networks
Sariola, R., & Martinsuo, M. M. (2015) · International Journal of Managing Projects in Business · doi:10.1108/ijmpb-10-2014-0069 · Cited by 15
Digital transformation in the construction industry: barriers and leadership competencies
Yang, K., Sunindijo, R. Y., & Wang, C. (2026) · International Journal of Construction Management · doi:10.1080/15623599.2026.2630248 · Cited by 15
Organizing construction logistics outsourcing: a logistics strategy perspective
Haglund, P., & Janné, M. (2023) · Construction Innovation · doi:10.1108/ci-01-2023-0017 · Cited by 14
The co-ordinative practices of temporary organisations
Peters, L. D., & Pressey, A. D. (2016) · Journal of Business and Industrial Marketing · doi:10.1108/jbim-12-2014-0259 · Cited by 18
“To aid internal validity, multiple perspectives were collected through interviewing actors at different points in the network (Yin, 1994) and through a process of pattern matching (Denzin and Lincoln, 1994; Eisenhardt, 1989) by comparing empirical patterns established in previous studies (Dubois and Gadde, 2002) and b…”
MethodA review on causes of cost overrun in the construction projects
M., F. A. A., Bahamid, R. A., Doh, S. I., Rahimi, A. R. A., Saad, M., & Suil, A. (2019) · UMP Institutional Repository (Universiti Malaysia Pahang) · Cited by 14
Lundberg, O., Sandberg, J., & Nylén, D. (2020) · Hawaii International Conference on System Sciences (HICSS) · doi:10.24251/hicss.2020.531 · Cited by 14
“The firm operates in a conservative and traditional productbased industry characterized by slow adaption and development of digital innovations [11, 26].”
BackgroundGopal, S., Sambasivan, M., & Viswanathan, K. K. (2020) · Built Environment Project and Asset Management · doi:10.1108/bepam-07-2020-0118 · Cited by 14
Self-organizing in urban development: developers coordinating between construction projects
Hedborg, S., & Rosander, L. (2023) · Construction Management and Economics · doi:10.1080/01446193.2023.2181367 · Cited by 15
“This was done in an iterative manner by both authors going back and forth between the empirics and the literature (Dubois & Gadde 2002b).”
BackgroundMethodInstitutional Waste within the UK Construction Procurement Context: A Conceptual Framework
Sarhan, S., Pasquire, C., King, A., & Manu, E. (2019) · Engineering Project Organization Journal · doi:10.25219/epoj.2018.00102 · Cited by 14
Taking Lead for Sustainability: Environmental Managers as Institutional Entrepreneurs
Gluch, P., & Månsson, S. (2021) · Sustainability · doi:10.3390/su13074022 · Cited by 16
“However, highly institutionalized project practices also make the industry “slow” and less receptive to change [15,16], which complicates the work of sustainability professionals [17–19].”
BackgroundMota, J., & de Castro, L. M. (2017) · Industrial Marketing Management · doi:10.1016/j.indmarman.2017.12.003 · Cited by 14
‘What does this mean’? Sensemaking in the strategic action field of construction
Fellows, R. F., & Liu, A. M. M. (2016) · Construction Management and Economics · doi:10.1080/01446193.2016.1231409 · Cited by 22
“Establishing harmonious working is hampered by changes in group membership – whether individuals and/ or organizations (e.g. membership of construction project TMos).”
BackgroundInfluentialТрач, Р., Chupryna, I., Tormosov, R., Druzhynin, M., Trach, Y., Ryzhakova, G., & Ratnikov, D. (2026) · Sustainability · doi:10.3390/su18031380 · Cited by 13
Investigating Adoption of Digital Technologies in Construction Projects
Gholami, Y. (2022) · Linköping studies in science and technology. Thesis · doi:10.3384/9789180750257 · Cited by 13
Amarkhil, Q., & Elwakil, E. (2023) · International Journal of Construction Management · doi:10.1080/15623599.2023.2286888 · Cited by 13
“Completion times for tasks can vary significantly due to factors like material characteristics, resource availability, and other external factors (Dubois and Gadde 2002; Kyriakidis et al. 2012; Carlier and Moukrim 2015; Amarkhil et al. 2020).”
Bug or feature? Institutional misalignments between construction technology and venture capital
Walzer, A. N., Tan, T., Graser, K., & Hall, D. (2024) · Construction Management and Economics · doi:10.1080/01446193.2024.2401818 · Cited by 13
“Inspired by Orlikowski’s (2010) “studying practice” approach, this study explores how loose couplings in the construction industry impede coordination and knowledge sharing, thus hindering innovation and productivity (Dubois and Gadde 2002a).”
Disruptions and resilience in construction supply chains
Golden, J., Mahdavisharif, M., Castelblanco, G., Mangano, G., & Ferrari, A. (2025) · Automation in Construction · doi:10.1016/j.autcon.2025.106577 · Cited by 13
Sandberg, R., Löwstedt, M., & Räisänen, C. (2020) · Construction Management and Economics · doi:10.1080/01446193.2020.1849751 · Cited by 13
“Drawing on Weick (1976) influential theory of organizations as loosely coupled systems, Dubois and Gadde (2002) suggest that the construction industry as a whole constitutes such a system.”
BackgroundMethodInfluentialOrganizational couplings: a literature review
Arango-Vasquez, L., & Gentilin, M. (2021) · Innovar · doi:10.15446/innovar.v31n79.91898 · Cited by 16
Janné, M., Fredriksson, A., Billger, M., Brusselaers, N., Fufa, S. M., Fahel, R. A., & Mommens, K. M. (2021) · ISOCARP World Planning Congress · doi:10.47472/cnkiaufi · Cited by 13
Liu, D., Lu, W., & Niu, Y. (2022) · Journal of Construction Engineering and Management · doi:10.1061/jcemd4.coeng-12475 · Cited by 13
A longitudinal study on logistics strategy: the case of a building contractor
Haglund, P., & Rudberg, M. (2022) · The International Journal of Logistics Management · doi:10.1108/ijlm-02-2022-0060 · Cited by 14
Involving customers in innovation: knowledgeability and agency as process variables
Peters, L. D., Pressey, A. D., Gilchrist, A., & Johnston, W. J. (2018) · Journal of Business and Industrial Marketing · doi:10.1108/jbim-04-2016-0083 · Cited by 13
“…at different points in the network, and at different points in time (Yin, 1994); and a process of pattern-matching (Denzin & Lincoln, 1994; Eisenhardt, 1989) by comparing with empirical patterns established in previous studies (e.g., Dubois & Gadde, 2002) and among the interviewed participants.”
ResultUsers’ influence on inter-organizational innovation: mapping the receptive context
Hedborg, S., Gustavsson, T. K., & Eriksson, P. E. (2018) · Construction Innovation · doi:10.1108/ci-12-2017-0095 · Cited by 14
Abdirad, H., Dossick, C. S., Johnson, B. R., & Migliaccio, G. C. (2020) · Building Research & Information · doi:10.1080/09613218.2020.1750939 · Cited by 16
Circumventing Obstacles in Digital Construction Design – A Workaround Theory Perspective
Merschbrock, C., & Figueres-Munoz, A. (2015) · Procedia Economics and Finance · doi:10.1016/s2212-5671(15)00174-4 · Cited by 13
“…industry negatively influencing BIM deployment include its fragmented nature, the slow development of common data-exchange practices, and the lack of knowledge about the possibilities of information and communication technology (Dubois & Gadde, 2002; Howard & Björk, 2008; Linderoth et al., 2011).”
BackgroundZong, H., Wang, G., & Cao, D. (2023) · Engineering Construction & Architectural Management · doi:10.1108/ecam-05-2022-0442 · Cited by 12
Eriqat, M. O., Sweis, R. J., & Sweis, G. J. (2024) · Construction Innovation · doi:10.1108/ci-08-2023-0186 · Cited by 16
Investigating Residential Building Materials in a Circular Economy: An Australian Perspective
Dorignon, L., Oswald, D., Kempton, L., Boehme, T., Iyer‐Raniga, U., Moore, T., & Dalton, T. (2024) · Journal of Construction Engineering and Management · doi:10.1061/jcemd4.coeng-13595 · Cited by 15
Fredriksson, A., Ivert, L. K., & Naz, F. (2025) · Construction Management and Economics · doi:10.1080/01446193.2025.2449996 · Cited by 12
“The construction setting has unique characteristics, such as the loosely coupled systems of actors (Dubois and Gadde 2002b) and its remaining immaturity regarding outsourcing logistics services and lack of trust over the involvement of TPL providers (Eriksson et al. 2021, Ekesk € ar et al. 2022).”
InfluentialQuantitative analysis of blind tower-crane lifts using laser-scanning information
Shapira, A., Filin, S., & Wicnudel, A. (2014) · Construction Innovation · doi:10.1108/ci-09-2013-0039 · Cited by 12
Löwstedt, M., & Sandberg, R. (2020) · Engineering Construction & Architectural Management · doi:10.1108/ecam-11-2018-0489 · Cited by 18
Martínez, E., & Cisterna, D. (2023) · Annual Conference of the International Group for Lean Construction · doi:10.24928/2023/0236 · Cited by 12
“This slow pace of digitalization is usually attributable to systematic industry barriers such as fragmentation, organizational decentralization, and the uniqueness and transience nature of construction projects (Dubois & Gadde, 2002; Hall et al., 2020).”
Background
Metadata
- Authors
- Dubois, A., & Gadde, L.-E.
- Affiliations
- Chalmers University of Technology (SE)
- ORCID
- Dubois, Anna
- Venue
- Construction Management and Economics
- Publisher
- Informa UK Limited
- Published
- 2002-10
- Volume
- 20
- Issue
- 7
- Pages
- 621-631
- ISSN
- 0144-6193 (ISSN-L)
- 1466-433X
- OpenAlex
- W2162531320
- Cited by
- 1,041
- References
- 36
- Citations by year
- 2026: 48 · 2025: 47 · 2024: 32 · 2023: 41 · 2022: 66 · 2021: 66 · 2020: 71 · 2019: 73 · 2018: 72 · 2017: 56 · 2016: 61 · 2015: 53 · 2014: 59 · 2013: 59 · 2012: 47
- FWCI
- 12.62
- Type
- journal article
- Language
- en
- Open access
- closed
- Locations
- Construction Management and Economics (publishedVersion)
- RePEc: Research Papers in Economics (submittedVersion)
- Topics
- Social Sciences › Decision Sciences › Management Science and Operations Research › Construction Project Management and Performance
- Social Sciences › Business, Management and Accounting › Management of Technology and Innovation › Product Development and Customization
- Physical Sciences › Engineering › Building and Construction › BIM and Construction Integration
- Keywords
- construction industry, loosely coupled systems, tight coupling, project networks, interorganizational networks, complexity, uncertainty, productivity, innovation, organizational learning
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.