The construction industry as a loosely coupled system: implications for productivity and innovation
The DOI matches its Crossref record; 37 of the 37 references it cites were found in a registry or an index.
Abstract
Previous research suggests that the construction industry is characterized by (1) particular complexity factors owing to industry specific uncertainties and interdependences, and (2) inefficiency of operations. The aim of this study was to analyse the operations and behaviour of firms as a means of dealing with complexity. The observations made indicate that the industry as a whole is featured as a loosely coupled system. Taking this as a starting point, the couplings among activities, resources and actors were analysed in different dimensions. The pattern of couplings builds on two interdependent layers: tight couplings in individual projects and loose couplings based on collective adaptations in the permanent network. It is concluded that the pattern of couplings seems to favour short term productivity while hampering innovation and learning.
Overview
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
Claims other papers make about this one
Each is checked against this paper’s own text: does it say what the citing paper says it does?
In the citing paper
“but also on the fact that the construction industry is characterized by slow adaptation to new technologies (Dubois and Gadde 2002 )”
From A review of LLMs and their applications in the architecture, engineering and construction industry (2025) · cites this paper as Dubois and Gadde 2002
Citations
Cites
Educational Organizations as Loosely Coupled Systems
Weick, K. E. (1976) · Administrative Science Quarterly · doi:10.2307/2391875 · Cited by 5,142
Organizations and Environments
Hougland, J. G., Shepard, J. M., & Aldrich, H. E. (1980) · The Academy of Management Review · doi:10.2307/257814 · Cited by 2,862
Capturing Value from Knowledge Assets: The New Economy, Markets for Know-How, and Intangible Assets
Teece, D. J. (1998) · California Management Review · doi:10.2307/41165943 · Cited by 2,617 · cited 1×
“According to Teece (1998) the opportunities for learning are closely related to previous activities and experiences: if many aspects of a rm’s learning environment change simultaneously the ability to form cognitive structures favouring learning becomes severely restricted.”
BackgroundLoosely Coupled Systems: A Reconceptualization
Orton, J. D., & Weick, K. E. (1990) · The Academy of Management Review · doi:10.2307/258154 · Cited by 2,431 · cited 5×
“Researchers should not simplify the concept but invoke it: ‘what elements are loosely coupled, what domains are they coupled on, and what are the characteristics of the couplings and decouplings?’ (Orton and Weick, 1990).”
BackgroundInfluentialIf Only We Knew What We Know: Identification and Transfer of Internal Best Practices
O'Dell, C., & Grayson, C. J. (1998) · California Management Review · doi:10.2307/41165948 · Cited by 1,543
von Krogh, G. (1998) · California Management Review · doi:10.2307/41165947 · Cited by 1,453
Managing Business Relationships
(2017) · Project Management · doi:10.1201/9780203710739-11 · Cited by 1,307
Powell, W. W. (1998) · California Management Review · doi:10.2307/41165952 · Cited by 1,096 · cited 3×
“These conditions differ from the situation in many other industries (Powell, 1998).”
BackgroundInfluentialBrown, J. S., & Duguid, P. (1998) · California Management Review · doi:10.2307/41165945 · Cited by 911
The four roles of supply chain management in construction
Vrijhoef, R., & Koskela, L. (2000) · European Journal of Purchasing & Supply Management · doi:10.1016/s0969-7012(00)00013-7 · Cited by 862 · cited 6×
“They are loose in terms of the coupling between the production of building materials and what is done on site; see e.g. Vrijhoef and Koskela (2000) and Akintoye et al. (2000).”
BackgroundInfluential
Research works printed but not linked: 6
- Björkegren, C. Learning for the next project. Proceedings of the 3rd Conference on Organisational Learning. Edited by: Easterby-Smith, M., Araujo, I. and Burgoyne, J. pp.107–123. Lancaster University.
- Crichtori C., 1966, Interdependence and Uncertainly: A Study of the Building Industry
- Gadde L. E., 2001, Supply Newwork Strategies
- Meyer J., 1975, Notes on a structure of educational organizations; quoted in Weick (1976)
- Powell W., 1991, Markets, Hierarchies & Networks, 265
- Winch G., 1987, Managing Construction Worldwide, Vol. 2, Productivity and Human factors
Cited by
Items 501–600 of 1,000
The balance of change and continuity in the German construction sector’s development path
Butzin, A., & Rehfeld, D. (2013) · ZFW – Advances in Economic Geography · doi:10.1515/zfw.2013.0002 · Cited by 12
Naveed, M. H., Thaheem, M. J., Khurshid, M. B., & Farooqui, R. U. (2016) · International Journal of Construction Education and Research · doi:10.1080/15578771.2016.1183732 · Cited by 12
Chen, B., Liu, A. M. M., & Hua, Y. (2017) · WIT transactions on the built environment · doi:10.2495/bim170171 · Cited by 12
“Much of this criticism can be attributed, at least in part, to the highly fragmented delivery structure that has beset the industry [3].”
BackgroundProduct Service Systems in Construction Supply Chains
Andersson, N., & Lessing, J. (2019) · Periodica Polytechnica Architecture · doi:10.3311/ppar.12726 · Cited by 12
Yan, L., Guo, L., & Ning, Y. (2020) · Advances in Civil Engineering · doi:10.1155/2020/3935843 · Cited by 12
Value chain management in Sri Lankan construction industry: contractor’s perspective
Perera, C. S. R., & Gunatilake, S. (2020) · International Journal of Construction Management · doi:10.1080/15623599.2020.1843110 · Cited by 12
“Competitive bidding, which is one the common procurement methods in the construction industry, is often a measure of efficiency of construction companies (Dubois and Gadde 2002; Kaushik 2018).”
BackgroundLenderink, B., Boes, J., Halman, J. I. M., Voordijk, H., & Dorée, A. G. (2022) · Innovation The European Journal of Social Science Research · doi:10.1080/13511610.2022.2094898 · Cited by 16
“…& Case 8 (Smart way to sustainable municipal buildings): Two programmes classi fi ed as a moderate degree of innovation and with competition based coopetition (Case 7) and a coopetition based cooperation (Case 8) Dubois and Gadde (2002) view learning as the sine qua non of technological innovation.”
Lu, W., Yang, H., & Langston, C. (2015) · Routledge eBooks · doi:10.4324/9781315882925 · Cited by 12
Rhetorical Strategies to Diffuse Social Procurement in Construction
Troje, D. (2018) · Chalmers Research (Chalmers University of Technology) · Cited by 15
Improving construction processes by integrating lean, green, and six-sigma
Banawi, A.-A. A. (2013) · D-Scholarship@Pitt (University of Pittsburgh) · Cited by 12
Federating information portals through an ontology-centred approach: A feasibility study
Rezgui, Y., Wilson, I. E., Miles, J. C., & Hopfe, C. J. (2010) · Advanced Engineering Informatics · doi:10.1016/j.aei.2010.02.001 · Cited by 12
Efficient Governance of Construction Projects through Cooperative Procurement Procedures
Eriksson, P. E. (2007) · DiVA (Luleå University of Technology) · Cited by 17
Construction logistics status and actors’ opinions – an industry wide survey in Sweden
Fredriksson, A., Sezer, A. A., & Sundquist, V. (2024) · Construction Innovation · doi:10.1108/ci-10-2023-0255 · Cited by 11
Haaja, E., & Evers, N. (2025) · Industrial Marketing Management · doi:10.1016/j.indmarman.2025.06.006 · Cited by 13
Bajracharya, A. (2014) · International Journal of System Dynamics Applications · doi:10.4018/ijsda.2014100105 · Cited by 11
“The construction industry has evolved as a predominantly loosely coupled system whereas its project based production process as a tightly coupled system (Dubois and Gadde, 2002).”
BackgroundPercent Base Design and Initial Award Performance in Design–Build Highway Projects
Papajohn, D., & Asmar, M. E. (2020) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000759 · Cited by 11
Evaluation of field labor and management productivity in the USA construction industry
Jahanger, Q. K., Trejo, D., & Louis, J. (2023) · Engineering Construction & Architectural Management · doi:10.1108/ecam-09-2022-0918 · Cited by 11
Lu, W., Peng, Y. M., Xue, F., Chen, K., Niu, Y., & Chen, X. (2017) · Elsevier eBooks · doi:10.1016/b978-0-12-409548-9.09677-9 · Cited by 11
Identification of Delay Causing Actor in the Indian Real Estate Project: an AHP-Based Approach
Deep, S., Asim, M., Kesarwani, N., & Kandpal, S. (2018) · Baltic Journal of Real Estate Economics and Construction Management · doi:10.2478/bjreecm-2018-0009 · Cited by 11
“Such factors lead to occurrence of short-term relationships in the construction industry between a client and a contractor (Dubois & Gadde, 2002; Fearne & Fowler, 2006; Qu et al., 2011; Ardeshir et al., 2014; Janipha et al., 2015; Cerchione & Esposito, 2016; Ali Kazmi, 2017; Ju et al., 2017)…”
BackgroundDreher, J., & Thiel, J. (2021) · European Planning Studies · doi:10.1080/09654313.2021.1951176 · Cited by 11
“Scholars maintain that these particularities hamper innovation (e.g. BMVBS 2011, 84; Butzin and Rehfeld 2009, 13; Dubois and Gadde 2002, 628/629).”
BackgroundZhao, N., Lei, C., Liu, H., & Wu, C. (2022) · Sustainability · doi:10.3390/su14159070 · Cited by 11
Making sense of stakeholder values emergence
Mills, G., & Austin, S. A. (2014) · Engineering Project Organization Journal · doi:10.1080/21573727.2014.940895 · Cited by 12
Supply Chain Systems Engineering in Construction
Vrijhoef, R., & de Ridder, H. A. J. (2007) · Cited by 11
In pursuit of innovation value in building projects
Maghsoudi, S., Duffield, C. F., & Wilson, D. (2016) · International Journal of Innovation Science · doi:10.1108/ijis-03-2016-003 · Cited by 11
Sensemaking in collaborative networks: creating and balancing activities in open business models
Peronard, J.-P., & Brix, J. (2018) · International Journal of Entrepreneurship and Innovation Management · doi:10.1504/ijeim.2018.095044 · Cited by 14
Rapid Alignment of Resources and Capabilities in Time-Bound Networks: A Theoretical Proposition
Razzak, M. A., Al-Kwifi, O. S., & Ahmed, Z. U. (2018) · Global Journal of Flexible Systems Management · doi:10.1007/s40171-018-0192-x · Cited by 13
“Dubois and Gadde (2002) followed a similar approach by suggesting that the loosely coupled system at the industry level adversely affects innovation.”
BackgroundExploratory Study on Current Status of Startups in the Hong Kong Built Environment Sector
Lam, P. T. I., & Fu, F. C. S. (2019) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000696 · Cited by 11
Exploring First-Year Engineering Students’ Innovation Self-Efficacy Beliefs by Gender and Discipline
Verdín, D., Godwin, A., & Benedict, B. S. (2020) · Journal of Civil Engineering Education · doi:10.1061/(asce)ei.2643-9115.0000020 · Cited by 11
Benchmarking of thesis research: a case study
Shahalizadeh, M., Amirjamshidi, G., & Shahalizadeh, S. (2009) · Benchmarking An International Journal · doi:10.1108/14635770910936540 · Cited by 11
The sustainability of construction small-medium enterprises (SMEs) in South Africa
Moloi, N. (2013) · University of the Witwatersrand, Johannesburg Institutional Repository on DSpace (University of the Witwatersrand, Johannesburg) · Cited by 23
Vigren, O., & Eriksson, K. (2025) · Journal of European Real Estate Research · doi:10.1108/jerer-04-2024-0027 · Cited by 10
Integration of Emerging Technologies with Construction Practices in Australia
Chaaya, M. L., Sarkis, L. M., & Tahmasebinia, F. (2025) · Buildings · doi:10.3390/buildings15030396 · Cited by 11
How to Succeed in Low-Energy Housing—Path Creation Analysis of Low-Energy Innovation Projects
Pässilä, P., Pulkka, L., & Junnila, S. (2015) · Sustainability · doi:10.3390/su7078801 · Cited by 10
Imitation and adaptation: lessons from a case study of a metro rail project in India
Balasubramani, M., Mahalingam, A., & Scott, W. R. (2019) · Construction Management and Economics · doi:10.1080/01446193.2019.1619932 · Cited by 11
“Scholars adopting a practice-based view of project governance first observed that the generic conception of project governance only partially explains the decisions enacted in projects (Dubois and Gadde 2002).”
BackgroundWilliams, J., Fugar, F. D. K., & Adinyira, E. (2021) · International Journal of Construction Management · doi:10.1080/15623599.2021.2006417 · Cited by 10
“Dubois and Gadde (2002) supported this position by positing that knowledge means a knower who can offer it to its immediate environment, e.g. teams, networks, and other surroundings.”
BackgroundUsing Design Science To Further Develop Visual Management Application in Construction
Brady, D. A., Tzortzopoulos, P., & Rooke, J. A. (2012) · University of Huddersfield Repository (University of Huddersfield) · Cited by 10
Together on the path to construction innovation: yet another example of escalation of commitment?
Rutten, M. E. J., Dorée, A. G., & Halman, J. I. M. (2014) · Construction Management and Economics · doi:10.1080/01446193.2014.933855 · Cited by 10
Fayek, A. R., & Tsehayae, A. A. (2012) · Annual Meeting of the North American Fuzzy Information Processing Society (NAFIPS) · doi:10.1109/nafips.2012.6291023 · Cited by 10
A review of the theory and measurement techniques of productivity in the construction industry
de Valence, G. (2015) · Routledge eBooks · doi:10.4324/9781315882925-17 · Cited by 10
Heylighen, A., Neuckermans, H., Casaer, M., & Dewulf, G. P. M. R. (2007) · Building Research & Information · doi:10.1080/09613210600945369 · Cited by 18
“This market consists of temporary coalitions of firms and individuals, which Dubois and Gadde (2002) define as ‘loose couplings’.”
BackgroundBresnen, M. (2009) · Wiley eBooks · doi:10.1002/9781444320916.ch4 · Cited by 16
Roles of accounting information in managerial work
Gullberg, C. (2014) · Uppsala University Publications (Uppsala University) · Cited by 63
The role of construction clients in digital innovation: insights from scenario analysis
Kussl, S., & Wald, A. E. (2025) · Construction Management and Economics · doi:10.1080/01446193.2024.2443658 · Cited by 9
Wuni, I. Y., & Eshun, B. T. B. (2025) · International Journal of Construction Management · doi:10.1080/15623599.2025.2583164 · Cited by 9
“The construction industry is considered a coupled system, with particularities of complexity (Dubois and Gadde 2002).”
Aslam, M. S., O’Reilly, D., & Shah, U. (2022) · International Business Review · doi:10.1016/j.ibusrev.2022.102081 · Cited by 9
Lambers, R., Cheung, Y. K. F., & Skitmore, M. (2023) · International Journal of Construction Management · doi:10.1080/15623599.2023.2252293 · Cited by 9
“…adheres to the rule of thumb principle (Roy et al. 2005; Manrique et al. 2015; Ye et al. 2015), missing out on the opportunity to innovate further (Dubois and Gadde 2002; Blayse and Manley 2004; Yusof et al. 2017) their practices to improve learned techniques (Shokri-Ghasabeh and Chileshe 2014),…”
BackgroundFixing concrete: inquiries, responsibility, power and innovation
Clegg, S. R., & Kreiner, K. (2014) · Construction Management and Economics · doi:10.1080/01446193.2013.848996 · Cited by 9
IDENTIFYING THE DETERMINANTS OF CONSTRUCTION INNOVATION
Manley, K. (2006) · QUT ePrints (Queensland University of Technology) · Cited by 9
Wu, H., Mao, C., & Liu, G. (2015) · Springer eBooks · doi:10.1007/978-3-662-46994-1_86 · Cited by 9
Understanding innovations in Malaysia’s construction industry: a study of four large national firms
Chang, Y. F., Rasiah, R., & Chan, W. M. (2016) · Asian Journal of Technology Innovation · doi:10.1080/19761597.2016.1248631 · Cited by 10
“Other studies also show that couplings and temporary coalitions are supportive of innovation in the construction industry (Dubois and Gadde 2002).”
BackgroundBuilding the Link between Technological Capacity Strategies and Innovation in Construction Companies
Ercan, T. Ş. (2019) · IntechOpen eBooks · doi:10.5772/intechopen.88238 · Cited by 9
Data Templates—Product Information Management Across Project Life-Cycle
Mêda, P., Sousa, H. J. C. D., & Hjelseth, E. (2020) · Building pathology and rehabilitation · doi:10.1007/978-3-030-46800-2_5 · Cited by 9
Takt Production as Operations Strategy: Client’s Perspective to Value-Creation and Flow
Lehtovaara, J., Heinonen, A., Ronkainen, M., Seppänen, O., & Peltokorpi, A. (2021) · Annual Conference of the International Group for Lean Construction · doi:10.24928/2021/0118 · Cited by 9
Construction tracking: implications of logistics data
Maxwell, D. W., & Couper, R. (2022) · Construction Innovation · doi:10.1108/ci-06-2021-0122 · Cited by 11
Walter, L., & Styhre, A. (2013) · Construction Management and Economics · doi:10.1080/01446193.2013.868632 · Cited by 14
Wacker, J. G., Hershauer, J. C., Walsh, K. D., & Sheu, C. (2013) · International Journal of Production Research · doi:10.1080/00207543.2013.836611 · Cited by 14
“Generally, construction of a major building involves building owners, building designers, and building contractors, along with the contractor’s subcontractors (Dubois and Gadde 2002).”
BackgroundThe Last Planner® System as an approach for coping with the complexity of construction projects
Saurin, T. A., & Rooke, J. A. (2020) · Routledge eBooks · doi:10.1201/9780429203732-16 · Cited by 15
Yang, Y., Zhang, Y., & Xie, H. (2020) · Sustainability · doi:10.3390/su12176902 · Cited by 9
Incentives for Innovation in Construction
Ørstavik, F. (2014) · Construction Innovation · doi:10.1002/9781118655689.ch2 · Cited by 9
A knowledge-based approach to innovation: An application for project-based firms
Bosch‐Sijtsema, P. M., & Postma, T. J. B. M. (2004) · University of Groningen research database (University of Groningen / Centre for Information Technology) · Cited by 9
Solution Selection in Digital Construction Design – A Lazy User Theory Perspective
Merschbrock, C., Tollnes, T., & Rolfsen, C. N. (2015) · Procedia Engineering · doi:10.1016/j.proeng.2015.10.097 · Cited by 9
“Moreover, the nature of construction projects with decentralized decision making and loose coupling foster an mindset where “nobody feels responsible for investing in technology that is best for the project” [12, 13].”
BackgroundSmart Construction Site: Ontology of Information System Architecture
Dakhli, Z., Danel, T., & Lafhaj, Z. (2019) · Modular and Offsite Construction (MOC) Summit Proceedings · doi:10.29173/mocs75 · Cited by 9
Characteristics of Innovative Production Home Builders
Koebel, C. T., & Cavell, M. (2013) · VTechWorks (Virginia Tech) · Cited by 9
Wu, Y. X., Zhao, B., & Li, Q. (2025) · Applied Sciences · doi:10.3390/app15073549 · Cited by 8
Beemsterboer, S., Baumann, H., & Wallbaum, H. (2025) · The International Journal of Life Cycle Assessment · doi:10.1007/s11367-025-02472-5 · Cited by 14
“LCA use was a central part of the development project, which at the time represented a best-practice case for building LCA at a construction company at the forefront of the sector.”
Interdisciplinary research for occupational safety and health knowledge
Pink, S., Waterson, P. E., Dainty, A., Cheyne, A., Haslam, R. A., Gibb, A., Morgan, J. D., Hartley, R., Finneran, A., & Bust, P. (2016) · Policy and Practice in Health and Safety · doi:10.1080/14773996.2016.1235832 · Cited by 8
“Thus, these loosely coupled organizations are temporarily tightly coupled through the project delivery process, a pattern of involvement that hampers learning and innovation across these inter-firm relationships (Dubois & Gadde, 2002).”
BackgroundManaging supply chain disruptions in the construction industry: an institutional approach
Bolomope, M. T., Nwadike, A. N., & Aigwi, I. E. (2024) · Journal of Financial Management of Property and Construction · doi:10.1108/jfmpc-01-2024-0003 · Cited by 8
Managers in the Era of Digital Transformation: Navigating the Dual Realities of Time
Focacci, C. N., Pichault, F., & Rondeaux, G. (2024) · New Technology Work and Employment · doi:10.1111/ntwe.12320 · Cited by 11
“This unexpected result led us to adopt an abductive approach (Dubois and Gadde 2002), which involved searching for appropriate concepts to describe surprising facts (Nubiola 2005), aligning with the exploratory purposes of our paper.”
Use and non-use of time in construction of new multi-dwelling buildings in Sweden
Josephson, P., & Mao, C. (2014) · International Journal of Construction Management · doi:10.1080/15623599.2013.875269 · Cited by 8
Hartmann, T., & Levitt, R. E. (2009) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000174 · Cited by 8
Innovation in the New Zealand Construction Industry – Diffusion of the Last Planner System
Hunt, R. J., & González, V. A. (2018) · Annual Conference of the International Group for Lean Construction · doi:10.24928/2018/0486 · Cited by 8
Existential learning: dialogues and places to be(come) in entrepreneurial Ba practice
Rennemo, Ø., & Åsvoll, H. (2019) · Journal of Innovation and Entrepreneurship · doi:10.1186/s13731-019-0103-1 · Cited by 8
“At the initial stage of the research process (step 1), we followed the pragmatists’ perspective (Peirce 1986) using an abductive approach (Dubois and Gadde 2002; Bryman and Bell 2015) in relation to our empirical field, to the stories presented by the entrepreneurs, and to the observations made…”
Improving supply chain management in construction. What can be learned from the aerospace industry
Voordijk, H., & Vrijhoef, R. (2003) · University of Twente Research Information · Cited by 8
Askland, H. H., Gajendran, T., & Brewer, G. J. (2013) · Engineering Project Organization Journal · doi:10.1080/21573727.2013.768986 · Cited by 8
The impact of complexity and managerial diseconomies on hierarchical governance
Brahm, F., & Tarziján, J. (2012) · Journal of Economic Behavior & Organization · doi:10.1016/j.jebo.2012.09.003 · Cited by 8
Effects of procurement on project performance : a survey of Swedish construction clients
Eriksson, P. E., & Vennström, A. (2009) · KTH Publication Database DiVA (KTH Royal Institute of Technology) · Cited by 8
Particle Swarm Optimization in Managing Construction Problems
Sahib, N. M., & Hussein, A. (2019) · Procedia Computer Science · doi:10.1016/j.procs.2019.06.039 · Cited by 8
Research on influencing factors of consummate performance behaviors: a configurational approach
Yan, L., & Guo, L. (2020) · Journal of Asian Architecture and Building Engineering · doi:10.1080/13467581.2020.1761817 · Cited by 8
Beemsterboer, S., Baumann, H., & Wallbaum, H. (2020) · IOP Conference Series Earth and Environmental Science · doi:10.1088/1755-1315/588/2/022007 · Cited by 8
“The building project is a central organising principle in the building industry [2, 3].”
BackgroundDeterminantes de la innovación en empresas constructoras de la Región de Atacama, Chile
Pape, H., & Nazer, A. (2021) · Obras y proyectos · doi:10.4067/s0718-28132021000100080 · Cited by 8
A Review of Research and Practice for the Industrial Networks of the Future
Dekkers, R., & Bennett, D. (2010) · Springer eBooks · doi:10.1007/978-1-84996-244-5_2 · Cited by 12
The Construction Company Through the Lens of Service Management: Inferences From Sweden
Jacobsson, M., & Wilson, T. L. (2012) · Services Marketing Quarterly · doi:10.1080/15332969.2012.662460 · Cited by 8
Polesie, P. (2012) · Construction Management and Economics · doi:10.1080/01446193.2012.658823 · Cited by 8
“Dubois and Gadde ( 2002a ) and Craig and Sommerville ( 2006 ) present the construction processes from overview perspectives and argue that the uncertainty is dependent on the difficulty of maintaining information systems.”
BackgroundDeveloping Products in Product Platforms in the AEC Industry
Jensen, P., Olofsson, T., Smiding, E., & Gerth, R. J. (2014) · International Conference on Computing in Civil and Building Engineering (ICCCBE) · doi:10.1061/9780784413616.132 · Cited by 8
“The short-term interactions between loosely coupled partners in the construction supply chain (Dubois and Gadde 2002; Segerstedt and Olofsson, 2010) also provide poor incentives for the development of practices, methods and designs that can be reused between disciplines, partners and projects…”
BackgroundKnowledge management practices in project-based organisations
Sandhu, M. A., & Naaranoja, M. (2009) · International Journal of Business Excellence · doi:10.1504/ijbex.2009.022715 · Cited by 9
Arndt, J., & Dibbern, J. (2006) · Hawaii International Conference on System Sciences (HICSS) · doi:10.1109/hicss.2006.486 · Cited by 8
“Following Dubois & Gadde [17], Figure 1 can be adapted to include these ideas.”
MethodInfluentialDigitalization of inspection data : a means for enhancing learning and continuous improvements?
Lundkvist, R., Meiling, J., & Vennström, A. (2010) · Diva portal (Dalarna University Library) · Cited by 8
Organisation of Purchasing and Buyer-Supplier Relationships in Large Construction Companies
Frödell, M. (2014) · Chalmers Publication Library (Chalmers University of Technology) · Cited by 8
The construction client as a change agent : contextual support and obstacles
Vennström, A. (2008) · DiVA (Luleå University of Technology) · Cited by 26
Svatoš-Ražnjević, H., Boeva, Y., Kropp, C., & Menges, A. (2025) · Building Research & Information · doi:10.1080/09613218.2025.2482970 · Cited by 7
“…knowledge and support of fabricators (T1) and innovator groups (T3), T2 is marked by a lack of permanent actors, often exhibiting loose coupling (Dubois & Gadde, 2002), where the same project is rarely repeated or involvement of similar actors in different projects is infrequent, suggesting…”
A Modular, Logistics-Centric Digital Twin Framework for Construction: From Concept to Prototype
Gehring, M., Brötzmann, J., & Rüppel, U. (2025) · CivilEng · doi:10.3390/civileng6040059 · Cited by 9
“As a result, a temporary network is created for the exchange of information and goods between the players involved [41].”
Duodu, B., Melagoda, D. G., & Rowlinson, S. (2023) · Construction Management and Economics · doi:10.1080/01446193.2023.2279195 · Cited by 8
“According to Dubois and Gadde (2002), this occurs within and across projects.”
BackgroundInfluentialRisk Management Practices in Ethiopian Somali Regional State Construction Projects
Kıvrak, S., & Udan, O. H. (2023) · Buildings · doi:10.3390/buildings13123130 · Cited by 7
Decentralized Data Networks for Lifecycle Management in the Built Environment
Bucher, D. F., Hunhevicz, J., Byers, B. S., Honic, M., Wolf, C. D., & Hall, D. (2025) · Journal of Information Technology in Construction · doi:10.36680/j.itcon.2025.034 · Cited by 14
“On the other hand, it could be argued that these technologies more accurately reflect the characteristics of the built environment (Dubois and Gadde, 2002; Hunhevicz, Dounas and Hall, 2022), as data creation occurs in a decentralized manner with various participants contributing to an integral…”
Measurement constructs to explore innovation diffusion in construction
Rose, T. M., & Manley, K. (2012) · QUT ePrints (Queensland University of Technology) · Cited by 7
The role of European R&D projects for SMEs’ resource development: an IMP perspective
Ciarmatori, F., Bocconcelli, R., & Pagano, A. (2018) · IMP Journal · doi:10.1108/imp-05-2017-0025 · Cited by 7
Dehe, B., Bamford, D., & Kotcharin, S. (2022) · Production Planning & Control · doi:10.1080/09537287.2022.2126952 · Cited by 8
“It has been argued that both the healthcare and the built environment industries have been suffering from a lack of open innovation (Bygballe and Ingemansson 2014; Cantarelli 2022; Dubois and Gadde 2002; Omachonu and Einspruch 2010; Thakur, Hsu, and Fontenot 2012).”
BackgroundRisk level analysis in the selected (initial) stage of the project life cycle
Borecki, M. (2020) · Management and Production Engineering Review · doi:10.24425/mper.2020.136124 · Cited by 7
Organizational ambidexterity in construction projects
Eriksson, P. E., & Szentes, H. (2014) · IEEE International Conference on Management of Innovation and Technology (ICMIT) · doi:10.1109/icmit.2014.6942405 · Cited by 7
L’intégration adaptative des chaînes logistiques : l’apport des chaînes de soins du dispositif MAIA
Guan, W., Sampieri-Teissier, N., & Fabbe‐Costes, N. (2017) · Logistique & Management · doi:10.1080/12507970.2017.1332961 · Cited by 7
Metadata
- Authors
- Dubois, A., & Gadde, L.-E.
- Affiliations
- Chalmers University of Technology (SE)
- ORCID
- Dubois, Anna
- Venue
- Construction Management and Economics
- Publisher
- Informa UK Limited
- Published
- 2002-10
- Volume
- 20
- Issue
- 7
- Pages
- 621-631
- ISSN
- 0144-6193 (ISSN-L)
- 1466-433X
- OpenAlex
- W2162531320
- Cited by
- 1,041
- References
- 36
- Citations by year
- 2026: 48 · 2025: 47 · 2024: 32 · 2023: 41 · 2022: 66 · 2021: 66 · 2020: 71 · 2019: 73 · 2018: 72 · 2017: 56 · 2016: 61 · 2015: 53 · 2014: 59 · 2013: 59 · 2012: 47
- FWCI
- 12.62
- Type
- journal article
- Language
- en
- Open access
- closed
- Locations
- Construction Management and Economics (publishedVersion)
- RePEc: Research Papers in Economics (submittedVersion)
- Topics
- Social Sciences › Decision Sciences › Management Science and Operations Research › Construction Project Management and Performance
- Social Sciences › Business, Management and Accounting › Management of Technology and Innovation › Product Development and Customization
- Physical Sciences › Engineering › Building and Construction › BIM and Construction Integration
- Keywords
- construction industry, loosely coupled systems, tight coupling, project networks, interorganizational networks, complexity, uncertainty, productivity, innovation, organizational learning
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.