Previous research suggests that the construction industry is characterized by (1) particular complexity factors owing to industry specific uncertainties and interdependences, and (2) inefficiency of operations. The aim of this study was to analyse the operations and behaviour of firms as a means of dealing with complexity. The observations made indicate that the industry as a whole is featured as a loosely coupled system. Taking this as a starting point, the couplings among activities, resources and actors were analysed in different dimensions. The pattern of couplings builds on two interdependent layers: tight couplings in individual projects and loose couplings based on collective adaptations in the permanent network. It is concluded that the pattern of couplings seems to favour short term productivity while hampering innovation and learning.
Overview
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
Claims other papers make about this one
Each is checked against this paper’s own text: does it say what the citing paper says it does?
In the citing paper
“but also on the fact that the construction industry is characterized by slow adaptation to new technologies (Dubois and Gadde 2002 )”
From A review of LLMs and their applications in the architecture, engineering and construction industry (2025) · cites this paper as Dubois and Gadde 2002
Citations
Cites
Educational Organizations as Loosely Coupled Systems
Weick, K. E. (1976) · Administrative Science Quarterly · doi:10.2307/2391875 · Cited by 5,142
Organizations and Environments
Hougland, J. G., Shepard, J. M., & Aldrich, H. E. (1980) · The Academy of Management Review · doi:10.2307/257814 · Cited by 2,862
Capturing Value from Knowledge Assets: The New Economy, Markets for Know-How, and Intangible Assets
Teece, D. J. (1998) · California Management Review · doi:10.2307/41165943 · Cited by 2,617 · cited 1×
“According to Teece (1998) the opportunities for learning are closely related to previous activities and experiences: if many aspects of a rm’s learning environment change simultaneously the ability to form cognitive structures favouring learning becomes severely restricted.”
BackgroundLoosely Coupled Systems: A Reconceptualization
Orton, J. D., & Weick, K. E. (1990) · The Academy of Management Review · doi:10.2307/258154 · Cited by 2,431 · cited 5×
“Researchers should not simplify the concept but invoke it: ‘what elements are loosely coupled, what domains are they coupled on, and what are the characteristics of the couplings and decouplings?’ (Orton and Weick, 1990).”
BackgroundInfluentialIf Only We Knew What We Know: Identification and Transfer of Internal Best Practices
O'Dell, C., & Grayson, C. J. (1998) · California Management Review · doi:10.2307/41165948 · Cited by 1,543
von Krogh, G. (1998) · California Management Review · doi:10.2307/41165947 · Cited by 1,453
Managing Business Relationships
(2017) · Project Management · doi:10.1201/9780203710739-11 · Cited by 1,307
Powell, W. W. (1998) · California Management Review · doi:10.2307/41165952 · Cited by 1,096 · cited 3×
“These conditions differ from the situation in many other industries (Powell, 1998).”
BackgroundInfluentialBrown, J. S., & Duguid, P. (1998) · California Management Review · doi:10.2307/41165945 · Cited by 911
The four roles of supply chain management in construction
Vrijhoef, R., & Koskela, L. (2000) · European Journal of Purchasing & Supply Management · doi:10.1016/s0969-7012(00)00013-7 · Cited by 862 · cited 6×
“They are loose in terms of the coupling between the production of building materials and what is done on site; see e.g. Vrijhoef and Koskela (2000) and Akintoye et al. (2000).”
BackgroundInfluential
Research works printed but not linked: 6
- Björkegren, C. Learning for the next project. Proceedings of the 3rd Conference on Organisational Learning. Edited by: Easterby-Smith, M., Araujo, I. and Burgoyne, J. pp.107–123. Lancaster University.
- Crichtori C., 1966, Interdependence and Uncertainly: A Study of the Building Industry
- Gadde L. E., 2001, Supply Newwork Strategies
- Meyer J., 1975, Notes on a structure of educational organizations; quoted in Weick (1976)
- Powell W., 1991, Markets, Hierarchies & Networks, 265
- Winch G., 1987, Managing Construction Worldwide, Vol. 2, Productivity and Human factors
Cited by
Items 301–400 of 1,000
BIM in Europe: innovation networks in the construction sectors of Sweden, France and the UK
Davies, R., Crespin‐Mazet, F., Linné, Å., Pardo, C., Havenvid, M. I., Harty, C. F., Ivory, C. J., & Salle, R. (2015) · Cited by 28
Barriers for Digital Transformation: The Role of Industry
Linderoth, H. C. J., Jacobsson, M., & Elbanna, A. R. (2018) · University of Technology, Sydney eBooks · doi:10.5130/acis2018.az · Cited by 28
“Major characteristics of the building and construction industry are for example that relations among actors are characterised by short-term market-based interactions (Gann 1996; Dubois and Gadde 2002).”
BackgroundUusitalo, P., & Lavikka, R. H. (2020) · Buildings · doi:10.3390/buildings10030045 · Cited by 32
Srivastava, M., & Tyll, L. (2020) · European Business Review · doi:10.1108/ebr-10-2019-0244 · Cited by 31
Gledson, B. (2021) · Construction Innovation · doi:10.1108/ci-02-2021-0021 · Cited by 28
How physical education teachers are positioned in models scholarship: a scoping review
Fjellner, R. L., Varea, V., & Barker, D. M. (2022) · Physical Education and Sport Pedagogy · doi:10.1080/17408989.2022.2083098 · Cited by 28
“Reinterpretation of the texts involved abductive analysis, where we moved between the themes and a theory to create new meaning (Dubois and Gadde 2002; Tavory and Timmermans 2014).”
BackgroundYoussef, M. F., Eid, A. F., & Khodeir, L. (2022) · Ain Shams Engineering Journal · doi:10.1016/j.asej.2022.102008 · Cited by 35
“1 Introduction The construction industry has unique characteristics and structures that differ from other industrial sectors [10].”
BackgroundMenegon, J., & Filho, L. C. P. D. S. (2022) · Iranian Journal of Science and Technology Transactions of Civil Engineering · doi:10.1007/s40996-022-00989-5 · Cited by 32
Contagion of BIM Implementation Practices in Interproject Networks: An Empirical Study in China
Shao, S., & Cao, D. (2023) · Journal of Management in Engineering · doi:10.1061/jmenea.meeng-5639 · Cited by 28
Donato, M., Ahsan, K., & Shee, H. (2015) · International Journal of Procurement Management · doi:10.1504/ijpm.2015.069157 · Cited by 34
Application of Indefinite Delivery–Indefinite Quantity Construction Strategies at the Federal Level
Stanford, M. S., Molenaar, K. R., & Sheeran, K. (2016) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000437 · Cited by 28
Innovation evaluation model for macro-construction sector companies: A study in Spain
Zubizarreta, M., Cuadrado, J., Iradi, J., García, H., & Orbe, A. (2016) · Evaluation and Program Planning · doi:10.1016/j.evalprogplan.2016.10.014 · Cited by 28
Isaksson, A., & Linderoth, H. C. J. (2018) · Journal of Housing and the Built Environment · doi:10.1007/s10901-017-9588-8 · Cited by 43
“This in turn implies that short-term solutions have been favoured over long-term solutions (see, e.g. Dubois and Gadde 2002; Demaid and Quintas 2006; Isaksson et al. 2009; Jacobsson et al. 2017).”
BackgroundFrom project partnering towards strategic supplier partnering
Sundquist, V., Hulthén, K., & Gadde, L. (2018) · Engineering Construction & Architectural Management · doi:10.1108/ecam-08-2016-0177 · Cited by 28
Self-citationDuryan, M., & Smyth, H. (2018) · Built Environment Project and Asset Management · doi:10.1108/bepam-04-2018-0060 · Cited by 31
Ružičić, M. M., Miletić, M., & Dobrota, M. (2021) · Sustainability · doi:10.3390/su13073591 · Cited by 28
The dilemma of scope and scale for construction professional service firms
Jewell, C., Flanagan, R., & Lu, W. (2014) · Construction Management and Economics · doi:10.1080/01446193.2013.879194 · Cited by 28
“Construction projects are characterized by their uniqueness (Dubois and Gadde, 2002).”
BackgroundBIM and systemic ICT innovation in AEC: Perceived needs and actor’s degrees of freedom
Singh, V. (2014) · Construction Innovation · doi:10.1108/ci-02-2013-0006 · Cited by 32
Development of CDPM matrix for the measurement of collaborative design performance in construction
Ren, Z., Anumba, C. J., & Yang, F. (2013) · Automation in Construction · doi:10.1016/j.autcon.2012.11.019 · Cited by 27
Adoption of Energy Star certifications: theory and evidence compared
Sanderford, A., McCoy, A. P., & Keefe, M. J. (2017) · Building Research & Information · doi:10.1080/09613218.2016.1252618 · Cited by 34
“They also face safety, health, sequencing, timing, material and labour risks in the process of creating or renovating the housing units and buildings they sell or lease (Bradshaw, 2011; Dubois & Gadde, 2002; Suraji, Duff, & Peckitt, 2001).”
BackgroundTroje, D. (2022) · Project Management Journal · doi:10.1177/87569728221126907 · Cited by 30
“The abductive analysis meant moving back and forth between the empirical data and the literature in an iterative manner (Dubois & Gadde, 2002), through which the findings and the literature on project management grew together and mutually reinforced each other (Van Maanen et al., 2007).”
BackgroundMethodResultInfluentialQuantifying uncertainty and equivocality in engineering projects
Chang, A. S., & Tien, C.-C. (2006) · Construction Management and Economics · doi:10.1080/01446190500310353 · Cited by 29
“It can be further inferred that learning is not easy on the project (Dubois and Gadde, 2002).”
BackgroundNaderpajouh, N., & Hastak, M. (2014) · Construction Management and Economics · doi:10.1080/01446193.2014.980835 · Cited by 30
“…on these interactions as a loose coupling between actors or the social interactions in construction projects, which several past studies indicated were one of the major sources of emergent dynamism (Dubois and Gadde, 2002; Cicmil and Marshal, 2005; Maylor et al., 2008; Williams et al., 2012).”
BackgroundA Review of IoT Applications in Supply Chain Optimization of Construction Materials
Kumar, A., & Shoghli, O. (2018) · International Symposium on Automation and Robotics in Construction (ISARC) · doi:10.22260/isarc2018/0067 · Cited by 27
“The construction industry is usually characterized as a complex industry because of the high variability in construction environments and the complication of the construction process [3].”
BackgroundFostering process innovations in construction through industry–university consortium
Lavikka, R. H., Seppänen, O., Peltokorpi, A., & Lehtovaara, J. (2020) · Construction Innovation · doi:10.1108/ci-08-2019-0081 · Cited by 27
Lingard, H. C., Wakefield, R. R., & Walker, D. H. T. (2020) · Construction Management and Economics · doi:10.1080/01446193.2020.1778758 · Cited by 27
Measuring building information modeling maturity: a Hong Kong case study
Lu, W., Chen, K., Zetkulic, A., & Liang, C. (2018) · International Journal of Construction Management · doi:10.1080/15623599.2018.1532385 · Cited by 26
“By collecting the case histories of numerous organisations providing the same or similar functions (Dubois and Gadde 2002) and mainly adopting a project-based organisation form to deliver construction works (Pryke and Pearson 2006), MBMM captures the traits of the construction industry.”
BackgroundLenderink, B., Halman, J. I. M., Boes, H., & Voordijk, H. (2020) · Construction Innovation · doi:10.1108/ci-05-2019-0044 · Cited by 33
Hetemi, E., Gemünden, H. G., & Ordieres-Meré, J. B. (2020) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000849 · Cited by 29
Building materials in a circular economy
Dalton, T., Dorignon, L., Boehme, T., Kempton, L., Iyer‐Raniga, U., Oswald, D., Amirghasemi, M., & Moore, T. (2023) · AHURI Final Report · doi:10.18408/ahuri5328401 · Cited by 30
Peer learning in construction work: virtuality and time in workplace learning
Styhre, A. (2006) · Journal of Workplace Learning · doi:10.1108/13665620610647809 · Cited by 35
Influences on innovation in small Australian construction businesses
Hardie, M. (2010) · Journal of Small Business and Enterprise Development · doi:10.1108/14626001011068699 · Cited by 33
Crespin‐Mazet, F., Goglio‐Primard, K., Havenvid, M. I., & Linné, Å. (2021) · Journal of Business and Industrial Marketing · doi:10.1108/jbim-01-2020-0066 · Cited by 26
Editorial for the special issue on social networks in construction
Pryke, S. D., Badi, S. M., & Bygballe, L. E. (2017) · Construction Management and Economics · doi:10.1080/01446193.2017.1341052 · Cited by 26
“…network characteristics of the construction industry as such, analysing interdependencies between contractual parties (e.g. Bygballe et al. 2013, Dubois and Gadde 2000, 2002, Håkansson and Ingemansson 2013), social network scholars are more often concerned with overcoming the task versus social…”
BackgroundHavinga, F., Mahdad, M., & Dolfsma, W. (2023) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2023.137455 · Cited by 25
Understanding policy and change: using a political economy analysis framework
Andreas, B., Fernie, S., & Dainty, A. (2021) · Construction Management and Economics · doi:10.1080/01446193.2021.2015795 · Cited by 31
“Similarly Dubois and Gadde (2002b) argued that the context of institutions – including policy interventions – has the capability to increase efficiency of working in the loosely-coupled sector of construction but, as such institutions become embedded, they may come to retard the rate of new learning and innovation.”
BackgroundInnovation development and adoption in small construction firms in Ghana
Dansoh, A., Oteng, D., & Frimpong, S. (2017) · Construction Innovation · doi:10.1108/ci-07-2016-0040 · Cited by 25
Visualization for Architecture, Engineering, and Construction: Shaping the Future of Our Built World
Abdelaal, M., Amtsberg, F., Becher, M., Estrada, R. D., Kannenberg, F., Calepso, A. S., Wagner, H. J., Reina, G., Sedlmair, M., Menges, A., et al. (2022) · IEEE Computer Graphics and Applications · doi:10.1109/mcg.2022.3149837 · Cited by 25
Characteristics of innovation orientations in construction companies
Yusof, N., Lai, K. S., & Kamal, E. M. (2017) · Journal of Engineering Design and Technology · doi:10.1108/jedt-06-2016-0037 · Cited by 25
Vrijhoef, R., Koskela, L., & Voordijk, H. (2003) · University of Twente Research Information · Cited by 25
Procurement for zero-emission construction sites: a comparative study of four European cities
Stokke, R. A., Qiu, X., Sparrevik, M., Truloff, S., Borge, I., & de Boer, L. (2022) · Environment Systems & Decisions · doi:10.1007/s10669-022-09879-7 · Cited by 30
“2018; Dubois and Gadde 2002; Gann and Salter 2000; Shin et al.”
BackgroundDefinitely Not a Walk in the Park: Coping with Competing Values in Complex Project Networks
Kuitert, L., Volker, L., & Hermans, M. H. (2022) · Project Management Journal · doi:10.1177/87569728221127958 · Cited by 26
“Although case studies, and especially single case studies, are limited to specific sets of circumstances, scholars have argued that any study can provide a useful basis for theoretical generalization and development (Dubois & Gadde, 2002; Yin, 1994).”
BackgroundGraser, K., Walzer, A. N., Hunhevicz, J., Jähne, R., Seiler, F., Wüst, R., & Hall, D. (2023) · Automation in Construction · doi:10.1016/j.autcon.2023.104964 · Cited by 24
Factores determinantes y propuestas para la gestión de la innovación en las empresas constructoras
Correa, C. L., Yepes, V., & Pellicer, E. (2007) · Revista de ingeniería de construcción · doi:10.4067/s0718-50732007000100001 · Cited by 24
Procurement maturity and IT-alignment models: overview and a case study
Versendaal, J., van den Akker, M., Xing, X., & de Bevere, B. (2013) · Electronic Markets · doi:10.1007/s12525-013-0130-x · Cited by 30
Network strategy for contractors’ business competitiveness
Keung, C. C. W., & Shen, L. (2017) · Construction Management and Economics · doi:10.1080/01446193.2017.1329539 · Cited by 30
“Thus, the project network structure lacks continuous interaction between project team members and causes difficulties to contractors in coordinating their efforts in different projects (Dubois and Gadde 2002).”
BackgroundConstruction Logistics in a City Development Setting
Janné, M. (2020) · Linköping studies in science and technology. Dissertations · doi:10.3384/diss.diva-170231 · Cited by 36
Rethinking client value within construction contracting services
Aliakbarlou, S., Wilkinson, S. J., & Costello, S. B. (2018) · International Journal of Managing Projects in Business · doi:10.1108/ijmpb-07-2017-0076 · Cited by 24
Dimensions of Interoperability in the AEC Industry
Poirier, É., Forgues, D., & Staub‐French, S. (2014) · ASCE Construction Research Congress (CRC) · doi:10.1061/9780784413517.203 · Cited by 23
“Dossick and Neff (2010) and Dubois and Gadde (2002) look into the discrepancies in the types of couplings within project networks, stating that organizations forming these networks are often tightly coupled through technology whereas they are loosely coupled organizationally.”
BackgroundCao, D., & Shao, S. (2020) · Complexity · doi:10.1155/2020/8812466 · Cited by 27
“As a pillar industry in many countries, the construction industry is a typical project-based sector within which production and business activities are generally organized based on temporary and multiorganizational projects [1, 2].”
BackgroundDFAB HOUSE: implications of a building-scale demonstrator for adoption of digital fabrication in AEC
Graser, K., Kahlert, A., & Hall, D. (2021) · Construction Management and Economics · doi:10.1080/01446193.2021.1988667 · Cited by 24
Technological transformation of the construction sector: a conceptual approach
Sadeh, H., Mirarchi, C., & Pavan, A. (2021) · International Journal of Construction Management · doi:10.1080/15623599.2021.2006400 · Cited by 23
Productization and product structure enabling BIM implementation in construction
Mansoori, S., Härkönen, J., & Haapasalo, H. J. O. (2022) · Engineering Construction & Architectural Management · doi:10.1108/ecam-09-2021-0848 · Cited by 24
Dhawan, K., Tookey, J., GhaffarianHoseini, A., & Poshdar, M. (2023) · Sustainability · doi:10.3390/su15021298 · Cited by 23
A value chain statistical definition of construction and the performance of the sector
Squicciarini, M., & Asikainen, A.-L. (2011) · Construction Management and Economics · doi:10.1080/01446193.2011.577438 · Cited by 23
“Furthermore, Dubois and Gadde ( 2002 ) remarked that the construction industry was a loosely coupled system characterized by complexity, uncertainty, independence and inefficient operations.”
BackgroundLinking Individual, Team and Organizational Learning in Construction Project Team Settings
Senaratne, S., & Malewana, C. (2011) · Architectural Engineering and Design Management · doi:10.3763/aedm.2010.0133 · Cited by 23
“Dubois and Gadde (2002) also state that learning is centred on individuals within construction projects.”
BackgroundManaging renewal in fragmented business networks
Havenvid, M. I., Håkansson, H., & Linné, Å. (2016) · IMP Journal · doi:10.1108/imp-06-2015-0023 · Cited by 23
Exploring organisational attributes affecting the innovativeness of UK SMEs
Gledson, B., & Phoenix, C. (2017) · Construction Innovation · doi:10.1108/ci-11-2015-0065 · Cited by 26
Waluszewski, A., Håkansson, H., & Snehota, I. (2019) · Journal of Business and Industrial Marketing · doi:10.1108/jbim-12-2018-0377 · Cited by 26
Singh, V., & Mirzaeifar, S. (2020) · Automation in Construction · doi:10.1016/j.autcon.2020.103386 · Cited by 24
Opportunities for learning from crises in projects
Hällgren, M., & Wilson, T. L. (2011) · International Journal of Managing Projects in Business · doi:10.1108/17538371111120207 · Cited by 27
“The construction industry has been described as loosely coupled ( Dubois and Gadde, 2002”
BackgroundConcurrent commercialization and new‐product adoption for construction products
McCoy, A. P., Badinelli, R. D., Koebel, C. T., & Thabet, W. Y. (2010) · European Journal of Innovation Management · doi:10.1108/14601061011040267 · Cited by 23
Diffusing systemic innovations: influencing factors, approaches and further research
Lindgren, J. (2015) · Architectural Engineering and Design Management · doi:10.1080/17452007.2015.1092942 · Cited by 23
Business model renewal in context of integrated solutions delivery: a network perspective
Rajakallio, K., Ristimäki, M., Andelin, M., & Junnila, S. (2017) · International Journal of Strategic Property Management · doi:10.3846/1648715x.2016.1249533 · Cited by 28
Pesämaa, O. (2007) · Munich Personal RePEc Archive (Ludwig Maximilian University of Munich) · Cited by 30
Learning to adapt health and safety initiatives from mega projects: an Olympic case study
Finneran, A., Hartley, R., Gibb, A., Cheyne, A., & Bust, P. (2012) · Policy and Practice in Health and Safety · doi:10.1080/14774003.2012.11667778 · Cited by 26
Qualitative Approach on Investigating Failure Factors of Yemeni Mega Construction Projects
Gamil, Y., Rahman, I. B. A., Nagapan, S., & Al-Emad, N. (2017) · MATEC Web of Conferences · doi:10.1051/matecconf/201710303002 · Cited by 22
“Construction industry is complex, fragmented, diversified, schedule driven and involves many stakeholders, commonly faces chronic threats and challenges such as cost and time overruns, poor quality, waste generation etc [1-8].”
BackgroundInnovating for the greater good: Examining innovation champions and what motivates them
Molloy, C., Bankins, S., Kriz, A., & Barnes, L. (2023) · Australian Journal of Public Administration · doi:10.1111/1467-8500.12577 · Cited by 25
Bridging boundaries between organizations in construction
Pemsel, S., & Widén, K. (2011) · Construction Management and Economics · doi:10.1080/01446193.2011.563786 · Cited by 27
Ranasinghe, U., Jefferies, M. C., Davis, P. R., & Pillay, M. (2021) · Buildings · doi:10.3390/buildings11030089 · Cited by 23
“Uncertain temporal • Speed of changes in project methods, tasks, team, structure, and deliverables as project progress [33,54,59]”
BackgroundMethodInfluentialZolghadr, A., Gharaie, E., & Naderpajouh, N. (2022) · Journal of Building Engineering · doi:10.1016/j.jobe.2022.104490 · Cited by 22
Green Logistics in Temporary Organizations: A Paradox? Learnings from the Humanitarian Context
Eng‐Larsson, F., & Vega, D. (2011) · Supply Chain Forum an International Journal · doi:10.1080/16258312.2011.11517266 · Cited by 22
“In construction for example, most projects can be considered as a temporary project network created from a permanent network of organizations that work together along different construction projects (Dubois & Gadde, 2002).”
BackgroundInfluentialConstruction Logistics Solutions in Urban Areas
Janné, M. (2018) · Linköping studies in science and technology. Thesis · doi:10.3384/lic.diva-147536 · Cited by 33
Down to Earth: Implementing Project-Level ESG Metrics in Chinese AEC Firms’ Practices
Zhang, R., Fu, Y., Chen, Y., & Du, B. X. (2024) · Journal of Management in Engineering · doi:10.1061/jmenea.meeng-5941 · Cited by 26
da Silva, M. A. R., Andersson, S., & Aagerup, U. (2024) · International Marketing Review · doi:10.1108/imr-02-2023-0019 · Cited by 30
Briefing: Using ‘safety climate factors’ to improve construction safety
Umar, T., & Wamuziri, S. (2016) · Proceedings of the Institution of Civil Engineers - Municipal Engineer · doi:10.1680/jmuen.16.00020 · Cited by 21
Sustainable Construction and Building Materials
Hemeda, S. (2019) · IntechOpen eBooks · doi:10.5772/intechopen.78713 · Cited by 22
Kullaya, D. M., Alemu, M. K., & Yeom, C. H. (2022) · The Open Transportation Journal · doi:10.2174/18744478-v16-e2208190 · Cited by 21
Gade, A. N., & Selman, A. (2023) · Journal of Building Engineering · doi:10.1016/j.jobe.2023.107815 · Cited by 21
Environmentally driven technical innovation by Australian construction SMEs
Hardie, M., Allen, J., & Newell, G. R. (2013) · Smart and Sustainable Built Environment · doi:10.1108/sasbe-01-2013-0003 · Cited by 21
“Several authors have pointed to the restrictive role that planning and building regulators may have on innovation (Gann and Salter, 2000; Dubois and Gadde, 2002).”
BackgroundThe implications of the construction industry to national wealth
Fulford, R. G. (2018) · Engineering Construction & Architectural Management · doi:10.1108/ecam-03-2018-0091 · Cited by 21
Andersson, N., & Lessing, J. (2020) · Organization Technology and Management in Construction An International Journal · doi:10.2478/otmcj-2020-0007 · Cited by 21
Creating stakeholder awareness in construction logistics by means of the MAMCA
Fredriksson, A., Janné, M., Nolz, P. C., de Chennevière, P. D. R., Lier, T. V., & Macharis, C. (2021) · City and Environment Interactions · doi:10.1016/j.cacint.2021.100067 · Cited by 21
The driving process of technological innovation in construction: a firm-level CDM analysis
Gong, Z., & Wang, N. (2021) · Construction Innovation · doi:10.1108/ci-12-2020-0194 · Cited by 22
Learning approaches for housing, service and infrastructure project organizations
Knauseder, I., Josephson, P., & Styhre, A. (2007) · Construction Management and Economics · doi:10.1080/01446190601164121 · Cited by 21
“The project‐based and highly fragmented environment of the construction industry creates numerous boundaries (Dubois and Gadde, 2002 ), such as those between several permanent organizations, between the different project organizations, and that between the project and the parent organization (Bresnen et al.”
Ali, Z., Zhu, F., & Hussain, S. (2018) · Buildings · doi:10.3390/buildings8110157 · Cited by 20
“It is also verified from other studies that competitive procurement creates uncertainty [43] and is not always a better option to control the total project cost escalation [74,75].”
BackgroundThe construction industry as agents of energy demand configuration in the existing housing stock
Killip, G., & Owen, A. M. (2020) · Energy Policy · doi:10.1016/j.enpol.2020.111816 · Cited by 20
Löwstedt, M., Fasth, J., & Styhre, A. (2021) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0002205 · Cited by 22
Ekeskär, A., Havenvid, M. I., Gustavsson, T. K., & Eriksson, P. E. (2021) · Construction Management and Economics · doi:10.1080/01446193.2021.2012815 · Cited by 20
Rosander, L. (2022) · Construction Management and Economics · doi:10.1080/01446193.2022.2108093 · Cited by 22
“In the later stages, the analysis moved back and forth between the empirical material and the literature (Dubois and Gadde 2002b, Gioia et al. 2013).”
BackgroundMethodInfluentialThe Promise of Blockchain for the Construction Industry: A Governance Lens
Hunhevicz, J., Dounas, T., & Hall, D. (2022) · Blockchain technologies · doi:10.1007/978-981-19-3759-0_2 · Cited by 22
Vigren, O. (2023) · Construction Management and Economics · doi:10.1080/01446193.2023.2247496 · Cited by 23
“…such as climate action; good health and well-being; clean water and sanitation; affordable and clean energy; industry, innovation, infrastructure; and sustainable cities requires considering the fragmented nature of the industry (Dubois and Gadde 2002) and the resulting challenges of cooperation.”
BackgroundConstructing a sustainable learning organization
Wilson, J. P., & Beard, C. (2014) · The Learning Organization · doi:10.1108/tlo-08-2012-0056 · Cited by 20
SCM competencies in construction: issues and challenges in New Zealand
Ying, J. F., Tookey, J., & Roberti, J. (2015) · Journal of Engineering Design and Technology · doi:10.1108/jedt-01-2013-0002 · Cited by 20
Toward Aligning Academic and Industry Understanding of Innovation in the Construction Industry
Rigby, E. T., McCoy, A. P., & Garvin, M. J. (2012) · International Journal of Construction Education and Research · doi:10.1080/15578771.2012.663861 · Cited by 20
“Each distinct construction project ‘‘takes on a life of its own’’ with minimal lessons learned traveling between organizations and projects (Dubois & Gadde, 2002).”
BackgroundInfluentialInfrastructure transitions towards sustainability: a complex adaptive systems perspective
Brown, K. A., Furneaux, C. W., & Gudmundsson, A. J. (2011) · International Journal of Sustainable Development · doi:10.1504/ijsd.2012.044034 · Cited by 25
Public Policy and Industry Views on Innovation in Construction
Bygballe, L. E., & Havenvid, M. I. (2011) · BIBSYS Brage (BIBSYS (Norway)) · Cited by 20
Gaur, A., & Vázquez‐Brust, D. (2019) · Greening of industry networks studies · doi:10.1007/978-3-030-15066-2_8 · Cited by 24
A routine dynamics lens on the stability-change dilemma in project-based organizations
Bygballe, L. E., Swärd, A., & Vaagaasar, A. L. (2021) · Project Management Journal · doi:10.1177/8756972820986660 · Cited by 20
Making the refugee multiple: The effects of classification work
Diedrich, A., & Styhre, A. (2008) · Scandinavian Journal of Management · doi:10.1016/j.scaman.2008.05.003 · Cited by 32
Metadata
- Authors
- Dubois, A., & Gadde, L.-E.
- Affiliations
- Chalmers University of Technology (SE)
- ORCID
- Dubois, Anna
- Venue
- Construction Management and Economics
- Publisher
- Informa UK Limited
- Published
- 2002-10
- Volume
- 20
- Issue
- 7
- Pages
- 621-631
- ISSN
- 0144-6193 (ISSN-L)
- 1466-433X
- OpenAlex
- W2162531320
- Cited by
- 1,041
- References
- 36
- Citations by year
- 2026: 48 · 2025: 47 · 2024: 32 · 2023: 41 · 2022: 66 · 2021: 66 · 2020: 71 · 2019: 73 · 2018: 72 · 2017: 56 · 2016: 61 · 2015: 53 · 2014: 59 · 2013: 59 · 2012: 47
- FWCI
- 12.62
- Type
- journal article
- Language
- en
- Open access
- closed
- Locations
- Construction Management and Economics (publishedVersion)
- RePEc: Research Papers in Economics (submittedVersion)
- Topics
- Social Sciences › Decision Sciences › Management Science and Operations Research › Construction Project Management and Performance
- Social Sciences › Business, Management and Accounting › Management of Technology and Innovation › Product Development and Customization
- Physical Sciences › Engineering › Building and Construction › BIM and Construction Integration
- Keywords
- construction industry, loosely coupled systems, tight coupling, project networks, interorganizational networks, complexity, uncertainty, productivity, innovation, organizational learning
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.