The construction industry as a loosely coupled system: implications for productivity and innovation
The DOI matches its Crossref record; 37 of the 37 references it cites were found in a registry or an index.
Abstract
Previous research suggests that the construction industry is characterized by (1) particular complexity factors owing to industry specific uncertainties and interdependences, and (2) inefficiency of operations. The aim of this study was to analyse the operations and behaviour of firms as a means of dealing with complexity. The observations made indicate that the industry as a whole is featured as a loosely coupled system. Taking this as a starting point, the couplings among activities, resources and actors were analysed in different dimensions. The pattern of couplings builds on two interdependent layers: tight couplings in individual projects and loose couplings based on collective adaptations in the permanent network. It is concluded that the pattern of couplings seems to favour short term productivity while hampering innovation and learning.
Overview
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
Claims other papers make about this one
Each is checked against this paper’s own text: does it say what the citing paper says it does?
In the citing paper
“but also on the fact that the construction industry is characterized by slow adaptation to new technologies (Dubois and Gadde 2002 )”
From A review of LLMs and their applications in the architecture, engineering and construction industry (2025) · cites this paper as Dubois and Gadde 2002
Citations
Cites
Educational Organizations as Loosely Coupled Systems
Weick, K. E. (1976) · Administrative Science Quarterly · doi:10.2307/2391875 · Cited by 5,142
Organizations and Environments
Hougland, J. G., Shepard, J. M., & Aldrich, H. E. (1980) · The Academy of Management Review · doi:10.2307/257814 · Cited by 2,862
Capturing Value from Knowledge Assets: The New Economy, Markets for Know-How, and Intangible Assets
Teece, D. J. (1998) · California Management Review · doi:10.2307/41165943 · Cited by 2,617 · cited 1×
“According to Teece (1998) the opportunities for learning are closely related to previous activities and experiences: if many aspects of a rm’s learning environment change simultaneously the ability to form cognitive structures favouring learning becomes severely restricted.”
BackgroundLoosely Coupled Systems: A Reconceptualization
Orton, J. D., & Weick, K. E. (1990) · The Academy of Management Review · doi:10.2307/258154 · Cited by 2,431 · cited 5×
“Researchers should not simplify the concept but invoke it: ‘what elements are loosely coupled, what domains are they coupled on, and what are the characteristics of the couplings and decouplings?’ (Orton and Weick, 1990).”
BackgroundInfluentialIf Only We Knew What We Know: Identification and Transfer of Internal Best Practices
O'Dell, C., & Grayson, C. J. (1998) · California Management Review · doi:10.2307/41165948 · Cited by 1,543
von Krogh, G. (1998) · California Management Review · doi:10.2307/41165947 · Cited by 1,453
Managing Business Relationships
(2017) · Project Management · doi:10.1201/9780203710739-11 · Cited by 1,307
Powell, W. W. (1998) · California Management Review · doi:10.2307/41165952 · Cited by 1,096 · cited 3×
“These conditions differ from the situation in many other industries (Powell, 1998).”
BackgroundInfluentialBrown, J. S., & Duguid, P. (1998) · California Management Review · doi:10.2307/41165945 · Cited by 911
The four roles of supply chain management in construction
Vrijhoef, R., & Koskela, L. (2000) · European Journal of Purchasing & Supply Management · doi:10.1016/s0969-7012(00)00013-7 · Cited by 862 · cited 6×
“They are loose in terms of the coupling between the production of building materials and what is done on site; see e.g. Vrijhoef and Koskela (2000) and Akintoye et al. (2000).”
BackgroundInfluential
Research works printed but not linked: 6
- Björkegren, C. Learning for the next project. Proceedings of the 3rd Conference on Organisational Learning. Edited by: Easterby-Smith, M., Araujo, I. and Burgoyne, J. pp.107–123. Lancaster University.
- Crichtori C., 1966, Interdependence and Uncertainly: A Study of the Building Industry
- Gadde L. E., 2001, Supply Newwork Strategies
- Meyer J., 1975, Notes on a structure of educational organizations; quoted in Weick (1976)
- Powell W., 1991, Markets, Hierarchies & Networks, 265
- Winch G., 1987, Managing Construction Worldwide, Vol. 2, Productivity and Human factors
Cited by
Environmental impacts and decarbonization strategies in the cement and concrete industries
Habert, G., Miller, S. A., John, V. M., Provis, J. L., Favier, A., Horvath, A., & Scrivener, K. L. (2020) · Nature Reviews Earth & Environment · doi:10.1038/s43017-020-0093-3 · Cited by 1,572
Oesterreich, T. D., & Teuteberg, F. (2016) · Computers in Industry · doi:10.1016/j.compind.2016.09.006 · Cited by 1,526
“Uncertainty: As each construction project is a time-limited, sitebased unique undertaking, there exists a lack of complete specification for processes and sub-processes and uniformity of materials, work and teams at construction site, resulting in an unpredictable environment [10].”
BackgroundUsing the Gioia Methodology in international business and entrepreneurship research
Magnani, G., & Gioia, D. (2023) · International Business Review · doi:10.1016/j.ibusrev.2022.102097 · Cited by 484
Key influences on construction innovation
Blayse, A. M., & Manley, K. (2004) · Construction Innovation · doi:10.1108/14714170410815060 · Cited by 527
“Industry relationships have an extremely significant influence on construction innovation (Anderson and Manseau, 1999; Miozzo and Dewick, 2002; Dubois and Gadde, 2002).”
BackgroundInfluentialDallasega, P., Rauch, E., & Linder, C. (2018) · Computers in Industry · doi:10.1016/j.compind.2018.03.039 · Cited by 468
Concrete material science: Past, present, and future innovations
Van Damme, H. (2018) · Cement and Concrete Research · doi:10.1016/j.cemconres.2018.05.002 · Cited by 398
Eriksson, P. E., & Westerberg, M. (2011) · International Journal of Project Management · doi:10.1016/j.ijproman.2010.01.003 · Cited by 363
“Practitioners, researchers, and society at large have, therefore, called for a change in attitudes, behaviour, and procedures in order to increase the chances for project success and improved end products (Dubois and Gadde, 2002).”
BackgroundAreas of Application for 3D and 4D Models on Construction Projects
Hartmann, T., Gao, J., & Fischer, M. (2008) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2008)134:10(776 · Cited by 300
Project management office a knowledge broker in project-based organisations
Pemsel, S., & Wiewiora, A. (2013) · International Journal of Project Management · doi:10.1016/j.ijproman.2012.03.004 · Cited by 261
Partnering relationships in construction: A literature review
Bygballe, L. E., Jahre, M., & Swärd, A. (2010) · Journal of Purchasing and Supply Management · doi:10.1016/j.pursup.2010.08.002 · Cited by 278
“In his study of contractor–client relationships, Eriksson (2007) argued that longterm partnering arrangements are the ultimate goal because they increase the incentives for cooperation.”
BackgroundAligning building information model tools and construction management methods
Hartmann, T., van Meerveld, H., Vossebeld, N., & Adriaanse, A. (2012) · Automation in Construction · doi:10.1016/j.autcon.2011.12.011 · Cited by 266
Embedding New Management Knowledge in Project-Based Organizations
Bresnen, M., Goussevskaia, A., & Swan, J. (2004) · Organization Studies · doi:10.1177/0170840604047999 · Cited by 277
“Others suggest that project basing can limit the innovative potential of firms (Dubois and Gadde 2002; Gann 2001; Gann and Salter 2000; Winch 1998).”
BackgroundHunhevicz, J. J., & Hall, D. M. (2020) · Advanced Engineering Informatics · doi:10.1016/j.aei.2020.101094 · Cited by 241
“In contrast to many other industries, the construction industry structure can be characterized as a decentralized, loosely-coupled network [11].”
BackgroundInterdependence in supply chains and projects in construction
Bankvall, L., Bygballe, L. E., Dubois, A., & Jahre, M. (2010) · Supply Chain Management: An International Journal · doi:10.1108/13598541011068314 · Cited by 253
Self-citationBenítez-Ávila, C., Hartmann, A., Dewulf, G., & Henseler, J. (2018) · International Journal of Project Management · doi:10.1016/j.ijproman.2017.12.005 · Cited by 248
Eriksson, P. E. (2013) · International Journal of Project Management · doi:10.1016/j.ijproman.2012.07.005 · Cited by 226
“However, the suggested improvement agenda fails to account for the specificities of innovating within the project-based context (Dubois and Gadde, 2002; Harty, 2008).”
BackgroundSupply chains in the construction industry
Segerstedt, A., & Olofsson, T. (2010) · Supply Chain Management: An International Journal · doi:10.1108/13598541011068260 · Cited by 223
“) reports investigated the current practice of loosely coupled supply chain; Dubois and Gadde (2002)”
BackgroundBao, Z., Lu, W., Chi, B., Yuan, H., & Hao, J. (2019) · Waste Management · doi:10.1016/j.wasman.2019.08.031 · Cited by 231
The logic of innovation in construction
Bygballe, L. E., & Ingemansson, M. (2014) · Industrial Marketing Management · doi:10.1016/j.indmarman.2013.12.019 · Cited by 218
Partnering in the construction industry—Problems and opportunities
Gadde, L.-E., & Dubois, A. (2010) · Journal of Purchasing and Supply Management · doi:10.1016/j.pursup.2010.09.002 · Cited by 208
Self-citationAn absorptive capacity model for green innovation and performance in the construction industry
Gluch, P., Gustafsson, M., & Thuvander, L. (2009) · Construction Management and Economics · doi:10.1080/01446190902896645 · Cited by 216
“On an institutional level these regimes can, for example, concern market, policy and legislative barriers (van Bueren and Jong, 2007 ), and on an industrial level, the regimes can concern organizational (Dubois and Gadde, 2002 ) and technological (Rothenberg and Zyglidopoulus, 2007 ) barriers.”
BackgroundManagement von Netzwerkorganisationen - Zum Stand der Forschung
Sydow, J. (2007) · Management von Netzwerkorganisationen · doi:10.1007/978-3-8349-9127-0_13 · Cited by 225
Peeking into the void: Digital twins for construction site logistics
Greif, T., Stein, N., & Flath, C. M. (2020) · Computers in Industry · doi:10.1016/j.compind.2020.103264 · Cited by 191
Wang, T.-K., Zhang, Q., Chong, H.-Y., & Wang, X. (2017) · Sustainability · doi:10.3390/su9020289 · Cited by 192
“Dubois and Gadde [23] analyzed the couplings among activities, resources and actors in different dimensions to find that the pattern of coupling seems to favor short-term productivity while hampering innovation and learning.”
BackgroundWhy don’t (or do) organizations learn from projects?
Swan, J., Scarbrough, H., & Newell, S. (2010) · Management Learning · doi:10.1177/1350507609357003 · Cited by 190
“It also helps us to understand why others have suggested that, far from being the vehicles of creativity, projects can create barriers to change and innovation, by privileging short-term task performance over long-term knowledge accumulation (Gann and Salter, 2000; Dubois and Gadde, 2002).”
BackgroundMethodological-Technological Framework for Construction 4.0
Muñoz-La Rivera, F., Mora-Serrano, J., Valero, I., & Oñate, E. (2021) · Archives of Computational Methods in Engineering · doi:10.1007/s11831-020-09455-9 · Cited by 178
“Design changes during construction Changes in design during construction are recurrent, for different reasons: inconsistencies, owner modifications, regulatory changes, but above all, early tenders where the economic criteria prevails over the technical quality of the design and energy efficiency or environmental cons…”
BackgroundInvestigating major challenges for industry 4.0 adoption among construction companies
Demirkesen, S., & Tezel, A. (2021) · Engineering, Construction and Architectural Management · doi:10.1108/ecam-12-2020-1059 · Cited by 167
Beerepoot, M., & Beerepoot, N. (2007) · Energy Policy · doi:10.1016/j.enpol.2007.04.015 · Cited by 188
“Dubois and Gadde (2002) refer to the project-based nature of the construction process as a system of ‘tight and loose couplings’.”
BackgroundLean thinking in the highways construction sector: motivation, implementation and barriers
Tezel, A., Koskela, L., & Aziz, Z. (2018) · Production Planning & Control · doi:10.1080/09537287.2017.1412522 · Cited by 165
“…algan tezel a.tezel@hud.ac.uk up of innovation and technology (Koskela 1992; Shirazi, Langford, and Rowlinson 1996; Vrijhoef and Koskela 2000; Dubois and Gadde 2002; Harvey 2003; Green and May 2005; McGuinness and Bennett 2006; Segerstedt and Olofsson 2010; Behera, Mohanty, and Prakash…”
BackgroundReducing waste to landfill: A need for cultural change in the UK construction industry
Ajayi, S. O., Oyedele, L. O., Akinade, O. O., Bilal, M., Owolabi, H. A., Alaka, H. A., & Kadiri, K. O. (2016) · Journal of Building Engineering · doi:10.1016/j.jobe.2015.12.007 · Cited by 170
“This is further exacerbated by the industry’s focus on individual project concerning financial control and decentralised decision-making (Dubois and Gadde, 2002).”
BackgroundLee, J. S., Ham, Y., Park, H., & Kim, J. (2022) · Automation in Construction · doi:10.1016/j.autcon.2021.104119 · Cited by 165
Zhou, T., Zhu, Q., & Du, J. (2020) · Advanced Engineering Informatics · doi:10.1016/j.aei.2020.101170 · Cited by 175
Bresnen, M. (2007) · International Journal of Project Management · doi:10.1016/j.ijproman.2007.01.007 · Cited by 161
Conceptual Model of Partnering and Alliancing
Anvuur, A. M., & Kumaraswamy, M. M. (2007) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2007)133:3(225 · Cited by 163
Theory development in humanitarian logistics: a framework and three cases
Jahre, M., Jensen, L., & Listou, T. (2009) · Management Research News · doi:10.1108/01409170910998255 · Cited by 162
“Coordination and linkages within and between temporary solutions and more permanent networks have been discussed in research on logistics in the construction sector in particular (Dubois and Gadde, 2002).”
Procurement Effects on Coopetition in Client-Contractor Relationships
Eriksson, P. E. (2008) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2008)134:2(103 · Cited by 215
Procurement effects on trust and control in client‐contractor relationships
Eriksson, P. E., & Laan, A. (2007) · Engineering Construction & Architectural Management · doi:10.1108/09699980710760694 · Cited by 155
“The transactions are mostly parts of construction projects, which involve many complex processes (Dubois and Gadde, 2002).”
BackgroundDiffusion of digital innovation in construction: a case study of a UK engineering firm
Shibeika, A., & Harty, C. F. (2015) · Construction Management and Economics · doi:10.1080/01446193.2015.1077982 · Cited by 149
“First, when the firm’s business groups were dispersed and fragmented (Dubois and Gadde, 2002), technology managers from the transportation group received the required buy-in from the business because of their technology championship to gain a central position within the firm.”
BackgroundPishgar, M., Issa, S. F., Sietsema, M., Pratap, P., & Darabi, H. (2021) · International Journal of Environmental Research and Public Health · doi:10.3390/ijerph18136705 · Cited by 173
“The construction industry is described as a loosely coupled system with several issues in a typical project [211].”
BackgroundInnovation in Construction: A Critical Review and Future Research
Xue, X., Zhang, R., Yang, R. J., & Dai, J. (2014) · International Journal of Innovation Science · doi:10.1260/1757-2223.6.2.111 · Cited by 145
Sepasgozar, S. M. E., & Davis, S. (2018) · Buildings · doi:10.3390/buildings8060074 · Cited by 158
“However, these are not suitable for the construction industry, as construction is widely recognized as a complex system and distinctly different from other industries [31-36].”
BackgroundApplicability of lean principles and practices in industrialized housing production
Höök, M., & Stehn, L. (2008) · Construction Management and Economics · doi:10.1080/01446190802422179 · Cited by 141
“concerning flexibility of the product, though this culture brings about a limitation of knowledge and experience diffusion from one project to another (Dubois and Gadde, 2002 ).”
BackgroundSepasgozar, S. M. E., Loosemore, M., & Davis, S. (2016) · Engineering Construction & Architectural Management · doi:10.1108/ecam-05-2015-0083 · Cited by 140
Gamil, Y., & Rahman, I. B. A. (2017) · Emerging Science Journal · doi:10.28991/ijse-01121 · Cited by 139
On-Site Construction Quality Inspection Using Blockchain and Smart Contracts
Wu, H., Zhong, B., Li, H., Guo, J., & Wang, Y. (2021) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000967 · Cited by 158
Implementing information systems with project teams using ethnographic–action research
Hartmann, T., Fischer, M. A., & Haymaker, J. R. (2008) · Advanced Engineering Informatics · doi:10.1016/j.aei.2008.06.006 · Cited by 158
“ness and changing character of project routines is further heightened as different organizations with their own social cultures work together and have to interact frequently [31,2,32].”
BackgroundChallenges when implementing BIM for industry change
Vass, S., & Gustavsson, T. K. (2017) · Construction Management and Economics · doi:10.1080/01446193.2017.1314519 · Cited by 135
“2013), supply chain integration (Briscoe and Dainty 2005) and productivity enhancement (Dubois and Gadde 2002).”
BackgroundCooperative Innovation Projects: Capabilities and Governance Mechanisms*
Bosch‐Sijtsema, P. M., & Postma, T. J. B. M. (2008) · Journal of Product Innovation Management · doi:10.1111/j.1540-5885.2009.00334.x · Cited by 167
Papadonikolaki, E. (2018) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000644 · Cited by 130
Two-layer Adaptive Blockchain-based Supervision model for off-site modular housing production
Li, X., Wu, L., Zhao, R., Lu, W., & Xue, F. (2021) · Computers in Industry · doi:10.1016/j.compind.2021.103437 · Cited by 134
“The loosely-coupled and project-based structures in the construction industry (Dubois and Gadde, 2002) require numerous stakeholders to communicate over time with various incentives.”
BackgroundFlexible and transportable robotic timber construction platform – TIM
Wagner, H. J., Alvarez, M., Kyjanek, O., Bhiri, Z., Buck, M., & Menges, A. (2020) · Automation in Construction · doi:10.1016/j.autcon.2020.103400 · Cited by 127
Bresnen, M., Goussevskaia, A., & Swan, J. A. (2005) · Building Research & Information · doi:10.1080/09613210500288837 · Cited by 127
“The way in which such interactions ‘play out’ in a project setting will be affected by the distinctive features of the project-based organization concerned, including its decentralized and dispersed mode of working (Dubois and Gadde, 2002 ), its temporal characteristics and dynamics, and the extent to which new knowle…”
BackgroundBuilding relationships for technological innovation
Holmén, E., Pedersen, A., & Torvatn, T. (2004) · Journal of Business Research · doi:10.1016/j.jbusres.2003.10.010 · Cited by 150
Vincenzo, F. D., & Mascia, D. (2011) · International Journal of Project Management · doi:10.1016/j.ijproman.2011.03.006 · Cited by 143
“The construction project may be considered as a specific temporary network within a more permanent network, where the firms have to coordinate their activities and resources among the different construction projects in which they are involved (Dubois and Gadde, 2002: 624).”
BackgroundReorganizing construction logistics for improved performance
Sundquist, V., Gadde, L., & Hulthén, K. (2017) · Construction Management and Economics · doi:10.1080/01446193.2017.1356931 · Cited by 148
Self-citationReview of construction journals on causes of project cost overruns
Durdyev, S. (2020) · Engineering Construction & Architectural Management · doi:10.1108/ecam-02-2020-0137 · Cited by 125
Innovation and interorganizational cooperation: a synthesis of literature
Rutten, M. E. J., Dorée, A. G., & Halman, J. I. M. (2009) · Construction Innovation · doi:10.1108/14714170910973501 · Cited by 147
“(4) Construction innovation (Bossink, 2002; Xiao and David, 2002; Dewick and Miozzo, 2004; Dorée and Holmen, 2004; Miozzo and Dewick, 2004; Holmen et al., 2005; Pries and Janszen, 1995; Dubois and Gadde, 2002; Nam and Tatum, 1997; Blayse and Manley, 2004; Bossink, 2004b; Pries and Dorée, 2005; Kulatunga et al., 2006;…”
BackgroundMatinheikki, J., Aaltonen, K., & Walker, D. H. T. (2018) · International Journal of Project Management · doi:10.1016/j.ijproman.2018.07.004 · Cited by 137
Gamil, Y., & Rahman, I. A. (2021) · Journal of Facilities Management · doi:10.1108/jfm-04-2021-0039 · Cited by 144
Aggregated construction supply chains: success factors in implementation of strategic partnerships
Lönngren, H., Rosenkranz, C., & Kolbe, H. (2010) · Supply Chain Management An International Journal · doi:10.1108/13598541011068297 · Cited by 121
Hall, D., Whyte, J. K., & Lessing, J. (2019) · Construction Management and Economics · doi:10.1080/01446193.2019.1656814 · Cited by 130
“…in the fixed price competitive bidding system, a diffusion of responsibility due to a lack of strong central coordinating firm and broken learning and feedback loops that occur when interfirm teams disband at the conclusion of projects (Gann and Salter 2000; Dubois and Gadde 2002a).”
BackgroundMethodTetik, M., Peltokorpi, A., Seppänen, O., & Holmström, J. (2019) · Automation in Construction · doi:10.1016/j.autcon.2019.102910 · Cited by 120
“Construction projects are loosely connected to other projects, leading their own life, with limited past or future coordination and learning between projects [2].”
BackgroundDiffusion of Safety Innovations in the Construction Industry
Esmaeili, B., & Hallowell, M. R. (2011) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000499 · Cited by 132
Osabutey, E. L. C., Williams, K., & Debrah, Y. A. (2013) · Journal of World Business · doi:10.1016/j.jwb.2013.12.009 · Cited by 116
“Since construction projects are often more transient and vary tremendously (Dubois & Gadde, 2002), formal and informal transfers can be more difficult to achieve at project-level.”
BackgroundOrganizational Routines, Situated Learning and Processes of Change in Project-Based Organizations
Bresnen, M., Goussevskaia, A., & Swan, J. A. (2005) · Project Management Journal · doi:10.1177/875697280503600304 · Cited by 145
Business model changes and green construction processes
Mokhlesian, S., & Holmén, M. (2012) · Construction Management and Economics · doi:10.1080/01446193.2012.694457 · Cited by 130
“In line with this argument Dubois and Gadde (2002) claim that efficiency is supposed to be encouraged by competitive tendering and by doing this conditions for the relationship among the parties are set.”
BackgroundThird-party logistics in construction: the case of a large hospital project
Ekeskär, A., & Rudberg, M. (2016) · Construction Management and Economics · doi:10.1080/01446193.2016.1186809 · Cited by 154
“Typically, a construction project is dependent on many, often small, firms acting as subcontractors (Dubois and Gadde, 2002; Miller et al., 2002).”
BackgroundAutomated re-prefabrication system for buildings using robotics
Kasperzyk, C., Kim, M.-K., & Brilakis, I. (2017) · Automation in Construction · doi:10.1016/j.autcon.2017.08.002 · Cited by 115
Client perceptions of barriers to partnering
Eriksson, P. E., Nilsson, T., & Atkin, B. L. (2008) · Engineering Construction & Architectural Management · doi:10.1108/09699980810916979 · Cited by 113
Peters, L. D., Pressey, A. D., Vanharanta, M., & Johnston, W. J. (2013) · Industrial Marketing Management · doi:10.1016/j.indmarman.2013.02.003 · Cited by 113
A conceptualization of knowledge governance in project-based organizations
Pemsel, S., Wiewiora, A. M., Müller, R., Aubry, M., & Brown, K. A. (2014) · International Journal of Project Management · doi:10.1016/j.ijproman.2014.01.010 · Cited by 127
Innovation in Construction Megaprojects
Brockmann, C., Brezinski, H., & Erbe, A. (2016) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0001168 · Cited by 119
Tezel, A., Koskela, L., & Aziz, Z. (2017) · International Journal of Project Management · doi:10.1016/j.ijproman.2017.10.004 · Cited by 129
“…working in silos, and a slow-take up of innovation and change (Koskela, 1992; Shirazi et al., 1996; Vrijhoef and Koskela, 2000; Dainty et al., 2002; Dubois and Gadde, 2002; Green and May, 2005; Assaf and Al-Hejji, 2006; Segerstedt and Olofsson, 2010; Eadie et al., 2013; Behera et al., 2015;…”
BackgroundMulti-storey timber buildings: breaking industry path dependency
Mahapatra, K., & Gustavsson, L. (2008) · Building Research & Information · doi:10.1080/09613210802386123 · Cited by 93
“The lack of permanent networks of actors, i.e. loose coupling (Dubois and Gadde, 2002), limits sustained interaction among the actors, which is vital for innovation.”
BackgroundInfluentialSambasivan, M., Deepak, T. J., Salim, A. N., & Venishri, P. (2017) · Engineering Construction & Architectural Management · doi:10.1108/ecam-09-2015-0145 · Cited by 138
Factors influencing technical innovation in construction SMEs: an Australian perspective
Hardie, M., & Newell, G. R. (2011) · Engineering Construction & Architectural Management · doi:10.1108/09699981111180926 · Cited by 102
“Possible explanations for this may include the project-based nature of construction work and the temporary couplings that make up much of the industry's relationships ( Dubois and Gadde, 2002”
BackgroundLavikka, R. H., Kallio, J., Casey, T. H., & Airaksinen, M. (2018) · Construction Management and Economics · doi:10.1080/01446193.2018.1476729 · Cited by 118
“The current relationships among the stakeholders tend to be short-term and market-based because of the lowest-price tender policy in the industry (Dubois and Gadde 2002).”
BackgroundPeñaloza, G. A., Saurin, T. A., & Formoso, C. T. (2019) · Applied Ergonomics · doi:10.1016/j.apergo.2019.102978 · Cited by 101
Saka, A. B., Chan, D. W. M., & Siu, M.-F. F. (2020) · Sustainability · doi:10.3390/su12093710 · Cited by 113
Multi‐storey wood‐frame buildings in Germany, Sweden and the UK
Mahapatra, K., Gustavsson, L., & Hemström, K. (2012) · Construction Innovation · doi:10.1108/14714171211197508 · Cited by 90
“the type of contractual agreements ( Dubois and Gadde, 2002”
BackgroundOesterreich, T. D., & Teuteberg, F. (2019) · Technological Forecasting and Social Change · doi:10.1016/j.techfore.2019.01.003 · Cited by 115
The Effect of Public–Private Partnerships on Innovation in Infrastructure Delivery
Liu, L. X., Clegg, S. R., & Pollack, J. (2023) · Project Management Journal · doi:10.1177/87569728231189989 · Cited by 115
“Infrastructure projects are characterized by “ technical interdependence and organisational independence ” (Dubois & Gadde, 2002, p. 627).”
BackgroundModelling procurement effects on cooperation
Eriksson, P. E., & Pesämaa, O. (2007) · Construction Management and Economics · doi:10.1080/01446190701468844 · Cited by 130
“This traditional procurement paradigm receives criticism for hindering contractor input regarding planning and technical solutions, which hampers innovation and buildability (Korczynski, 1996; Dubois and Gadde, 2002 ).”
BackgroundYang, Y., Pan, M., & Pan, W. (2019) · Automation in Construction · doi:10.1016/j.autcon.2019.102932 · Cited by 118
Communications and coordination in construction projects
Hossain, L. (2009) · Construction Management and Economics · doi:10.1080/01446190802558923 · Cited by 109
“In a purely graph theoretical sense, centrality is the state or quality of being central in a network structure (Faust, 1997). Centrality is a structural attribute of nodes in a network, an attribute not of actors themselves, but of their structural position in the network. Measures of centrality are based on attribut…”
BackgroundAdaptation and adaptability in logistics networks
Jahre, M., & Fabbe‐Costes, N. (2005) · International Journal of Logistics Research and Applications · doi:10.1080/13675560500110903 · Cited by 97
“to disintegrate logistics systems, or do we have to differentiate between system levels focusing on tight couplings between a limited number of resources and loose couplings between these levels? [See Dubois and Gadde (2002) for an interesting discussion of this in the construction industry.”
BackgroundIdentifying the Role of Supply Chain Integration Practices in the Adoption of Systemic Innovations
Hall, D., Algiers, A., & Levitt, R. E. (2018) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000640 · Cited by 95
Collaborative Project Delivery Models and the Role of Routines in Institutionalizing Partnering
Bygballe, L. E., & Swärd, A. R. S. (2019) · Project Management Journal · doi:10.1177/8756972818820213 · Cited by 103
“The data were analyzed according to the constant comparative method (Glaser & Strauss, 1967) and systematic combining (Dubois & Gadde, 2002b).”
BackgroundMethodInfluentialDigital transformation in construction – a review
Samuelson, O., & Stehn, L. (2023) · Journal of Information Technology in Construction · doi:10.36680/j.itcon.2023.020 · Cited by 135
Gosling, J., TOWILL, D. R., Naim, M. M., & Dainty, A. (2014) · Production Planning & Control · doi:10.1080/09537287.2014.880816 · Cited by 118
“The ETO principles are derived from theory relating to systems thinking and MTS principles, but are informed and ‘confronted’ by empirical elements (Dubois and Gadde 2002b).”
InfluentialThe nature and management of crises in construction projects: Projects-as-practice observations
Hällgren, M., & Wilson, T. L. (2008) · International Journal of Project Management · doi:10.1016/j.ijproman.2007.10.005 · Cited by 94
“Although firms in the industry have been described as loosely coupled systems [15], which would suggest resistance to the ‘‘cascades of failures’’ [9] associated with tightly coupled systems, crises still occur – the consequence of planning introduces tight coupling in activities.”
BackgroundSupplier relationship management in the construction industry: the effects of trust and dependence
Jiang, Z., Henneberg, S. C. M., & Naudé, P. (2011) · Journal of Business and Industrial Marketing · doi:10.1108/08858621211188920 · Cited by 115
“Taking a wider perspective might as a next step consider the view proposed by Dubois and Gadde (2002)”
BackgroundWiesner, R., Chadee, D. D., & Best, P. J. (2017) · Organization & Environment · doi:10.1177/1086026616689292 · Cited by 92
“We conducted the analysis by way of a systematic combining approach (Dubois & Gadde, 2002).”
MethodCao, D., Li, H., Wang, G., Luo, X., Yang, X., & Tan, D. (2016) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000503 · Cited by 100
Self-Organizing Networks in Complex Infrastructure Projects
Pryke, S. D., Badi, S. M., Almadhoob, H., Soundararaj, B., & Addyman, S. (2018) · Project Management Journal · doi:10.1177/875697281804900202 · Cited by 97
Organising logistics and transport activities in construction
Dubois, A., Hulthén, K., & Sundquist, V. (2019) · The International Journal of Logistics Management · doi:10.1108/ijlm-12-2017-0325 · Cited by 88
Self-citationDewald, U., & Achternbosch, M. (2015) · Environmental Innovation and Societal Transitions · doi:10.1016/j.eist.2015.10.001 · Cited by 99
Organizational Improvement Through Standardization of the Innovation Process in Construction Firms
Pellicer, E., Correa, C. L., Yepes, V., & Alarcón, L. F. (2012) · Engineering Management Journal · doi:10.1080/10429247.2012.11431935 · Cited by 88
Calza, F., Sorrentino, A., & Tutore, I. (2023) · Management Decision · doi:10.1108/md-05-2022-0613 · Cited by 86
Cao, D., Li, H., Wang, G., Luo, X., & Tan, D. (2018) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000600 · Cited by 95
Metadata
- Authors
- Dubois, A., & Gadde, L.-E.
- Affiliations
- Chalmers University of Technology (SE)
- ORCID
- Dubois, Anna
- Venue
- Construction Management and Economics
- Publisher
- Informa UK Limited
- Published
- 2002-10
- Volume
- 20
- Issue
- 7
- Pages
- 621-631
- ISSN
- 0144-6193 (ISSN-L)
- 1466-433X
- OpenAlex
- W2162531320
- Cited by
- 1,041
- References
- 36
- Citations by year
- 2026: 48 · 2025: 47 · 2024: 32 · 2023: 41 · 2022: 66 · 2021: 66 · 2020: 71 · 2019: 73 · 2018: 72 · 2017: 56 · 2016: 61 · 2015: 53 · 2014: 59 · 2013: 59 · 2012: 47
- FWCI
- 12.62
- Type
- journal article
- Language
- en
- Open access
- closed
- Locations
- Construction Management and Economics (publishedVersion)
- RePEc: Research Papers in Economics (submittedVersion)
- Topics
- Social Sciences › Decision Sciences › Management Science and Operations Research › Construction Project Management and Performance
- Social Sciences › Business, Management and Accounting › Management of Technology and Innovation › Product Development and Customization
- Physical Sciences › Engineering › Building and Construction › BIM and Construction Integration
- Keywords
- construction industry, loosely coupled systems, tight coupling, project networks, interorganizational networks, complexity, uncertainty, productivity, innovation, organizational learning
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.