Understanding the key risks in construction projects in China
The DOI matches its Crossref record; 21 of the 21 references it cites were found in a registry or an index.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
A guide to the project management body of knowledge (PMBOK guide)
Pmbok (2004) · Cited by 4,316
Survey Methods in Social Investigation.
T., C. G., & Moser, C. A. (1958) · The Incorporated Statistician · doi:10.2307/2986383 · Cited by 1,434
Contributing factors in construction accidents
Haslam, R. A., Hide, S. A., Gibb, A. G. F., Gyi, D. E., Pavitt, T., Atkinson, S., & Duff, A. R. (2005) · Applied Ergonomics · doi:10.1016/j.apergo.2004.12.002 · Cited by 1,005
Risk Management and Construction
Flanagan, R. (1993) · Medical Entomology and Zoology · Cited by 910
Factors influencing construction time and cost overruns on high-rise projects in Indonesia
Kaming, P. F., Olomolaiye, P. O., Holt, G. D., & Harris, F. C. (1997) · Construction Management and Economics · doi:10.1080/014461997373132 · Cited by 698
Identifying elements of poor construction safety management in China
Tam, C. M., Zeng, S. X., & Deng, Z. M. (2004) · Safety Science · doi:10.1016/j.ssci.2003.09.001 · Cited by 590
Modelling global risk factors affecting construction cost performance
Baloi, D., & Price, A. D. F. (2003) · International Journal of Project Management · doi:10.1016/s0263-7863(02)00017-0 · Cited by 587
Identifying Root Causes of Construction Accidents
Abdelhamid, T. S., & Everett, J. G. (2000) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2000)126:1(52 · Cited by 566
Survey Methods in Social Investigation.
Moss, L., Moser, C. A., & Kalton, G. (1972) · Journal of the Royal Statistical Society. Series A (General) · doi:10.2307/2344698 · Cited by 552
Rowe, W. D. (1977) · Medical Entomology and Zoology · Cited by 447
Cited by
Hwang, B.-G., Zhao, X., & Gay, M. J. S. (2013) · International Journal of Project Management · doi:10.1016/j.ijproman.2012.08.003 · Cited by 410
Towards a better modelling and assessment of construction risk: Insights from a literature review
Taroun, A. (2014) · International Journal of Project Management · doi:10.1016/j.ijproman.2013.03.004 · Cited by 387
A critical review of 3D printing in construction: benefits, challenges, and risks
El-Sayegh, S., Romdhane, L., & Manjikian, S. (2020) · Archives of Civil and Mechanical Engineering · doi:10.1007/s43452-020-00038-w · Cited by 387
A review of risk management through BIM and BIM-related technologies
Zou, Y., Kiviniemi, A., & Jones, S. W. (2017) · Safety Science · doi:10.1016/j.ssci.2015.12.027 · Cited by 373
Eriksson, P. E., & Westerberg, M. (2011) · International Journal of Project Management · doi:10.1016/j.ijproman.2010.01.003 · Cited by 363
Does infrastructure investment lead to economic growth or economic fragility? Evidence from China
Ansar, A., Flyvbjerg, B., Budzier, A., & Lunn, D. (2016) · Oxford Review of Economic Policy · doi:10.1093/oxrep/grw022 · Cited by 351
Marcelino-Sádaba, S., González-Jaen, L. F., & Pérez-Ezcurdia, A. (2015) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2015.03.020 · Cited by 337
Yang, R. J., & Zou, P. X. W. (2014) · Building and Environment · doi:10.1016/j.buildenv.2013.12.014 · Cited by 321
Self-citationIdentifying and assessing critical risk factors for BIM projects: Empirical study
Chien, K.-F., Wu, Z.-H., & Huang, S.-C. (2014) · Automation in Construction · doi:10.1016/j.autcon.2014.04.012 · Cited by 317
Qazi, A., Quigley, J., Dickson, A., & Kirytopoulos, K. (2016) · International Journal of Project Management · doi:10.1016/j.ijproman.2016.05.008 · Cited by 294
A fuzzy synthetic evaluation approach for risk assessment: a case of Singapore's green projects
Zhao, X., Hwang, B.-G., & Gao, Y. (2016) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2015.11.042 · Cited by 279
Risk Assessment Using a New Consulting Process in Fuzzy AHP
Lyu, H.-M., Sun, W.-J., Shen, S.-L., & Zhou, A.-N. (2020) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0001757 · Cited by 279
Structural Equation Model for Evaluating Factors Affecting Quality of Social Infrastructure Projects
Hussain, S., Fangwei, Z., Siddiqi, A. F., Ali, Z., & Shabbir, M. S. (2018) · Sustainability · doi:10.3390/su10051415 · Cited by 245
“Code Factors Stakeholder Related Factor (SRF) SRF_1 Poor relationship and partnering among project participants [2,50] SRF_2 Lack of contractor supervision [11,22] SRF_3 Making site decisions on cost and not the value of work [24] SRF_4 Lack of Management commitment [51,52] SRF_5 Poor site installation procedure [24]…”
BackgroundXia, N., Zou, P. X. W., Griffin, M. A., Wang, X., & Zhong, R. (2018) · International Journal of Project Management · doi:10.1016/j.ijproman.2018.03.006 · Cited by 229
“To pursue the success of construction projects, risk should be managed effectively (Chapman and Ward, 2004; Du et al., 2016; Zou et al., 2007).”
BackgroundMethodInfluentialSelf-citationFactors affecting contractors’ risk attitudes in construction projects: Case study from China
Wang, J., & Yuan, H. (2011) · International Journal of Project Management · doi:10.1016/j.ijproman.2010.02.006 · Cited by 216
“…many external economic environment related factors have been considered as important risks in construction projects in China (Shen et al., 2001; Zou et al., 2007), the external economic environment was ranked fairly low in our survey in terms of its influence on contractors’ risk attitudes.”
BackgroundResultInfluentialSelf-citationRisk paths in international construction projects: Case study from Chinese contractors
Liu, J., Zhao, X., & Yan, P. (2016) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0001116 · Cited by 203
“RC has been seen as a function of LO and MI (Zou et al. 2007; Hwang et al. 2015b).”
Kuo, Y.-C., & Lu, S.-T. (2013) · International Journal of Project Management · doi:10.1016/j.ijproman.2012.10.003 · Cited by 199
A hybrid BN-HFACS model for predicting safety performance in construction projects
Xia, N., Zou, P. X. W., Liu, X., Wang, X., & Zhu, R. (2018) · Safety Science · doi:10.1016/j.ssci.2017.09.025 · Cited by 163
Self-citationRisk-taking behaviors of Hong Kong construction workers – A thematic study
Man, S. S., Chan, A. H. S., & Wong, H. M. (2017) · Safety Science · doi:10.1016/j.ssci.2017.05.004 · Cited by 160
Ebrahimnejad, S., Mousavi, S. M., Tavakkoli-Moghaddam, R., Hashemi, H., & Vahdani, B. (2012) · Applied Mathematical Modelling · doi:10.1016/j.apm.2011.11.050 · Cited by 156
Park, Y., & Papadopoulou, T. C. (2012) · Built Environment Project and Asset Management · doi:10.1108/20441241211280873 · Cited by 91
Risk assessment of construction projects using Monte Carlo simulation
Qazi, A., & Simsekler, M. C. E. (2021) · International Journal of Managing Projects in Business · doi:10.1108/ijmpb-03-2020-0097 · Cited by 41
Risk Management in Construction Industry
Divya Sankar, S., Shashikanth, K., & Mahender, S. (2022) · Lecture Notes in Civil Engineering · doi:10.1007/978-981-16-5543-2_4 · Cited by 18
Risk Management Processes and Analysis in Projects Construction Industry
Leslie Appiah, B. (2020) · Journal of Civil, Construction and Environmental Engineering · doi:10.11648/j.jccee.20200504.14 · Cited by 5
“Managing risks in construction projects has been recognized as a very important process when it is implemented in a systematic manner throughout the lifecycle of a construction project, thus from the planning to the completion stage, this therefore leads to the achievement of the project objectives in terms of time, c…”
BackgroundQUANTITATIVE RISK ASSESSMENT OF MEGA REAL ESTATE PROJECTS: A MONTE CARLO SIMULATION APPROACH
Chief Executive Officer (CEO), G. H. L. (. G., & Jahid, M. S. R. (2022) · Journal of Sustainable Development and Policy · doi:10.63125/nh269421 · Cited by 3
Metadata
- Authors
- Zou, P. X. W., Zhang, G., & Wang, J.
- Venue
- International Journal of Project Management
- Publisher
- Elsevier BV
- Published
- 2007-08
- Volume
- 25
- Issue
- 6
- Pages
- 601-614
- ISSN
- 0263-7863 (ISSN-L)
- OpenAlex
- W1989678580
- Cited by
- 859
- References
- 21
- FWCI
- 21.94
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.